Alcatel BSS

A9110-E BTS Commissioning

Manual

BTS Document

Commissioning Manual

Release B9

3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 2/74

Status RELEASED

Short title COM

All rights reserved. Passing on and copying of this document, useand communication of its contents not permitted without writtenauthorization from Alcatel/Evolium.

BLANK PAGE BREAK

2  / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 3/74

Contents

Contents

Preface   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   7

1 General Information   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   9

1.1 Hardware Description   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   101.1.1 Configurations   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   101.1.2 Weight and Dimensions  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   13

1.2 Restrictions   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   131.3 Prerequisites   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   131.4 Initial State   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   131.5 Final State   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   131.6 Operating Principle   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   151.7 Time Schedule   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   161.8 Information Required  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   171.9 Conventions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   17

2 Preliminary Checks  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   19

2.1 Before Going to the Site   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   202.2 Before You Start (On Arrival at the Site)   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   20

3 Installing the Micro - BTS Units   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   21

3.1 Case A: Installation With the Manual Lift   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   223.2 Case B: Installation With the Crane  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   26

3.2.1 Specific Safety Instructions for Craning   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   263.2.2 Installation of the Crane on MOFRA   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   263.2.3 Preparation for Craning   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   283.2.4 Installing the Micro-BTS on MOCO  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   29

4 Making the Connections to the BTS   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   33

4.1 OPTION: Installing the Integrated Antenna   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   344.2 OPTION: Installing the VSWR Detector   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   35

4.2.1 Mechanics   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   354.2.2 Fixing the VSWR Detector   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   364.2.3 Connecting the Cables   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   37

4.3 Making the Connections to the BTS   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   38

5 Checking Power Supply and Powering Up   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   41

5.1 Case 1: A9110-E BTS Without SSC   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   425.2 Case 2: A9110-E BTS With SSC  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   42

6 Commissioning Tests   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   45

6.1 BTS Software Downloading . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   466.2 BTS Initialization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   486.3 Performing BTS Inventory   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   49

6.4 Setting and Checking the External Alarms   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   496.4.1 Set and Check the Alarm Mapping   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   496.4.2 Test the External Alarms   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   50

6.5 Checking the Status of Modules  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   526.6 VSWR Check   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   526.7 Abis Loop Test   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   556.8   End of Commissioning   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   55

7 Setting Transmission Module Parameters   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   57

8 Connecting to the BSC   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   59

9 Finishing Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   61

Appendix A : Abbreviations   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   63

Appendix B : List of Items Required   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   65

3BK 17422 3081 RJZZA Ed.02   3  / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 4/74

Contents

Appendix C : Description of ABISCO and ACCO Boards   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   67

Appendix D : Antenna Port and External Alarm Mapping Rules   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   71

4  / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 5/74

Figures

Figures

Figure 1: Example of 6 Modules with Single Antenna   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   10

Figure 2: Example Low-Loss Configuration With Antenna Diversity (6 sectors)   . . . . . . . . . . . . . . . . . . . . . . . .   11

Figure 3: Evolium A9110-E Pure Configuration (Maximum 6 Evolium A9110-E Modules, 12 TREs)   . . . . . .   11

Figure 4: Evolium A9110-E / Evolium A9110 Mixed Configuration (5 Modules: 4 Evolium A9110-E +1 EvoliumA9110, 10 TREs in total) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   12

Figure 5: Evolium A9110-E / Evolium A9110 Mixed Configuration (3 Modules: 1 Evolium A9110-E + 2 EvoliumA9110, 6 TREs in total ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   12

Figure 6: Example of A9110-E BTS ( Maximum 6 Evolium A9110-E Configuration With Cover )   . . . . . . . . .   14

Figure 7: Example of A9110-E BTS (3 modules with SSC Option)  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   14

Figure 8: Installation and Arrangement of the Threaded Bolt   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   22

Figure 9: Installation of the Handwheel   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   23

Figure 10: Installing the Gallows   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   23Figure 11: Installing the BTS Handle   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   24

Figure 12: BTS Handle Fixed on the Module   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   24

Figure 13: Putting the A9110-E BTS in Position   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   25

Figure 14: Fixing the Unit  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   25

Figure 15: Mounting the Lifting Ring   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   26

Figure 16: Installing the Crane   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   27

Figure 17: ACout BTS Power Connector of ACCO Board is Used to Power the Crane   . . . . . . . . . . . . . . . . . .   28

Figure 18: Lifting and Plugging in the Micro-BTS Unit   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   29

Figure 19: Fixing the Micro-BTS to MOCO   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   31

Figure 20: Installation of Integrated Antenna (GSM and DCS)   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   34

Figure 21: The VSWR Detector   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   35

Figure 22: VSWR Detector - RF Installation   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   36

Figure 23: Connecting the ALARM / VCC Cables  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   37

Figure 24: Connection of IEB PG 11 Glands to COBO for All Modules  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   39

Figure 25: ACCO Board   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   43

Figure 26: SSC Switch Configuration   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   43

Figure 27: “ Sector Mapping Micro BTS“ Window   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   48

Figure 28: ABISCO Board for A9110-E   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   67

Figure 29: ABISCO Board for A9110   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   68

Figure 30: Connectors and LEDs on ABISCO   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   69

Figure 31: Mechanical Drawing of ACCO   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   70

Figure 32: Electrical Drawing of ACCO   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   70

Figure 33: “ Application part “ Window   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   74

3BK 17422 3081 RJZZA Ed.02   5  / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 6/74

Figures

6  / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 7/74

Preface

Preface

Purpose   This document describes how to commission an Alcatel A9110-E micro BTS.This document applies to operational BSS, release B9.

What’s New   In Edition 02

Editorial improvement.

In Edition 01

Creation in B9.

Audience   This document is intended for:

Site administrators

Supervisors

Project managers

Field service technicians

Occasional users.

Assumed Knowledge   The personnel involved must be familiar with:

ALCATEL Operation & Maintenance (O&M) concepts for the Base Station

Subsystem (BSS)

Commissioning tools

Personal Computers (PCs) using the Windows 2000/XP environment.

3BK 17422 3081 RJZZA Ed.02   7  / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 8/74

Preface

8  / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 9/74

1 General Information

1 General Information

This chapter provides general information concerning the operating principleand requirements of the procedure:

Hardware description

Prerequisites

Restrictions

Initial state

Final state

Tasks sequences

Time schedule

Information required

Conventions.

3BK 17422 3081 RJZZA Ed.02   9  / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 10/74

1 General Information

1.1 Hardware Description

1.1.1 Configurations

With this product, one BTS comprises up to six units of two TRX, in a

hierarchical interconnection.

Only one of these units handles the Abis lines; this unit called the master,

the other units called slaves.

A unit can have one antenna output (3.2 W/TRX max. power) or two

antenna outputs (7 W/TRX max. power).

One lower slave cannot be equipped because of 12 TRX limitation!In the following exemples the Slave 22 is eliminated, but depending on siteconfiguration, you can have maximum 3 lower slave units on the 4 possiblepositions: Slave11, Slave12, Slave 21, Slave 22.

Figure 1: Example of 6 Modules with Single Antenna 

10 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 11/74

1 General Information

Figure 2: Example Low-Loss Configuration With Antenna Diversity (6 sectors)

The following rules are defined for pure Evolium A9110-E and EvoliumA9110/Evolium A9110-E mixed configurations:

Maximum 6 modules are allowed for Evolium A9110-E.

Maximum 3 hierarchy levels are allowed (Master, Upper Slave, Lower Slave)

M5M

Master

M5M

Lower Slave 11

M5M

Lower Slave 12

M5M

Lower Slave 21

M5M

Upper Slave 1

M5M

Upper Slave 2

Figure 3: Evolium A9110-E Pure Configuration (Maximum 6 Evolium A9110-E Modules, 12 TREs)

Evolium A9110 module allowed only as upper slave, no lower slaves can

connect to it.

