® A SCANA COMPANY
v.c. Summer Nuclear Station
Combined Emergency Plan Review
(Units 1 , 2, & 3)
March 26, 2013
Agenda
~ Team Introductions
~ Current EP-Plan Overviews
~ Proposed Changes
~ New Technical Support Center
~ Emergency Response
~ Public Health and Safety
~ NRC Prior Approvals
2 ~-------""~SCE&G®
A SCANA COMPANY
Team Introductions
~ Emergency Preparedness
• Bob Williamson, Manager - Emergency Planning
~ Tim Bonnette, Supervisor - Emergency Services
~ Nuclear Licensing
lI> Bruce Thompson, Manager
John Garza, Supervisor
~ Amy Monroe, Engineer
~ Beth Quattlebaum, Engineer
Tom Collins, Specialist
~SCE&G®3 A SCANA COMPANY
Current EP-Plans
~ VCSNS Unit 1 Radiation Emergency Plan, EP-l00 SER Received on Revision 5 (dated 10/81), NUREG-717 SUppa 3, NRC Safety Evaluation Report Dated 01/82 Current Revision is 62
Unit 1 guidance Up to date through new EP Rule Making to 10 CFR 50.47 (b) and 10 CFR 50 Appendix E (November, 2011, ML102510626)
~ VCSNS Units 2 & 3 Radiation Emergency Plan SER Received on Revision 4 for Units 2 & 3, ML110410366, 02/11
Contains guidance for VCSNS Unit 1 up to and including EP-100 Revision 57 Contains guidance for VCSNS Units 2 & 3, prior to rule making
~SCE&G®4 A SCANA COMPANY
Proposed Changes - Unit 1 Plan
~ Combine plans Single Emergency Response Organization structure
Incorporate the new Technical Support Center
Change the activation criteria for the Emergency Response Organization
~ Change the activation times for the Emergency Response Facilities
~ Expand Emergency Planning Zone in Lexington, SC
~ Relocate the Joint Information Services (Joint Information Center)
~.SCE&G® A SCANA COMPANY5
Proposed Changes - Units 2 & 3 Plan
~ Update based on EP Rule Making Elements
~ 10 CFR 50.54 (q) Process
~ Evacuation Time Estimates
~ Alert and Notification System Design Report
Alternate Facility
~ Combine plans
~ Single Emergency Response Organization structure
~ Changes to responsibilities for Risk Significant Planning
Standards
"SCF&G® A SCANA COMPANY 6
Proposed Changes - Units 2 & 3 Plan
Continued:
~ Expand the Emergency Planning Zone in Lexington, SC
~ Relocate the Joint Information Services (Joint Information Center)
"SCE&G®7 A SCANA COMPANY
Site Layout
.-~-~~>",": ",.,;;', , .... "'
Nuclear Operations Building
\~ \ \.,
, ~~I ~ " ...---, [\ I
' I, .. . ""~ ,---, ""~.
.'--.."""""","'.... ('/
Ce><"Iy """oJ,,'\,
/ \ ....... ----.-"
;
I
Legend N
Water ~ ~ -..' Slle Boundary/Exclusion Area Boundary (EAB)
--- Road
-- Stale Route +"-~ Railroad I0 025 05 0.75 1 I
~ 1 .... le.
~.SCE&G®8 A SCANA COMPANY
z c n-CD Q.)... o -c CD iiJ...._. o :::s tn III c_.-c._. :::s cc
~ n:::r ~-n Q)-en c -a -a 0 ;:l
- 00 CD ~ r+CD..,
;I o :::T ~_. o S»-en c: -c -c o :+ o CD ~ r+CD..,
Technical Support Center (TSC)
~ The new TSC is located outside and between the Unit 1 Protected Area and the Units 2 & 3 Protected Area
~ Basement of the new Nuclear Operations Building
~ "'7,000 square feet of working space, including Command Area, Engineering Area, NRC Area, Executive Video Conference Room, two support areas, Back-up Operational Support Center, bathrooms, storage, etc.
~SCE&G®12 A SCANA COMPANY
Technical Support Center (TSC)
Continued:
• Positive pressure facility with HEPA and Charcoal Filtration System in emergency mode
• Uninterruptable Power Supply with Back-up Emergency Diesel Generator Power
• Computers (network and plant data display), telephones, radios, and satellite phones
• Response capability for any combination of single or multi-unit emergencies
~SCEF&G® A SCANA COMPANY 13
Emergency Response
~ Single Emergency Response Organization Structure
~ EOF for corporate and offsite command and control
~ TSC for onsite command and control
All primary Engineering functions moved to the TSC
t 3 - Operational Support Centers (one per Unit)
~ 3 - Control Rooms (one per Unit)
14 4(.SCE&G®A SCANA COMPANY
Emergency Response
~ Activation of Emergency Response Facilities
Current Proposed
TSC and OSC activated at ALERT . ALL facilities activated at an ALERT
EOF activated at SITE AREA EMERGENCY
~ Activation of the Emergency Response Organization
Current Proposed
ERO response required within about ERO response required within 75 60 minutes minutes
~SCE&G® A SCANA COMPANY 15
Public Health and Safety
~ Expand the Emergency Planning Zone
~ Lexington County, South Carolina near Chapin, SC
~ Lexington has requested Federal Emergency Management Agency review
~ 2012 Evacuation Time Estimate has been completed
~ Additional Early Warning Sirens sites have been identified in the expanded area
-e.SCE&G® A SCANA COMPANY 16
Emergency Planning Zone
" ..,. \',
"''lr.. ''"' 'f~j~
''I. @;iIIii~.. _ _ _ ...;r _ "
Green: Current I EPZ Boundary ~ I for Zone D-2
". - ... ... .; r-~
~·SCE&G®17 A SCANA COMPANY
Public Health and Safety
Continued:
~ Relocation of Joint Information Services (JIS)
» State of South Carolina Emergency Management Division no
longer desires to support utility Joint Information Centers
~ The SC Emergency Operations Center (SEOC) will be used as
the primary JIS location
SCE&G/SCANA will send staff to SEOC JIS as the Company
Spokesperson
EOF staff will support the Company Spokesperson
~ SCE&G will maintain the capabilities to operate its current
facility
~SCE&G®18 A SCANA COMPANY
NRC Prior Approval
~ Relocation of the Technical Support Center for Unit 1
~ Outside the guidance of NUREG-0696
~ Reassignment of the Risk Significant Planning Standards for Units 2 & 3
Classification responsibility assigned to TSC
~ Activation of Emergency Response Facilities
~ Emergency Response Organization Structure
~ Add and eliminate positions and reassign responsibilities
~SC:E&G® A SCANA COMPANY 19
NRC Prior Approval
Expand the Emergency Planning Zone
Increases the number of evacuees and vehicle on the roadways
~ Relocation of the Joint Information Services (JIS)
Primary JIS location is no longer at SCE&G facility or controlled by licensee
~ Cumulative affect of all changes
t2SCE&G® A SCANA COMPANY 20
License Amendment Request
~ License Amendment Request will be submitted for Unit 1, Unit 2, and Unit 3
~ Expected to be submitted in second quarter, 2013
~ Expected Implementation in second quarter, 2014
~SC:E&G® A SCANA COMPANY 21
--