As-Submitted Results Report v1 Letting of April 05, 2019 Letting Call: 1904 001 Low Bid: $5,581,254.52 Project: GF19 80023-200908 Engineer Estimate: $4,840,449.25 Local Agreement: Pct Over/Under Estimate: 15.30 % Start Date: July 9, 2019 Completion Date: September 27, 2019 Description: 2.46 mi of hot mix asphalt overlay and reconstruction, earthwork, drainage, concrete curb and gutter, guardrail, median cable barrier and pavement markings on I-94 eastbound from east of County Road 687 to east of County Road 681, Van Buren County. This project includes a 5 year materials and workmanship pavement warranty. No DBE participation required Bidder As-Submittted Michigan Paving and Materials Company $5,581,254.52 Rieth-Riley Construction Co., Inc. $6,635,152.25 Total Number of Bidders: 2

Upload: others

Post on 21-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

As-Submitted Results Report v1

Letting of April 05, 2019

Letting Call: 1904 001 Low Bid: $5,581,254.52

Project: GF19 80023-200908 Engineer Estimate: $4,840,449.25

Local Agreement: Pct Over/Under Estimate: 15.30 %

Start Date: July 9, 2019 Completion Date: September 27, 2019

Description:

2.46 mi of hot mix asphalt overlay and reconstruction, earthwork, drainage, concrete curb and gutter, guardrail,

median cable barrier and pavement markings on I-94 eastbound from east of County Road 687 to east of County

Road 681, Van Buren County. This project includes a 5 year materials and workmanship pavement warranty.

No DBE participation required

Bidder As-SubmitttedMichigan Paving and Materials Company $5,581,254.52Rieth-Riley Construction Co., Inc. $6,635,152.25

Total Number of Bidders: 2

Page 2: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 002 Low Bid: $1,763,878.19

Project: HSIP 69023-203022 Engineer Estimate: $1,765,978.15

Local Agreement: Pct Over/Under Estimate: -0.12 %

Start Date: April 15, 2019 Completion Date: November 29, 2019

Description:

Application of longitudinal pavement markings on various routes, Alcona, Alpena, Antrim, Benzie, Charlevoix, Cheboygan, Crawford, Emmet, Grand Traverse, Iosco, Kalkaska, Leelanau, Manistee, Missaukee, Montmorency, Ogemaw, Oscoda, Otsego, Presque Isle, Roscommon and Wexford Counties.

No DBE participation required

Bidder As-SubmitttedP.K. Contracting, Inc. $1,763,878.19JV Contracting, Inc. $2,130,295.32

Total Number of Bidders: 2

Page 3: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 003 Low Bid: $2,988,170.21

Project: MCS 50000-133064 Engineer Estimate: $2,958,542.52

Local Agreement: 19-5046 Pct Over/Under Estimate: 1.00 %

Start Date: May 6, 2019 Completion Date: November 1, 2019

Description:

Bridge removal and replacement and approach work on Jefferson Avenue over Salt River, Macomb County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedZ Contractors, Inc. $2,988,170.21Dan's Excavating, Inc. $3,771,892.13C. A. Hull Co., Inc. $3,832,934.15Toebe Construction LLC $3,934,448.87

Total Number of Bidders: 4

Page 4: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 004 Low Bid: $1,674,630.98

Project: STU 63000-203428 Engineer Estimate: $1,754,722.40

Local Agreement: 19-5059 Pct Over/Under Estimate: -4.56 %

Start Date: May 6, 2019 Completion Date: August 9, 2019

Description:

3.50 mi of hot mix asphalt cold milling and resurfacing, joint repairs, concrete pavement repair, curb, gutter, sidewalk and ramps, and pavement markings on Stephenson Highway (southbound) from 14 Mile Road to Girard Avenue and on Stephenson Highway (northbound) from 12 Mile Road to 14 Mile Road in the city of Madison Heights, Oakland County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedFlorence Cement Company $1,674,630.98Cadillac Asphalt, L.L.C. $1,815,805.98Pro-Line Asphalt Paving Corp. $1,948,747.90Ajax Paving Industries, Inc. $1,988,034.68

Total Number of Bidders: 4

Page 5: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 005 Low Bid: $1,625,396.35

Project: STL 38000-202737-2 Engineer Estimate: $1,729,486.91

Local Agreement: 18-5396 Pct Over/Under Estimate: -6.02 %

Start Date: 10 days after award Completion Date: November 15, 2019

Description:

5.20 mi of hot mix asphalt crushing, shaping and resurfacing, shoulder widening and station grading on King Road from Albion Road to Mathews Road, Jackson County. This is a Local Agency project.

4.00 % DBE participation required

Bidder As-SubmitttedMichigan Paving and Materials Company $1,625,396.35Rieth-Riley Construction Co., Inc. $1,677,970.22

Total Number of Bidders: 2

Page 6: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 006 Low Bid: $1,387,520.41

Project: FLAP 02003-130985 Engineer Estimate: $1,205,447.41

Local Agreement: 19-5040 Pct Over/Under Estimate: 15.10 %

Start Date: July 8, 2019 Completion Date: October 15, 2019

Description:

0.86 mi of hot mix asphalt roadway reconstruction and pavement markings on H-58 from Washington Street to Connors Road in the city of Munising, Alger County. This is a Local Agency project.

2.00 % DBE participation required

Bidder As-SubmitttedOberstar Inc. $1,387,520.41Gerou Excavating, Inc. $1,471,754.42Bacco Construction Company $1,530,963.81Smith Construction, Inc. $1,774,900.75

Total Number of Bidders: 4

Page 7: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 007 Low Bid: $873,922.22

Project: BO 25000-133037 Engineer Estimate: $1,156,468.00

Local Agreement: 19-5058 Pct Over/Under Estimate: -24.43 %

Start Date: 10 days after award Completion Date: May 29, 2020

Description:

Bridge replacement with 21-inch prestressed concrete deck, concrete curb, gutter and approach, culverts, drainage, guardrail, cofferdams, steel piles and pavement markings on Lippincott Boulevard over Kearsley Creek, Genesee County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedJ. E. Kloote Contracting, Inc. $873,922.22Nashville Construction Company $969,980.69Milbocker and Sons, Inc. $997,590.55E.T. MacKenzie Company $1,036,977.70Grand River Construction, Inc. $1,055,474.79Z Contractors, Inc. $1,121,785.32Trojan Development Company, Inc. $1,208,353.05

Total Number of Bidders: 7

Page 8: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 008 Low Bid: $568,281.00

Project: STUL 70000-130780 Engineer Estimate: $572,150.00

Local Agreement: 19-5043 Pct Over/Under Estimate: -0.68 %

Start Date: May 6, 2019 Completion Date: June 28, 2019

Description:

0.35 mi of hot mix asphalt resurfacing, concrete curb, gutter, sidewalk and ramps, water main, sanitary and storm sewer and pavement markings on Exchange Street from Jackson Street to Elm Street in the village of Spring Lake, Ottawa County. This is a Local Agency project.

4.00 % DBE participation required

Bidder As-SubmitttedMilbocker and Sons, Inc. $568,281.00Kamminga & Roodvoets, Inc. $655,575.50

Total Number of Bidders: 2

Page 9: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 009 Low Bid: $436,210.94

Project: STL 21000-205375 Engineer Estimate: $489,028.40

Local Agreement: 19-5021 Pct Over/Under Estimate: -10.80 %

Start Date: 10 days after award Completion Date: September 15, 2019

Description:

4.87 mi of hot mix asphalt overlay, aggregate shoulder and pavement markings on County Road 495 (LL Road) from US-2 to Main Street, Delta County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedBacco Construction Company $436,210.94Payne & Dolan Inc. $489,844.34

Total Number of Bidders: 2

Page 10: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 010 Low Bid: $307,465.43

Project: STUL 09000-204827 Engineer Estimate: $266,374.30

Local Agreement: 19-5065 Pct Over/Under Estimate: 15.43 %

Start Date: June 3, 2019 Completion Date: July 13, 2019

Description:

1.00 mi of hot mix asphalt cold milling and resurfacing, gravel shoulders, centerline corrugations and pavement

markings on South Mackinaw Road from Salzburg Road to US-10, Bay County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedAce-Saginaw Paving Company $307,465.43Pyramid Paving and Contracting Co. $317,097.51

Total Number of Bidders: 2

Page 11: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 011 Low Bid: $132,387.90

Project: STU 41000-130703 Engineer Estimate: $156,654.00

Local Agreement: 19-5060 Pct Over/Under Estimate: -15.49 %

Start Date: June 17, 2019 Completion Date: July 20, 2019

Description:

0.51 mi of hot mix asphalt resurfacing, pavement markings and restoration on North Main Street from Lewis Street to Northland Drive in the city of Rockford, Kent County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $132,387.90Michigan Paving and Materials Company $133,724.28Kamminga & Roodvoets, Inc. $145,030.15

Total Number of Bidders: 3

Page 12: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 012

Project: STU 81000-201828 Engineer Estimate:

Local Agreement: 19-5048 Pct Over/Under Estimate:

Start Date: July 8, 2019 Completion Date: October 25, 2019

Description:

Bridge removal and replacement with an aluminum box culvert and approach work on Cavanaugh Lake Road over Mill Creek, Washtenaw County. This is a Local Agency project.