3BK 17422 3081 RJZZA Ed.02   11 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 12/74

1 General Information

M5M

Master

M5M

Lower Slave 11

M5M

Lower Slave 12

M5M

Upper Slave 1

M4M

Upper Slave 2

Figure 4: Evolium A9110-E / Evolium A9110 Mixed Configuration (5 Modules: 4 Evolium A9110-E +1 Evolium A9110, 10 TREs in total)

M5M

Master

M4M

Upper Slave 1

M4M

Upper Slave 2

Figure 5: Evolium A9110-E / Evolium A9110 Mixed Configuration (3 Modules: 1 Evolium A9110-E + 2 Evolium A9110, 6 TREs in total )

12 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 13/74

1 General Information

1.1.2 Weight and Dimensions

Characteristics   Each unit with cover

(2TRX, 2 ANT)

Each unit without cover

(2TRX, 2 ANT)

Width (mm)   450 385

Height (mm) 815 (w/ o PG)

915 with fan (w/ o PG)

735 (w/ o PG)

Depth (mm)   190 162

Max. weight with 2 ant. (kg)   26 26

Cover weight (kg)   7 - 9 -

Support weight (kg)   5.6 5.6

Maximum weight (kg)   38.6 - 40.6 31.6

1.2 Restrictions

None.

1.3 Prerequisites

The following prerequisites apply:

The site must comply with the “ Safety rules “ ( See BSS Methods Handbook 

)

The BSC must be operational and ready for BTS connection

The following requirement is not mandatory: antenna connected.

1.4 Initial State

Before starting commissioning:

The MOCOs are installed and connected as described in the installationmanual: power supply, PCM (for master unit) even not connected to the

network, external alarms

The micro-BTS units are not plugged into their connection boxes.

1.5 Final State

After finishing commissioning:

The BTS is installed (master and slave units)

3BK 17422 3081 RJZZA Ed.02   13 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 14/74

1 General Information

The BTS is commissioned, powered up and connected to the BSC via a

PCM interface ready for network integration

Integrated antenna option: integrated antennas are installed on all units

Antennas present: the antennas have been connected

Antennas absent: the tests have been carried out under load.

Figure 6: Example of A9110-E BTS ( Maximum 6 Evolium A9110-E Configuration With Cover )

Customer Alarm Box

Alarm pointsfor Customer 

230 VAC

1.5 m 

 MASTER SLAVE 2 SLAVE 1

Ground 

Plate

Wire braid 

Figure 7: Example of A9110-E BTS (3 modules with SSC Option)

14 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 15/74

1 General Information

1.6 Operating Principle

Preparation before leaving for the site

Preparation after arrival at the site

Manual lift/ Crane

Installation with the crane

Option: Installation of the integrated antenna

Option: Installation of VSWR detector 

Making the connections to BTS

Checking power supply and powering up

BTS software downloading 

Setting antenna mapping 

BTS initialization

Performing BTS inventory 

Setting and checking the external alarms

Checking status of modules

Case: Antenna present

Checking the VSWR under load 

Abis loop test

End of commissioning test

Setting transmission module paramenters

Connecting to the BSC 

Finishing commissioning 

Checking the antenna VSWR

YES   NO 

Installation with the manual lift

3BK 17422 3081 RJZZA Ed.02   15 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 16/74

1 General Information

1.7 Time Schedule

Duration (min) 1st person 2nd person

Preliminary checks

Before leaving for the site   10 10

Before you start   5 5

Installing the micro-BTS units(1)

Case A: Installation with the manual lift 10 / unit 10 / unit

Case B: Installation with the crane 15 / unit 15 / unit

Making the connections to the BTS

Option: Installation of integrated antenna 5 / unit 5 / unit

Option: Installation of the VSWR detector 10 / unit 10 / unit

Making the connections to BTS units 5 / unit 5 / unit

Checking power supply and powering up   10 10

Commissioning tests

BTS software downloading   5 -

Setting antenna mapping   2 -

BTS initialization   5 -

Performing BTS inventory   5 -

Setting and checking the external alarms   5 5

Checking status of modules   2   -

VSWR check 5 / unit 5 / unit

Abis loop test(2) 3(2) 3(2)

End of commissioning   5-10(3) -

Setting transmission module parameters   5 -

Connecting to the BSC   5 5

Finishing commissioning   5 5

1h 32 - 2h 50 1h 08 - 2h 15

(1)   : Tasks where two persons are mandatory

(2)   : Not performed if MW or TNL equipment installed in SSC(3)   : 10 min only if the inventory has to be performed again

16 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 17/74

1 General Information

The times given are based on technical constraints, not taking into accountsafety considerations.

1.8 Information Required

Site   Position of breakers on the customer’s power panel

If DDF cabled: position of PCM cables (Abis1, Abis2) on the DDF side.

Equipment configuration   Configuration of the BTS (number of units, type: Evolium A9110/Evolium

A9110-E)

Configuration of sectors and number of MTREs per sector

Mapping table correlating logical and physical BTS sectors

If DDF installed: external alarm mapping and position of alarm wires on

the DDF side

If SSC option: customer external alarm mapping (other than SSC external

alarms).

Other   Software version

Test frequencies

Transmission configuration

Qmux address

OML TS and signalling rate (optional).

Antennas connected or not.

1.9 Conventions

The following list gives the conventions used in this document:

Press [ Enter ] means press the Enter key

Click [ OK ] means click the button OK with the mouse

Operator input is indicated after a double right-pointing arrow in Courier font

Operator input

To describe a menu path, the menu options are linked as follows:

Tools   ⇒   Options   ⇒   Printer   ⇒...

A message is indicated in Courier font:

Message

3BK 17422 3081 RJZZA Ed.02   17 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 18/74

1 General Information

18 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 19/74

2 Preliminary Checks

2 Preliminary Checks

This chapter describes the preparation of the operation in two steps:

At base

On arrival at the site.

3BK 17422 3081 RJZZA Ed.02   19 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 20/74

2 Preliminary Checks

2.1 Before Going to the Site

Check prerequisites fulfillment   See Prerequisites (Section 1.3)  .

Check availability of information

required

See  Information Required (Section 1.8) .

Check availability of documentation   See List of Documents Required  ( in section B  ) .

Check availability of tools   See  Tools Required  ( in section B  )  , refer to the ”Toolscatalogue ” for content checking.

Verify the calibration label when indicated in  Tools Required ( in section B  )  .

Check availability and version ofsoftware

See List of Software Required  ( in section B  ) ; refer to thecorresponding documents for checking the SW version.

2.2 Before You Start (On Arrival at the Site)

Check applicable notification list andOperation Instructions

Refer to  Applicable Notifications List  (ITL) for checking ifnotifications have to applied during the operation.

Refer to   Applicable Operation Instructions List  (IO) forchecking if operation instructions have to applied.

Check that safety instructions areapplied

Refer to  BSS Methods Handbook   for checking that safetyprecautions have been taken into accordance with safety

instructions.

Read instructions to be applied in caseof anomaly

Refer to BSS methods Handbook  for instructions.

Complete premises inspection form   Refer to “ BSS site premises inspection, post handover “ andcomplete “ Premises inspection form ” (CEL).

Fill in completion check list   Complete the header field of the CCL (See CompletionCheck List)

In particular, see tools catalogue and note downmeasurement accuracy when indicated in tool kit list

(appendix)

The CCL is completed as each installation instruction iscarried out.

Check the antistatic wrist strap   Check that the resistance of the antistatic wrist strap isgreater than 1M .

Connect the antistatic wrist strap to rack earth.

Check availability of Alcatel kits   See List of Items Required (Section B)  .

20 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 21/74

3 Installing the Micro - BTS Units

3 Installing the Micro - BTS Units

This chapter describes the procedure for fixing the micro BTS on MOFRA.

Before the installation of the BTS units, check the lead seal.If damaged, make a note in the CCL.

The installation procedure is the same for master and slave units.

Do not work under power.Open the circuit breakers to be sure that the power supply is disconnected.For an installation with SSC: Check that the " Battery back-up " is OFF (redLED is lit) !!! (in the case of battery back-up there is 288 V DC on the BTSconnector and the crane will be damaged!!!)

