भारत सरकार government of indianerpc.nic.in/commercial/rea/2019-2020/rea feb...

16
भारत सरकार Government of India वɮयुत मंğालय Ministry of Power उ×तर पूवȸ ¢ेğीय वɮयुत समǓत North Eastern Regional Power Committee एन आर पी सी कॉàÜलेÈस, डɉग पारमाओ, लापालाङ, शãलɉग-७९३००६, मेघालय NERPC Complex, Dong Parmaw, Lapalang, Shillong - 793006, Meghalaya Ph. No: 0364 – 2534039 Fax No: 0364 - 2534040 Website: www.nerpc.nic.in No. NERPC/COM/REA/2019/4554-4599 04 March 2020 To 1. CMD, TSECL, Bidyut Bhawan, Agartala – 799 001 2. Director (Distribution), MePDCL, Lumjingshai, S.R. Road, Shillong – 793 001 3. Engineer-in-Chief (P&E), P&E Dept., Govt. of Mizoram, Aizawl – 796 001 4. Chief General Manager (Comml), APDCL, Bijulee Bhawan, Paltan Bazar, Guwahati – 781 001 5. Chief Engineer (E Zone), Dept. of Power, Govt. of Arunachal Pradesh, Itanagar – 791 111 6. Managing Director, MSPDCL, Keishampat, Imphal-795 001. 7. Chief Engineer (Power), Dept. of Power, Govt. of Nagaland, Kohima – 797 001 8. Chief Engineer, Loktak HE Project, Vidyut Vihar, Komkeirap, Manipur – 795 124 9. Executive Director (Comml.), NEEPCO Ltd., Lower New Colony, Shillong – 793 003 10. Executive Director, NERTS, POWERGRID, Lapalang, Shillong – 793 006 11. Managing Director, OTPC, 6 th Floor, IFCI Tower, 61 Nehru Place, New Delhi – 110 019 12. GM (Comml.), NTPC, 3 rd Floor OLIC building, Plot No.N.17/2, Nayapalli, Bhubaneshwar-12 वषय: February 2020 का एबीती आधाǐरत संशोधत आर. . ए । Sub: ABT based REA for February, 2020. महोदय, Sir, February 2020 माह का एबीती आधाǐरत संशोधत ¢ेğीय उजा[ लेखा (आर.. ) क ĤǓत आवæयक करवाई के लए संलÊन है । आर..ए लेखा उ.पू .¢े ..स कȧ वेबसाईट www.nerpc.nic.in पर भी उपलÞध करा Ǒदया गया है । A copy of ABT based Regional Energy Accounting (REA) for the month of February, 2020 is enclosed herewith for necessary action. The REA is also available on NERPC website www.nerpc.nic.in. संघटक अपने अवलोकन / ǑटÜपणयां यǑद कोई हो तो आर..के जारȣ होने के 15 Ǒदनɉ के अंदर भेज दɅ । यǑद संघटको से कोई पğ åयवहार नहȣ होता है तो जारȣ कया गया आर..को अंǓतम माना जाएगा । Constituents may send their observation/ comments, if any on the same within 15 days from the date of issue of REA. In case no communication is received from constituents, the REA as issued would be treated as final REA. Bilateral transactions will be issued separately. संलÊनक : उपरोÈतानु सार Encl.: As above. भवदȣय / Yours faithfully, एस. एम. आइमोल / S. M. Aimol Ǔनदेशक / Director अधी¢ण अभयंता / Superintending Engineer वाणÏय / Commercial

Upload: others

Post on 01-May-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: भारत सरकार Government of Indianerpc.nic.in/Commercial/REA/2019-2020/REA Feb 2020.pdf · 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon,

