a3 opal ii & opal eh ts 4.5-3 instruction 8...outlet on the base of cistern. remove inlet valve...
TRANSCRIPT
![Page 1: A3 Opal II & Opal EH TS 4.5-3 Instruction 8...outlet on the base of cistern. Remove inlet valve to gain access to the right hand cistern fixing hole. 2-Position cistern onto pan, and](https://reader030.vdocuments.us/reader030/viewer/2022040401/5e7bafb7357939636d32a562/html5/thumbnails/1.jpg)
PLUMBERS INSTALLATION INSTRUCTIONSFor Vitreous China Opal II & Opal II Easy Height Toilet Suite
PLEASE READ CAREFULLY BEFORE INSTALLATION
ROUGHING IN:
The Opal II and Opal II Easy Height pans are universal for both ‘S’ and ‘P’-Trap installations as detailed. The recommended set-out for ‘S’-Trap installations is 140mm from the finished wall with set-out flexibility for existing soil pipe positions ranging from 60mm to 220mm and 25mm sideways adjustment with the Uni-Orbital® connector supplied, as detailed in Fig. 2.
The cistern is only suitable for back inlet connection. It is essential that the cold water connection (1/2” B.S.P. Connection Nipple) be accurately positioned in the wall as detailed in Fig. 1. Allow for recommended bedding height of 10mm from back of pan when applicable.
‘S’- TRAP CONNECTOR FIXING PROCEDURE
1- Mark centre line of the pan on finished wall, as detailed in Fig. 1. This is to be used as a guide when connecting the pan. The centre line can be offset by up to 25mm from the soil pipe, as detailed in Fig. 2.
2- Determine set-out "C" of existing pan connector, as detailed in Fig. 2. Set-out range 60mm - 220mm. Recommended set-out 140mm, as detailed in Fig. 3. For ‘P’ trap installation see Fig. 5. 3- For installation of the Uni-Orbital® connector, reference must be made to the instructions supplied with the Uni-Orbital® connector.
4- Prepare for pan fixing method (either bedding or bracket installation) as detailed below.
PAN FIXING PROCEDURE
Pan bedding:
1- Remove an area of tiles which are within the internal area covered by the foot of the pan to expose the sub floor and provide a bondage key for the bedding mixture.
2- Ensure that the bedding area is clean and free of building material.
3- Locate blanking cap (supplied) into pan fixing holes as detailed in Fig. 6.
4- Prepare bedding sand cement mixture 3:1 to depth of 60mm as detailed in Fig. 3. Note: Do not fill the foot of the pan with bedding mix or include lime or fast drying cement into the mix, these may cause cracking in the foot of the pan.
5- Position and push pan into connector using the marked centre line on the wall as a guide and level pan into bedding mixture, so that the back of the foot of the pan is approximately 10mm above the finished floor as detailed in Fig. 4. It is recommended that wedges are used to support the foot of the pan during the positioning.
6- Locate the cistern on to the pan and check that the cistern is level (side to side) and aligned with the tiling edges. Adjust pan position if necessary. Allow bedding mixture to set for at least 24 hours prior to use.
Bracket fixing:
1- Position and push pan into connector using the marked centre line on the wall as a guide and locate the cistern onto the pan, checking that the cistern aligns with the finished wall. Adjust pan position if necessary. Remove the cistern and pan.
2- Locate the D82 Concealed Fixing Brackets into position on centre line of pan 300mm from the finished wall and mark bracket fixing hole centres on finished floor.
3- Drill two holes in the marked positions on the floor. The hole diameter is dependent on the type of fixing system and floor finish.
4- Secure Brackets to finished floor.
5- Ensure that the area around the floor is clean and free from building material.
6- Run a bead of acetic cured silicone sealant at a height of 8mm approximately fully around the foot of the pan which contacts the floor. Use Wedges around the foot base (if required) so that the maximum height of silicone sealant is not greater that 5mm on completion on bedding.
7- Connect pan to connector and locate plastic sleeve into holes in the pan. Fit screw into the bracket and tighten to bed pan to floor while ensuring level, as detailed in Fig. 7. IMPORTANT-DO NOT OVER TIGHTEN, AS THIS MAY CRACK THE PAN FOOT. Snap on plastic cap, as detailed in Fig. 7.
8- Provide support under the pan foot so that it is maintained in the levelled position while the silicone sealant sets. Remove any excess sealant to provide a neat joint between the pan and the floor. Allow at least 24 hours for the bedding sealant to set before use.
CISTERN FIXING PROCEDURE
Note: The cistern fixes directly to the pan with a robust base fixing system without the need for wall fixing.
