5 15/03/2016 4 24/02/2016 3 16/03/2015 2 19/02/2015 1 07/10/2014 Rev Date Date Drawn Rev Mar-16 RAS 5 Appendidx H - Logitstics Plan Comments Drawing Description A6 TO MANCHESTER AIRPORT RELIEF ROAD LOGISTICS PLAN Updated photos Added Poynton notes Added notes, structure details Updated photos and office areas Added one way access route for structures B007 and B008 Title Buxton Line Woodford Rd - Bramhall Woodford Road West Coast Mainline Styal Rd A555/B5358 Wlmslow Rd A34 / Stanley Rd B001 B002 B004 B012 B013 B004A R010 B010A B008 B007 B006 B005 TR1A TR1B R002A R003 R004 R009 TR1F TR1G R011 TR1 12 TR1 11 TR1 1 TR1 2 TR1 3 CHESTER ROAD OFFICES AND COMPOUND B001 OFFICES AND COMPOUND B002 OFFICES AND A6 TO MANCHESTER AIRPORT RELIEF ROAD LOGISTICS PLAN B014 B015 RO16 TR1M B003 STYAL ROAD OFFICES AND COMPOUND M56 West and M6 M60 North and West M60 North and West South (via Wilmslow) M60 East Derbyshire quarries and South East Chester Rd Link Notes Compounds Storage compound areas are shown on the plan in strategic locations to assist with the transfer of materials throughout the job with adequate provision for loading, unloading and storage of materials and equipment within these areas. Three main site compounds (for storage, office, parking, etc.) will be set up near Styal road, Chester Road and Buxton Road. Detailed views of these can be seen on the drawings Appendix H – Styal Road Compound, Appendix H – Chester Road Compound, and Appendix H – Buxton Road Compound. Offices and welfare facilities Site offices are to be set up within the three main compound areas with a pedestrian crossing facility to be provided close to the Buxton Road compound for safe access to construction works. Each office will provide both working space and welfare amenities. Further facilities will also be provided for fuel storage, laboratory testing, first aid, and changing rooms in the main compound at Chester Road. In more remote areas of the construction works portable welfare facilities will be provided as required. Parking Car parking locations are indicatively shown on the plan with main parking areas to be found at the three main office site compounds. Additional parking areas have been identified to provide for access to structures during construction along the route which can be found near Wilmslow Road/A555 junction, Dairy House Lane, Woodford Road Bramhall/A555 junction, Woodford Road Poynton, and Macclesfield Road. Parking facilities have been identified within close proximity of the construction works wherever possible, with any pedestrian routes from the parking to work sites being identified on the drawing. Where parking is not available close to the new structures it is proposed that transportation (works bus) from identified parking sites will be provided for contractors to access the works. Haul routes Haul routes for construction and delivery vehicles are shown for both non-public and public roads with additional vehicular access to structures also shown. At any intersection between a haul route on a non-public road and a public road there will be a wheel wash provided to minimise the deposit of extraneous matter onto the public road. Controlled crossings for plant will be provided at Styal Road and Macclesfield Road. Cranes Indicative details of cranes to be used at the structures throughout the site can be seen on in the structures key opposite. In addition, it will also be necessary for an 80 tonne mobile support crane to be used at each of the bridge structures. Suggested positions of the main cranes for structures B001, B002, B005, B007, B010A, B014, and B015 are available in more detailed drawings Code Description Crane(s) required B001 A6 bus overbridge Liebher LTM 1160 - 160 tonne mobile B002 Hazel Grove to Buxton railway overbridge Liebher LTM 1080 - 80 tonne mobile (East side) Demag AC200 - 200 tonne mobile (West side) B003 Old Mill Lane accommodation bridge Demag AC200 - 200 tonne mobile B004 Prow bridge over Norbury Brook Liebher LTM 1080 - 80 tonne mobile B004A Macclesfield Road bridge extension Liebher LTM 1080 - 80 tonne mobile B005 Mill Hill hollow bridge Liebher LTM 1400 - 400 tonne mobile B006 Hill Green accommodation bridge Demag AC200 - 200 tonne mobile B007 Woodford Road, Poynton bridge Demag AC200 - 200 tonne mobile B008 Westcoast main line bridge Liebher LTM 1400 - 400 tonne mobile B010A Woodford Road bridge Liebher LTM 1400 - 400 tonne mobile B012 Yew Tree accommodation bridge Liebher LTM 1080 - 80 tonne mobile B013 Styal railway bridge Liebher LTM 1800 - 800 tonne mobile B014 Styal Road - east bridge structure Demag AC200 - 200 tonne mobile Liebher LTM 1400 - 400 tonne mobile B015 Styal Road - west bridge structure Demag AC200 - 200 tonne mobile Liebher LTM 1400 - 400 tonne mobile R002A Retaining wall Liebher LTM 1080 - 80 tonne mobile R003 Retaining wall Liebher LTM 1080 - 80 tonne mobile R004 Retaining wall Liebher LTM 1080 - 80 tonne mobile R009 Retaining wall Liebher LTM 1080 - 80 tonne mobile R010 Retaining wall Liebher LTM 1080 - 80 tonne mobile R011 Retaining wall Liebher LTM 1080 - 80 tonne mobile R016 Retaining wall Liebher LTM 1080 - 80 tonne mobile TR1 1 Gantry Liebher LTM 1080 - 80 tonne mobile TR1 11 Dairy House Lane culvert Liebher LTM 1080 - 80 tonne mobile TR1 12 Spath Brook culvert extension Liebher LTM 1080 - 80 tonne mobile TR1 2 Gantry Liebher LTM 1080 - 80 tonne mobile TR1 3 Gantry Liebher LTM 1080 - 80 tonne mobile TR1A Retaining wall Liebher LTM 1080 - 80 tonne mobile TR1B Retaining wall Liebher LTM 1080 - 80 tonne mobile TR1F Retaining wall Liebher LTM 1080 - 80 tonne mobile TR1G Retaining wall Liebher LTM 1080 - 80 tonne mobile TR1M Retaining structure Liebher LTM 1080 - 80 tonne mobile Structures Key Dairyhouse Lane KEY TOPSOIL STOCKPILE AREAS COMPOUND / LAYDOWN AREAS STRUCTURE OFFICE / WELFARE ACCOMMODATION AREA (DETAILED VIEW AVAILABLE) PLANT CROSSING GANTRY HAUL ROUTES ON NON-PUBLIC ROADS HAUL ROUTES ON PUBLIC ROADS ONE WAY ROUTE FOR ACCESS TO STRUCTURES ON PUBLIC ROADS CAR PARKING All works will be carried out in accordance with A6 to MARR Code of Construction Practice PEDESTRIAN ACCESS TO WORKS 21916m 3 Topsoil BRIDGE CONSTRUCTION CRANE POSITION (DETAILED VIEW AVAILABLE) WOODFORD REC SATELLITE OFFICES AND COMPOUND Permitted route for secondary construction traffic. Generally light vehicles, but occasional HGVs. SHENTONS OFFICES AND COMPOUND Woodford Road Offices Styal Road Offices Shentons Offices A523 Macclesfield Rd A6 Buxton Rd Access to structures B007 and B008 is gained through a one way system as shown. Entering from the A5143 and exiting onto the A5149 Chester Road. During movements of abnormal loads temporary mobile traffic lights will be used to control the narrowing at Norbury Brook