भारत सरकार Government of India

व युत मं ालय Ministry of Power

उ तर पूव े ीय व युत स म त North Eastern Regional Power Committee

एन ई आर पी सी कॉ ले स, ड ग पारमाओ, लापालाङ, श ल ग-७९३००६, मेघालय

NERPC Complex, Dong Parmaw, Lapalang, Shillong - 793006, Meghalaya

Ph. No: 0364 – 2534039 Fax No: 0364 - 2534040 Website: www.nerpc.nic.in

No. NERPC/COM/REA/2019/4554-4599 04 March 2020 To 1. CMD, TSECL, Bidyut Bhawan, Agartala – 799 001 2. Director (Distribution), MePDCL, Lumjingshai, S.R. Road, Shillong – 793 001 3. Engineer-in-Chief (P&E), P&E Dept., Govt. of Mizoram, Aizawl – 796 001 4. Chief General Manager (Comml), APDCL, Bijulee Bhawan, Paltan Bazar, Guwahati – 781 001 5. Chief Engineer (E Zone), Dept. of Power, Govt. of Arunachal Pradesh, Itanagar – 791 111 6. Managing Director, MSPDCL, Keishampat, Imphal-795 001. 7. Chief Engineer (Power), Dept. of Power, Govt. of Nagaland, Kohima – 797 001 8. Chief Engineer, Loktak HE Project, Vidyut Vihar, Komkeirap, Manipur – 795 124 9. Executive Director (Comml.), NEEPCO Ltd., Lower New Colony, Shillong – 793 003 10. Executive Director, NERTS, POWERGRID, Lapalang, Shillong – 793 006 11. Managing Director, OTPC, 6th Floor, IFCI Tower, 61 Nehru Place, New Delhi – 110 019 12. GM (Comml.), NTPC, 3rd Floor OLIC building, Plot No.N.17/2, Nayapalli, Bhubaneshwar-12 वषय: February 2020 का एबीती आधा रत संशो धत आर. ई. ए ।

Sub: ABT based REA for February, 2020. महोदय, Sir,

February 2020 माह का एबीती आधा रत संशो धत े ीय उजा लेखा (आर.ई.ए) क त आव यक करवाई के लए संल न है । आर.ई.ए लेखा उ.पू. .े व.स क वेबसाईट www.nerpc.nic.in पर भी उपल ध करा दया गया है ।

A copy of ABT based Regional Energy Accounting (REA) for the month of February, 2020 is enclosed herewith for necessary action. The REA is also available on NERPC website www.nerpc.nic.in. संघटक अपने अवलोकन / ट प णयां य द कोई हो तो आर.ई.ए के जार होने के 15 दन के अंदर भेज द । य द संघटको से कोई प यवहार नह होता है तो जार कया गया आर.ई.ए को अं तम माना जाएगा ।

Constituents may send their observation/ comments, if any on the same within 15 days from the date of issue of REA. In case no communication is received from constituents, the REA as issued would be treated as final REA. Bilateral transactions will be issued separately. संल नक : उपरो तानुसार Encl.: As above. भवद य / Yours faithfully,

एस. एम. आइमोल / S. M. Aimol

नदेशक / Director अधी ण अ भयंता / Superintending Engineer वा ण य / Commercial

Page 2: भारत सरकार Government of Indianerpc.nic.in/Commercial/REA/2019-2020/REA Feb 2020.pdf · 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon,

Copy forwarded to: 1. CE (G. M.), CEA, SewaBhawan, R.K.Puram, New Delhi – 110 066. 2. G. M., NERLDC, Lower Nongrah, Dongtieh, Lapalang, Shillong - 6. 3. C.G.M (SLDC ) AEGCL, Kahelipara, Guwahati. 4. Gen. Manager (Comml.), NHPC Ltd., NHPC Office complex, Sector –33, Faridabad-121003. 5. G.M (Commercial) APDCL, Bijulee Bhawan, Paltan Bazar, Guwahati - 781 001. 6. General Manager, Ranganadi HEP, NEEPCO, Yazlee, Ar. Pradesh 7. Project Manager, Doyang HEP, NEEPCO, Nagaland 8. Project Manager, AGBPP, NEEPCO Ltd., No. –III, Vill. Bokuloni, Dibrugarh, Assam. 9. Project Manager, AGTPP, NEEPCO Ltd., Ramchandranagar, Agartala, Tripura West- 799008. 10. Dy. G. M (Elect.), Kopili HEP, NEEPCO Ltd., Umrangso, N.C. Hills, Assam. 11. Supdt. Engr. (System Management) MeECL, Lumjingshai, Short Round Road, Shillong. 12. Supdt. Engr. (Commercial) Deptt. of Electricity, Govt.of Manipur, Keisampet, Imphal. 795001 13. Executive Engineer, MSLDC, P & E Dept., Chaltlang, Aizawl- 796012. 14. Supdt. Engr. Dimapur Sub-station Deptt. of Power, Govt.of Nagaland, Dimapur. 15. Dy. G. M. (Commercial) NERTS, Lower Nongrah, Dongtieh, Lapalang, Shillong - 6. 16. Dy. General Manager (ER), POWERGRID, Boring Road, Alankar Place, Patna - 800 001 17. DGM (Comml), OTPC, 6th Floor, IFCI Tower, 61 Nehru Place, New Delhi – 110 019 18. DGM (Comml.), NTPC, 3rd Floor OLIC building, Plot No.N.17/2, Nayapalli, Bhubaneshwar-12 19. AGM (Comml.), NTPC, Bongaigaon Thermal Power Project, P.O Salakati, Kokrajhar-783369 20. Addl. General Manager,Comml & Sys.Opn., TSECL,Banamalipur,Agartala.-799001. 21. Ex. Engr., SLDC, Deptt. of Power, Itanagar, Ar. Pradesh – 791 111 22. CEO, NVVNLtd., 7th Floor, Scope Complex, Lodhi Road, N.Delhi- 110 003 23. Power Trading Corpn. of India Ltd., 2nd Floor, NBCC Tower, 15-Bhikaji Cama Place, New Delhi – 66. 24. DGM (Power Trading),Adani Exports Ltd,13 Palam Marg ,Vasant Vihar, New Delhi- 110057. 25. ED,TPTCL,Block ‘A’,34,Sant Tukaram Road,Carnac Bunder,Mumbai-400 009. 26. Member Secretary, NRPC,18-A,Shaheed Jeet Singh Marg,Katwaria Sarai, NewDelhi-110016. 27 Member Secretary, ERPC,14, Golf Club Road, Kolkata- 700 033. 28. Member Secretary, WRPC, Plot No F-3,MIDC Area, Opp Seepz,Marol,Andheri (E), Mumbai-400 093. 29. Member Secretary, SRPC, 29, Race Course Road, Bangalore- 560009. 30. Lanco Electric Utility Limited, LANCO House,141, Avenue,8, Banjara Hills, Hyderabad-500 034 31. Reliance Energy Trading Ltd., Reliance Energy Centre, Santa Cruz (E), Mumbai-400 055 32.Vice President, Indian Energy Exchange Limited, 10th Floor, B Wing, Statesman House, Barakhamba Road, Connought Place, New Delhi - 110 001. 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon, Haryana – 122 016. 34. RPTCL, Agrawal House, 2, St. George’s Gate Road, 6th Floor, Kolkata – 700 022.

