a3-00 - · pdf filea3-00 enlarged new work floor plan - area a 1/4" = 1'-0" 1...

6

Upload: dodan

Post on 07-Feb-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A3-00 -  · PDF fileA3-00 Enlarged New Work Floor Plan - Area A 1/4" = 1'-0" 1 FGM Statement of Intellectual Property The ideas, concepts, drawings and thoughts conveyed
Page 2: A3-00 -  · PDF fileA3-00 Enlarged New Work Floor Plan - Area A 1/4" = 1'-0" 1 FGM Statement of Intellectual Property The ideas, concepts, drawings and thoughts conveyed
Page 3: A3-00 -  · PDF fileA3-00 Enlarged New Work Floor Plan - Area A 1/4" = 1'-0" 1 FGM Statement of Intellectual Property The ideas, concepts, drawings and thoughts conveyed

OFFICEEXISTING

ART ROOMEXISTING D01

D02

D02

D03

D01

D04

D05

D06

D07

D08

D09

D10

D11D12

D13

D14

D15

D15

D18D16 D17

D19

D20

D08

D04

D05

D10

D21

D21

D11

D10

D14

D01

D22

D01D23D24

D23D24

D08

D23D08

D25

D18

D16D17

D26

VESTIBULEEXISTING

COORIDOREXISTINGD45D45 D46 D46

D47

D47

D45 D46

D49

D249

D51

D41

D42

D43

D35

D35

D35

D35

D41

D27

D44D36 D37

D36 D37

D32

D32

D40

D40

D08

D30

D30

D30

D15

D15

D15

D15

D42

D15

D15

D15

D15

D34

D34

D31

D31

D15

D28

D28

D34

D34

D48

D36A

D36A

D37A

D37A

D52

D34

D35

D27

D38

D39

D40

D15

D08

D30D30

D32

D31 D31

D33

D36 D37

D25 D28D08 D45 D46D48 D50

D34

D37A

D36A

D27

D15

D25 D28D29

D08

D30D31

D32

D33

D34D34

D35

D36 D37

D45 D46

D39

D48

D48D48

D34

D50

D49

D37A

D36A

ENLARGED DEMOFLOOR PLANS

A3-00

Enlarged New Work Floor Plan - Area A1/4" = 1'-0"

1

FGM

Statement of Intellectual Property

The ideas, concepts, drawings and thoughts conveyedherein are the intellectual property of PARTNERS inArchitecture, PLC, 65 Market Street, Mount Clemens, MI,48043 (P 586.469.3600). This set of drawings, in whole orin part, may not be reproduced, without the written consentof PARTNERS in Architecture, PLC. This information isprotected under U.S. Copyright Law, all rights reserved.

© Copyright 2015

65 MARKET STREETMOUNT CLEMENS, MI 48043P 586.469.3600F 586.469.3607

CONSULTANT

OWNER

PROJECT NAME

ISSUES / REVISIONS

DRAWN BY

CHECKED BY

APPROVED BY

SHEET NO.

SHEET NAME

KEY PLAN

PROJECT NO.

Van Dyke Public Schools

23500 MacArthur Blvd.Warren, MI 48089

Kennedy EarlyChildhood Center Renovations

11333 Kaltz Ave.Warren, MI 48089

15-114

Bidding / Construction 04/23/2015

CDG

MAM

NORTH

B

A

C

D

REMOVE MARKER, TACK OR CHALK BOARD AND ALL ASSOCIATEDCOMPONENTS - CLEAN, GRIND AND POINT MASONRY WALLS SCHEDULED TOREMAIN TO PROVIDE FOR A LIKE-NEW APPEARANCE

REMOVE SURFACE MOUNTED RACEWAY AND PATCH WALL FOR A LIKE-NEWAPPEARANCE - COORDINATE WITH ELECTRICAL

REMOVE WALL MOUNTED WIRE RACK AND PATCH WALL FOR A LIKE-NEWAPPEARANCE

REMOVE CLOCK, BACK BOX AND ASSOCIATED COMPONENTS AND SALVAGEFOR REINSTALLATION - PULL WIRE BACK OUT FOR CONSTRUCTION AREA FORRECONNECTION UPON COMPLETION OF CONSTRUCTION - COORDINATE WITHELECTRICAL

REMOVE PA SPEAKER AND ASSOCIATED COMPONENTS AND SALVAGE FORREINSTALLATION - PULL WIRE BACK OUT FOR CONSTRUCTION AREA FORRECONNECTION UPON COMPLETION OF CONSTRUCTION - COORDINATE WITHELECTRICAL

