a sustainable solution replacing an active and inefficient

28
Joyce Cruz - Project Geologist – [email protected] João Marcellino – Project Manager – [email protected] Olivier Maurer – Senior Technologist – [email protected] Christian Nogueira – Senior Reviewer – [email protected] Renata Moura – Petrom Contract Manager - [email protected] A sustainable solution replacing an active and inefficient Dual Phase Extraction System

Upload: others

Post on 28-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A sustainable solution replacing an active and inefficient

Joyce Cruz - Project Geologist – [email protected]

João Marcellino – Project Manager – [email protected]

Olivier Maurer – Senior Technologist – [email protected]

Christian Nogueira – Senior Reviewer – [email protected]

Renata Moura – Petrom Contract Manager - [email protected]

A sustainable solution replacing an active and inefficient Dual Phase Extraction System

Page 2: A sustainable solution replacing an active and inefficient

2

Schedule

•  Introduction

• NAPL distribution model

• Conceptual approach

• Construction

• Conclusions

Page 3: A sustainable solution replacing an active and inefficient

3

A sustainable solution replacing an active and inefficient Dual Phase Extraction System

Page 4: A sustainable solution replacing an active and inefficient

4

Introduction We  will  present  the  main  steps  of  a  Permeable  Adsorp5ve  Barrier  system  at  the  a  chemical  facility  near  São  Paulo  Brazil  (Petrom,  Mogi  das  Cruzes).  :  

-­‐  to  design  

-­‐  construct,    

-­‐  and  operate  

•  Dual-­‐Phase   Extrac5on   System   in   opera5on   since   2007   to   treat   LNAPL,   not  sufficient  enough  and  not  sustainable.      

•  APer  revising  the  Site  Conceptual  Model  (CSM)  a  Passive  Barrier  System  was  viewed  as  a  more  sustainable  solu5on  to  prevent  poten5al  light  non-­‐aqueous  phase   liquid   (LNAPL)   (di(2-­‐ethylhexyl)phthalate   (DEHP)   and   di-­‐n-­‐butyl  phthalate   (DBP))   from   entering   a   channelized   water   stream   crossing   the  facility,  the  main  environmental  receptor.    

Page 5: A sustainable solution replacing an active and inefficient

5

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

Localization

Page 6: A sustainable solution replacing an active and inefficient

6

New Conceptual Site Model (CSM) • Provided the necessary support for the technical team to propose a

modification on the remedial approach to CETESB, with the replacement of the existing MPE system for a permeable reactive barrier (PAB wall).

Lost on MPE System efficiency

Significant long term expenditures, without knowing the closure plan

Company was looking for a consulting firm with exp. on Sustainable

Remediation

Main receptor of concern, not yet impacted.

Page 7: A sustainable solution replacing an active and inefficient

7

Petrom Study Case •  2013 – first steps, select a more sustainable solution and gain support from authorities

–  Review and revision of existing conceptual site model (CSM) and Human Health Risk Assessment,

–  Presentation to CETESB of new remedial concept and approval

•  2014 – Barrier Construction

•  2015 – Cetesb presentation

•  2015 – Dual system evaluation

Suggested that the free product plume was relatively stable with low mobility

Narrow Valley

NAPL containing di(2-ethylhexyl)phthalate (DEHP)

and di-n-butyl phthalate (DBP)

Page 8: A sustainable solution replacing an active and inefficient

8

MPE System Loss of Efficiency

0

2000

4000

6000

8000

10000

12000

0

500

1000

1500

2000

2500

3000

3500

4000

4500

Acu

mul

ated

(Lite

rs)

Volu

me

(Lite

rs)

Volume of Extract Product

!  Product removed from1999 to sept/2006: 54.717L !  Clear lost on efficiency !  Heavy O&M scope, costs and energy consumption