नदेशक / Director अधी ण अ भयंता / Superintending Engineer वा ण य / Commercial

Page 3: भारत सरकार Government of Indianerpc.nic.in/Commercial/REA/2019-2020/REA Feb 2020.pdf · 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon,

NORTH EASTERN REGIONAL POWER COMMITTEEREGIONAL ENERGY ACCOUNT FOR THE MONTH OF February 2020

Sr. No. Units Figure1 MW 2002 in % 13 in % 794 GWh 1186.14 #5 in % 126 MU 1043.8037 in ₹ Cr. 120.2764 #

8 KWh 0.582

9 kWh 0

10 KWh 0

11 KWh 012 in ₹ 0

A. HYDEL POWER STATIONS

1: KOPILI StationDetails

Installed CapacityAuxiliary Energy Consumption (AUX)

Annual Fixed Charges

Energy Charge Rate (ECR) on ex-PP basis

Scheduled energy (ex-bus) for the month

Free Energy (ex-PP) of the month

Saleable Energy (ex-PP) of the month

Annual Saleable Energy

Total Energy Charge payable for the month

Normative Plant Availability Factor (NAPAF)Annual Design Energy (DE) Free Energy for Home State (FEHS)

Page 1 of 14

12 in ₹ 013 MWh 69590814 in % 0.0015 in % 53.0116 in ₹ 0

Beneficiaries

Share allocation for the current month (%)

Capacity Charge Payble by

beneficiaries (in ₹)

Ar. Pradesh 5.1910 0.0000Assam 53.4550 0.0000

Manipur 7.3950 0.0000Meghalaya 17.3950 0.0000Mizoram 4.6100 0.0000Nagaland 6.1470 0.0000Tripura 5.8070 0.0000HVDC 0.0000 0.0000

Reg MegTotal 100.0000 0.0000

# As per CERC order dated 13.01.2016 in petition No 46/GT/2015

Capacity charge inclusive of incentive payble for the month

Total Energy Charge payable for the monthCumulative scheduled energy including current monthPlant Availability Factor achieved during the month (PAFM)Cumulative Plant Availability Factor achieved upto the month

0.00000.00000.00000.00000.0000

0.0000

BILLING STATEMENT

Energy Charge payable by beneficiaries in ₹

Billing Schedule of Beneficiaries

MWH

Drawal Schedule of Beneficiaries MWH

0.00000.0000

0.00000.0000

0.00000.0000

0.0000

0.00000.00000.00000.00000.0000

0.0000

0.00000.00000.00000.00000.0000

0.0000

0.0000 0.00000.0000

Page 1 of 14

Page 4: भारत सरकार Government of Indianerpc.nic.in/Commercial/REA/2019-2020/REA Feb 2020.pdf · 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon,

NORTH EASTERN REGIONAL POWER COMMITTEEREGIONAL ENERGY ACCOUNT FOR THE MONTH OF February 2020

Sr. No. Units Figure1 MW 252 in % 13 in % 694 GWh 86.3 #5 in % 12

6 MU 75.9447 in ₹ Cr. 12.2577 #

8 KWh 0.815

9 kWh 010 KWh 011 KWh 0

Details

Free Energy (ex-PP) of the monthSaleable Energy (ex-PP) of the month

Installed CapacityAuxiliary Energy Consumption (AUX)Normative Plant Availability Factor (NAPAF)Annual Design Energy (DE) Free Energy for Home State (FEHS)