REMOVE CALL BUTTON AND ASSOCIATED COMPONENTS - COORDINATE WITHELECTRICAL

REMOVE WALL MOUNTED THERMOSTAT AND ALL ASSOCIATED COMPONENTS- COORDINATE WITH MECHANICAL

REMOVE MASONRY BLOCK WALL AND ALL ASSOCIATED COMPONENTS -PATCH INTERSECTING/ADJACENT MASONRY WALLS WITH NEW TOOTHED-INMASONRY BLOCK AND/OR BULLNOSE JAMBS FOR A LIKE-NEW APPEARANCE -PATCH FLOOR AS REQUIRED FOR FLUSH INSTALL OF NEW FINISHES

REMOVE MASONRY AS REQUIRED FOR NEW WORK - COORDINATE EXISTINGRETURN AIR SHAFT OPENING WITH NEW WORK AND MECHANICAL

REMOVE GYPSUM BOARD SOFFIT AND ALL ASSOCIATED COMPONENTS -CLEAN, GRIND AND POINT MASONRY WALLS SCHEDULED TO REMAIN TOPROVIDE FOR A LIKE-NEW APPEARANCE

REMOVE CEILING MOUNTED MECHANICAL UNIT AND ALL ASSOCIATEDCOMPONENTS - COORDINATE WITH MECHANICAL

REMOVE WALL MOUNTED SHELF TRACK AND PATCH WALL FOR A LIKE-NEWAPPEARANCE

REMOVE WALL MOUNTED WOOD BLOCKING AND PATCH WALL FOR ALIKE-NEW APPEARANCE

WINDOW BLINDS AND ASSOCIATED COMPONENTS TO REMAIN - CLEAN ALLPARTS AND VERTICAL SLATS FOR A LIKE-NEW APPEARANCE

REMOVE LIGHT FIXTURES - COORDINATE WITH ELECTRICAL

REMOVE EXISTING VCT FLOORING - PREP AND PATCH FLOOR AS REQUIREDFOR FLUSH INSTALLATION OF NEW FLOOR FINISHES

REMOVE EXISTING TILE FLOOR BASE AND PATCH WALL FOR A LIKE-NEWAPPEARANCE

REMOVE LAY-IN CEILING GRID AND ALL ASSOCIATED COMPONENTS - MODIFYEXISTING CEILING GRID IF PORTION IS SCHEDULED TO REMAIN PER NEWWORK

REMOVE BI-FOLD DOORS, FRAME AND ASSOCIATED COMPONENTS AND PATCHWALL FOR A LIKE-NEW APPEARANCE

REMOVE PORTION OF FACE BRICK WALL AND SALVAGE BRICK FOR NEW JAMBRETURNS WITHIN THIS OPENING - TOOTHED-IN FACE BRICK AT JAMBS FOR ALIKE-NEW APPEARANCE - PATCH FLOOR AS REQUIRED FOR FLUSH INSTALL OFNEW FINISHES

REMOVE WALL MOUNTED SPEAKERS AND RETURN TO OWNER

REMOVE FIRE ALARM PULL STATION - COORDINATE WITH ELECTRICAL

REMOVE A PORTION OF EXISTING CASEWORK AND COUNTERTOP - MODIFY ASREQUIRED FOR A LIKE-NEW APPEARANCE WITH ALL EXPOSED SURFACES WITHMATCHING FINISHES - PATCH FLOOR AND WALL AS REQUIRED FOR FLUSHINSTALL OF NEW FINISHES AND FOR A LIKE-NEW APPEARANCE

EXISTING CASEWORK AND COUNTERTOP TO REMAIN - MODIFY AS REQUIREDFOR NEW WORK

DOOR, FRAME AND HARDWARE TO ME REMOVE FOR NEW WORK

REMOVE FENCE POSTS, FABRIC AND ALL ASSOCIATED COMPONENTS - PATCHCONCRETE FOR A LIKE-NEW APPEARANCE

REMOVE WALL MOUNTED MIRROR AND ASSOCIATED COMPONENTS

REMOVE STONE THRESHOLD AND PREP FOR NEW WORK

REMOVE DRINKING FOUNTAIN - COORDINATE WITH MECHANICAL ANDELECTRICAL

REMOVE PAPER TOWEL DISPENSER COMPLETE

REMOVE EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED COMPONENTSAND PREP FOR NEW WORK - COORDINATE WITH MECHANICAL

REMOVE EXISTING TOILET PARTITIONS AND ASSOCIATED COMPONENTS

REMOVE EXISTING FLOOR DRAIN COVER AND PREP FOR NEW COVER -COORDINATE WITH MECHANICAL

REMOVE EXISTING PLUMBING FIXTURE AND SALVAGE FOR REINSTALLATION -COORDINATE WITH MECHANICAL

REMOVE SOAP DISPENSER COMPLETE

PREPARE EXISTING C.T. FLOOR FINISH TO RECEIVE NEW C.T. FINISH PER TCNAMETHOD TR713-12 - MECHANICALLY ABRADE EXISTING TILE SURFACE WITHCARBIDE DISK.