4.00 % DBE participation required

All Bids Rejected

06/12/2019

Page 13: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 013 Low Bid: $1,682,262.84

Project: HSIP 39022-203024 Engineer Estimate: $1,622,097.78

Local Agreement: Pct Over/Under Estimate: 3.71 %

Start Date: May 1, 2019 Completion Date: November 30, 2019

Description:

Application of permanent pavement markings on various trunkline routes, Berrien, Branch, Calhoun, Cass, Kalamazoo, St. Joseph, and Van Buren Counties.

No DBE participation required

Bidder As-SubmitttedJV Contracting, Inc. $1,682,262.84P.K. Contracting, Inc. $1,723,907.53

Total Number of Bidders: 2

Page 14: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 014 Low Bid: $676,957.22

Project: NH 63000-203426 Engineer Estimate: $604,088.22

Local Agreement: 19-5057 Pct Over/Under Estimate: 12.06 %

Start Date: July 8, 2019 Completion Date: September 13, 2019

Description:

1.03 mi of concrete pavement repair on 13 Mile Road from John R Road to Dequindre Road in the city of Madison Heights, Oakland County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedCipparrone Contracting, Inc. $676,957.22Di Lisio Contracting, Inc. $692,140.72Florence Cement Company $692,612.72Major Cement Co. $738,670.72Great Lakes Contracting Solutions, LLC $794,366.22Interstate Highway Construction, Inc. $945,737.12Century Cement Company, Inc. $991,138.00

Total Number of Bidders: 7

Page 15: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 015 Low Bid: $653,221.00

Project: STL 13000-130078 Engineer Estimate: $685,141.00

Local Agreement: 19-5051 Pct Over/Under Estimate: -4.66 %

Start Date: June 10, 2019 Completion Date: August 23, 2019

Description:

3.00 mi of hot mix asphalt cold milling and resurfacing, shoulder gravel, sign replacement and pavement markings

on Michigan Avenue from 22.5 Mile Road to 25.5 Mile Road, Calhoun County. This is a Local Agency project.

2.00 % DBE participation required

Bidder As-SubmitttedLakeland Asphalt Corporation $653,221.00Rieth-Riley Construction Co., Inc. $693,137.00Michigan Paving and Materials Company $742,562.50

Total Number of Bidders: 3

Page 16: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 016 Low Bid: $1,092,552.40

Project: STUL 12000-132276 Engineer Estimate: $1,115,152.00

Local Agreement: 19-5070 Pct Over/Under Estimate: -2.03 %

Start Date: April 29, 2019 Completion Date: August 30, 2019

Description:

0.35 mi of hot mix asphalt partial reconstruction, cold milling and resurfacing, concrete curb, gutter, sidewalk, ramps, driveway, drainage, sewer, water main and pavement markings on Jefferson Street from US-12 south to Park Street in the city of Coldwater, Branch County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedC & D Hughes, Inc. $1,092,552.40Milbocker and Sons, Inc. $1,178,452.90Hoffman Bros., Inc. $1,344,225.55Dunigan Bros, Inc. $1,468,705.50

Total Number of Bidders: 4

Page 17: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 017 Low Bid: $125,318.25

Project: STL 05141-133195 Engineer Estimate: $137,688.24

Local Agreement: 19-5056 Pct Over/Under Estimate: -8.98 %

Start Date: 10 days after award Completion Date: July 31, 2019

Description:

Countywide pavement markings on various routes, Antrim County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedP.K. Contracting, Inc. $125,318.25Michigan Pavement Markings, LLC $129,183.61JV Contracting, Inc. $142,786.60

Total Number of Bidders: 3

Page 18: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 018 Low Bid: $81,845.12

Project: NHG 50111-129131 Engineer Estimate: $102,709.65

Local Agreement: Pct Over/Under Estimate: -20.31 %

Start Date: July 8, 2019 Completion Date: August 2, 2019

Description:

Replacement of cantilever, sign and guardrail on I-94 north of 12 Mile Road in the city of Roseville, Macomb County.

No DBE participation required

Bidder As-SubmitttedJ. Ranck Electric, Inc. $81,845.12Highway Service Company, Inc. $107,529.50Action Traffic Maintenance, Inc. $116,755.08

Total Number of Bidders: 3

Page 19: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 019 Low Bid: $1,968,900.35

Project: NH 48041-201202 Engineer Estimate: $1,955,627.43

Local Agreement: Pct Over/Under Estimate: 0.68 %

Start Date: 10 days after award Completion Date: November 1, 2019

Description:

15.25 mi of paver placed surface seal, overband crack fill, guardrail, aggregate shoulders and pavement markings on M-28 from the Schoolcraft/Luce County Line to M-117, Luce County. This project includes a 3 year materials and workmanship pavement warranty.

No DBE participation required

Bidder As-SubmitttedPayne & Dolan Inc. $1,968,900.35Bacco Construction Company $2,014,702.77

Total Number of Bidders: 2

Page 20: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 020 Low Bid: $913,077.50

Project: FM 51170-125982 Engineer Estimate: $870,000.00

Local Agreement: Pct Over/Under Estimate: 4.95 %

Start Date: September 10, 2019 Completion Date: 15 Calendar Days

Description:

Rehabilitate Runway 10/28 and Install Airfield Pavement Markings at the Manistee County Blacker Airport, city of Manistee, Manistee County.

4.00 % DBE participation required

Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $913,077.50Elmer's Crane and Dozer, Inc. $1,444,130.45

Total Number of Bidders: 2

Page 21: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 021 Low Bid:

Project: 59129-202052 Engineer Estimate:

Local Agreement: Pct Over/Under Estimate:

Start Date: June 3, 2019 Completion Date: 30 Calendar Days

Description:

Surface treatment, joint and crack sealing, drainage, paint marking, HMA, and electrical on the Taxiway, Apron, and Hangar Taxilanes at Greenville Municipal Airport, city of Greenville, Montcalm County.

4.00 % DBE participation required

This proposal has been withdrawn.

Page 22: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 022 Low Bid: $21,371,133.04

Project: IM 63174-124864 , ETC Engineer Estimate: $20,768,594.83

Local Agreement: Pct Over/Under Estimate: 2.90 %

Start Date: April 29, 2019 Completion Date: October 25, 2019

Description:

5.56 mi of hot mix asphalt cold milling and resurfacing, concrete curb and gutter approach, full-depth concrete pavement repairs, concrete joint resealing, detail 7 joint, crack repairs, shoulder fog seal, permanent pavement markings, bridge rehabilitation, shallow concrete overlay, epoxy overlay, substructure repairs, slope paving repairs and approach work on along I-75 from South Boulevard to west of Giddings Road in the city of Auburn Hills, Oakland County. This project includes two 5 year and one 3 year materials and workmanship pavement warranties, one 2 year concrete surface warranty and one 2 year bridge coating warranty.

5.00 % DBE participation required

Bidder As-SubmitttedC. A. Hull Co., Inc. $21,371,133.04Z Contractors, Inc. $22,189,314.14

Total Number of Bidders: 2

Page 23: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 023 Low Bid:

Project: 63102-132944pp Engineer Estimate:

Local Agreement: Pct Over/Under Estimate:

Start Date: 10 days after award Completion Date: September 20, 2020

Description:

Pump station rehabilitation along I-696 WB at the Rouge River in the city of Southfield, Oakland County. Please see the Unique Special Provision for Determination of Lowest Successful Bidder for more information.