3BK 17422 3081 RJZZA Ed.02   21 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 22/74

3 Installing the Micro - BTS Units

3.1 Case A: Installation With the Manual Lift

Purpose   To install the BTS on the MOCO.

Preparation   1.   Open the front cover to reveal the MOCO (with cover option)

2.  Remove the COBO protection cover (3BK 08586 AA).

3.   Remove the bottom protection cover of the micro-BTS unit (3BK 08555 AA).

Install the Threaded Bolt   1.   The threaded bolt must be screwed into the M8 thread on top of the A9110-EBTS housing, down to the internal screw-thread stop (See Figure 8  )

2.   Do not tighten

3.   Arrange the bolt with the flattened sides to the left and right.

Figure 8: Installation and Arrangement of the Threaded Bolt 

22 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 23/74

3 Installing the Micro - BTS Units

Install the Handwheel   1.   The handwheel must be screwed down to the threaded bolt stop (SeeFigure  9  )

2.   Make sure the handwheel and bolt are not damaged

Figure 9: Installation of the Handwheel 

Install the Gallows   1.   The gallows are plugged into the Mounting Frame (MOFRA) (See Figure 10  )

2.   The safety catch (1) keeps the gallows in place.

Figure 10: Installing the Gallows 

3BK 17422 3081 RJZZA Ed.02   23 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 24/74

3 Installing the Micro - BTS Units

Install the BTS-Handle   1.   Fix the metal pieces (3) with screws (4 — two at each side) to each side ofthe BTS Handle (2), see figure  11

2.  Fix the assembly to the the hinge flanges, with one screw (4) at eachside (picture  12  )

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8  

12

34 5Figure 11: Installing the BTS Handle 

3.  Remove the A9110-E BTS protective cap.

Figure 12: BTS Handle Fixed on the Module 

24 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 25/74

3 Installing the Micro - BTS Units

Install the A9110-E BTS

in Position

1.  Two people place the unit in the gallows (See Figure  13  )

2.   The A9110-E BTS housing is let down by rotating the handwheel.

3.   Ensure that the housing descends into the right position.

Figure 13: Putting the A9110-E BTS in Position 

Fix the BTS in Position   1.  Fix the housing on the mounting frame with the two screws on top ofhousing (See Figure 14  )

2.   Fix the housing on COBO with the two screws left and right of COBO.

Figure 14: Fixing the Unit 

Remove the Manual Lift

and the Handle

1.   Completely unscrew the handwheel, then remove it

2.   Remove the gallows from MOFRA, by lifting it (and pushing the safety catch)

3.   Unscrew the threaded bolt and remove it from the housing

4.   Detach the BTS-handle from the housing by releasing the screw (5) onfigure  11.

3BK 17422 3081 RJZZA Ed.02   25 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 26/74

3 Installing the Micro - BTS Units

3.2 Case B: Installation With the Crane

3.2.1 Specific Safety Instructions for Craning

You must carefully read the " A9110 Crane Instruction Manual " and theseinstructions before using the crane.

It is strictly prohibited to stand under a floating crane load during the

operation

Hot surface warning :  Don’t handle the crane by its motor after use, the

temperature can exceed 45 degrees Celsius (see left, " Hot Surface "label on the crane)

Check availability of the completed " Security control - check list and report", enclosed with the crane (see " A9110 Crane Instruction Manual " ) the  checkmust be carried out  every six months, note the check date in the CCL.

3.2.2 Installation of the Crane on MOFRA

Procedure   1.  Check that the lifting ring and the two screws for fixing to MOFRA areavailable

2.   Mount the lifting ring onto the top part of the micro-BTS unit. The ring mustbe screwed completely (See Figure  15  )

3.   Put the crane on top of MOFRA. The small safety blade keeps the cranein place (See Figure  16  )

4.  Open the COBO door

5.   Connect the crane power cable to the ACout BTS power connector (SeeFigure  17  )

6.   Hook the cables as shown in the drawings.

Figure 15: Mounting the Lifting Ring 

26 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 27/74

3 Installing the Micro - BTS Units

MOFRA

Crane

Power cable

Figure 16: Installing the Crane 

Ac out BTS connector is used to power the crane

3BK 17422 3081 RJZZA Ed.02   27 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 28/74

3 Installing the Micro - BTS Units

Figure 17: ACout BTS Power Connector of ACCO Board is Used to Power the Crane 

3.2.3 Preparation for Craning

The following checks and precautions must be considered before craning!Depending of the country and customer regulations more tests foroverloading and usage time may be required.To be checked and applied!

Purpose

To check the fixing of the MOCO and crane.

Procedure   1.   Check the screws securing the MOCO on the wall2.   Define a safety area 2 m around the MOFRA and make sure that nobody will

enter the area during operations

3.  Move the unit under the crane on the floor

4.  Remove the COBO protection cover (3BK 08586 AA).

5.   Close the circuit breakers that power COBO

6.   Using the switching box on the crane power cable, let down the liftingband to the micro-BTS level

7.   Hang the unit on the crane (make sure the belt is not turned on itself)

8.  Lift the unit and suspend it 10 cm above the floor9.   Execute a movement up and down with the micro-BTS

10.  Lay the micro-BTS an the floor

11.   Check the MOFRA - Crane assembly and fixings.

28 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 29/74

3 Installing the Micro - BTS Units

3.2.4 Installing the Micro-BTS on MOCO

Figure 18: Lifting and Plugging in the Micro-BTS Unit 

3BK 17422 3081 RJZZA Ed.02   29 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 30/74

3 Installing the Micro - BTS Units

Take care not to damage the connectors during the operation.Do not lift the BTS by hand from the ground, use the crane!

Do not work under powerOpen the circuit breakers to be sure that the power supply isdisconnected.For installation with SSC: Check that the “ Battery back-up “ is OFF(red LED is lit) !!!

Purpose

To install the BTS on the MOCO.

Procedure   1.   Lift the micro-BTS unit to an appropriate level for mounting (See Figure 18  )

2.   Remove the bottom protection cover of the micro-BTS unit (3BK 08555 AA).3.  Fit the handle on the reel of the crane, on the left side

4.   Move the micro-BTS nearer to the MOFRA (by pushing the handle) and fit itonto the guide bolts (there are two guide bolts on MOFRA that must fit intothe back part of the micro-BTS unit)

5.   Plug the micro-BTS unit into the COBO by slowly releasing the unit andfitting the two guide pins of the COBO into the corresponding holes in themicro-BTS housing

6.   Fix the micro-BTS onto the MOCO using the four screws provided (SeeFigure  19  )

7.   Unhook the micro-BTS8.   Unplug the crane power cable

9.  Remove the crane from MOFRA

10.   Unscrew the lifting ring and put it with the crane to avoid losing it.

30 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 31/74

3 Installing the Micro - BTS Units

Figure 19: Fixing the Micro-BTS to MOCO 

3BK 17422 3081 RJZZA Ed.02   31 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 32/74

3 Installing the Micro - BTS Units

32 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 33/74

4 Making the Connections to the BTS

4 Making the Connections to the BTS

This chapter describes:

How to install the integrated antenna, with the integrated antenna option

How to instal the VSWR detector, with the VSWR option

How to make the necessary connections to the BTS units

3BK 17422 3081 RJZZA Ed.02   33 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 34/74

4 Making the Connections to the BTS

4.1 OPTION: Installing the Integrated Antenna

Purpose

To install the integrated antenna on each micro-BTS unit (master and slaves).

This procedure is the same for master and slave units.

Figure 20: Installation of Integrated Antenna (GSM and DCS)

Connect the integrated antenna to the upper housing side of the A9110-EBTS using the four self tapping screws (M3 x 16) provided in the integratedantenna kit.

The above figure also shows the special front cover and the final view of a

BTS with integrated antenna.On fact, the front cover will not be mounted until the end of commissioning.

34 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 35/74

4 Making the Connections to the BTS

4.2 OPTION: Installing the VSWR Detector

Purpose   To install the VSWR detector on each micro-BTS unit (master and slaves)

This procedure is the same for master and slave units.