REMOVE MIN 6'-0" OF C.T. FLOOR TO TRANSITION NEW FINISH FLOORELEVATION TO NEW THRESHOLD ELEVATION AND EXISTING FINISH FLOOR.

PREPARE EXISTING C.T. WALL FINISH TO RECEIVE NEW C.T. FINISH PER TCNAMETHOD TR713-12 - MECHANICALLY ABRADE EXISTING TILE SURFACE WITHCARBIDE DISK.

REMOVE EXISTING C.T WALL/FLOOR FINISH AT RECESS AS REQ'D TOCOMPLETE NEW INSTALLATION AND ADAPT TO NEW FINISH SURFACE - REFERTO MECH/ELEC FOR ADDITIONAL EQUIPMENT SCOPE.

REMOVE AND SALVAGE WALL MOUNTED BABY CHANGING STATION FORREINSTALLATION

REMOVE EXISTING CEILING MOUNTED EXHAUST GRILL AND PREP FORINSTALLATION OF NEW - COORDINATE WITH MECHANICAL

REMOVE WALL MOUNTED AIR FRESHENER

REMOVE EXISTING HOSE BIBB AND PREP FOR INSTALLATION OF NEW -COORDINATE WITH MECHANICAL

REMOVE EXISTING WALL MOUNTED EXHAUST GRILL AND PREP FORINSTALLATION OF NEW - COORDINATE WITH MECHANICAL

REMOVE EXISTING ELECTRIC HAND DRYER - COORDINATE WITH ELECTRICAL

D02

D07

D09

D04

D05

D06

D11

D13

D14

D12

D03

D08

D10

D01

DEMOLITION FLOOR PLAN - KEY NOTES:A. ALL DEMOLITION DRAWINGS AND DEMOLITION DETAILS ARE PROVIDED TO SHOW

THE GENERAL SCOPE OF THE DEMOLITION WORK. IT IS THE CONTRACTOR'SRESPONSIBILITY TO PERFORM ALL DEMOLITION WORK NECESSARY TOACCOMPLISH NEW WORK. THE DEMOLITION DRAWINGS AND DETAILS MAY NOTETYPICAL ITEMS IN SOME AREAS, WHICH APPLY IN OTHER AREAS (AND AREDESIGNATED WITH DASHED, HIDDEN OR STRUCK THRU LINES). COORDINATE ALLDEMOLITION WORK WITH ALL ARCHITECTURAL, CIVIL, STRUCT., MECH. ANDELEC. DRAWINGS. CONTRACTOR RESPONSIBLE TO REFERENCE ALL DRAWINGS/SPECIFICATIONS TO CONFIRM EXTENT OF DEMOLITION WORK.

B. ALL REMOVED ITEMS, WALLS, FLOORS CEILING, OPENINGS, ETC ARE TO BEPATCHED/REPAIRED AND PREPPED TO RECEIVE NEW WORK AND/OR FINISHES.

C. ALL CONSTRUCTION AND DEMOLITION MEANS, METHODS AND SAFETYPRECAUTIONS SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

D. WALL REMOVAL THAT TERMINATES INTO A WALL OR CEILING TO REMAIN SHALLBE COMPLETELY REMOVED FREE OF PROJECTIONS, READY TO RECEIVE NEWWORK.

E. REMOVE ALL ITEMS PROJECTING FROM EXISTING WALLS OR FLOORS TO REMAIN(BLOCKING, SCREWS, FASTENERS, PIPES, CONDUITS, MOUNTING PLATES, FIXEDEQUIPMENT, ETC). PATCH AND REPAIR FOR NEW FINISH.

F. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING AND UNDERSTANDINGEXISTING CONDITIONS PRIOR TO BIDDING.

G. CONTRACTOR SHALL PROTECT EXISTING BUILDING ELEMENTS AND SITE FROMDAMAGE CAUSED BY CONSTRUCTION OR CONSTRUCTION TRADES. CONTRACTORSHALL REPAIR ALL DAMAGED AREAS (IDENTIFIED BY OWNER, ARCHITECT, ORCONSTRUCTION MANAGER) AT NO ADDITIONAL COST.

H. MAINTAIN EXISTING FIRE RATING WHERE OCCURS AND WHERE POSSIBLE DURINGDEMOLITION. REFER TO CODE AND LIFE SAFETY SHEETS FOR MOREINFORMATION AS WELL AS CONSTRUCTION MANAGER'S INSTRUCTIONS.

I. ASBESTOS AND OTHER HAZARDOUS MATERIALS WILL BE REMOVED BYOWNER'S ABATEMENT CONTRACTOR PRIOR TO START OF CONSTRUCTION. IF ANYSUSPECTED HAZARDOUS MATERIAL IS ENCOUNTERED, STOP WORK IN THATAREA AND IMMEDIATELY INFORM THE ARCHITECT, CONSTRUCTION MANAGER,AND OWNER.