3.00 % DBE participation required

This proposal has been postponed.

Page 24: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 024 Low Bid: $4,764,867.29

Project: NH 37014-201354 Engineer Estimate: $5,043,790.13

Local Agreement: Pct Over/Under Estimate: -5.53 %

Start Date: September 9, 2019 Completion Date: June 12, 2020

Description:

12.79 mi of hot mix asphalt cold milling and overlay, concrete headwall, curb and gutter, aggregate base, shoulders and pavement markings on US-127 from River Road to south of US-10BR, Isabella County. This project includes a 3 year material and workmanship pavement warranty.

3.00 % DBE participation required

Bidder As-SubmitttedCentral Asphalt, Inc. $4,764,867.29Rieth-Riley Construction Co., Inc. $5,559,986.26

Total Number of Bidders: 2

Page 25: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 025 Low Bid: $19,994,037.37

Project: NH 41027-45790-2 Engineer Estimate: $20,311,459.96

Local Agreement: Pct Over/Under Estimate: -1.56 %

Start Date: May 20, 2019 Completion Date: June 24, 2022

Description:

1.17 mi of hot mix asphalt pavement reconstruction, drainage, traffic signal installation, signing and pavement markings on I-196 from Maryland Avenue to I-96 and on I-96 eastbound from Leonard Street to East Beltline Avenue in the city of Grand Rapids and Grand Rapids Township, Kent County. This project includes a 5 year materials and workmanship pavement warranty.

5.00 % DBE participation required

Bidder As-SubmitttedKamminga & Roodvoets, Inc. $19,994,037.37Toebe Construction LLC $22,070,755.53

Total Number of Bidders: 2

Page 26: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 026 Low Bid: $2,168,519.75

Project: ST 42021-203191 Engineer Estimate: $1,264,044.24

Local Agreement: Pct Over/Under Estimate: 71.55 %

Start Date: 10 days after award Completion Date: October 18, 2019

Description:

Rehabilitation of 2 structures including deck replacement, steel repair, structural painting, substructure patching, culverts, hot mix asphalt overlay, approaches, guardrail and pavement markings on M-26 over the Eagle River, Keweenaw County. This project includes a 2 year bridge coating warranty.

No DBE participation required

Bidder As-SubmitttedAnlaan Corporation $2,168,519.75Abhe & Svoboda, Inc. $2,974,095.90

Total Number of Bidders: 2

Page 27: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 027 Low Bid: $1,259,446.01

Project: NH 37014-128734 Engineer Estimate: $1,241,183.84

Local Agreement: Pct Over/Under Estimate: 1.47 %

Start Date: September 3, 2019 Completion Date: June 12, 2020

Description:

Bridge rehabilitation including concrete deck replacement, pavement, curb, gutter, patching, substructure, slope pavement and approaches, steel beam repair, full paint and pavement markings on US-127BR northbound over US-127 southbound, Isabella County. This project includes a 5 year materials and workmanship pavement warranty, a 2 year bridge coating warranty and a 2 year concrete surface coating warranty.

3.00 % DBE participation required

Bidder As-SubmitttedGrand River Construction, Inc. $1,259,446.01Anlaan Corporation $1,333,243.23C. A. Hull Co., Inc. $1,467,386.00Davis Construction, Inc. $1,497,759.23Milbocker and Sons, Inc. $1,819,241.89

Total Number of Bidders: 5

Page 28: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 028 Low Bid: $1,046,577.05

Project: M 25032-204664 Engineer Estimate: $715,245.84

Local Agreement: Pct Over/Under Estimate: 46.32 %

Start Date: June 10, 2019 Completion Date: September 21, 2019

Description:

Rehabilitation of 12 bridges including superstructure, substructure and joint repair, thrie beam retrofit, epoxy overlay and pressure relief joint on various routes in the cities of Flint and Swartz Creek, Genesee and Lapeer Counties. This project includes a 5 year performance warranty for thin epoxy bridge deck overlay.

No DBE participation required

Bidder As-SubmitttedZ Contractors, Inc. $1,046,577.05Anlaan Corporation $1,167,196.06C. A. Hull Co., Inc. $1,188,795.02

Total Number of Bidders: 3

Page 29: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 029 Low Bid: $450,968.00

Project: HSIP 09034-203016 Engineer Estimate: $494,300.13

Local Agreement: Pct Over/Under Estimate: -8.77 %

Start Date: May 20, 2019 Completion Date: November 15, 2019

Description:

Application of special pavement markings on various routes, Arenac, Bay, and Saginaw Counties.

No DBE participation required

Bidder As-SubmitttedJV Contracting, Inc. $450,968.00P.K. Contracting, Inc. $532,548.01

Total Number of Bidders: 2

Page 30: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 030

Project: GF19 75061-130241

Local Agreement:

Start Date: 10 days after award

Description:

Bridge rehabilitation including deck patching, full paint and scour countermeasures on M-28/M-77 over the Fox River, Schoolcraft County. This project includes a 2 year bridge coating warranty.

No DBE participation required

All Bids Rejected

5/15/2019

Page 31: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 031 Low Bid: $72,975.44

Project: MER 70063-205281 Engineer Estimate: $86,024.00

Local Agreement: Pct Over/Under Estimate: -15.17 %

Start Date: May 6, 2019 Completion Date: May 25, 2020

Description:

Mechanically stabilized earth wall repair due to high-load hit on 112th Avenue over I-96, Ottawa County.

No DBE participation required

Bidder As-SubmitttedAnlaan Corporation $72,975.44Nashville Construction Company $90,490.70Grand River Construction, Inc. $99,726.00C. A. Hull Co., Inc. $150,300.15

Total Number of Bidders: 4

Page 32: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 032 Low Bid: $372,619.25

Project: GF19 31051-130232 Engineer Estimate: $208,694.74

Local Agreement: Pct Over/Under Estimate: 78.55 %

Start Date: May 15, 2019 Completion Date: September 27, 2019

Description:

Bridge rehabilitation including healer/sealer, deck patching, full steel cleaning and coating and scour counter measures on US-41 over the Sturgeon River Slough, Houghton County. This project includes a 2 year bridge coating warranty.

No DBE participation required

Bidder As-SubmitttedCivil Coatings and Construction Inc. $372,619.25Seaway Painting, L.L.C. $386,886.00Abhe & Svoboda, Inc. $547,730.00Atsalis Brothers Painting Co. $760,983.00

Total Number of Bidders: 4

Page 33: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 033 Low Bid: $2,597,534.50

Project: STU 41000-130707 Engineer Estimate: $2,467,343.65

Local Agreement: 19-5081 Pct Over/Under Estimate: 5.28 %

Start Date: 10 days after award Completion Date: August 9, 2019

Description:

1.50 mi of hot mix asphalt cold milling and resurfacing, concrete patching, curb, gutter, sidewalk and ramps, aggregate base, drainage, signing, signals, water main, and pavement markings on Ivanrest Avenue from 44th Street to Prairie Street in the city of Grandville, Kent County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedSchippers Excavating, Inc. $2,597,534.50Michigan Paving and Materials Company $2,832,326.25Kamminga & Roodvoets, Inc. $2,834,197.15Al's Excavating, Inc. $3,057,878.00Rieth-Riley Construction Co., Inc. $3,112,423.00

Total Number of Bidders: 5

Page 34: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 034 Low Bid: $1,779,122.32

Project: STUL 81000-203454 Engineer Estimate: $1,853,720.70

Local Agreement: 19-5072 Pct Over/Under Estimate: -4.02 %

Start Date: 10 days after award Completion Date: October 11, 2019

Description:

0.39 mi of road reconstruction including pavement removal and replacement, sidewalk, drainage, water main and pavement markings on West Main Street from Ann Arbor Railway to Platt Road in the city of Milan, Washtenaw County. This is a Local Agency project.

