ABB’s integrated power and automation Five key steps to help you solve today’s challenges ABB as a partner Strong track record Integrated offering Technology experts Global footprint Committed to safety Equipment optimization Optimized equipment se- lection, standard telecoms, reduced footprint needs Example 60% space savings re: e-House + automation cabinets Efficient startup and commissioning Potential to save 50,000+ engineering hours by one customer through integrated equipment approach Minimize schedule risk Systems accountability off-loaded to ABB; simplifies critical path for deliveries Turnkey delivery for assigned scope with potential risk/reward contract structure. Global reach, local service presence 1 2 3 4 5 Example for one customer resulting from an integrated approach Savings from integration Unified power and automation system for capital cost savings For more information visit: www.abb.com/oilandgas

Upload: ngolien

Post on 09-Sep-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

ABB’s integrated power and automationFive key steps to help you solve today’s challenges

ABB as a partner

Strong track record

Integrated offering

Technology experts

Global footprint

Committed to safety

ABB as a partner

Strong track record

Integrated offering

Technology experts

Global footprint

Committed to safety

ABB as a partner

Strong track record

Integrated offering

Technology experts

Global footprint

Committed to safety

ABB as a partner

Strong track record

Integrated offering

Technology experts

Global footprint

Committed to safety

ABB as a partner

Strong track record

Integrated offering

Technology experts

Global footprint

Committed to safety

ABB as a partner

Strong track record

Integrated offering

Technology experts

Global footprint

Committed to safety

Equipment optimization Optimized equipment se-lection, standard telecoms, reduced footprint needs

Example

60% space savings re: e-House + automation cabinets

Effi cient startup and commissioningPotential to save

50,000+engineering hours by one customer through integrated equipment approach

Minimizeschedule risk Systems accountability off-loaded to ABB; simplifies critical path for deliveriesTurnkey delivery for assigned scope with potential risk/reward contract structure.

Global reach, local service presence1 2 3 4 5

1 2 3 4 51 2 Effi cient startup and commissioning3 4 51 2 3 4 5

1 2 3 4 Global reach, local service 5

Example

for one customer resulting from an

integrated approach

Savings from integration Unified power and automation system

for capital cost savings