J. DISPOSE OF ALL DEMOLITION MATERIALS LEGALLY OFF-SITE, U.O.N.

K. REMOVE ALL PICTURES, FRAMES &PLAQUES THAT MAY BE DAMAGED DURINGCONSTRUCTION AND RETURN TO OWNER.

L. CONTRACTOR IS TO DEMO AND PREPARE EXISTING WALL CONSTRUCTION ASREQUIRED FOR INSTALLATION OF NEW MECHANICAL AND ELECTRICAL WORKWITHIN EXISTING WALL.

M. PREPARE ALL MASONRY OPENINGS TO RECEIVE NEW TOOTHED-IN MASONRY FORLIKE NEW APPEARANCE WHERE DEMOLITION OCCURS AND WALL IS VISIBLE.

N. CONTRACTOR TO COORDINATE EXISTING CONCRETE SLAB REMOVAL THAT ISREQUIRED FOR INSTALLATION OF NEW UNDERGROUND PLUMBING WITHDEMOLITION CONTRACTOR.

O. REMOVE ALL EXISTING EXPOSED CONDUIT NOT IN USE PRIOR TO OR AFTER NEWWORK.

P. ALL DEVICES SUCH AS SECURITY CAMERAS, CLOCKS, DVD, VCR, WIFI WIRELESSROUTERS, ETC. AND THEIR ASSOC. COMPONENTS ARE TO BE CAREFULLYREMOVED AND TURNED OVER TO OWNER.

DEMOLITION FLOOR PLAN - GENERAL NOTES:

Enlarged New Work Floor Plan - Area B1/4" = 1'-0"

2

Enlarged New Work Floor Plan - Area C1/4" = 1'-0"

3

Enlarged New Work Floor Plan - Area D1/4" = 1'-0"

4

D15

D16

D17

D18

D19

D20

D21

D22

D23

D24

D25

D26

D27

D28

D29

D30

D31

D32

D33

D34

D35

D36

D37

D38

D39

D40

D41

D42

D43

D44

D45

D46

D47

REMOVE EXISTING WALL CONSTRUCTION TO ACCESS MECHANICAL WORK.REPLACE WALL CONSTRUCTION TO MATCH W/ ADJUSTMENT FOR NEWFINISHES - REFER TO MECH

LINE OF CONC FLOOR SAWCUT AND REMOVED TO ACCESS MECH WORK -COORD. W/ MECH TRADES - REPLACE CONC FLOOR AND PREP FOR NEWFINISH INSTALLATION OR FINISH PATCHING

EXISTING PLASTER CEILING TO BE REMOVED AND REPLACED TO ACCESS NEWMECH WORK - PREP FOR NEW FINISH - REMOVE AND REINSTALL LAY-INCEILING AS OCCURS - COORD. W/ MECH

EXISTING ROOF DECK AND ROOFING TO BE REMOVED FOR NEW MECH PIPINGOR DUCT PENETRATION - REFERT TO MECH - REMOVE AND REINSTALL CEILINGAS REQ'D TO COMPETE WORK - REFER TO NEW WORK PLANS

REMOVE WHITE C.T. FINISH AS URINAL WALL AREA - REFER TO KEY NOTE D37.

D49

D50

D48

DEMOLITION FLOOR PLAN - KEY NOTES: (cont.)

D51

PR-01 07/06/2015

REMOVE STAINLESS SHELF AND SALVAGE FOR REUSE

REMOVE VCT FLOORING AS REQUIRED FOR NEW CONSTRUCTION ANDREINSTALL / PREP FOR NEW WORK - SALVAGE TILE BASE FOR REINSTALLATION

MODIFY EXISTING LAY-IN CEILING GRID AS REQUIRED FOR NEW WORK

REMOVE WALL MOUNTED RETURN AIR LOUVER AND PREP FOR NEW 4"TOOTHED-IN MASONRY INFILL

D36A

D37A

D51

Page 4: A3-00 -  · PDF fileA3-00 Enlarged New Work Floor Plan - Area A 1/4" = 1'-0" 1 FGM Statement of Intellectual Property The ideas, concepts, drawings and thoughts conveyed