5.00 % DBE participation required

Bidder As-SubmitttedC & D Hughes, Inc. $1,779,122.32Fonson Company, Inc. $1,863,453.86Mead Bros. Excavating Inc. $1,919,971.42

Total Number of Bidders: 3

Page 35: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 035 Low Bid: $1,415,185.53

Project: HIP 29000-133044 Engineer Estimate: $1,494,899.75

Local Agreement: 19-5089 Pct Over/Under Estimate: -5.33 %

Start Date: 10 days after award Completion Date: May 21, 2020

Description:

Bridge replacement with prestressed concrete bulb-tee beams, curb and gutter approach, culverts, drainage, guardrail, cofferdams, steel piling and pavement markings on Lumberjack Road over Pine River, Gratiot County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedGrand River Construction, Inc. $1,415,185.53Hardman Construction, Inc. $1,458,715.93Miller Development, Inc. $1,500,747.53Milbocker and Sons, Inc. $1,516,109.13J. E. Kloote Contracting, Inc. $1,594,069.84E.T. MacKenzie Company $1,814,414.58

Total Number of Bidders: 6

Page 36: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 036 Low Bid: $1,517,826.54

Project: BHT 25402-126579 , ETC Engineer Estimate: $1,344,169.00

Local Agreement: 19-5088 Pct Over/Under Estimate: 12.92 %

Start Date: 10 days after award Completion Date: November 15, 2019

Description:

0.01 mi of removal of existing culvert, construction of precast concrete culvert and approach work on 12th Street over Carman Creek in the city of Flint, Genesee County. This is a Local Agency project.

4.00 % DBE participation required

Bidder As-SubmitttedAnlaan Corporation $1,517,826.54Zito Construction $1,551,285.00Z Contractors, Inc. $1,581,472.01Milbocker and Sons, Inc. $1,949,136.66

Total Number of Bidders: 4

Page 37: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 037 Low Bid: $1,179,969.48

Project: STUL 58000-203587 Engineer Estimate: $1,077,821.50

Local Agreement: 19-5071 Pct Over/Under Estimate: 9.48 %

Start Date: 10 days after award Completion Date: October 31, 2019

Description:

0.86 mi of hot mix asphalt cold milling and resurfacing, subbase repairs, concrete curb and gutter and pavement markings on West Front Street from South Telegraph Road to Harrison Street in the city of Monroe, Monroe County. This is a Local Agency project.

5.00 % DBE participation required

Bidder As-SubmitttedC & D Hughes, Inc. $1,179,969.48

Total Number of Bidders: 1

Page 38: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 038 Low Bid: $939,737.20

Project: STUL 09000-129765 Engineer Estimate: $914,467.90

Local Agreement: 19-5076 Pct Over/Under Estimate: 2.76 %

Start Date: 10 days after award Completion Date: September 15, 2019

Description:

0.43 mi of hot mix asphalt reconstruction and widening, concrete curb, gutter, sidewalk and ramps, drainage, signing and pavement markings on Garfield Road from the US-10 westbound off ramp northerly to Midland Road in the city of Auburn, Bay County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedShaw Contracting Co. $939,737.20McGuirk Sand-Gravel, Inc. $957,460.45Crawford Contracting, Inc. $1,026,849.81Rohde Bros. Excavating, Inc. $1,045,854.00Champagne and Marx Excavating, Inc. $1,114,303.89

Total Number of Bidders: 5

Page 39: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 039 Low Bid: $1,199,966.49

Project: BRT 04000-133071 Engineer Estimate: $895,239.25

Local Agreement: 19-5080 Pct Over/Under Estimate: 34.04 %

Start Date: 10 days after award Completion Date: October 4, 2019

Description:

Bridge replacement with prestressed concrete I-beams, concrete pavement approach, culverts, steel sheet piling, steel piles, cofferdams, drainage, guardrail and pavement markings on Werth Road over Mud Creek, Alpena County. This is a Local Agency project.

2.00 % DBE participation required

Bidder As-SubmitttedMacArthur Construction, Inc. $1,199,966.49Milbocker and Sons, Inc. $1,252,793.29

Total Number of Bidders: 2

Page 40: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 040 Low Bid: $835,353.95

Project: SUG 82000-132670 Engineer Estimate: $643,500.00

Local Agreement: 19-5073 Pct Over/Under Estimate: 29.81 %

Start Date: 10 days after award Completion Date: September 21, 2019

Description:

Application of pavement markings on various routes in the city of Detroit, Wayne County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedJV Contracting, Inc. $835,353.95P.K. Contracting, Inc. $842,923.54

Total Number of Bidders: 2

Page 41: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 041 Low Bid: $453,388.35

Project: BHT 54000-133053 Engineer Estimate: $477,686.52

Local Agreement: 19-5077 Pct Over/Under Estimate: -5.09 %

Start Date: May 13, 2019 Completion Date: October 18, 2019

Description:

Superstructure replacement with prestressed concrete box beams, curb and gutter approach, guardrail and

pavement markings on New Millpond Road over Ryan Creek, Mecosta County. This is a Local Agency project.

2.00 % DBE participation required

Bidder As-SubmitttedJ. E. Kloote Contracting, Inc. $453,388.35Milbocker and Sons, Inc. $455,482.39John Henry Excavating Inc. $465,970.00Anlaan Corporation $498,832.63E.T. MacKenzie Company $501,352.35

Total Number of Bidders: 5

Page 42: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 042 Low Bid: $448,297.00

Project: ER 56000-203305 Engineer Estimate: $417,950.14

Local Agreement: 19-5054 Pct Over/Under Estimate: 7.26 %

Start Date: 10 days after award Completion Date: July 26, 2019

Description:

0.01 mi of hot mix asphalt approach, precast concrete culvert, cofferdams, riprap and pavement markings on East Letts Road over Waldo drain, Midland County. This is a Local Agency project.

2.00 % DBE participation required

Bidder As-SubmitttedTri-City Groundbreakers, Inc. $448,297.00Rohde Bros. Excavating, Inc. $547,640.00Milbocker and Sons, Inc. $582,579.96

Total Number of Bidders: 3

Page 43: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 043 Low Bid: $410,877.93

Project: HRRR 06000-202876 Engineer Estimate: $380,902.15

Local Agreement: 19-5084 Pct Over/Under Estimate: 7.87 %

Start Date: June 10, 2019 Completion Date: October 25, 2019

Description:

1.36 mi of hot mix asphalt surfacing, aggregate base, trenching, culverts, ditch cleanout and guardrail on Grove Road from US-23 to Wyatt Road, Arenac County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedKatterman Trucking, Inc. $410,877.93Tri-City Groundbreakers, Inc. $491,957.00John Henry Excavating Inc. $538,939.00

Total Number of Bidders: 3

Page 44: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 044 Low Bid: $233,885.76

Project: HSIP 81000-203464 Engineer Estimate: $169,384.50

Local Agreement: 19-5093 Pct Over/Under Estimate: 38.08 %

Start Date: July 1, 2019 Completion Date: October 8, 2019

Description:

0.22 mi of high friction surface treatment, hot mix asphalt paving, guardrail and pavement markings on Jackson Avenue from the eastbound I-94 off ramp to west of Gralake Street in the city of Ann Arbor, Washtenaw County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedRAM Construction Services of Michigan, Inc. $233,885.76

Total Number of Bidders: 1

Page 45: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 045 Low Bid: $169,233.25

Project: HSIP 31000-203274 Engineer Estimate: $151,932.00

Local Agreement: 19-5090 Pct Over/Under Estimate: 11.39 %

Start Date: 10 days after award Completion Date: August 23, 2019

Description:

0.12 mi of hot mix asphalt reconstruction, earth excavation, aggregate base and pavement markings on Airport Park Road north of Hilltop Road, Houghton County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedB & B Contracting, Calumet, Inc. $169,233.25Bacco Construction Company $174,340.53Payne & Dolan Inc. $177,293.06FA Industrial Services, Inc. $213,450.87

Total Number of Bidders: 4

Page 46: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 046 Low Bid: $6,262,267.94

Project: STU 63000-204558 , ETC Engineer Estimate: $6,309,887.50

Local Agreement: 19-5110 Pct Over/Under Estimate: -0.75 %

Start Date: 10 days after award Completion Date: November 16, 2021

Description:

0.45 mi of hot mix asphalt pavement, earth excavation, aggregate base, concrete curb and gutter, sidewalk, storm sewer, crosswalks, landscaping, street furniture and pavement markings along Auburn Road from Culbertson Avenue to Hessel Avenue in the city of Rochester Hills, Oakland County. This is a Local Agency project.