Annual Saleable Energy

2: KOPILI II Station

Annual Fixed Charges

Energy Charge Rate (ECR) on ex-PP basis

Scheduled energy (ex-bus) for the month

Page 2 of 14

11 KWh 012 in ₹ 013 MWh 10057314 in % 0.0015 in % 63.3316 in ₹ 0

Beneficiaries

Share allocation for the current month (%)

Capacity Charge Payble by

beneficiaries (in ₹)

Ar. Pradesh 5.9920 0.0000Assam 52.3550 0.0000

Manipur 6.9450 0.0000Meghalaya 13.6750 0.0000Mizoram 6.0400 0.0000Nagaland 5.7350 0.0000Tripura 9.2580 0.0000HVDC 0.0000 0.0000

Reg MegTotal 100.0000 0.0000

# As per CERC order dated 22.02.2016 in ORDER NO. 45/GT/2015

Saleable Energy (ex-PP) of the monthTotal Energy Charge payable for the month

0.0000 0.0000 0.0000

0.0000 0.0000 0.00000.0000 0.0000 0.00000.0000 0.0000 0.0000

0.00000.0000 0.0000 0.0000

0.0000 0.0000 0.0000

Cumulative scheduled energy including current monthPlant Availability Factor achieved during the month (PAFM)Cumulative Plant Availability Factor achieved upto the monthCapacity charge inclusive of incentive payble for the month

BILLING STATEMENT

0.0000 0.0000 0.00000.0000 0.0000 0.0000

Drawal Schedule of Beneficiaries MWH

Billing Schedule of Beneficiaries

MWH

Energy Charge payable by beneficiaries in ₹

0.0000 0.0000 0.0000

Page 2 of 14

Page 5: भारत सरकार Government of Indianerpc.nic.in/Commercial/REA/2019-2020/REA Feb 2020.pdf · 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon,

NORTH EASTERN REGIONAL POWER COMMITTEEREGIONAL ENERGY ACCOUNT FOR THE MONTH OF February 2020

Sr. No. Units Figure1 MW 502 in % 13 in % 694 GWh 277.61 #5 in % 126 MU 244.29687 in ₹ Cr. 40.4858#

8 KWh 0.837

9 kWh 7283000

10 KWh 873960

11 KWh 640904012 in ₹ 4698612

Free Energy for Home State (FEHS)Annual Saleable Energy Annual Fixed Charges

Energy Charge Rate (ECR) on ex-PP basis

Scheduled energy (ex-bus) for the month

Free Energy (ex-PP) of the month

3: KHANDONG StationDetails

Installed CapacityAuxiliary Energy Consumption (AUX)Normative Plant Availability Factor (NAPAF)Annual Design Energy (DE)

Saleable Energy (ex-PP) of the monthTotal Energy Charge payable for the month

Page 3 of 14

12 in ₹ 469861213 MWh 17912014 in % 45.4015 in % 59.9016 in ₹ 10582274

Beneficiaries

Share allocation

for the current

month (%)

Capacity Charge Payble by

beneficiaries (in ₹)

Ar. Pradesh 4.1940 443820.5584Assam 56.2850 5956232.7449

Manipur 6.5550 693668.0402Meghalaya 16.9050 1788933.3668Mizoram 3.9400 416941.5833Nagaland 6.6530 704038.6684Tripura 5.4680 578638.7252HVDC 0.0000 0.0000

Reg MegTotal 100.0000 10582273.6873

# As per CERC order dated 13.01.2016 in petition No 42/GT/2015.

BILLING STATEMENT

Drawal Schedule of Beneficiaries MWH

Billing Schedule of Beneficiaries

MWH

Energy Charge payable by beneficiaries in ₹

307.4267 307.4267 257312.7332

Total Energy Charge payable for the monthCumulative scheduled energy including current monthPlant Availability Factor achieved during the month (PAFM)Cumulative Plant Availability Factor achieved upto the monthCapacity charge inclusive of incentive payble for the month

286.9501

404.7268

240174.11761232.3600 795.3800 0.0000

286.9501

4089.6512 3652.6712 3057285.8331478.5696 478.5696 400557.5170

483.3154

6409.0399

404529.6660404.7268

7282.9999

338751.8913

4698611.7582

483.3154

0.0000 0.0000 0.00000.0000

Page 3 of 14

Page 6: भारत सरकार Government of Indianerpc.nic.in/Commercial/REA/2019-2020/REA Feb 2020.pdf · 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon,

NORTH EASTERN REGIONAL POWER COMMITTEEREGIONAL ENERGY ACCOUNT FOR THE MONTH OF February 2020

Sr. No. Units Figure1 MW 4052 in % 13 in % 854 GWh 1509.69#5 in % 12

6 MU 1328.52727 in ₹ Cr. 272.6449#

8 KWh 1.037

9 kWh 3134754010 KWh 376170511 KWh 27585835

4: RANGANADI StationDetails

Installed Capacity

Energy Charge Rate (ECR) on ex-PP basis

Scheduled energy (ex-bus) for the monthFree Energy (ex-PP) of the monthSaleable Energy (ex-PP) of the month