22

3

2

1

22

1 N01N01

N01

N01

N20

N02

N03

N04

N04

N05

N05

N06

N06

N14

100VESTIBULEEXISTING

101CORRIDOREXISTING

103AREA

WAITING

104AREA

RECEPTION

105CLINIC

106RESTROOM

OFFICE

107ROOM

CONFERENCE

108OFFICE

PRINCIPAL

109ART ROOMEXISTING

N12

N12

N12N12

N12

N12

106

107

108

105

103A

103B

100A

100B

100C

100D

100E

100F

109

TA-3TA-1TA-6 TA-2

TA-8

TA-4

TA-7

TA-13

TA-11

N17

N17

N14

N18

N18

N17

N19

N19

N02

N20

N20

N22

N22

N22

N09

N09

N06

N06

N06

N06

N06

N06

N06

N06

N10N10

N11

N11

N11

N11

N12

N12

N08

N08

N13

N01

102CORRIDOREXISTING

112RESTROOM

GIRLS

113RESTROOM

BOYS

112

113

TA-3TA-1TA-6

TA-13

TA-6

TA-13

TA-13

TA-6

TA-5

TA-13

TA-6

TA-13

TA-13

TA-6

TA-5

TA-2TA-11

TA-6

TA-10

TA-12

TA-6

TA-10

TA-6

TA-10

TA-3TA-1TA-6

TA-2TA-11

TA-6

TA-10

TA-12

TA-9

TA-9

TA-9

TA-9

1

N06N06 N07

N08

N06

N06

N15

102CORRIDOREXISTING

N12

111RESTROOM

GIRLS

111

N16TA-12

TA-11

TA-5

TA-7 TA-7

TA-6

TA-10

TA-1TA-3TA-6

TA-2

TA-13TA-13TA-13

N17

TA-9

TA-9

N21

1

N06N06 N07

N08

N01

N06

N06

101CORRIDOREXISTING

110RESTROOM

BOYS

N12

110

N13

TA-12

TA-11

TA-1TA-3TA-6

TA-2

TA-5

TA-7 TA-7 TA-13TA-13TA-13

N17

TA-9

TA-9

N22

N22

ENLARGED NEWWORK FLOORPLANS

A3-10Enlarged New Work Floor Plan - Area A1/4" = 1'-0"

1

FGM

Statement of Intellectual Property

The ideas, concepts, drawings and thoughts conveyedherein are the intellectual property of PARTNERS inArchitecture, PLC, 65 Market Street, Mount Clemens, MI,48043 (P 586.469.3600). This set of drawings, in whole orin part, may not be reproduced, without the written consentof PARTNERS in Architecture, PLC. This information isprotected under U.S. Copyright Law, all rights reserved.

© Copyright 2015

65 MARKET STREETMOUNT CLEMENS, MI 48043P 586.469.3600F 586.469.3607

CONSULTANT

OWNER

PROJECT NAME

ISSUES / REVISIONS

DRAWN BY

CHECKED BY

APPROVED BY

SHEET NO.

SHEET NAME

KEY PLAN

PROJECT NO.

Van Dyke Public Schools

23500 MacArthur Blvd.Warren, MI 48089

Kennedy EarlyChildhood Center Renovations

11333 Kaltz Ave.Warren, MI 48089

15-114

Bidding / Construction 04/23/2015

CDG

MAM

NORTH

B

A

C

D

A. ALL PLAN DIMENSIONS ARE NOMINAL TO FACE OF WALL. WALL THICKNESSESARE SHOWN NOMINAL - SEE WALL TYPES FOR ACTUAL THICKNESS.

B. COORDINATE SIZE AND LOCATION OF ALL DUCT, SHAFT AND LOUVER OPENINGSIN WALLS AND FLOORS WITH MECHANICAL AND ELECTRICAL. PROVIDE ALLREQUIRED LINTELS FOR OPENINGS.

C. ALL EXPOSED CORNERS OF MASONRY BLOCK ARE TO BE BULLNOSED.

D. DO NOT SCALE DRAWINGS. USE DIMENSIONS PROVIDED. IF A CONFLICT ISENCOUNTERED OR A REQUIRED DIMENSION IS NOT PROVIDED, REQUEST ACLARIFICATION FROM THE ARCHITECT.

E. EXISTING MASONRY WALL INTERSECTIONS WHICH ARE LEFT EXPOSED AFTERDEMOLITION OF ADJACENT MASONRY CONSTRUCTION MUST BE PATCHED ANDREPAIRED WITH NEW MASONRY OR EXISTING BRICK VENEER, TOOTH-IN TOMATCH EXISTING COURSING AND BOND PATTERN, TYPICAL AT ALL LOCATIONS.

F. ALL NEW WALLS TO EXTEND TO UNDERSIDE OF DECK- REFER TO WALL TYPESFOR CONSTRUCTION METHOD.

G. REFER TO STRUCTURAL DRAWING FOR BEARING WALLS, COLUMN SIZES ANDLOCATIONS.

H. REFER TO DRAWINGS FOR ABBREVIATIONS AND OTHER SYMBOL DEFINITIONS.

I. REFER TO MECHANICAL / ELECTRICAL DRAWINGS FOR INSTALLATION OF NEWEQUIPMENT, WIRING, ETC. AT EXISTING WALLS. ALL ITEMS ARE TO BE INSTALLEDWITHIN EXISTING WALLS - REMOVE AND REINSTALL MASONRY (TOOTH-IN) ATALL LOCATIONS.

J. REFER TO MECHANICAL / ELECTRICAL DRAWINGS FOR REMOVAL OF EXISTINGEQUIPMENT WITHIN EXISTING CONSTRUCTION - TOOTH-IN NEW MASONRY BLOCKAND AND PREP FOR NEW FINISH.