6.00 % DBE participation required

Bidder As-SubmitttedAngelo Iafrate Construction Company $6,262,267.94Zito Construction $7,059,426.55Dan's Excavating, Inc. $7,442,651.37

Total Number of Bidders: 3

Page 47: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 047 Low Bid: $744,702.80

Project: EDD 51000-129695 , ETC Engineer Estimate: $834,092.94

Local Agreement: 19-5099 Pct Over/Under Estimate: -10.72 %

Start Date: May 15, 2019 Completion Date: August 30, 2019

Description:

13.95 mi of intermittent hot mix asphalt wedging, chip seal, fog seal, and pavement markings on various routes, Manistee County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedHighway Maintenance and Construction Company $744,702.80Pavement Maintenance Systems, LLC $745,774.22

Total Number of Bidders: 2

Page 48: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 048 Low Bid: $867,117.93

Project: STL 56000-130265 Engineer Estimate: $822,823.25

Local Agreement: 19-5107 Pct Over/Under Estimate: 5.38 %

Start Date: April 15, 2019 Completion Date: 180 Calendar Days

Description:

2.28 mi of cold in place recycling, hot mix asphalt base crushing, shaping, resurfacing and shoulder widening, drainage, and pavement markings on 11 Mile Road from LaPorte Road north to Odd Road then east on Odd Road to Porter Road then north on Porter Road to Pine River, Midland County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedD. J. McQuestion & Sons, Inc. $867,117.93Ace-Saginaw Paving Company $898,908.89Central Asphalt, Inc. $920,740.41

Total Number of Bidders: 3

Page 49: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 049 Low Bid: $370,425.75

Project: STU 33000-129930 Engineer Estimate: $391,307.50

Local Agreement: 19-5086 Pct Over/Under Estimate: -5.34 %

Start Date: 10 days after award Completion Date: July 1, 2019

Description:

0.50 mi of hot mix asphalt cold milling and resurfacing, concrete curb and gutter and traffic signal detection on Harrison Road from Forest Road to Mt. Hope Road in the city of East Lansing, Ingham County. This is a Local Agency project.

4.00 % DBE participation required

Bidder As-SubmitttedC & D Hughes, Inc. $370,425.75Michigan Paving and Materials Company $398,037.04Rieth-Riley Construction Co., Inc. $445,769.69

Total Number of Bidders: 3

Page 50: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 050 Low Bid: $173,420.70

Project: TA 41000-202713 Engineer Estimate: $182,207.00

Local Agreement: 19-5078 Pct Over/Under Estimate: -4.82 %

Start Date: 10 days after award Completion Date: 60 Calendar Days

Description:

0.44 mi of concrete sidewalk, ADA ramps and restoration on Pinetree Avenue from Gentian Drive to 60th Street in the city of Kentwood, Kent County. This is a Local Agency project. This is a Small Business Program project. Only those approved by MDOT as a Small Business may be eligible to bid as a prime contractor.

No DBE participation required

Bidder As-SubmitttedC L Trucking & Excavating, LLC $173,420.70Weick Bros., Inc. $180,156.25Nashville Construction Company $181,824.57

Total Number of Bidders: 3

Page 51: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 051 Low Bid: $1,289,518.31

Project: STU 82000-203498 Engineer Estimate: $1,384,020.50

Local Agreement: 19-5061 Pct Over/Under Estimate: -6.83 %

Start Date: 10 days after award Completion Date: October 15, 2019

Description:

0.38 mi of hot mix asphalt cold milling and resurfacing and concrete curb and gutter on Vernier Road from Fairway

Lane to Morningside Drive in the city of Grosse Pointe Woods, Wayne County. This is a Local Agency project.

5.00 % DBE participation required

Bidder As-SubmitttedCipparrone Contracting, Inc. $1,289,518.31Florence Cement Company $1,313,441.66Major Cement Co. $1,434,367.36

Total Number of Bidders: 3

Page 52: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 052 Low Bid: $1,462,084.00

Project: FM 74225-125576 Engineer Estimate: $1,415,350.00

Local Agreement: Pct Over/Under Estimate: 3.30 %

Start Date: September 3, 2019 Completion Date: 65 Calendar Days

Description:

Runway and Lighting Rehabilitation at the Marlette Township Airport, city of Marlette, Sanilac County.

4.00 % DBE participation required

Bidder As-SubmitttedAce-Saginaw Paving Company $1,462,084.00Pyramid Paving and Contracting Co. $1,901,519.00

Total Number of Bidders: 2

Page 53: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 053 Low Bid: $7,070,714.96

Project: NH 49022-120031 Engineer Estimate: $6,538,286.15

Local Agreement: Pct Over/Under Estimate: 8.14 %

Start Date: 10 days after award Completion Date: June 26, 2020

Description:

8.19 mi of hot mix asphalt cold milling and resurfacing with asphalt stabilized crack relief layer and shoulder reconstruction on US-2 from west of West Beach Road easterly to Borgstrom Road, Mackinac County. This project includes a 3 year materials and workmanship pavement warranty.

3.00 % DBE participation required

Bidder As-SubmitttedBacco Construction Company $7,070,714.96Payne & Dolan Inc. $7,381,244.87

Total Number of Bidders: 2

Page 54: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 054 Low Bid: $1,738,685.65

Project: GF19 42012-204219 Engineer Estimate: $2,039,658.25

Local Agreement: Pct Over/Under Estimate: -14.76 %

Start Date: 0 days after award Completion Date: 40 Working Days

Description:

10.15 mi of hot mix asphalt overlay, gravel shoulders, centerline corrugations and permanent pavement markings on US-41 from north of Upper Delaware Road north to M-26, Keweenaw County. This project includes a 3 year materials and workmanship pavement warranty.

No DBE participation required

Bidder As-SubmitttedBacco Construction Company $1,738,685.65Payne & Dolan Inc. $1,991,397.85

Total Number of Bidders: 2

Page 55: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 055 Low Bid: $2,599,920.20

Project: CM 19041-120416 , ETC Engineer Estimate: $2,424,724.01

Local Agreement: 19-5074 Pct Over/Under Estimate: 7.23 %

Start Date: May 20, 2019 Completion Date: November 11, 2019

Description:

0.78 mi of hot mix asphalt paving, concrete paving, shared use path, curb, gutter, sidewalk and ramps, aggregate base, drainage, signal modernization, signing and pavement markings on I-69BL (Saginaw Highway) at the intersections of Old M-78 and Marsh Road, indirect crossover construction at Towner Road and Newton Road, Clinton and Ingham Counties.

5.00 % DBE participation required

Bidder As-SubmitttedC & D Hughes, Inc. $2,599,920.20Malley Construction, Inc. $2,839,548.29Hoffman Bros., Inc. $2,900,288.31Kamminga & Roodvoets, Inc. $2,946,333.73Zito Construction $2,949,799.08

Total Number of Bidders: 5

Page 56: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 056 Low Bid: $806,538.10

Project: ER 31013-205239 Engineer Estimate: $1,060,528.80

Local Agreement: Pct Over/Under Estimate: -23.95 %

Start Date: 10 days after award Completion Date: July 19, 2019

Description:

2.58 mi of hot mix asphalt shoulder repairs, concrete curb, gutter, sidewalk, ditch and culvert cleanout, slope

restoration, guardrail and pavement markings on various routes in the city of Hancock, Houghton County.

No DBE participation required

Bidder As-SubmitttedBacco Construction Company $806,538.10MJO Contracting, Inc. $935,386.00

Total Number of Bidders: 2

Page 57: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 057 Low Bid: $291,442.26

Project: HSIP 33084-203029 Engineer Estimate: $295,236.97

Local Agreement: Pct Over/Under Estimate: -1.29 %

Start Date: April 15, 2019 Completion Date: December 1, 2019

Description:

Application of special pavement markings on various routes, Eaton and Lenawee Counties.

No DBE participation required

Bidder As-SubmitttedP.K. Contracting, Inc. $291,442.26

Total Number of Bidders: 1

Page 58: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 058 Low Bid: $1,531,795.58

Project: NH 28012-205478 Engineer Estimate: $1,871,092.32

Local Agreement: Pct Over/Under Estimate: -18.13 %

Start Date: June 3, 2019 Completion Date: July 26, 2019

Description:

3.00 mi of hot mix asphalt cold milling and resurfacing including shoulders on US-31/M-37 from south of Rennie School Road to north of South Airport Road in the city of Traverse City, Grand Traverse County. This project includes a 3 year material and workmanship pavement warranty.