4.2.1 Mechanics

Figure 21: The VSWR Detector 

3BK 17422 3081 RJZZA Ed.02   35 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 36/74

4 Making the Connections to the BTS

4.2.2 Fixing the VSWR Detector

The VSWR detector can not be used together with an integrated antenna, if theisolation between antennas on the same site is < 25 dB.

Procedure   1.   Unlock the bottom section of the front protective cover, open it upwards andfix it at the front cover by the installed magnetic snap-on fastening

2.   Connect the VSWR detector to the antenna output connector of the A9110-Eby screwing the N male connector (See Figure  22  )

3.   Connect the VSWR RF jumper cable to the RF output N-female connector ofthe VSWR detector

4.   Connect the standard antenna cable to the RF jumper cable.

EvoliumBTS A9110−E 

 VSWR 

detector

RF Jumper Cable

 Antenna Jumper

COBO 

F

 M : N−male connector F : N− female connector

 M  F   M 

Figure 22: VSWR Detector - RF Installation 

36 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 37/74

4 Making the Connections to the BTS

4.2.3 Connecting the Cables

Procedure   1.   Open the COBO

2.   Unscrew the appropriate PG gland

3.   Run the ALARM / VCC cable through that PG gland into COBO

4.   Screw the PG gland with the ALARM/ VCC cable

5.   Connect the ALARM/ VCC wires inside the COBO to the clamp stripslocated on the ABISCO board as shown in Figure  23  .

In a two antenna configuration the isolated wires for VCC-VSWR1 andVCC-VSWR2 and ground (GND) have to be fixed together with the enclosedcable and sleeves and inserted in the described terminals of the ABISCO(See Figure  23  ).

Figure 23: Connecting the ALARM / VCC Cables 

3BK 17422 3081 RJZZA Ed.02   37 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 38/74

4 Making the Connections to the BTS

4.3 Making the Connections to the BTS

One lower slave cannot be equipped because of 12 TRX limitation!Depending on site configuration, you can have  maximum 3 lower slave unitson the 4 possible positions: Slave11, Slave12, Slave 21, Slave 22.

When connecting a slave unit, the position where to plug the IEB cable intomaster unit (S1 or S2 connectors) will determine if it is Slave1 or Slave2.

Purpose

To connect the antenna

To connect the IEB cables in a master-slave configuration.

Procedure   1.   With the integrated antenna option, connect the integrated antennas RFcables to the antenna connector(s) of the micro-BTS unit (master andslaves, as appropriate)

2.   With external antennas, connect the antenna jumper(s) to the antennaconnector(s) of the micro-BTS units (master and slaves) according to theirsector number (See  Information Required (Section 1.8)  )

3.  To install the slave units, connect the IEB cables between the master andslaves:

At the Master unit plug the cable into the“ Conn. to Slave 1 “ or

“ Conn. to Slave 2 “  connector, depending the slave (1 or 2) that is

going to be connected

At the Slave 1  unit plug the cable from master into the  “ Conn. to

Master “ connector. Plug the cable to  Slave 11 into “ Conn. to Slave 1

“ and / or the cable to  Slave 12 into “ Conn. to Slave 2“.

At the Slave 2  unit plug the cable from master into the  “ Conn. to

Master “ connector. Plug the cable to  Slave 21 into “ Conn. to Slave 1

“ and / or the cable to  Slave 22 into “ Conn. to Slave 2“.

At the Slave 11 unit and / or  Slave 12 unit plug the cables from Slave1

into the “ Conn. to Master “  connector.

At the Slave 21 unit and / or Slave 22 unit plug the cable from Slave2

into the “ Conn. to Master “  connector.

38 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 39/74

4 Making the Connections to the BTS

To SLAVE 2

MASTER

To SLAVE 1

From MASTER

SLAVE 1

To SLAVE 11 To SLAVE 12From MASTER

SLAVE 2

To SLAVE 21

SLAVE 12

From SLAVE 1From SLAVE 1

SLAVE 11 SLAVE 21

From SLAVE 2

Figure 24: Connection of IEB PG 11 Glands to COBO for All Modules 

3BK 17422 3081 RJZZA Ed.02   39 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 40/74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 41/74

5 Checking Power Supply and Powering Up

5 Checking Power Supply and Powering Up

This chapter describes how to check the power supply voltage and power upthe micro-BTS units (master and slaves).

Before checking the power supply and powering up the micro-BTS, ensurethat the safety instructions in the SAF procedure are followed ( See  BSS Methods Handbook  ). It is essential that:

The protective earth is connected to the equipment earth terminal

The ACout BTS connectors in the COBOs (Figure  25  ) that feed the

micro-BTS units are disconnected.

3BK 17422 3081 RJZZA Ed.02   41 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 42/74

5 Checking Power Supply and Powering Up

5.1 Case 1: A9110-E BTS Without SSC

Procedure   1.   Check the power panel to make sure the breakers are OFF

2.   Using a multimeter, check at each COBO that there is no voltage between L(line) and N (neutral) , N and PE (protective earth), L and PE (See Figure 25  )

3.   Close the circuit breakers at the power panel

4.  Check the voltage (220 V AC) between line (L) and neutral (N) on theACout BTS connector of each COBO

5.  Check that there is  no voltage between N and PE

6.  Power up the unit by plugging in their ACout BTS connectors.

FIRST power up the master unit, THEN power up the slave units!The slave units MUST be powered up within seconds after poweringup the master unit.

5.2 Case 2: A9110-E BTS With SSC

Procedure   1.   Check the power panel to make sure the SSC breakers are OFF

2.   Check the SSC to make sure main AC switch S1 is off and no green LEDsare lit (See Figure  26  )

3.   Close the circuit breakers at the site power panel

4.   Close main switch S1, the AC mains breaker then the µBTS1, µBTS2,µBTS3 circuit breakers in the SSC

5.   Check the 220 V AC voltage between line (L) and neutral (N) on the ACout

BTS connector (X401) of each COBO (See Figure  25  )

6.  Check that there is  no voltage between N and PE

7.   Check that the Mains Power supply 1 and 2 and Charger LEDs are lit onthe SSC front panel

8.   Push (if necessary) the Battery backup button to on (red LED is not lit)

9.   Power up the A9110-E units by plugging in their ACout BTS connectors.

FIRST power up the master unit, THEN power up the slave units!The slave units MUST be powered up within seconds after poweringup the master unit.

10.  Check that the BTS remains on battery supply if main switch S1 isdisconnected, then set the switch S1 to ON

11.   Push and hold down the Fan Test button and check that the SSC top fansare working.

42 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 43/74

5 Checking Power Supply and Powering Up

If the BTS must be powered down, disconnect the batteries first by pushingthe “ Back-up Off “ switch to ON (red LED is lit), then set the main powerswitch S1 to OFF.

BTS fuses

(T=2.5 A)

FAN fuses

(T=2.5 A)L

N

L

N

SLAVE 1SLAVE 2

X403X404

X401

X402

X400

ACoutBTS

IEC− Conn.

FAN

ACin, Mains

L

L

LL

N

NN

N

PE

PE PE

PE

Figure 25: ACCO Board 

PS1   PS2 PS3

Battery unit

AC Connection Area

S1

Battery back−Up button

Back−UpOff

Power 230V ACSocket AC230V AC mains

µBTS1

µBTS2

µBTS3

Fan Test

Power Supply 1

Power Supply 2

Charger

 Mains

Figure 26: SSC Switch Configuration 

3BK 17422 3081 RJZZA Ed.02   43 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 44/74

5 Checking Power Supply and Powering Up

44 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 45/74

6 Commissioning Tests

6 Commissioning Tests

This chapter describes the following operations:

BTS software downloading

Setting antenna mapping

BTS initialization

Performing BTS inventory

Setting and checking the external alarms

Checking status of modules

Checking the antenna VSWR

Abis loop test

End of commissioning.

Use the antistatic wrist strap when working with the ABISCO board.Check that the BTS is isolated :At the DDF side by disconnecting terminals, from the PCM link comingfrom the network.For installation with SSC, by disconnecting connectors X2, X3 and X4on the connection area.