K. FIELD VERIFY ALL EXISTING OPENINGS TO RECEIVE NEW WORK PRIOR TOFABRICATION OF ANY FRAME TYPES - NOTIFY ARCHITECT OF ANYDISCREPANCIES.

NEW WORK FLOOR PLAN - GENERAL NOTES:

Enlarged New Work Floor Plan - Area B1/4" = 1'-0"

2

Enlarged New Work Floor Plan - Area c1/4" = 1'-0"

3

Enlarged New Work Floor Plan - Area D1/4" = 1'-0"

4

TA-1 42” GRAB BAR

TA-2 36” GRAB BAR

TA-3 18” VERTICAL GRAB BAR

TA-4 24”W X 48”H MIRROR

TA-5 48”W X 48”H MIRROR

TA-6 TOILET TISSUE DISPENSER

TA-7 SOAP DISPENSER

TA-8 PAPER TOWEL DISPENSER

TA-9 SEMI-RECESSED HAND DRYER

TA-10 DOOR BUMBER/COAT HOOK

TA-11 COAT HOOK

TA-12 DOOR BUMPER

TA-13 UNDERLAV GUARD

GENERAL NOTES- TOILET ACCESSORIESA. REFER TO SPECIFICATION SECTION 102800 FOR

DESCRIPTION OF TOILET ACCESSORIES.B. REFER TO MECHANICAL PLANS FOR ALL PLUMBING

FIXTURES.

LEGEND- TOILET ACCESSORIES

N01 TOOTH-IN NEW MASONRY BLOCK AT LOCATION OF REMOVED WALL, DOOR,RECESSED ITEM - PREP WALL TO RECEIVE NEW FINISH - REMOVE EXISTINGBULLNOSED BLOCK AS OCCURS

TOOTH-IN NEW MASONRY BLOCK AT LOCATION OF REMOVED RETURN AIRGRILL - PREP WALL TO RECEIVE NEW FINISH.

PROVIDE 12" OF MASONRY INFILL AND 2 #5 BARS FROM FLOOR TO TOP OFWALL - BARS TO BE DOWELED 4" INTO CONCRETE FLOOR

NEW CASEWORK - REFER TO INTERIOR ELEVATIONS

MODIFY EXISTING CASEWORK AS REQUIRED FOR NEW WORK - REMOVECASEWORK AT NEXT FULL CABINET (COORDINATE WITH ARCHITECT) -PROVIDE NEW FINISHED FILLER PANELS AND COUNTERTOP TO MATCHEXISTING FINISH

PLUMBING FIXTURE - REFER TO MECHANICAL

NEW REMOVAL KEY HOSE BIBB - REFER TO MECHANICAL

NEW TOILET PARTITION DOORS, PANELS AND ACCESSORIES

NEW REMOVAL KEY HOSE BIBB TO REPLACE EXISTING - REFER TOMECHANICAL

EXISTING CABINET UNIT HEATER COVER TO BE CLEANED AND PREPPED -PAINT WITH EPOXY PAINT

NEW ADA OPERATOR PUSH-BUTTON

ROOM IDENTIFICATION SIGNAGE - REFER TO SIGNAGE SCHEDULE ANDDETAILS.

NEW URNIAL TOILET PARTITION SCREEN WITH FLOOR TO CEILING MOUNT

GROMMET IN P.LAM COUNTER TOP - COORDINATE EXACT LOCATION WITHARCHITECT PRIOR TO INSTALLATION

INSTALL SALVAGE WALL MOUNTED BABY CHANGING SYSTEM - PROVIDE ALLNECESSARY ATTACHMENTS TO PROVIDE A FULLY FUNCTION UNIT

AT END OF ALL WING WALL PROVIDE #4 BARS AND GROUT THE TWO OUTERBLOCK CORES

INSTALL NEW VCT AND BASE AS REQUIRED FOR NEW WORK - MATCHEXISTING

NEW GYPSUM BOARD CORNER GUARD

NEW 6'-0" WIDE MARKER BOARD

NEW 4'-0" WIDE TACK BOARD

NEW WALL AND/OR CEILING PATCHING INFILL FOR MECH/ELEC WORK -REFER TO MECH/ELEC FOR EXTENT OF NEW CONSTRUCTION PATCHING ANDREFINISHING

AREA OF NEW CONC FLOOR INFILL AT MECH PIPING INSTALLATION - COORD.W/ MECH TRADES - INFILL FLOOR AREA TO RECEIVE NEW FLOOR FINISHES

N02

N03

N04

N05

N07

N08

N09

N10

N11

NEW WORK FLOOR PLAN - KEY NOTES:

N12

N13

N14

N15

N16

N17

N06

N18

N19

N20

N21

N22

NOTE: REFER TO DEMO AND MECH/ELEC FOR MISCWALL / CEILING PATCHING AND REFINISHING.