3.00 % DBE participation required

Bidder As-SubmitttedElmer's Crane and Dozer, Inc. $1,531,795.58Rieth-Riley Construction Co., Inc. $1,682,150.45

Total Number of Bidders: 2

Page 59: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 059 Low Bid: $2,782,163.34

Project: IM 33045-205234 Engineer Estimate: $2,119,673.08

Local Agreement: Pct Over/Under Estimate: 31.25 %

Start Date: June 3, 2019 Completion Date: August 30, 2019

Description:

3.06 mi of hot mix asphalt cold milling and resurfacing, joint repair and pavement markings on I-496/US-127 from I- 96 to CN Railroad in the cities of East Lansing and Lansing, Ingham County. This project includes a 3 year material and workmanship pavement warranty.

4.00 % DBE participation required

Bidder As-SubmitttedMichigan Paving and Materials Company $2,782,163.34Rieth-Riley Construction Co., Inc. $3,925,326.43

Total Number of Bidders: 2

Page 60: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 060 Low Bid: $30,779.02

Project: ST 17032-202011 Engineer Estimate: $33,033.98

Local Agreement: Pct Over/Under Estimate: -6.83 %

Start Date: 10 days after award Completion Date: October 25, 2019

Description:

Carpool lot demolition, restoration, concrete curb and gutter at the northwest quadrant of the I-75/3 Mile Road interchange in the city of Sault Ste. Marie, Chippewa County.

No DBE participation required

Bidder As-SubmitttedElmer's Crane and Dozer, Inc. $30,779.02Rigid Pavement Construction LLC $36,865.00J. Ranck Electric, Inc. $39,489.03Arrow Constructions $40,482.70Payne & Dolan Inc. $48,145.00M & M Excavating Company $59,000.00

Total Number of Bidders: 6

Page 61: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 061

Project: M 47000-M61901

Local Agreement:

Start Date: June 3, 2019

Completion Date: July 31, 2019

Description:

3.39 mi of hot mix asphalt cold milling and single course overlay on multiple ramps, concrete sidewalk, ramps and pavement markings in Livingston and Washtenaw Counties.

No DBE participation required

All Bids Rejected:

04/15/2019

Page 62: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 062 Low Bid: $379,576.02

Project: M 11015-M51903 Engineer Estimate: $347,232.43

Local Agreement: Pct Over/Under Estimate: 9.31 %

Start Date: July 8, 2019 Completion Date: July 19, 2019

Description:

5.03 mi of hot mix asphalt longitudinal joint milling and resurfacing, skip paving and pavement markings on Westbound I-94 from Kruger Road to Three Oaks Road, Berrien county.

No DBE participation required

Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $379,576.02C & D Hughes, Inc. $426,987.07

Total Number of Bidders: 2

Page 63: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 063 Low Bid: $89,006.53

Project: M 11057-M51902 Engineer Estimate: $102,089.39

Local Agreement: Pct Over/Under Estimate: -12.82 %

Start Date: August 5, 2019 Completion Date: August 9, 2019

Description:

0.34 mi of hot mix asphalt overlay on existing concrete ramp (Exit 5) Southbound US-31, Berrien County.

No DBE participation required

Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $89,006.53Michigan Paving and Materials Company $122,320.00

Total Number of Bidders: 2

Page 64: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 064 Low Bid: $568,767.50

Project: M 13081-M51966 Engineer Estimate: $574,456.21

Local Agreement: Pct Over/Under Estimate: -0.99 %

Start Date: June 3, 2019 Completion Date: July 26, 2019

Description:

46.19 mi of hot mix asphalt cold milling and resurfacing and pavement markings on I-94, M-311 (11 Mile Road) and M-37 (Bedford Road) in the city of Battle Creek, Calhoun County.

No DBE participation required

Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $568,767.50Michigan Paving and Materials Company $573,916.23

Total Number of Bidders: 2

Page 65: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 065 Low Bid: $1,011,472.95

Project: M 31031-201184 Engineer Estimate: $1,113,086.36

Local Agreement: Pct Over/Under Estimate: -9.13 %

Start Date: 10 days after award Completion Date: 24 Working Days

Description:

5.52 mi of hot mix asphalt overlay, gravel shoulders, centerline corrugations and pavement markings on M-203 from Salo Road easterly to 11th Street in the village of Calumet, Houghton County. This project includes a 3 year materials and workmanship pavement warranty.

No DBE participation required

Bidder As-SubmitttedBacco Construction Company $1,011,472.95Payne & Dolan Inc. $1,053,121.00

Total Number of Bidders: 2

Page 66: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 066 Low Bid: $1,834,960.73

Project: NH 82053-128774 Engineer Estimate: $1,406,195.36

Local Agreement: Pct Over/Under Estimate: 30.49 %

Start Date: May 1, 2019 Completion Date: October 27, 2019

Description:

Bridge rehabilitation including partial superstructure replacement, epoxy overlay, concrete deck and substructure

patching, replacement of expansion joints, guardrail and approach work on US-24 over the Upper Rouge River in

the city of Detroit, Wayne County. This project includes a 5 year materials and workmanship pavement warranty.

4.00 % DBE participation required

Bidder As-SubmitttedZ Contractors, Inc. $1,834,960.73C. A. Hull Co., Inc. $2,069,412.48

Total Number of Bidders: 2

Page 67: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 067 Low Bid: $442,812.89

Project: HSIP 25084-201993 Engineer Estimate: $434,221.08

Local Agreement: Pct Over/Under Estimate: 1.98 %

Start Date: July 22, 2019 Completion Date: October 26, 2019

Description:

141.34 mi of delineator replacement on I-69 from the west Shiawassee County Line easterly to I-94, on I-75 from the south Genesee County Line northerly to the north Genesee County line and on US-23 from the south Genesee County Line northerly to I-75, Genesee, Shiawassee, Lapeer, and St. Clair Counties.

No DBE participation required

Bidder As-SubmitttedJ. Ranck Electric, Inc. $442,812.89Poco Sales, Inc. $509,959.90Give 'em A Brake Safety, LLC $516,258.76Action Traffic Maintenance, Inc. $594,653.53

Total Number of Bidders: 4

Page 68: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 068 Low Bid: $2,963,028.85

Project: NH 69021-204273 Engineer Estimate: $2,615,121.53

Local Agreement: Pct Over/Under Estimate: 13.30 %

Start Date: June 3, 2019 Completion Date: August 16, 2019

Description:

11.75 mi of hot mix asphalt cold milling and resurfacing and paver placed surface seal, concrete curb and gutter and pavement markings on M-32 from east of US-131 to east of Murner Road in the city of Gaylord, Otsego and Antrim Counties. This work includes a 3 year pavement performance warranty and a 3 year materials and workmanship pavement warranty.

3.00 % DBE participation required

Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $2,963,028.85Payne & Dolan Inc. $2,999,935.15

Total Number of Bidders: 2

Page 69: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 069 Low Bid: $448,302.16

Project: STUL 46417-133079 Engineer Estimate: $437,715.00

Local Agreement: 19-5130 Pct Over/Under Estimate: 2.42 %

Start Date: 10 days after award Completion Date: August 23, 2019

Description:

0.62 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutters and ADA ramps on various routes, Lenawee County. This is a Local Agency project.