Page 9: A sustainable solution replacing an active and inefficient

9 Presentation Title

NAPL Distribution Model

Page 10: A sustainable solution replacing an active and inefficient

10

Bis[2-ethylhexyl]phtalate Soil Plume

Figure 1 Bis [2-ethylhexyl] phthalate Soil Plume Petrom Mogi Das Cruzes, Brazil

Barrier Wall

Page 11: A sustainable solution replacing an active and inefficient

11

0,1 % NAPL Saturation Plume

Figure 2a 0.1% LNAPL Saturation Plume Petrom Mogi Das Cruzes, Brazil

Barrier Wall Culverted Stream

Page 12: A sustainable solution replacing an active and inefficient

12

0,5 % NAPL Saturation Plume

Figure 2b 0.5% LNAPL Saturation Plume Petrom Mogi Das Cruzes, Brazil

Barrier Wall

Page 13: A sustainable solution replacing an active and inefficient

13

1,0 % NAPL Saturation Plume

Figure 2c 1.0% LNAPL Saturation Plume Petrom Mogi Das Cruzes, Brazil

Barrier Wall

Page 14: A sustainable solution replacing an active and inefficient

14

2,0 % NAPL Saturation Plume

Figure 2d 2.0% LNAPL Saturation Plume Petrom Mogi Das Cruzes, Brazil

Barrier Wall

Page 15: A sustainable solution replacing an active and inefficient

15 Presentation Title

Conceptual Approach

Page 16: A sustainable solution replacing an active and inefficient

16

New Remedial System (PAB) • Passive Adsorptive Barrier, using the natural GW flow to protect the

primary receptor as well as collecting the free phase and treating the dissolved phase

Added collection trench associated with 2 sumps and

skimmers

PMs to monitor and control the system performance

Page 17: A sustainable solution replacing an active and inefficient

17 Presentation Title

Construction

Page 18: A sustainable solution replacing an active and inefficient

18

The Barrier System

•  4  main  components:  1.  LNAPL  interceptor  and  a  recovery  trench;  

2.  Situated  immediately  upgradient  of  the  PAB;  

3.  Cement-­‐bentonite  (CB)  slurry  wall  sec5ons;    

4.  Sumps   to   recover   and   prevent   LNAPL   from   accumula5ng   at   the   upgradient  faces  of  both  wall  sec5ons.  

•  Design:  –  Based  on  nature  and  es5mated  quan55es  of  LNAPL    

–  Three  key  issues  :    1.  Preven5ng  migra5on  of  the  LNAPL  through  the  PAB  wall;    

2.  Clogging  of  the  PAB  wall  by  LNAPL;  and,  

3.  Preven5ng  migra5on  of  dissolved  COCs  through  the  PAB  wall.    

Page 19: A sustainable solution replacing an active and inefficient

19

Layout

Page 20: A sustainable solution replacing an active and inefficient

20

Cement-bentonite Barrier •  Two  cement-­‐bentonite  barriers  were  built  in  order  to  drive  groundwater  flow  to  the  Drainage  Barriers  to  the  Adsorp5ve  Permeable  Sec5on;  

•  First   barrier:   68  meters   in   length,   depth   of   4  meters   and   average  width   of  0.70  meters;  

•  Second  barrier:  25  meters  long,  depth  of  4  meters  and  0.70  meters  width;  

•  Preven5ng   that   the   supernatant   free   phase   contact   the   Tributary   of   Oropó  Stream.  

Page 21: A sustainable solution replacing an active and inefficient

21

Cement-bentonite Barrier

Page 22: A sustainable solution replacing an active and inefficient

22

Gravel Trench Draining  Barrier  

•  The  Draining  Barrier  was  built  about  30  meters,  average  width  of  0.80  meters  and  depth  of  2.70  meters;  

•   Lined  with  geotex5le  (Bidim)  and  filled  with  graded  gravel  (#2);  

•  Two  wells  to  extract  product  (with  skimmers);  

•  To   focus   the   groundwater   flow   (and   free   phase   product),   direct   it   to   the  collec5on  wells.  

Page 23: A sustainable solution replacing an active and inefficient

23

Gravel Trench

Page 24: A sustainable solution replacing an active and inefficient

24

Permeable Adsorptive Barrier (PAB) Filtering  Barrier  or  Permeable  Adsorp5ve  Barrier  (PAB)  

Excavated  with  dimensions  of  4.6x3.50  meters  with  depth  of  4  meters,  forming  a  filter  box,  "enveloped"  by  a  permeable  geosynthe5c.

Page 25: A sustainable solution replacing an active and inefficient

25

Barriers Section

Page 26: A sustainable solution replacing an active and inefficient

26 Presentation Title

Conclusions

Page 27: A sustainable solution replacing an active and inefficient

27

Conclusions

•  The system has collected more than 10,000 liters of product.

•  Less O&M

•  Energy consumption

•  Carbon footprint,

•  Innovation in Brazil

•  Favorizing operation by local resources

Page 28: A sustainable solution replacing an active and inefficient

Thanks