One lower slave cannot be equipped because of 12 TRX limitation!Depending on site configuration, you can have  maximum 3 lower slave unitson the 4 possible positions: Slave11, Slave12, Slave 21, Slave 22.Configuration is determined by IEB cable connections between units

3BK 17422 3081 RJZZA Ed.02   45 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 46/74

6 Commissioning Tests

6.1 BTS Software Downloading

Start up BTS Terminal   1.   Connect the BTS Terminal cable between the COM1 port of the PC andthe MMI connector (X100) on the ABISCO board of the master unit (SeeFigure  28  )

2.   Launch the BTS Terminal according to the OS used (Windows 2000/XP)3.   At the BTS Terminal enter:

If software upgrade must be performed during commissioning:

User/Group name :UPGRAD

Password :

SUMSUP

If only commissioning must be performed:

User/Group name :

COMMTE

Password :

COMMTE

Click [ Logon ].

The “ Setup Information “ window usually appears.

Set the Baud Rate   If not already done, set the baud rate of the connection and the pathto the Inventar software

1.   If the “ Setup Information “ window is displayed:

Click [ Baudrate ] or choose:

Settings   ⇒   Terminal

2.  Select 115200 and the port under the “ Serial Interface “ tab in the “ BTSTerminal “ part of the window

3.   Select the “ Misc “ tab and if not already done, click [ Browse ] and select thepath to INVENTAR (usually c:\WINVENT\Program\pwinvent.exe)

4.   Click [ Ok ].

Select the terminal   Select   ⇒   BTS Terminal (Evolium BTS)

Set up the connection   File   ⇒   Connect/ Disconnect

OPTION:   Only if the Files are not Already on the PC

1.  Create the directory :   c:\A9110_fls

2.  Copy all the BTS SW files into the above directory.

46 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 47/74

6 Commissioning Tests

Download the BTS With

the BTS TE

1.   Commissioning   ⇒   Download   ⇒   BTS-SW...

If a message asking you to check the  Qmux address appears, set  the correctQmux address and  save it !

Select at “List files of type:” on the left bottom corner:  All files (*.*)Masterfile:   bm*sav**.***   (1) (See   Information

Required    (Section 1.8)   )

CPF File:   00o2av**.ddl   (1)

(1) Click [ Browse ] to give the path of each file:   c:\A9110_fls

2.  Click [ Download ].

Check the Downloading

of the BTS

1.   A disconnection occurs during the download, wait for the connection tobe  re-established

2.  The message “   The connection to the OMU has been established

!   “ appears

3.  The following messages or windows appear during downloading:

No operator action during next 80 seconds!!!

BTS SW download in progress...

Start operational software...

No operator action during next 80 seconds!!!

BTS SW download in progress...

Initialization in progress...

Receiving data...

Reading all RI’s .

If the file downloading stops during several minutes and the BTS Terminalis showing no message or action, perform a second download of the BTS( See Download the BTS With the BTS TE  ( in section 6.1 )  .)

BE PATIENT:   WAIT for the “ Edit frequencies “ window, about 5 mn:

1.   Select the “ Frequency band “ (GSM 900/ DCS 1800/ DCS 1900/ EGSM)

2.   Select the test frequency by clicking [ Add ] or [ Remove ] in “ AvailableARFNs “ list to obtain the correct frequencies in “ Select ARFNs “ list. Thetest frequencies are given by the customer (See   Information Required ( Section 1.8)  ).

3.  Click [ Submit ].

4.  Wait for “Sector mapping” window (See Figure  27 ) to open.

5.   Set the mapping of BTS units ports to sectors, according to the requestedconfiguration and the mapping rules (See Information Required  &  Antenna Port and External Alarm Mapping Rules  (Section D)

6.  Click [ Save ]

7.   Wait for “ Updating flash...” and “ Cabling detection in progress... “ messagesto disappear.

3BK 17422 3081 RJZZA Ed.02   47 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 48/74

6 Commissioning Tests

Figure 27: “ Sector Mapping Micro BTS“ Window 

6.2 BTS Initialization

Initialize Commissioning   1.   At BTS Terminal select:

Commissioning    ⇒   Initialization   ⇒   All sectors...

2. Wait for the “Initialization for commissioning in progress“message to disappear

3.   The “ HW check configuration “ window appears4.   Check that the configuration shown in the “ HW check configuration “

window corresponds to the requested HW configuration (See  Information Required  (Section 1.8)  )

5. Wait for the MTRE and ANX module downloading to finish.

Workaround:   If the “ HW check configuration “ window information does not correspondto the antenna mapping information written in RI (this behaviour appearsusually when the final antenna mapping information is different from the initialinformation), repeat the initialization of all sectors (steps 1 and 2).

48 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 49/74

6 Commissioning Tests

Activation is finished when the options in the commissioning menu becomesactive.

6.3 Performing BTS Inventory1.   Use the tasks specified in CI 08 - Site Equipment Inventory  for:

Adding additional modules in RI

Executing the Inventar program for the BTS

2.  For SSC installation, the SSC is considered as an additional module.

Check that there are no alarms when running the Inventar for BTS. Thismeans that the modules inside the BTS meet the requirements for aspecific customer.

6.4 Setting and Checking the External Alarms

Purpose

To set the external alarm mapping in the RI according to requirements

To check the reporting of external alarms to the BTS TE.

6.4.1 Set and Check the Alarm MappingSet the logical numberof the external alarms

1.  AT BTS Terminal select:

Commissioning    ⇒   Edit Remote Inventory (RI)...

2.   Module selection:   UT_BTS_BCB 17

3.  Click [ Upload ]

4.  Click [ Application part ]

5.   In the “ Application part “ window set the external alarm mapping accordingto the rules in the Appendix (See   Information Required (Section 1.8)  &Antenna Port and External Alarm Mapping Rules (Section D)  )

6.  Click [ Manufacturing part ]

7.   Click [ Write back ] if modifications were made. Wait for “Updating

flash...“ message to disappear.

8.  Click [ Close ].

Loop the External Alarm   Loop the External Alarm Inputs that are not Connected to Their Sensors

1.   On the DDF loop the external alarms that are not connected to their sensorsto avoid reporting of alarms to the  OMC-R

2.   On the ABISCO board of each unit (master or slave) loop the declared alarminputs that do not reach the DDF and are not yet connected to their sensors.

3BK 17422 3081 RJZZA Ed.02   49 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 50/74

6 Commissioning Tests

6.4.2 Test the External Alarms

Check the Alarms   1.  On the BTS Terminal display the external alarms

2.   Monitor   ⇒   Active Alarms

3.   On the BTS Terminal check that there are no external alarms.

Check the Alarms in DDF   If the external alarms are transferred to a terminal block, generate analarm and check its appearance on BTS Terminal

1.   Open the circuits corresponding to the external alarms on the DDF side, byinserting a red disconnecting pin into the terminal block

2.  On the BTS Terminal, check that the appropriate alarm message isgenerated

3.   Close the circuit that has been opened at the terminal block by removing thedisconnecting pin

4.  On the BTS Terminal, check that the external alarm message hasdisappeared.

Check the Alarms That

Do Not Reach the DDF

In COBO (master and slaves)

1.   For the declared external alarms that do not reach the DDF, generate analarm by opening and then closing a loop (See  Connectors Description  ( in section C  )  in appendix for connectors description)

2.   Check alarm reporting on the BTS Terminal.

Note:   If the Fan option was included, check the fan alarm:

1.  Disconnect the fan power supply cable from ACCO board

2.   On the BTS Terminal , check that the alarm is present:

’ BTS1, BTS EXTERN, Air condition (1) ’

3.   Plug in the fan power supply cable and check that the alarm is cleared.

Note:   If the SSC option was included, check the external alarms:

1.   Set the mains switch S1 to OFF to check mains power failure

2.   On the BTS Terminal, check that alarm 2 is present, then set switch S1to ON again

3.   On the BTS Terminal, check that alarm 3 is present (SSC door open) bycompletely closing (with the key) and opening the door.