5.00 % DBE participation required

Bidder As-SubmitttedC & D Hughes, Inc. $448,302.16Gerken Paving, Inc. $448,829.76Michigan Paving and Materials Company $479,778.92

Total Number of Bidders: 3

Page 70: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 070 Low Bid: $216,158.03

Project: BO 37000-133011 , ETC Engineer Estimate: $183,347.00

Local Agreement: 19-5096 Pct Over/Under Estimate: 17.90 %

Start Date: 10 days after award Completion Date: October 10, 2019

Description:

Epoxy overlay, deck joint replacements, concrete surface coating and guardrail on Broomfield Road over the south branch of the Chippewa River, Isabella County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedAnlaan Corporation $216,158.03Grand River Construction, Inc. $244,420.50C. A. Hull Co., Inc. $280,864.85

Total Number of Bidders: 3

Page 71: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 071 Low Bid: $463,844.56

Project: BHT 73000-133002 Engineer Estimate: $716,110.00

Local Agreement: 19-5101 Pct Over/Under Estimate: -35.23 %

Start Date: July 8, 2019 Completion Date: October 25, 2019

Description:

Deck joint replacement, concrete bridge approach, curb and gutter, deck patching, railing replacement, epoxy overlay, beam end repairs and guardrail on Sheridan Road over Flint River, Saginaw County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedGrand River Construction, Inc. $463,844.56Anlaan Corporation $531,841.68C. A. Hull Co., Inc. $533,175.68Z Contractors, Inc. $567,792.61

Total Number of Bidders: 4

Page 72: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 072 Low Bid: $428,194.15

Project: STL 79000-130162 Engineer Estimate: $407,683.15

Local Agreement: 19-5124 Pct Over/Under Estimate: 5.03 %

Start Date: 10 days after award Completion Date: August 31, 2019

Description:

1.16 mi of hot mix asphalt base crushing, shaping, resurfacing, asphalt cement stabilized base, aggregate shoulder and pavement markings on Bay City Forestville Road from the east Unionville village limit east to French Road, Tuscola County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedPyramid Paving and Contracting Co. $428,194.15Ace-Saginaw Paving Company $450,132.09Astec Asphalt, Inc. $478,558.91

Total Number of Bidders: 3

Page 73: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 073 Low Bid: $1,012,844.78

Project: BHT 25000-133031 Engineer Estimate: $1,474,876.75

Local Agreement: 19-5091 Pct Over/Under Estimate: -31.33 %

Start Date: July 8, 2019 Completion Date: June 26, 2020

Description:

Superstructure replacement with prestressed concrete box beams, hot mix asphalt approach, drainage, guardrail

and pavement markings on Carpenter road over the Flint River, Genesee County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedE.T. MacKenzie Company $1,012,844.78Milbocker and Sons, Inc. $1,116,330.28Z Contractors, Inc. $1,133,442.33C. A. Hull Co., Inc. $1,174,611.68Anlaan Corporation $1,235,295.90Toebe Construction LLC $1,258,257.10Grand River Construction, Inc. $1,278,545.67

Total Number of Bidders: 7

Page 74: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 074 Low Bid: $393,933.25

Project: STUL 22000-132295-2 Engineer Estimate: $335,642.50

Local Agreement: 19-5095 Pct Over/Under Estimate: 17.37 %

Start Date: 10 days after award Completion Date: July 3, 2019

Description:

0.70 mi of hot mix asphalt crushing, shaping and resurfacing and concrete curb and gutter, sidewalk ramps on Vulcan Street from 4th Street to East Grant Street, Margaret Street from Stephenson Avenue (US-2) to Vulcan Street and East Grant Street from Vulcan Street to Millie Street in the city of Iron Mountain, Dickinson County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedBacco Construction Company $393,933.25Payne & Dolan Inc. $591,717.50

Total Number of Bidders: 2

Page 75: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 075 Low Bid: $354,506.38

Project: STL 29000-205128 Engineer Estimate: $362,813.50

Local Agreement: 19-5123 Pct Over/Under Estimate: -2.29 %

Start Date: 10 days after award Completion Date: September 27, 2019

Description:

1.00 mi of hot mix asphalt base crushing, shaping and resurfacing, aggregate shoulders and pavement markings on Buchanan Road from Blair Road east to Wisner Road, Gratiot County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedCentral Asphalt, Inc. $354,506.38D. J. McQuestion & Sons, Inc. $377,247.16Michigan Paving and Materials Company $397,625.63Rieth-Riley Construction Co., Inc. $524,915.00

Total Number of Bidders: 4

Page 76: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 076 Low Bid: $396,971.00

Project: BO 58000-133158 Engineer Estimate: $447,389.00

Local Agreement: 19-5098 Pct Over/Under Estimate: -11.27 %

Start Date: July 1, 2019 Completion Date: October 10, 2019

Description:

Bridge removal and replacement with a four sided precast concrete culvert and approach work on Exeter Road over Little Swan Creek, Monroe County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedErie Construction, LLC $396,971.00Angelo Iafrate Construction Company $402,047.50Fonson Company, Inc. $443,778.00Z Contractors, Inc. $452,203.81Anlaan Corporation $538,321.33

Total Number of Bidders: 5

Page 77: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 077 Low Bid: $474,964.70

Project: TAUL 73000-202383 Engineer Estimate: $539,375.50

Local Agreement: 19-5108 Pct Over/Under Estimate: -11.94 %

Start Date: June 10, 2019 Completion Date: June 15, 2020

Description:

0.89 mi of hot mix asphalt shared use path, concrete sidewalk, sidewalk ramps, culverts, drainage, sewer along O'hern and Van Wormer road, Saginaw County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedMalley Construction, Inc. $474,964.70Tri-City Groundbreakers, Inc. $502,127.00Geiersbach Construction, Inc. $503,000.00Rohde Bros. Excavating, Inc. $521,210.00Champagne and Marx Excavating, Inc. $542,217.85Zito Construction $606,954.00

Total Number of Bidders: 6

Page 78: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 078 Low Bid: $459,951.22

Project: STL 29000-205096 Engineer Estimate: $462,703.50

Local Agreement: 19-5144 Pct Over/Under Estimate: -0.59 %

Start Date: 10 days after award Completion Date: August 2, 2019

Description:

3.00 mi of hot mix asphalt resurfacing, aggregate shoulders and pavement markings on Lincoln Road from Barry Road east to the Gratiot East County Line, Gratiot County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedCentral Asphalt, Inc. $459,951.22Michigan Paving and Materials Company $586,318.42

Total Number of Bidders: 2

Page 79: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 079 Low Bid: $1,526,249.50

Project: STL 23000-130123 Engineer Estimate: $1,450,973.94

Local Agreement: 19-5109 Pct Over/Under Estimate: 5.19 %

Start Date: April 15, 2019 Completion Date: August 16, 2019

Description:

4.00 mi of hot mix asphalt cold milling and resurfacing, concrete curb and gutter, joint and crack repair, shoulder trenching, culvert replacement and cleanout, ditching, slope restoration, guardrail and pavement markings on Battle Creek Road from south of Five Point Highway to Carlisle Highway, Eaton County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedLakeland Asphalt Corporation $1,526,249.50Rieth-Riley Construction Co., Inc. $1,566,513.27Michigan Paving and Materials Company $1,738,655.95

Total Number of Bidders: 3

Page 80: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 080 Low Bid: $4,325,036.12

Project: STU 63000-203657 Engineer Estimate: $4,941,194.75

Local Agreement: 19-5116 Pct Over/Under Estimate: -12.47 %

Start Date: April 29, 2019 Completion Date: October 10, 2019

Description:

1.30 mi of concrete reconstruction, concrete curb, gutter and ADA ramps, aggregate base, storm sewer, signals and pavement markings on University Drive from Martin Luther King Boulevard to the east city limits of Pontiac, Oakland County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedFlorence Cement Company $4,325,036.12Mark Anthony Contracting, Inc. $4,795,977.56Toebe Construction LLC $5,293,648.34

Total Number of Bidders: 3

Page 81: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 081 Low Bid: $1,266,506.81

Project: TAU 82457-132552 Engineer Estimate: $1,163,586.95

Local Agreement: 19-5117 Pct Over/Under Estimate: 8.85 %

Start Date: 10 days after award Completion Date: November 15, 2020

Description:

0.53 mi of hot mix asphalt shared use path includes aggregate trail, prefabricated truss bridge, concrete curb and gutter, drainage, sewer, helical piles and pavement markings along Ann Arbor Trail from Dover Street to Hines Park Drive in the city of Westland, Wayne County. This is a Local Agency project.

5.00 % DBE participation required

Bidder As-SubmitttedZ Contractors, Inc. $1,266,506.81

Total Number of Bidders: 1

Page 82: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 082 Low Bid: $898,694.25

Project: BHT 41000-133045 Engineer Estimate: $920,777.70

Local Agreement: 19-5106 Pct Over/Under Estimate: -2.40 %

Start Date: 10 days after award Completion Date: October 4, 2019

Description:

Bridge sidewalk patching, deck epoxy overlay, expansion joint replacement, sidewalk healer sealer, cleaning and coating of the steel bridge rails and pavement markings on Bridge Street, North Park Street and Ann Street over the Grand River in the city of Grand Rapids, Kent County. This is a Local Agency project.

