April 2009 Introducing ABB Bangladesh © ABB Group July 1, 2009 | Slide 1 Introducing ABB Bangladesh

Upload: lycong

Post on 19-Mar-2018

221 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: ABB Bangladesh  · PDF fileABB has been present in Bangladesh since its independence through ABB in Bangladesh History agents / intermediaries ABB has pioneered 230 kV

April 2009

Introducing ABB Bangladesh

© ABB Group July 1, 2009 | Slide 1

Introducing ABB Bangladesh

Page 2: ABB Bangladesh  · PDF fileABB has been present in Bangladesh since its independence through ABB in Bangladesh History agents / intermediaries ABB has pioneered 230 kV

Facts about ABB

� Headquarters: Zurich, Switzerland

� About 120,000 employees in around 100 countries

© ABB Group July 1, 2009 | Slide 2

� About 120,000 employees in around 100 countries

� Orders in 2008: $38.3 billion

� Revenues in 2008: $34.9 billion

� Listed on Stockholm, Swiss and New York exchanges; traded on SWX Europe

Page 3: ABB Bangladesh  · PDF fileABB has been present in Bangladesh since its independence through ABB in Bangladesh History agents / intermediaries ABB has pioneered 230 kV

Facts about ABB

� A leading power and automation technology company with leading market positions in core businesses

© ABB Group July 1, 2009 | Slide 3

� We help our customers:

� to improve power availability, quality and reliability

� to increase industrial productivity

� to improve energy efficiency and lower environmental impact

Page 4: ABB Bangladesh  · PDF fileABB has been present in Bangladesh since its independence through ABB in Bangladesh History agents / intermediaries ABB has pioneered 230 kV

ABB’s vision

As one of the world’s leading engineering companies, we help our customers to use electrical power efficiently, to increase industrial productivity and to lower environmental

© ABB Group July 1, 2009 | Slide 4

increase industrial productivity and to lower environmental impact in a sustainable way.

Power and productivity for a better world

Page 5: ABB Bangladesh  · PDF fileABB has been present in Bangladesh since its independence through ABB in Bangladesh History agents / intermediaries ABB has pioneered 230 kV

ABB’s mission

Improve performanceABB helps customers improve their operating performance, grid reliability and productivity while saving energy and grid reliability and productivity while saving energy and lowering environmental impact.

Drive innovationInnovation and quality are key characteristics of our product,systems and service offering.

Attract talentABB is committed to attracting and retaining dedicated and skilled people and offering employees an attractive, global work

© ABB Group July 1, 2009 | Slide 5

Act responsiblySustainability, lowering environmental impact and business ethicsare at the core of our market offering and our own operations.

skilled people and offering employees an attractive, global work environment.

Page 6: ABB Bangladesh  · PDF fileABB has been present in Bangladesh since its independence through ABB in Bangladesh History agents / intermediaries ABB has pioneered 230 kV

ABB Executive Committee

Joe HoganJoe HoganCEO

Michel DemaréCFO and Global Markets

Gary SteelHuman Resources

Ulrich SpiesshoferCorporateDevelopment

Diane de Saint VictorGeneral Counsel

© ABB Group July 1, 2009 | Slide 6

Bernhard JuckerPowerProducts

Peter LeuppPowerSystems

Tom SjökvistAutomationProducts

Veli-Matti ReinikkalaProcessAutomation

Anders JonssonRobotics

Page 7: ABB Bangladesh  · PDF fileABB has been present in Bangladesh since its independence through ABB in Bangladesh History agents / intermediaries ABB has pioneered 230 kV

ABB in BangladeshOverview

© ABB Group July 1, 2009 | Slide 7

Page 8: ABB Bangladesh  · PDF fileABB has been present in Bangladesh since its independence through ABB in Bangladesh History agents / intermediaries ABB has pioneered 230 kV

� ABB has been present in Bangladesh since its independence through

ABB in BangladeshHistory

independence through agents / intermediaries

� ABB has pioneered 230 kV transmission system & supplied enhancement of distribution network

� ABB’s Supervisory Control & Data Acquisition (SCADA) system has

© ABB Group July 1, 2009 | Slide 8

(SCADA) system has been successfully monitoring and controlling the distribution of electricity in the capital city Dhaka since 1998

Page 9: ABB Bangladesh  · PDF fileABB has been present in Bangladesh since its independence through ABB in Bangladesh History agents / intermediaries ABB has pioneered 230 kV

� The 750 MW Ashuganj power plant is running successfully even after 40

ABB in BangladeshHistory

successfully even after 40 years of commissioning. ABB is part of the ongoing retrofit and up gradation of the plant

� ABB is involved in supplying automation system for the country’s sole Hydro power plant at Kaptai, Rangamati

© ABB Group July 1, 2009 | Slide 9

Kaptai, Rangamati

� ABB is a preferred supplier of automation systems for major industries across all key sectors in Bangladesh