Note:   If the VSWR option was included, check the external alarms:

1. Make the connections as follows:For A9110-E BTS units with one antenna output:

• use ANT A and the following MTREs for transmission:

UT_TRE 18 or  UT_TRE 19 for  master

UT_TRE 38 or  UT_TRE 39 for  slave 1

UT_TRE 54 or  UT_TRE 55 for  slave 2.

UT_TRE 42 or  UT_TRE 43 for  slave 11.

UT_TRE 46 or  UT_TRE 47 for  slave 12.

UT_TRE 58 or  UT_TRE 59 for  slave 21.

UT_TRE 62 or  UT_TRE 63 for  slave 22.

50 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 51/74

6 Commissioning Tests

For A9110-E BTS units with two antenna outputs

• use ANT A and the following MTREs for transmission:

UT_TRE 19  for  master

UT_TRE 39  for  slave 1

UT_TRE 55  for  slave 2.UT_TRE 43 for  slave 11.

UT_TRE 47 for  slave 12.

UT_TRE 59 for  slave 21.

UT_TRE 63 for  slave 22.

• use ANT B and the following MTREs for transmission:

UT_TRE 18  for  master

UT_TRE 38  for  slave 1

UT_TRE 54  for  slave 2.

UT_TRE 42 for  slave 11.

UT_TRE 46 for  slave 12.

UT_TRE 58 for  slave 21.

UT_TRE 62 for  slave 22.

2. Check if an alarm is present at BTS Terminal:

Commissioning    ⇒   Output Power Test

In the “ Output Power Test “ window select the MTRE Number:

UT_TRE** (See above)

Select one timeslot and click [ On ] to enable the power

Select an attenuation of  -10dB on the used timeslot

Click [ Start ]

Wait for the BTS to start the emission

Disconnect the antenna cable from the RF jumper cable.

As the power level is lower than 50mW you are allowed to disconnect the cable..

Wait 15 seconds to see if an alarm is sent to the BTS Terminal.

At the BTS Terminal choose: Monitor   ⇒   Active alarms

Check that an  Alarm related to the tested  TRE  is present

Connect the antenna cable to the RF jumper cable

Check at the BTS Terminal that no alarms are present

3BK 17422 3081 RJZZA Ed.02   51 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 52/74

6 Commissioning Tests

Click [ Stop ]

Wait for MTRE to stop transmission.

After pressing the [ Stop ] button wait until MTRE stops transmission.Follow the messages that appear in the bottom part of the window,

which indicates the state of MTRE.

3. Repeat the actions from step 2 for all the antenna outputs of all BTSunits (master and slaves).

6.5 Checking the Status of Modules

Check the Status of

the BTS

1.   At BTS Terminal choose:

 Monitor   ⇒   BTS Modules

2.   Check that BTS, CLLK, OMU and EACB are IT

3.   Check that the MTREs and TR_CLK are OP.

Check the Active Alarms   1.   At BTS Terminal choose:

 Monitor   ⇒   Active Alarms

2.  Check that there are no alarms present.

6.6 VSWR Check

Purpose

To connect the BTS to the antenna

To check the Voltage Standing Wave Ration (VSWR) of the transmit antenna.

Before transmitting on the antenna:

Check that transmission is allowed at the nominal frequency

If there are no antennas, measure the VSWR across the load.

The VSWR measurement must be performed for each antenna output!

Connect the Power

Meter/ Reflectometer

Connect the power meter/ reflectometer between the BTS antenna jumperand antenna or load as appropiate

1.   For A9110-E BTS units with one antenna output:

• connect the power meter/ reflectometer to the antenna jumper connectedto ANT A and use the following MTREs for transmission:

UT_TRE 18 or  UT_TRE 19  for  master

UT_TRE 38 or  UT_TRE 39  for  slave 1

UT_TRE 54 or  UT_TRE 55  for  slave 2.

UT_TRE 42 or  UT_TRE 43 for  slave 11.

52 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 53/74

6 Commissioning Tests

UT_TRE 46 or  UT_TRE 47 for  slave 12.

UT_TRE 58 or  UT_TRE 59 for  slave 21.

UT_TRE 62 or  UT_TRE 63 for  slave 22.

2.   For A9110-E BTS units with two antenna outputs

• connect the power meter/ reflectometer to the antenna jumper connectedto ANT A and use the following MTREs for transmission:

UT_TRE 19  for  master

UT_TRE 39  for  slave 1

UT_TRE 55  for  slave 2.

UT_TRE 43  for  slave 11.

UT_TRE 47  for  slave 12.

UT_TRE 59  for  slave 21.

UT_TRE 63  for  slave 22.

• connect the power meter/ reflectometer to the antenna jumper connectedto ANT B and use the following MTREs for transmission:

UT_TRE 18  for  master

UT_TRE 38  for  slave 1

UT_TRE 54  for  slave 2.

UT_TRE 42  for  slave 11.

UT_TRE 46  for  slave 12.UT_TRE 58  for  slave 21.

UT_TRE 62  for  slave 22.

Measure the VSWR   Measure the VSWR of the antenna (VSWR1) or across the load (VSWR2) ifthere is no antenna

Measure the VSWR ofthe antenna (VSWR1) 1.   At BTS Termial choose:

Commissioning    ⇒   Output Power Test

2.   In the “ Output Power Test “ window select the MTRE Number:  UT_TRE**

(See above)

3. All Timeslots: click [ On ] to enable the power

4.   Select an attenuation of  -4dB on each timeslot from TS0 to TS7

5.   Click [ Start ]

6.  Record the VSWR value  (VSWRx):

VSWR 1 when measuring with antenna connected

VSWR 2 when measuring across the load.

7.   Click [ Stop ]

8.   Wait for MTRE to stop transmission.

3BK 17422 3081 RJZZA Ed.02   53 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 54/74

6 Commissioning Tests

Do not disconnect the power meter, the antenna or the load during MTREtransmission. After pressing the [ Stop ] button wait until MTRE stopstransmission.Follow the messages that appear in the bottom part of the window,which indicates the state of MTRE.

Measure the VSWR

(VSWR 2) Using a Load

If antenna VSWR 1 > 1.3 measure the VSWR (VSWR 2) using a load

1.  Instead of antennas use 50 ohm loads

2.   Measure the  VSWR 2  values with the BTS TE in the same way as inMeasure the VSWR of the antenna (VSWR1)

3.   Analyze the results: (See Table  1  )

VSWR 1 is the VSWR value measured in  Measure the VSWR of

the antenna (VSWR1)

VSWR 2 is the VSWR value measured in  Measure the VSWR (VSWR

2) Using a Load.

Value   Sanction   Action

VSWR 2 >1.2   Fault in equipment supplied byAlcatel

Check the tightness of theconnectors

VSWR 2  ≤1.2 and

VSWR 1  ≤1.5

Fault on the feeder or antenna(when present)

Inform the operator that theVSWR is within a critical range

VSWR 2  ≤1.2 and

VSWR 1 >1.5

Fault on the antenna or feeder

(when present)

Report the high reading to the

Site Manager

Table 1: Interpretation of VSWR Results 

Finish the Measurement   1. Disconnect the power meter and reconnect the antenna jumper tothe antenna or load as the case

2. Repeat steps 1 to 4 for all the antenna outputs of all the BTS units(master and slaves)

54 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 55/74

6 Commissioning Tests

6.7 Abis Loop Test

Purpose   To test the PCM cabling between the master unit and DDF.

For Microwave or TNL installation in SSC for PCM connection,  do not performAbis loop test.

Procedure   1. At BTS Terminal choose:

Commissioning    ⇒   Station Unit Test...

The “ Station Unit Test “ window appears.

In the “ Station Unit Test “ window, select “  external loop“

Click [ Start ].

A message appears prompting you to fit the shortcut connector.Do not use any shortcut connector, because you are testing the cabling tothe DDF, not the ABISCO board.

2. At the DDF (not on ABISCO) set up loops between TX and RX for Abis1and Abis2, using wires.

It is important for both Abis links to be looped!

3. At BTS Terminal:

Click [ Ok ]

Remove the loops when the respective message window appears and

then click [ Ok ]

Wait for the test to finish

Check that the list of tests shown in the “ Station Unit Test “ window is  Ok

Click [ Cancel ].