NOTE: REFER TO DEMO AND MECH/ELEC FOR MISCWALL / CEILING PATCHING AND REFINISHING.

NOTE: REFER TO DEMO AND MECH/ELEC FOR MISCWALL / CEILING PATCHING AND REFINISHING.

NOTE: REFER TO DEMO AND MECH/ELEC FOR MISCWALL / CEILING PATCHING AND REFINISHING.

PR-01 07/06/2015

Page 5: A3-00 -  · PDF fileA3-00 Enlarged New Work Floor Plan - Area A 1/4" = 1'-0" 1 FGM Statement of Intellectual Property The ideas, concepts, drawings and thoughts conveyed

R05

R05

R03

R03

R03

R03

R03

R03

R03

R03

R08R08

3'-1

"

R16

R17 R18R17 R18

R05

R03R03

R02

R09

R05

R03R03

R02

R09

R09

R11

R10

- 3 5/8" MTL. FRAMING @ 16" O.C. MAX.- 5/8" GYP BD

CEILING AS SCHD.

VARIES (SEE CEILING PLAN)VA

RIES

CEILING AS SCHD.

3-5/8" MTL. KICKERS@ 32" O.C. MAX

REFER TO RCP

VARI

ES

REFER TO RCP

REFER TO RCP

R05

R03R03

R02

R03 R03

R03R03 R03

R03

R03

R03

R03

R03

R03

R06

R06

R06

R06

R06

R02

R03

R06

R06

R06

R06A4-10

5

R09

R09

R11

R10

R14

R12

R13

R12

R12

R12

R12

R04

R15

SURFACE MOUNTED EXTERIOR LIGHTFIXTURES. REMOVE AND REPLACE ATOVERHANG AREA. REFER TOELECTRICAL (TYPICAL)

ENLARGEDREFLECTEDCEILING PLANS

A4-10Enlarged Reflected Ceiling Plan - Area A1/4" = 1'-0"

1

FGM

Statement of Intellectual Property

The ideas, concepts, drawings and thoughts conveyedherein are the intellectual property of PARTNERS inArchitecture, PLC, 65 Market Street, Mount Clemens, MI,48043 (P 586.469.3600). This set of drawings, in whole orin part, may not be reproduced, without the written consentof PARTNERS in Architecture, PLC. This information isprotected under U.S. Copyright Law, all rights reserved.

© Copyright 2015

65 MARKET STREETMOUNT CLEMENS, MI 48043P 586.469.3600F 586.469.3607

CONSULTANT

OWNER

PROJECT NAME

ISSUES / REVISIONS

DRAWN BY

CHECKED BY

APPROVED BY

SHEET NO.

SHEET NAME

KEY PLAN

PROJECT NO.

Van Dyke Public Schools

23500 MacArthur Blvd.Warren, MI 48089

Kennedy EarlyChildhood Center Renovations

11333 Kaltz Ave.Warren, MI 48089

15-114

Bidding / Construction 04/23/2015

CDG

MAM

NORTH

B

A

C

DEnlarged Reflected Ceiling Plan - Area B1/4" = 1'-0"

2

Enlarged Reflected Ceiling Plan - Area C1/4" = 1'-0"

3

Enlarged Reflected Ceiling Plan - Area D1/4" = 1'-0"

4

REFLECTED CEILING PLAN GENERAL NOTES:

KEY NOTES- REFLECTED CEILING PLAN

R01

R02

R03

R04

A. REFER TO FLOOR PLANS FOR ROOM DIMENSIONS

B. REFER TO ELECTRICAL FOR LIGHT FIXTURE TYPES AND SPECIFICATIONS

C. REFER TO MECHANICAL FOR DIFFUSERS, REGISTERS, AND RETURNS

D. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR ADDITIONAL REQUIRED ACCESSPANELS WITHIN CEILING SYSTEM - ALL PANELS ARE TO BE KEY/LOCKABLE - PAINT TOMATCH CEILING

E. = ASSUMED EXISTING 1 HR RATED CORRIDOR WALLCONSTRUCTED UNDER PREVIOUS CODE TO BE MAINTAINED.

R05

R06

R07

Ceiling Soffit Detail1-1/2" = 1'-0"

5

GYPSUM BOARD SOFFIT

CEILING MOUNTED EXHAUST LOUVER - COORDINATE WITH MECHANICAL

CEILING MOUNTED LIGHT FIXTURE - COORDINATE WITH ELECTRICAL AND NEW STALLLAYOUT

MODIFY EXISTING CEILING AND GRID AS REQUIRED FOR NEW WORK

EXISTING GYPSUM BOARD CEILING TO REMAIN - CLEAN, PATCH AND PAINT FOR ALIKE-NEW APPEARANCE

MECHANICAL SUPPLY / RETURN - COORDINATE WITH MECHANICAL

NEW LAY-IN CEILING SYSTEM

NEW RADIANT PANEL INSTALLED IN EXISTING PLASTER CEILING. PATCH AND REPAIRPLASTER AT UNIT EDGE AND PIPING REPLACEMENT ACCESS POINTS. REFER TO DEMO,MECHANICAL AND ELECTRICAL. PROVIDE PANEL LENGTH PLUS 12" MIN. WIDE ACCESSTRIM PANEL TO MATCH ROOM WIDTH. SET PANEL FLUSH W/ BULKHEAD AND PROVIDEMATCHING EDGE TRIM AT TOILET ROOM SIDE AND WINDOW.