Back inlet installation:
1- Securely attach the self-adhesive foam seal around the outlet on the base of cistern. Remove inlet valve to gain access to the right hand cistern fixing hole.
2- Position cistern onto pan, and align the cistern fixing holes with the threaded fixing holes located in the cistern platform.
3- Ensure that the back inlet water connection nipple is aligned with the cut out in the back of the cistern. Fit the seals onto the winged fixing bolts.
4- Insert the winged fixing bolts through the cistern fixing holes into the threaded fixing holes located in the pan. Gradually tighten the left and right hand nuts by hand to firmly secure the cistern to pan, as detailed in Fig. 10.
5- Fit cistern stop valve (supplied) to the 1/2” B.S.P. nipple in the wall using approved thread seal, in the downward angled position 45° to the right hand side, as detailed in Fig. 9.
6- Refit the inlet valve into position.
7- Flush the lines before connecting the flexible hose to the cistern stop valve and ensure the hose is not rubbing against the inside of the cistern.
8- Turn on water mains. Open cistern stop valve and check for leaks and operation of mechanisms and valves. Ensure there is no leakage from the cistern into the pan. 9- Adjust water level to the 4.5 litre water level mark inside the cistern by simply turning the float arm screw in a clockwise or anti-clockwise direction as detailed in Fig. 9.
10- Fit cistern lid to check push button operation to complete installation.
Issue No: 8Date of Issue: 04/09/14
Foamseal
Wingedfixing bolt
Seal
Cistern
Pan Capturednut toggle
10m
m b
edde
d po
sitio
n5m
m s
ilicon
e
Level pan when bedding
185
140
mm
Rec
omm
ende
dR
ange
60m
m -
220
mm
220Pan outlet
Fig. 8
Fig. 4 Fig. 5
Fig. 2
Pan Uni-Orbital® Connector Set-Out Dimension 'C'
‘S’ Trap Bedding Installation ‘P’ Trap Bedding Installation
10 m
m b
edde
d po
sitio
n5m
m s
ilicon
e
185
Fig. 11
Fig. 10
D82 Concealed Fixing Brackets
Cap
Plastic Sleeve
ConcealedFixing Bracket
D82 Concealed BracketFixing Centre
260
185
220
300
140 recommended (range 60 – 220mmwith Uni-Orbital® connector supplied)
Pan outlet
Stop Valve and Inlet Valve Detail
Increase water
levelDecrease waterlevel
Note: For back inlet installations the workingpressure minimum 30 kPa to maximum1000 kPa flow pressure
Finished Wall
Pan footlevel
100mm PVC DWVsoil pipe
Recommended set-outdimension 140mm
Set-out range60mm - 220mm
“C”
Pan seal
220
60
Wasteoutlet
Level pan when beddingPush pan onto
Uni-Orbital® connector
Push pan onto connector
Fig. 1
Pan Connection
1/2” B.S.P.Nipple
Finishedwall
Important22mm
projection from wall
Important:Pan foot level
Mark centre line of pan on wall. This can be offset by up to 50mm from the soile pipe, as detailed in Fig. 2.
“A”
Cen
tre
of b
ack
inle
t con
nect
ion
“B”
110
Dimensions A BOpal II 750 395Opal II EH 785 435
All measurements are subject to accepted manufacturing tolerances.To ensure accuracy please check actual product dimensions before drilling for installation.The manufacturer reserves the right to change specifications at any time without giving prior notification.This product should be installed by a qualified plumber. Local authority, Water Board, and Building Regulations may apply to the installation of this product, and you should consult the appropriate bodies on these requirements.
IMPORTANTTO ACHIEVE A SATISFACTORY 4.5/3LFLUSH PERFORMANCE AND A 4 STARWATER EFFICIENCY RATING THE CISTERNMUST BE MATCHED WITH A COMPATIBLECAROMA SMARTFLUSH 4.5/3L TOILET PAN.
Fig. 9
Fig. 6
Fig. 7
Fixing Hole Cover Detail for Bedding Installations
Bracket Fixing Detail
Blankingcap
Pan foot
Cap
Fixinghead
Pan foot
Siliconebedding
Threaded stud
D82 ConcealedFixing Bracket
Plastic sleeve
395
Pan footlevel
Relieve bed around pan connector
Finished Wall
185
260Fixed installation
dimension for all set-outs
From
pan
foot
leve
l
ImportantPan footlevel
Det
erm
ine
cutti
nghe
ight
Preparation For Bedding
Fig. 3 140mm Recommended*
*
Bed height60mm
Uni-Orbital® connectorcan be positionedanywhere in shaded area in a 25mm arc
25