6.8 End of Commissioning

Purpose

To update the Remote Inventory of all the modules according to the site

To perform an inventar in case any modules were changed during

commissioning

To end the commissioning phase

To save the commissioning report.

Procedure   1. At BTS Terminal :Commissioning    ⇒   End 

commissioning 

3BK 17422 3081 RJZZA Ed.02   55 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 56/74

6 Commissioning Tests

2. Check that the commissioning date is correct:

If not, click [ Close ] and click [ Cancel ]

Modify the internal date of the PC (in Control Panel)

Go back to step 1.

3. Give the name of the BTS site (< 10 characters) and the NetworkIdentity.

4. Select all the modules from the list on the left (if any) to enter them inthe “ modules to be updated “ list

Click [ Add ] for all the modules on the left (if any)

Click [ Submit ].

The following message appears:   ”Do you want to execute INVENTAR

now?”

5. Option: If any modules were added or changed during commissioning,run Inventar:

Click [ Yes ]

The “ Receiving Remote Inventory Data “ message appears, and the

INVENTAR application is launched

Use the tasks specified in  CI 08 - Site Equipment Inventory   for the

following actions:

Adding additional modules in RI (if appropiate)

Running Inventar for the BTS.

6. Option: If no modules were added or changed during commissioningclick [ No ]

When you end commissioning, the BTS is automatically reset after about 2minutes (the connection is lost for about 5s).Wait until the connection with the BTS is reestablished.The BTS is then ready for downloading from the BSC.

7. Save the “ Commissioning Report “ window:

Click [ Commissioning Report ] window to make it active

File   ⇒   Save As...

Give a name to the file (Site name and number of BTS  - no more then 8

characters) and save the file to a floppy disk.

56 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 57/74

7 Setting Transmission Module Parameters

7 Setting Transmission Module Parameters

This chapter describes how to configure the transmission module of the SUMboard.

3BK 17422 3081 RJZZA Ed.02   57 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 58/74

7 Setting Transmission Module Parameters

Purpose

To set the Qmux address

To set the OML TS and signalling rate, if this information is provided.

Make sure the BTS is isolated at the DDF from the network beforeproceeding.

Procedure   1. Set the Qmux address:

At BTS Terminal choose:

Settings   ⇒   Transmission   ⇒   Initial Settings...

The “ Receiving current configuration data... “ window appears.

Enter the parameter:Qmux address

Click [ Transmit ]

Click [ Close ].

2. OPTION: Set the position and signalling rate for OML, if required:

Setting the OML TS and signalling rate allows the BTS to load faster from BSCbecause MSUMA will not perform OML autodetection when connecting to Abis.

Settings   ⇒   Transmission   ⇒   Board Configuration...

Click [ Get Config ]

Set the signaling TS number and the signalling rate for OMU 1

Click [ Transmit ]

Click [ Close ].

58 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 59/74

8 Connecting to the BSC

8 Connecting to the BSC

This chapter describes how to connect the BTS to the BSC and verify theOML status.

3BK 17422 3081 RJZZA Ed.02   59 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 60/74

8 Connecting to the BSC

Purpose   To connect the BTS to the BSC and check the OML status.

Procedure   1. Connect the BTS to the BSC:

Check that the BIE connectors are connected

With BTS connected via the “ site “ distribution frame and an “ equipment

“ distribution frame: disconnect the loop between the transmit and

receive terminal blocks on the “ site “ distribution frame

With SSC option: connect the PCM cable to connectors X2, X3 and

X4 in the SSC connection area.

2. Check the state of the OML: on the SUM board check that the OML LEDis ON (indicating the OML is IT).

For further information about downloading the BTS from the BSC andnetwork integration refer to  Add BTS procedure.

60 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 61/74

9 Finishing Commissioning

9 Finishing Commissioning

This chapter describes the final operations before leaving the site.

3BK 17422 3081 RJZZA Ed.02   61 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 62/74

9 Finishing Commissioning

Purpose

To leave the site

To return the commissioning report and inventory files to base.

Procedure   1.  Leave the BTS powered up2.  Leave the log book on site

3.  Close the COBO door

4.  Reposition the front cover and lock the bottom cover (if appropriate)

5.  Close the SSC door (if appropriate)

6.  Check the CCL and the appendices

7.   Remove all other packaging and surplus equipment.

8.   Clean the site

9.   Close the site and hand the keys to the key holder

10.   Return the completed forms and the inventory file related to the operationto base.

62 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 63/74

Appendix A : Abbreviations

Appendix A: Abbreviations

Abis   Abis Interface: Interface between BSC and BTS

ABISCO   ABIS COnnection board

AC   Alternating Current

ACCO   Alternating Current Connection board

AN   Antenna Network

BCB   BTS Control Bus

BCCH   Broadcast Control Channel

BSC   Base Station Controller

BSS   Base Station Subsystem

BTS   Base Transceiver Station

CLK   Clock

COBO   COnnection BOx

CPF   Configuration Parameters File

DC   Direct Current

DDF   Digital Distribution Frame

Dual Rate   Full rate and Half rate

E-GSM   Extended band GSM

ETS   European Telecomunication Standard

FIT   Failure In Time

GSM   Global System for Mobiles (900 MHz)

IEB   Inter Entity Bus (between master and slave units)

MD   Multi Drop

MDT   Manufacturer’s Delegate Testing

MMI   Man Machine Interface

MOCO   MOFRA+COBO

MOFRA   MOunting FRAme

MSC   Mobile Switching Centre

3BK 17422 3081 RJZZA Ed.02   63 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 64/74

Appendix A : Abbreviations

MSUMA   Micro-BTS Station Unit Module

MTRE   Micro-BTS Transceiver

MUX   Multiplexer

O&M   Operation and Maintenance

OMC   Operation and Maintenance Centre

OMC-R   Operation and Maintenance Centre - Radio (OMC of BSS)

OML   Operation and Maintenance Link

OMU   Operation and Maintenance Unit

PCM   Pulse Code Modulation (PCM link = 2.048 Mbit/s terrestrial link)

RF   Radio Frequency

RI   Remote Inventory

RIT   Replaceable ITem

RSL   Radio Signalling Link

SDCCH   Slow Dedicated Control Channel

SBL   Security BLock

SSC   Site Support Cabinet

TCH   Traffic Channel

TRE   TRansceiver Equipment

TREA   TRE - Analog part

TRED   TRE - Digital part

VSWR   Voltage Standing Wave Ratio

XBCB   External BTS Control Bus

XIN   External Input

64 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 65/74

Appendix B : List of Items Required

Appendix B: List of Items Required

Installation Kits   The following table is used to check, on site, the mandatory or optional deliveryitem kits.

The used symbols are:

• mandatory kit

∇  technical choice kit

◊ customer option kit

Optional kits for BTS configuration   Mnemo Reference   Qty

◊  Integrated antenna for GSM band   PUIT - ANTG 3BK 08581 AAAA 1/ unit

◊  Integrated antenna for DCS band   PUIT - ANTD 3BK 08582 AAAA 1/ unit

◊ VSWR detector for GSM band   VSWG 3BK 25062 AAAA 1/ ant

◊ VSWR detector for DCS band   VSWD 3BK 25063 AAAA 1/ ant

.

List of DocumentsRequired

The following table is used to check, at base, the availability of the necessarydocuments.

Catalogue of Techincal and Logistic Information (ITL-PRO) 3DF 00462 0004 AAAGA

Catalogue of Instruction Operation (IO) 3DF 00300 0004 UAZZA

BSS Methods Handbook  release B9 3BK 17422 0002 PCZZA

CI 08 Site Equipment Inventory    3BK 17257 0001 RJZZA

Tools Catalogue for Field Activity    3BK 20458 0001 RJZZA

Site Premises Inspection Form (CEL) 8BL 00704 0015 DRBRA

SPP 36 - Specification for Site Preparation A9110 BTS 8BL 00704 0052 DRAGA

BSS Site Premises Inspection, Post Handover 8BL 00704 0016 DRBRA

A9110 Crane HW Instruction Manual 3BK 20489 AAAA PCZZA

3BK 17422 3081 RJZZA Ed.02   65 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 66/74

Appendix B : List of Items Required

List of Software

Required

The following table is used to check, at base, the availability and version ofthe necessary software;refer to corresponding document for checking theSW version.