Page 10: ABB Bangladesh  · PDF fileABB has been present in Bangladesh since its independence through ABB in Bangladesh History agents / intermediaries ABB has pioneered 230 kV

� ABB has been a pioneer in driving technology up gradation in its core sectors of power and automation. Technologies pioneered by ABB in Bangladesh include:

Leading-edge technologyMany-firsts of ABB in Bangladesh

pioneered by ABB in Bangladesh include:

� First dynamic VAR compensation in the industrial sector

� First Compact Secondary Substation (CSS) in Bangladesh installed in Chittagong

� First compact 11kV GIS Ring Main Unit (RMU) installed at BSRM, Chittagong

� First 230 kV grid network in Bangladesh

© ABB Group July 1, 2009 | Slide 10

� First 230 kV grid network in Bangladesh

� Automation systems for the First Hydro Power Plant in Bangladesh

� Largest Power Transformer in private sector (80/65 MVA, 132 / 33kV) supplied to BSRM, Chittagong

Page 11: ABB Bangladesh  · PDF fileABB has been present in Bangladesh since its independence through ABB in Bangladesh History agents / intermediaries ABB has pioneered 230 kV

Presence in Bangladesh

© ABB Group July 1, 2009 | Slide 11

International Marketing Office & Service Branch Headquarter

Turbocharger Service Station

Page 12: ABB Bangladesh  · PDF fileABB has been present in Bangladesh since its independence through ABB in Bangladesh History agents / intermediaries ABB has pioneered 230 kV

What we offer: Divisional Structure and Portfolio

Transformers, high- and medium-voltage switchgear, breakers, automation relays

Power Products

automation relays

Power Systems

AutomationProducts

Substations, Power plant and network automation

Low-voltage products, drives, motors, power electronics and instrumentation

Control systems and application-specific

© ABB Group July 1, 2009 | Slide 12

ProcessAutomation

Robotics

Control systems and application-specific automation solutions for process industries

Robots, peripheral devices and modular manufacturing solutions for industry

Page 13: ABB Bangladesh  · PDF fileABB has been present in Bangladesh since its independence through ABB in Bangladesh History agents / intermediaries ABB has pioneered 230 kV

Power SystemsT&D Systems, Electrical Balance of Plant for Power Plants including Control & Instrumentation, Power System Consulting &

Project businesses

Utility AutomationNetwork Management, Substation Automation, Plant Automation, Utility Communication

Infrastructure & ElectricalsHeating, Ventilation & Air Conditioning of Large Commercial / Industrial buildings; Infrastructure projects’ Electrical Installations

including Control & Instrumentation, Power System Consulting &Services

© ABB Group July 1, 2009 | Slide 13

Process AutomationPetroleum, Chemical, Consumer, Minerals, Mining, Paper and Metals Industries, EPC for Gas Compression Stations

Industrial buildings; Infrastructure projects’ Electrical Installations

Page 14: ABB Bangladesh  · PDF fileABB has been present in Bangladesh since its independence through ABB in Bangladesh History agents / intermediaries ABB has pioneered 230 kV

� Power & Industrial Transformers

� IEC 61850 protocol based Substation Automation products

Expanding portfolio of offeringNew products

� Gas insulated primary & secondary switchgear

� Static & Dynamic Reactive Power Compensation products

� Energy Efficient Motors

� Energy Saving Industrial Drives

� Analytic Instruments

� Programmable Logic Controllers

� Standard & Customised LV & HV Motors

© ABB Group July 1, 2009 | Slide 14

� Standard & Customised LV & HV Motors

� LV Switchgear

� Instrumentation

� Line Protections Devices

Page 15: ABB Bangladesh  · PDF fileABB has been present in Bangladesh since its independence through ABB in Bangladesh History agents / intermediaries ABB has pioneered 230 kV

� Shop Area: 7500 SFT

� Scope of service:

Focus on serviceGlobal Turbocharger service center, Chittagong

� Turbocharger and spares

� Onsite and offsite service

� Turbocharger overhauling

� Dynamic balancing

� Offshore service to oil and gas and marine customers

� Annual maintenance and service contract

© ABB Group July 1, 2009 | Slide 15

service contract

Page 16: ABB Bangladesh  · PDF fileABB has been present in Bangladesh since its independence through ABB in Bangladesh History agents / intermediaries ABB has pioneered 230 kV

� Warranty support

� Paid post warranty service, both onsite & offsite

Focus on serviceDrives center center, Dhaka

both onsite & offsite

� Commissioning support

� Retrofit of old ABB or non-ABB drives

� Automation solution through drives

� Drives spares

© ABB Group July 1, 2009 | Slide 16

� Annual maintenance and service contracts

Page 17: ABB Bangladesh  · PDF fileABB has been present in Bangladesh since its independence through ABB in Bangladesh History agents / intermediaries ABB has pioneered 230 kV

© ABB Group July 1, 2009 | Slide 17