Auxiliary Energy Consumption (AUX)Normative Plant Availability Factor (NAPAF)Annual Design Energy (DE) Free Energy for Home State (FEHS)

Annual Saleable Energy Annual Fixed Charges

Page 4 of 14

11 KWh 2758583512 in ₹ 2647591913 MWh 120470814 in % 44.9715 in % 85.6316 in ₹ 57303878

Beneficiaries

Share allocation

for the current

Capacity Charge Payble by

beneficiaries (in ₹)

Ar. Pradesh 18.4620 10579442.0290Assam 43.3280 24828624.4304

Manipur 8.3730 4798053.7379Meghalaya 11.5050 6592811.2092Mizoram 5.7000 3266321.0684Nagaland 5.3350 3057161.9123Tripura 7.2970 4181464.0064HVDC 0.0000 0.0000

Reg MegTotal 100.0000 57303878.3936

# As per CERC order dated 05.01.2016 and corrigendum 07.03.2016 in petition No.40/GT/2015.

Saleable Energy (ex-PP) of the monthTotal Energy Charge payable for the monthCumulative scheduled energy including current monthPlant Availability Factor achieved during the month (PAFM)Cumulative Plant Availability Factor achieved upto the monthCapacity charge inclusive of incentive payble for the month

1786.8098

BILLING STATEMENT

27585.8352 26475919.1512

1786.80981661.42161661.4216

2347.2928

31347.5400

1851996.07271722033.52642432926.5943

Drawal Schedule of Beneficiaries MWH

Billing Schedule of Beneficiaries

MWH

Energy Charge payable by beneficiaries in ₹

3617.5041

2347.2928

3749477.69082635.0723 2635.0723 2731204.8849

3617.5041

5805.5612 2043.8564 2119.479113493.8781 13493.8781 13986160.9030

0.00000.0000 0.0000 0.0000

Page 4 of 14

Page 7: भारत सरकार Government of Indianerpc.nic.in/Commercial/REA/2019-2020/REA Feb 2020.pdf · 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon,

NORTH EASTERN REGIONAL POWER COMMITTEEREGIONAL ENERGY ACCOUNT FOR THE MONTH OF February 2020

Sr. No. Units Figure1 MW 752 in % 13 in % 734 GWh 227.24#5 in % 126 MU 199.97127 in ₹ Cr. 108.4121#

8 KWh 2.738

9 kWh 6174423

10 KWh 740931

11 KWh 543349212 in ₹ 14877274

Free Energy for Home State (FEHS)Annual Saleable Energy Annual Fixed Charges

Energy Charge Rate (ECR) on ex-PP basis

Scheduled energy (ex-bus) for the month

Free Energy (ex-PP) of the month

5: DOYANG StationDetails

Installed CapacityAuxiliary Energy Consumption (AUX)Normative Plant Availability Factor (NAPAF)Annual Design Energy (DE)

Saleable Energy (ex-PP) of the monthTotal Energy Charge payable for the month

Page 5 of 14

12 in ₹ 1487727413 MWh 16704214 in % 58.0015 in % 67.7216 in ₹ 34215939

Beneficiaries

Share allocation for the current month (%)

Capacity Charge Payble by

beneficiaries (in ₹)

Ar. Pradesh 6.8520 2344476.1719Assam 43.8080 14989318.7590

Manipur 7.8650 2691083.6386Meghalaya 11.4550 3919435.8652Mizoram 5.2500 1796336.8217Nagaland 17.9670 6147577.8429Tripura 6.8030 2327710.3615HVDC 0.0000 0.0000

Reg MegTotal 100.0000 34215939.4609

# As per CERC order dated 13.01.2016 and corrigendum dtd. 07.03.16 in petition No 43/GT/2015.

429.8501 429.8501

324.1572 324.1572

BILLING STATEMENT

Drawal Schedule of Beneficiaries MWH

Billing Schedule of Beneficiaries

MWH

Energy Charge payable by beneficiaries in ₹

1176961.2112

Total Energy Charge payable for the monthCumulative scheduled energy including current monthPlant Availability Factor achieved during the month (PAFM)Cumulative Plant Availability Factor achieved upto the monthCapacity charge inclusive of incentive payble for the month

711.3596 711.3596 1947755.0330489.6979 1340828.8690

14877273.5430

1105.5303 364.5996 998273.7968441.8241 441.8241 1209746.9261

0.0000 0.0000 0.0000

6174.4225 5433.49180.0000

887566.2636

2672.0032 2672.0032 7316141.4433489.6979

Page 5 of 14

Page 8: भारत सरकार Government of Indianerpc.nic.in/Commercial/REA/2019-2020/REA Feb 2020.pdf · 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon,