Name Version checking

Operating system See Tools Catalogue 

A9110-E BTS commissioning

BTS-Terminal

A9110 BTS-SW

-

B9 Commissioning package/ BTS-TE

B9 Commissioning package/ BTS-SW

.

Tools Required   The following table is used to check, at base, the availability of the necessarytools (See Tools Catalogue  for content checking).

Kit name Reference   Calibration

Utility PC DES 002 NO

Power/ reflectometer DES 003 YES

Basic toolkit OUT 001 NO

Specific toolkit for A9110/A9110-E BTS OUT 006 NO

Test cables and plugs for A9110/A9110-E BTS OUT 013 NO

Radio connection kit OUT 014 NO

66 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 67/74

Appendix C : Description of ABISCO and ACCO Boards

Appendix C: Description of ABISCO and ACCO Boards

ABISCO Boards   .

Figure 28: ABISCO Board for A9110-E 

3BK 17422 3081 RJZZA Ed.02   67 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 68/74

Appendix C : Description of ABISCO and ACCO Boards

X104,X115

X105,X112

X106,X110

X107,X102

X100: MMI

X109

CALCLK 

LED5: ABIS1

LED6: ABIS2

LED7*

see table

X200

LED4

BTS_LMT OK

LED1: SLAVE1

LED2: SLAVE2

LED3: MASTER

LED8 :   MPSON

X108

FCLK 

X211 HDSLX210  ABISTRACE

Figure 29: ABISCO Board for A9110 

68 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 69/74

Appendix C : Description of ABISCO and ACCO Boards

Connectors Description   .

Figure 30: Connectors and LEDs on ABISCO 

3BK 17422 3081 RJZZA Ed.02   69 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 70/74

Appendix C : Description of ABISCO and ACCO Boards

ACCO Board   .

BTS fuses(T=2.5 A)

FAN fuses(T=2.5 A)

L

N

L

N

SLAVE 1SLAVE 2

X403X404

X401

X402

X400

ACout

BTS

IEC− Conn.

FAN

ACin, Mains

L

L

LL

N

NN

N

PE

PE PE

PE

Figure 31: Mechanical Drawing of ACCO 

 AC in

FFKDSA/V1− 7.62 

(FFKDSA/V1− 7.62)

for 2.5 qmm

FFKDSA/V1− 7.62 

ACo2 

ACo1  

X404

X403

X400

LP

T=2 x 2.5 A

T=2 x 1.25 A

GICV 2.5/ 3−GF−7.62

X402

X401

AC

AC BTS

IEC connector(cable lenght ~ 10 cm)

Figure 32: Electrical Drawing of ACCO 

70 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 71/74

Appendix D : Antenna Port and External Alarm Mapping Rules

Appendix D: Antenna Port and External Alarm MappingRules

Rules for antenna port mapping

If there is an antenna port on a  micro-BTS unit (master or slave), thecorresponding field will be completed with the sector number  (1...6)

If there is no antenna port (units with one antenna output or unconnected

slaves) the corresponding port will be completed with 0 (disabled)

Example 1:Master unit with no slaves, two antenna outputs 1x2:

Master port A:  1   Master port B: 1

Example 2:Master-slave configuration  3x4, no diversity

Master port A:  1   Master port B: 0

Slave 1 port A:  1   Slave 1 port B: 0

Slave 11 port A:  2   Slave 11 port B: 0

Slave 12 port A:  2   Slave 12 port B: 0

Slave 2 port A:  3   Slave 2 port B: 0

Slave 21 port A:  3   Slave 21 port B: 0

Example 3:Master-slave configuration  2x6, with diversity

Master port A:  1   Master port B: 1

Slave 1 port A:  2   Slave 1 port B: 2

Slave 11 port A:  2   Slave 11 port B: 2

Slave 12 port A:  2   Slave 12 port B: 2

Slave 2 port A:  1   Slave 2 port B: 1

Slave 21 port A:  1   Slave 21 port B: 1

3BK 17422 3081 RJZZA Ed.02   71 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 72/74

Appendix D : Antenna Port and External Alarm Mapping Rules

Rules for alarm mapping

The mapping for alarms 9-56 are take into consideration only if the slave unitsare installed. Otherwise they are considered disabled and are not reported.

All the alarms that are not used are  set to 255   . This means that they aredisabled.

Select each external alarm  1- 56 (See Figure 28  ) and modify the logicalnumber as required.

If you select [ Default Setting ] in the “Remote Inventory “ window ofUT_BCB_17, the good values will be directly mapped for the alarms, detailed inthe following tables.

Note:   If the Fan Option  was chosen, typical mapping of the fan alarms is:

Ext. alarm(physical)

Number (logical) to bemapped for dedicatedexternal alarm reporting

Refers to...

08 234   Fan Alarm Master

16 235   Fan Alarm Slave 1

24 236   Fan Alarm Slave 2

32 237   Fan Alarm Slave 11

40 238   Fan Alarm Slave 12

48 239   Fan Alarm Slave 21

56 240   Fan Alarm Slave 22

Note:   If the SSC Option was chosen, typical mapping of the SSC alarms is:

Ext. alarm(physical)

Number (logical) to bemapped

Refers to...

01 11   SSC - Battery deep discharge

02 02   SSC - Mains power failure

03 03   SSC - Open door alarm

72 / 74   3BK 17422 3081 RJZZA Ed.02

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 73/74

Appendix D : Antenna Port and External Alarm Mapping Rules

Note:   If the VSWR Option  was chosen, typical mapping of the fan alarms is:

Ext. alarm(physical)

Number (logical) to bemapped

Refers to...

06 241   VSWR1 Alarm Master (ANT A)

07 242   VSWR2 Alarm Master (ANT B)

09 243   VSWR1 Alarm Slave 1 (ANT A)

10 244   VSWR2 Alarm Slave 1 (ANT B)

17 245   VSWR1 Alarm Slave 2 (ANT A)

18 246   VSWR2 Alarm Slave 2 (ANT B)

25 247   VSWR1 Alarm Slave 11 (ANT A)

26 248   VSWR2 Alarm Slave 11 (ANT B)

33 249   VSWR1 Alarm Slave 12 (ANT A)

34 250   VSWR2 Alarm Slave 12 (ANT B)

41 251   VSWR1 Alarm Slave 21 (ANT A)

42 252   VSWR2 Alarm Slave 21 (ANT B)

49 253   VSWR1 Alarm Slave 22 (ANT A)

50 254   VSWR2 Alarm Slave 22 (ANT B)

Note:   Other alarms to be mapped:

Ext. alarm (physical) Ext. alarm (logical) Refers to...

04 04   Door Alarm Master

05 05   PMS Alarm Master

12 12   Door Alarm Slave 1

13 13   PMS Alarm Slave 1

20 20   Door Alarm Slave 2

21 21   PMS Alarm Slave 2

28 28   Door Alarm Slave 11

29 29   PMS Alarm Slave 11

36 36   Door Alarm Slave 12

37 37   PMS Alarm Slave 12

3BK 17422 3081 RJZZA Ed.02   73 / 74

7/25/2019 A9110E UBTS Commissioning

http://slidepdf.com/reader/full/a9110e-ubts-commissioning 74/74

Appendix D : Antenna Port and External Alarm Mapping Rules

Ext. alarm (physical) Ext. alarm (logical) Refers to...

44 44   Door Alarm Slave 21

45 45   PMS Alarm Slave 21

52 52   Door Alarm Slave 22

53 53   PMS Alarm Slave 22

11, 14, 15, 19, 22, 23, 27,30, 31, 35, 38, 39, 43, 46,47, 51, 52, 55

255   — Disabled —

Depending on the options installed, the alarm mapping can be changedaccording to the site situation.