PATCH AND REFINISH PLASTER CEILING AT NEW MECHANICAL / ELECTRICALINSTALLATIONS. REFINISH CEILING PER FINISH SCHEDULE OR TO MATCH EXISTING INUN-SCHEDULED AREAS. REFER TO DEMO, MECHANICAL AND ELECTRICAL.

REMOVE AND REINSTALL EXISTING ACOUSTICAL LAY-IN CEILING AS REQUIRED TOCOMPLETE WORK ABOVE CEILING. REFER TO DEMO, MECHANICAL AND ELECTRICAL.

MECHANICAL ACCESS PANEL IN EXISTING / REPAIRED PLASTER CEILING ABOVE LAY-INCEILING. REFER TO MECHANICAL.

MECHANICAL SUPPLY RETURN GRILLE IN EXISTING LAY-IN ACOUTIC CEILING TO BEMODIFIED AS REQUIRED. MATCH GRID COMPONENTS AND TILE. REFER TOMECHANICAL & ELECTRICAL.

EXISTING ACOUSTIC LAY-IN CEILING TILE, GRID AND LIGHTING TO BE REMOVED ANDREINSTALLED AS REQUIRED TO INSTALL NEW MECHANICAL & ELECTRICAL.

NEW DOOR OPENING AT NEW ROOF TOP EXHAUST FAN. PROVIDE 3-1/2" x 3-1/2" x 5/16"STEEL ANGLE DECK SUPPORTS AT OPENING PERIMETER. WELD TO EXISTING STEELJOISTS AND NEW MASONRY BEARING PLATE SECURED TO ADJACENT MASONRY WALL.PROVIDE 14" H. PRE-FAB INSULATED CURB. REFER TO MECHANICAL.

NEW EXTERIOR CEMENT PLASTER INFILL AND REPAIR AT REMOVED GRILLES. MATCHCONSTRUCTION AND FINISH TEXTURE. REPAINT ENTIRE ALCOVE CEILING.

INSTALL NEW BULKHEAD/DROP TO MATCH EXISTING FOR NEW TOILET STALL LAYOUT.PROVIDE 1/2" GYP BD ON MTL STUD FRAMING. VERIFY DIM AND LAYOUT IN FIELD.

NEW LAYOUT FOR RADIANT PANEL W/ 12" ACCESS PANEL TRIM AT VALVE LOCATION.RECESS RADIANT PANEL INTO EXISTING BULKHEAD. PANEL AND TRIM TO EXTENDFROM WALL TO WALL.

PROVIDE MATCHING ±6" HIGH MTL EDGE TRIM AT AREA BEYOND BULKHEAD AND ATWINDOW RECESS.

R08

R09

R10

R11

R12

R13

R14

R15

LINE OF EXISTING STEEL JOISTSTRUCTURE. VERIFY IN FIELD AND

COORDINATE UNIT PLACEMENT.

PROVIDE 6x5x3/8" LLV STEEL ANGLESUPPORTS BELOW CURB PERIMETER

REMOVE ROOFING AND STEEL DECK ATSUPPLY AND RETURN DUCTS. PROVIDE

3-1/2"x3-1/2x5/16" STEEL ANGLESUPPORT AT OPENING PERIMETER. WELD

TO CURB SUPPORT FRAME.

LINE OF NEW ROOF TOP MECH UNIT WITH14" PRE-FAB CURB. REFER TO MECH.

Addendum No. 2 05/01/2105PR-01 07/06/2015

R16

R17

R18

Page 6: A3-00 -  · PDF fileA3-00 Enlarged New Work Floor Plan - Area A 1/4" = 1'-0" 1 FGM Statement of Intellectual Property The ideas, concepts, drawings and thoughts conveyed
pelderkin
Text Box
PR-01
pelderkin
Text Box
07/06/2015
pelderkin
Polygon
pelderkin
Line
pelderkin
Line
pelderkin
Pencil
pelderkin
Line
pelderkin
Text Box
@ WINDOW
pelderkin
Polygon
pelderkin
Line
pelderkin
Text Box
@ WINDOW
pelderkin
Line
pelderkin
Line
pelderkin
Pencil
pelderkin
Polygon
pelderkin
Polygon