NORTH EASTERN REGIONAL POWER COMMITTEEREGIONAL ENERGY ACCOUNT FOR THE MONTH OF February 2020

Sr. No. Units Figure1 MW 1052 in % 13 in % 854 GWh 448.00#5 in % 12

6 MU 394.247 in ₹ Cr. 150.2829#

8 KWh 1.925

9 kWh 1759277010 KWh 211113211 KWh 15481637

DetailsInstalled CapacityAuxiliary Energy Consumption (AUX)

Energy Charge Rate (ECR) on ex-PP basis

Scheduled energy (ex-bus) for the monthFree Energy (ex-PP) of the monthSaleable Energy (ex-PP) of the month

6: LOKTAK Station

Normative Plant Availability Factor (NAPAF)Annual Design Energy (DE) Free Energy for Home State (FEHS)

Annual Saleable Energy Annual Fixed Charges

Page 6 of 14

11 KWh 1548163712 in ₹ 2980578613 MWh 32810614 in % 84.2315 in % 90.2516 in ₹ 59159998

Beneficiaries

Share allocation for the current month (%)

Capacity Charge Payble by

beneficiaries (in ₹)

Ar. Pradesh 4.9400 2922503.8840Assam 29.4450 17419661.3084

Manipur 42.5080 25147731.8015Meghalaya 0.0000 0.0000Mizoram 5.0200 2969831.8821Nagaland 6.4350 3806945.8488Tripura 11.6520 6893322.9263HVDC 0.0000 0.0000Total 100.0000 59159997.6511

# As per CERC order dated 18.09.2015 in Order no. 228/GT/2014

Saleable Energy (ex-PP) of the month

2084.4044 2084.4044 4012967.7097

7490.4297 5379.2973 10356410.02030.0000 0.0000 0.0000

880.3957 880.3957 1694968.47485128.7889 5128.7889 9874122.6540

Plant Availability Factor achieved during the month (PAFM)Cumulative Plant Availability Factor achieved upto the month

0.0000 0.0000 0.0000

Capacity charge inclusive of incentive payble for the month

BILLING STATEMENT

Drawal Schedule of Beneficiaries MWH

Billing Schedule of Beneficiaries

MWH

Energy Charge payable by beneficiaries in ₹

17592.7699 15481.6375 29805786.3839

883.9751 1701859.53681124.7761 1124.7761 2165457.9884

Total Energy Charge payable for the monthCumulative scheduled energy including current month

883.9751

Page 6 of 14

Page 9: भारत सरकार Government of Indianerpc.nic.in/Commercial/REA/2019-2020/REA Feb 2020.pdf · 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon,

NORTH EASTERN REGIONAL POWER COMMITTEEREGIONAL ENERGY ACCOUNT FOR THE MONTH OF February 2020

Sr. No. Units Figure1 MW 1102 in % 123 kWh 127746254 KWh 15329555 KWh 112416706 MWh 4390997 in % 54.24

8 in % 92.58

Beneficiaries

Ar. PradeshAssam 40.51000 5134.16710

7: PARE StationDetails

Installed CapacityFree Energy for Home State (FEHS)

Billing Schedule of Beneficiaries MWH

886.40158

BILLING STATEMENT

5134.16710

Scheduled energy (ex-bus) for the monthFree Energy (ex-PP) of the monthSaleable Energy (ex-PP) of the monthCumulative scheduled energy including current monthPlant Availability Factor achieved during the month (PAFM)

Cumulative Plant Availability Factor achieved upto the month

Share allocation for the current month (%)

18.87250

Drawal Schedule of Beneficiaries MWH

2419.35660

Page 7 of 14

AssamManipur

MeghalayaMizoramNagalandTripura

HVDC

Reg MegTotal 100.00000 12774.62520

40.510008.35500

13.33000

5134.167101072.299651707.83724736.45718684.85008

1019.65735

0.00000

5.765005.400007.76750

0.00000

5134.167101072.299651707.83724736.45718684.85008

1019.65735

0.00000

11241.670180.00000

Page 7 of 14

Page 10: भारत सरकार Government of Indianerpc.nic.in/Commercial/REA/2019-2020/REA Feb 2020.pdf · 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon,

NORTH EASTERN REGIONAL POWER COMMITTEEREGIONAL ENERGY ACCOUNT FOR THE MONTH OF February 2020

THERMAL STATIONS

Page 8 of 14Page 8 of 14

Page 11: भारत सरकार Government of Indianerpc.nic.in/Commercial/REA/2019-2020/REA Feb 2020.pdf · 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon,

NORTH EASTERN REGIONAL POWER COMMITTEEREGIONAL ENERGY ACCOUNT FOR THE MONTH OF February 2020

Sr. No. Units Figure1 in % 77.992 in % 69.133 in % 72.004 in % 73.925 in % 63.096 in % 85.00

Beneficiaries Wt. Schedule Energy for

current month (MWh)