Upload: vominh

Post on 04-Jan-2017

223 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: A6MARR - Logistics Plan - Rev 5 - Mar 2016.xlsx

5 15/03/2016

4 24/02/2016

3 16/03/2015

2 19/02/2015

1 07/10/2014

Rev Date

Date Drawn Rev

Mar-16 RAS 5Appendidx H - Logitstics Plan

Comments

Drawing Description

A6 TO MANCHESTER AIRPORT RELIEF ROAD

LOGISTICS PLAN

Updated photos

Added Poynton notes

Added notes, structure details

Updated photos and office areas

Added one way access route for structures B007 and B008

Title

Buxton Line

Woodford Rd - Bramhall

Woodford Road

West Coast Mainline

Styal Rd

A555/B5358 Wlmslow Rd

A34 / Stanley Rd

B001

B002

B004

B012

B013

B004A

R010

B010A

B008

B007

B006

B005

TR1A

TR1B

R002A

R003

R004

R009

TR1F

TR1G

R011

TR1 12

TR1 11

TR1 1

TR1 2

TR1 3

CHESTER ROAD

OFFICES AND

COMPOUND

B001

OFFICES AND

COMPOUND

B002

OFFICES AND

A6 TO MANCHESTER

AIRPORT RELIEF ROAD

LOGISTICS PLAN

B014

B015

RO16

TR1M

B003

STYAL ROAD

OFFICES AND

COMPOUND

M56 West and M6

M60 North and West

M60 North and West

South (via Wilmslow)

M60 East

Derbyshire quarries

and South East

Chester Rd Link

Notes

Compounds

Storage compound areas are shown on the plan in strategic locations to assist with the transfer of materials throughout the job with adequate provision for loading, unloading and storage of

materials and equipment within these areas. Three main site compounds (for storage, office, parking, etc.) will be set up near Styal road, Chester Road and Buxton Road. Detailed views of

these can be seen on the drawings Appendix H – Styal Road Compound, Appendix H – Chester Road Compound, and Appendix H – Buxton Road Compound.

Offices and welfare facilities

Site offices are to be set up within the three main compound areas with a pedestrian crossing facility to be provided close to the Buxton Road compound for safe access to construction works.

Each office will provide both working space and welfare amenities. Further facilities will also be provided for fuel storage, laboratory testing, first aid, and changing rooms in the main

compound at Chester Road. In more remote areas of the construction works portable welfare facilities will be provided as required.

Parking

Car parking locations are indicatively shown on the plan with main parking areas to be found at the three main office site compounds. Additional parking areas have been identified to provide

for access to structures during construction along the route which can be found near Wilmslow Road/A555 junction, Dairy House Lane, Woodford Road Bramhall/A555 junction, Woodford

Road Poynton, and Macclesfield Road. Parking facilities have been identified within close proximity of the construction works wherever possible, with any pedestrian routes from the parking

to work sites being identified on the drawing. Where parking is not available close to the new structures it is proposed that transportation (works bus) from identified parking sites will be

provided for contractors to access the works.

Haul routes

Haul routes for construction and delivery vehicles are shown for both non-public and public roads with additional vehicular access to structures also shown. At any intersection between a haul

route on a non-public road and a public road there will be a wheel wash provided to minimise the deposit of extraneous matter onto the public road. Controlled crossings for plant will be

provided at Styal Road and Macclesfield Road.

Cranes

Indicative details of cranes to be used at the structures throughout the site can be seen on in the structures key opposite. In addition, it will also be necessary for an 80 tonne mobile support

crane to be used at each of the bridge structures. Suggested positions of the main cranes for structures B001, B002, B005, B007, B010A, B014, and B015 are available in more detailed

drawings

Code Description Crane(s) required

B001 A6 bus overbridge Liebher LTM 1160 - 160 tonne mobile

B002 Hazel Grove to Buxton railway overbridgeLiebher LTM 1080 - 80 tonne mobile (East side)

Demag AC200 - 200 tonne mobile (West side)

B003 Old Mill Lane accommodation bridge Demag AC200 - 200 tonne mobile

B004 Prow bridge over Norbury Brook Liebher LTM 1080 - 80 tonne mobile

B004A Macclesfield Road bridge extension Liebher LTM 1080 - 80 tonne mobile

B005 Mill Hill hollow bridge Liebher LTM 1400 - 400 tonne mobile

B006 Hill Green accommodation bridge Demag AC200 - 200 tonne mobile

B007 Woodford Road, Poynton bridge Demag AC200 - 200 tonne mobile

B008 Westcoast main line bridge Liebher LTM 1400 - 400 tonne mobile

B010A Woodford Road bridge Liebher LTM 1400 - 400 tonne mobile

B012 Yew Tree accommodation bridge Liebher LTM 1080 - 80 tonne mobile

B013 Styal railway bridge Liebher LTM 1800 - 800 tonne mobile

B014 Styal Road - east bridge structureDemag AC200 - 200 tonne mobile

Liebher LTM 1400 - 400 tonne mobile

B015 Styal Road - west bridge structureDemag AC200 - 200 tonne mobile

Liebher LTM 1400 - 400 tonne mobile

R002A Retaining wall Liebher LTM 1080 - 80 tonne mobile

R003 Retaining wall Liebher LTM 1080 - 80 tonne mobile

R004 Retaining wall Liebher LTM 1080 - 80 tonne mobile

R009 Retaining wall Liebher LTM 1080 - 80 tonne mobile

R010 Retaining wall Liebher LTM 1080 - 80 tonne mobile

R011 Retaining wall Liebher LTM 1080 - 80 tonne mobile

R016 Retaining wall Liebher LTM 1080 - 80 tonne mobile

TR1 1 Gantry Liebher LTM 1080 - 80 tonne mobile

TR1 11 Dairy House Lane culvert Liebher LTM 1080 - 80 tonne mobile

TR1 12 Spath Brook culvert extension Liebher LTM 1080 - 80 tonne mobile

TR1 2 Gantry Liebher LTM 1080 - 80 tonne mobile

TR1 3 Gantry Liebher LTM 1080 - 80 tonne mobile

TR1A Retaining wall Liebher LTM 1080 - 80 tonne mobile

TR1B Retaining wall Liebher LTM 1080 - 80 tonne mobile

TR1F Retaining wall Liebher LTM 1080 - 80 tonne mobile

TR1G Retaining wall Liebher LTM 1080 - 80 tonne mobile

TR1M Retaining structure Liebher LTM 1080 - 80 tonne mobile

Structures Key

Dairyhouse Lane

KEY

TOPSOIL STOCKPILE AREAS

COMPOUND / LAYDOWN AREAS

STRUCTURE

OFFICE / WELFARE ACCOMMODATION AREA(DETAILED VIEW AVAILABLE)

PLANT CROSSING

GANTRY

HAUL ROUTES ON NON-PUBLIC ROADSHAUL ROUTES ON PUBLIC ROADS

ONE WAY ROUTE FOR ACCESS TO STRUCTURES ON PUBLIC ROADS

CAR PARKING All works will be carried out in accordance with

A6 to MARR

Code of Construction PracticePEDESTRIAN ACCESS TO WORKS

21916m3

Topsoil

BRIDGE CONSTRUCTION CRANE POSITION(DETAILED VIEW AVAILABLE)

WOODFORD REC

SATELLITE OFFICES

AND COMPOUND

Permitted route for secondary construction traffic.Generally light vehicles, but occasional HGVs.

SHENTONS

OFFICES AND

COMPOUND

Woodford Road Offices

Styal Road Offices

Shentons Offices

A523 Macclesfield Rd

A6 Buxton Rd

Access to structures B007 and B008 is gained through a one way system as shown. Entering from the A5143

and exiting onto the A5149 Chester Road.During movements of abnormal loads temporary mobile

traffic lights will be used to control the narrowing at Norbury Brook