Ar. Pradesh 5.694000 8417.187312

Assam 56.503000 86826.914712

Manipur 8.105000 5247.525432Meghalaya 11.815000 18053.973528 143202.556264 96.953112 12560.410189

Cum. Schedule Energy upto current

month (MWh)

Unrequisitioned Energy for current

month (MWh)

Cum. Unrequisitioned Energy upto current

month (MWh)

81151.100543 331.041048 8943.022390

Plant Load Factor for current monthCum. Plant Load Factor upto current month

852690.385335 213.035208 60986.509464

84052.553270 7201.700856 45816.223018

1: AGBPP StationDetails

Plant Availability Factor for current month

Normative Plant Availability Factor (NAPAF)Cum. Plant Availability Factor upto current

NAPLF

Page 9 of 14

Meghalaya 11.815000 18053.973528Mizoram 5.410000 8309.070336Nagaland 5.805000 8131.756848Tripura 6.668000 10151.266608HVDC 0.000000 0.000000

Reg Meg 0.000000

Total 100.000000 145137.694776

0.000000 0.000000

143202.556264 96.953112 12560.41018971109.025509 14.312232 15200.091240

197.146680 12797.56920380925.909581 785.656296 13504.69589897907.460330

0.000000

1411038.990832 8839.845432 169808.521402

RRAS (MWH)RRAS UP

RRAS DOWN871.2

419.28

Page 9 of 14

Page 12: भारत सरकार Government of Indianerpc.nic.in/Commercial/REA/2019-2020/REA Feb 2020.pdf · 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon,

NORTH EASTERN REGIONAL POWER COMMITTEEREGIONAL ENERGY ACCOUNT FOR THE MONTH OF February 2020

Sr. No. Units Figure1 in % 89.612 in % 76.803 in % 85.004 in % 84.075 in % 67.786 in % 85.00

Beneficiaries Wt. Schedule Energy for

current month (MWh)

Ar. Pradesh 6.702000 5196.378000

Assam 43.720000 33891.987024Manipur 8.225000 3571.918272

Meghalaya 12.633000 9923.813640Mizoram 6.000000 4713.164112

2: AGTCCPP StationDetails

Plant Availability Factor for current monthCum. Plant Availability Factor upto currentNormative Plant Availability Factor (NAPAF)Plant Load Factor for current month

52274.569437 2903.683488 13060.81738079445.119784 1.609656 5239.17620839642.345147 0.765888 7973.118717

Cum. Plant Load Factor upto current monthNAPLF

53957.903982301743.383418 708.733608

Cum. Schedule Energy upto current

month (MWh)

Unrequisitioned Energy for current

month (MWh)

Cum. Unrequisitioned Energy upto current

month (MWh)

48535.431263 69.195504 3901.836990

Page 10 of 14

Mizoram 6.000000 4713.164112Nagaland 5.737000 4184.414256Tripura 16.983000 13231.647624HVDC 0.000000 0.000000

Reg Meg 0.000000Total 100.000000 74713.322928 685712.674907 4149.047520 103751.067462

39642.345147 0.765888 7973.118717

0.000000 0.000000 0.000000123304.377741 142.169904 14121.94864840767.448117 322.889472 5496.265537

RRAS (MWH)RRAS UP 347.52

RRAS DOWN 1353.84

Page 10 of 14

Page 13: भारत सरकार Government of Indianerpc.nic.in/Commercial/REA/2019-2020/REA Feb 2020.pdf · 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon,

NORTH EASTERN REGIONAL POWER COMMITTEEREGIONAL ENERGY ACCOUNT FOR THE MONTH OF February 2020

Sr. No. Units Figure1 in % 31.562 in % 65.503 in % 85.004 in % 31.145 in % 63.276 in % 85.00

Beneficiaries Wt. Schedule Energy for

current month (MWh)

Ar. Pradesh 3.030303 4229.911368

Assam 33.057851 51094.797096

Manipur 5.785124 7299.471600Meghalaya 10.881543 16794.410184

3: PALATANA StationDetails

Plant Availability Factor for current monthCum. Plant Availability Factor upto currentNormative Plant Availability Factor (NAPAF)Plant Load Factor for current monthCum. Plant Load Factor upto current monthNAPLF

Cum. Schedule Energy upto current

month (MWh)

Unrequisitioned Energy for current

month (MWh)

Cum. Unrequisitioned Energy upto current

month (MWh)

86628.485764 20.769432 5334.561064

1197433.827878 0.000000 29417.803767

191004.869762 1649.404968 23275.874495382600.136762 0.000000 20774.046628

Page 11 of 14

Meghalaya 10.881543 16794.410184Mizoram 3.030303 4676.924208Nagaland 3.719008 5507.143848Tripura 26.997245 41652.857904HVDC 0.000000 0.000000Total 86.501377 131255.516208

382600.136762 0.000000 20774.046628106389.424204 0.000000 5953.861928117709.389445 163.338000 8416.897869974956.385833 14.285112 26422.964679

3056722.519648 1847.797512 119596.0104300.000000 0.000000 0.000000

Page 11 of 14

Page 14: भारत सरकार Government of Indianerpc.nic.in/Commercial/REA/2019-2020/REA Feb 2020.pdf · 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon,

NORTH EASTERN REGIONAL POWER COMMITTEEREGIONAL ENERGY ACCOUNT FOR THE MONTH OF February 2020

Sr. No. Units Figure1 in % 99.582 in % 93.553 in % 85.004 in % 64.015 in % 60.796 in % 85.00

Beneficiaries Wt. Schedule Energy for

current month (MWh)

Ar. Pradesh 5.13250 15646.17410

Assam 57.42000 243703.68703Manipur 7.50500 2795.74538

Meghalaya 11.64667 0.00000Mizoram 5.41500 25197.82104

Cum. Schedule Energy upto current

month (MWh)

Unrequisitioned Energy for current

month (MWh)

Cum. Unrequisitioned Energy upto current

month (MWh)

Normative Plant Availability Factor (NAPAF)Plant Load Factor for current monthCum. Plant Load Factor upto current monthNAPLF

187418.05709 7770.67010 64862.82119

2452926.17643146016.51386 30792.20494 217222.40026

0.00000 0.00000 0.00000157879.16413 451.24140 120587.80199

22954.54543 512031.70049

4: BGTPP NTPC StationDetails

Plant Availability Factor for current monthCum. Plant Availability Factor upto current

Page 12 of 14

Mizoram 5.41500 25197.82104Nagaland 4.93000 16898.12059Tripura 7.61750 18308.33573

HVDC BNC 0.33000 727.71540REG. MEG 0.00000 53380.00882

Total 100.00000 376657.60810

206140.87563 17301.13586 197023.61590187375.03257 5561.75292 62329.30684157879.16413 451.24140 120587.80199

8233.57029569181.26154

804.37939 8662.334360.00000 0.00000

3915170.65153 85635.93005 1182719.98101

RRAS (MWH)

RRAS UP 15521.28RRAS DOWN 8809.92

SCED (MWH)SCED UP 10161.6

SCED DOWN 42628.32

Page 12 of 14

Page 15: भारत सरकार Government of Indianerpc.nic.in/Commercial/REA/2019-2020/REA Feb 2020.pdf · 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon,

NORTH EASTERN REGIONAL POWER COMMITTEEREGIONAL ENERGY ACCOUNT FOR THE MONTH OF February 2020

Sl No. Farakka I & II Farakka III Kahalgaon I Kahalgaon II Talcher1 Ar.Pradesh 0.191917 0.000000 0.191747 0.000000 0.1968982 Assam 2.455737 0.000000 2.104847 5.093479 2.0954193 Manipur 0.000000 0.000000 0.000000 0.000000 0.0000004 Meghalaya 0.000000 0.000000 0.000000 0.000000 0.0000005 Mizoram 0.141736 0.000000 0.141610 0.000000 0.1417366 Nagaland 0.429803 0.000000 0.424460 0.000000 0.424823

7Assam (NVVN Coal Power)

0.091912 0.091912 0.091912 0.091912 0.091912

C. SHARE ALLOCATIONS % IN CS STATIONS FROM EASTERN REGION

Page 13 of 14

in MW in (%) in MW in (%) in MW in (%)Ar. Pradesh 205.9630 7.4234 6.6503 3.5842 212.6133 7.1827Assam* 1326.2480 47.8010 159.3289 85.8710 1485.5769 50.1873Manipur 246.4486 8.8826 0.0000 0.0000 246.4486 8.3258Meghalaya 334.3622 12.0512 0.0000 0.0000 334.3622 11.2958Mizoram 137.8088 4.9669 4.8747 2.6272 142.6834 4.8203Nagaland 153.4678 5.5313 14.6905 7.9175 168.1584 5.6809Tripura 367.7206 13.2535 0.0000 0.0000 367.7206 12.4227HVDC 2.4750 0.0892 0.0000 0.0000 2.4750 0.0836Total 2774.5190 100.0000 185.5444 100.0000 2960.0634 100.0000*Includes entitlement for bundling with solar power.

Beneficiaries

Weighted Average Entitlement for the current month of ISGS in

NER

Weighted Average Entitlement for the current month of ISGS outside NER

Total Entitlement for the current month of ISGS

WEIGHTED AVERAGE ENTITLEMENT OF THE BENEFICIARIES FOR THE MONTH

Page 13 of 14

Page 16: भारत सरकार Government of Indianerpc.nic.in/Commercial/REA/2019-2020/REA Feb 2020.pdf · 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon,

NORTH EASTERN REGIONAL POWER COMMITTEEREGIONAL ENERGY ACCOUNT FOR THE MONTH OF February 2020

Page 14 of 14

CONCLUDED

Page 14 of 14