4.00 % DBE participation required

Bidder As-SubmitttedAnlaan Corporation $898,694.25C. A. Hull Co., Inc. $1,363,721.32

Total Number of Bidders: 2

Page 83: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 083 Low Bid: $605,201.69

Project: ST 59023-202806 Engineer Estimate: $586,434.39

Local Agreement: Pct Over/Under Estimate: 3.20 %

Start Date: August 12, 2019 Completion Date: October 4, 2019

Description:

3.63 mi of full-depth concrete pavement repairs, concrete joint and crack sealing, intermediate and joint concrete spall repairs, and hot mix asphalt cold milling and resurfacing the carpool lot in Carson City, portions of mainline and shoulders on M-57 from east of Fish Creek easterly to the east city limits of Carson City and the interchange ramps on US-131 at M-82, Cannonsville Road and at 22 Mile Road, Kent and Montcalm Counties.

5.00 % DBE participation required

Bidder As-SubmitttedCausie Contracting, Inc. $605,201.69Rieth-Riley Construction Co., Inc. $788,107.74C & D Hughes, Inc. $863,843.97Major Cement Co. $896,183.71Cipparrone Contracting, Inc. $1,092,840.68

Total Number of Bidders: 5

Page 84: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 084 Low Bid: $369,317.11

Project: ST 60012-204145 Engineer Estimate: $478,982.77

Local Agreement: Pct Over/Under Estimate: -22.90 %

Start Date: August 5, 2019 Completion Date: September 13, 2019

Description:

35.26 mi of hot mix asphalt crack treatment at various locations in the cities of Alpena, Harrisville and Onaway and the village of Hillman, Alcona, Alpena, Iosco, Montmorency, Oscoda and Presque Isle Counties. This project includes a 2 year pavement performance warranty.

No DBE participation required

Bidder As-SubmitttedMichigan Joint Sealing, Inc. $369,317.11Scodeller Construction, Inc. $369,492.27Fahrner Asphalt Sealers, L.L.C. $373,693.35

Total Number of Bidders: 3

Page 85: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 085 Low Bid: $337,574.59

Project: NH 69013-204234 Engineer Estimate: $469,857.00

Local Agreement: Pct Over/Under Estimate: -28.15 %

Start Date: May 28, 2019 Completion Date: June 21, 2019

Description:

85.31 Lnmi of hot mix asphalt crack treatment on state trunklines and freeways in Roscommon, Crawford, and Otsego Counties. This project includes a 2 year pavement performance warranty for 3 of 5 locations.

No DBE participation required

Bidder As-SubmitttedMichigan Joint Sealing, Inc. $337,574.59Scodeller Construction, Inc. $347,521.60Fahrner Asphalt Sealers, L.L.C. $434,174.34

Total Number of Bidders: 3

Page 86: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 086 Low Bid:

Project: ST 82025-200962 Engineer Estimate:

Local Agreement: 17-5432 Pct Over/Under Estimate:

Start Date: May 28, 2019 Completion Date: Calendar Days

Description:

No DBE participation required

Bidder As-Submittted

Total Number of Bidders: No Bids Submitted

Page 87: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 087 Low Bid: $2,130,868.92

Project: HSIP 21000-203026 Engineer Estimate: $1,956,328.11

Local Agreement: 18-5551 Pct Over/Under Estimate: 8.92 %18-556418-556618-5567

Start Date: April 15, 2019 Completion Date: November 29, 2019

Description:

Application of permanent pavement markings on trunkline routes, Alger, Baraga, Chippewa, Delta, Dickinson, Gogebic, Houghton, Iron, Keweenaw, Luce, Mackinac, Marquette, Menominee, Ontonagon, and Schoolcraft Counties and on local roads, Baraga, Chippewa, Dickinson, and Keweenaw Counties.

No DBE participation required

Bidder As-SubmitttedP.K. Contracting, Inc. $2,130,868.92

Total Number of Bidders: 1

Page 88: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 088 Low Bid: $2,403,242.72

Project: STU 63000-203633 , ETC Engineer Estimate: $2,314,160.00

Local Agreement: 19-5160 Pct Over/Under Estimate: 3.85 %

Start Date: 10 days after award Completion Date: September 18, 2021

Description:

1.20 mi of hot mix asphalt cold milling and resurfacing, concrete pavement, driveway, curb, gutter, sidewalk and ramps, drainage, signing, adjust structures and pavement markings on Woodward Heights Boulevard from Bermuda Street to Hilton Road, Oakland County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedFlorence Cement Company $2,403,242.72Angelo Iafrate Construction Company $2,648,725.10Dan's Excavating, Inc. $3,036,739.34

Total Number of Bidders: 3

Page 89: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 089 Low Bid:

Project: BRT 79000-133041 Engineer Estimate:

Local Agreement: 19-5114 Pct Over/Under Estimate:

Start Date: 10 days after award Completion Date: Calendar Days

Description:

3.00 % DBE participation required

Bidder As-Submittted

Total Number of Bidders: No Bids Submitted

Page 90: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 090 Low Bid: $938,628.16

Project: BHT 19000-200647 , ETC Engineer Estimate: $822,880.55

Local Agreement: 19-5148 Pct Over/Under Estimate: 14.07 %

Start Date: May 20, 2019 Completion Date: June 28, 2019

Description:

4.08 mi of hot mix asphalt cold milling and resurfacing, trenching, concrete curb and gutter, gravel shoulders,

bridge maintenance and pavement markings on East Island Road from Shepardsville Road east to Hollister Road

and E Colony Road from Williams Road east to Chandler Road, Clinton County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $938,628.16Michigan Paving and Materials Company $969,959.63

Total Number of Bidders: 2

Page 91: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 091 Low Bid: $379,136.76

Project: STRH 03000-202336 Engineer Estimate: $323,885.00

Local Agreement: 19-5112 Pct Over/Under Estimate: 17.06 %

Start Date: 10 days after award Completion Date: July 26, 2019

Description:

0.24 mi of railroad crossing improvements including crossing lights and gates, median island, concrete curb and gutter, sidewalks, culverts, sewer, drainage and pavement markings on Waverly Road and East 40th Street at CSX Railroad crossings in the city of Holland, Allegan County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedMilbocker and Sons, Inc. $379,136.76Kamminga & Roodvoets, Inc. $385,253.60Michigan Paving and Materials Company $496,431.00Al's Excavating, Inc. $579,167.00

Total Number of Bidders: 4

Page 92: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 092 Low Bid: $1,889,066.60

Project: STL 39000-120246 , ETC Engineer Estimate: $1,784,529.00

Local Agreement: 19-5141 Pct Over/Under Estimate: 5.86 %

Start Date: May 20, 2019 Completion Date: April 24, 2020

Description:

4.04 mi of hot mix asphalt cold milling and resurfacing, concrete curb and gutter, culverts, sewer, drainage, shoulder widening and pavement markings on D Avenue West from Rolling Meadow Drive to Douglas Avenue and from 17th Street to Riverview Drive, Kalamazoo County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $1,889,066.60Lakeland Asphalt Corporation $1,895,214.10Michigan Paving and Materials Company $1,991,175.35

Total Number of Bidders: 3

Page 93: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 093 Low Bid: $1,385,259.96

Project: BRT 81000-133161 Engineer Estimate: $950,525.25

Local Agreement: 19-5133 Pct Over/Under Estimate: 45.74 %

Start Date: July 8, 2019 Completion Date: October 25, 2019

Description:

Bridge removal and replacement with a three sided culvert and approach work on Saline Milan Street over the Koch Drain, Washtenaw County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedAnlaan Corporation $1,385,259.96

Total Number of Bidders: 1

Page 94: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 094 Low Bid: $309,999.64

Project: TAU 82000-204958 Engineer Estimate: $282,277.00

Local Agreement: 19-5105 Pct Over/Under Estimate: 9.82 %

Start Date: June 17, 2019 Completion Date: October 11, 2019

Description:

0.49 mi of concrete driveway, sidewalk and ramps, aggregate base, drainage and pavement markings along the southside of Marquette Street from North Newburgh Road to North Wayne Road in the city of Westland, Wayne County. This is a Small Business Program project. Only those approved by MDOT as a Small Business may be eligible to bid as a prime contractor. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedAudia Concrete Construction, Inc. $309,999.64Erie Construction, LLC $389,976.00

Total Number of Bidders: 2

Page 95: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 095 Low Bid: $465,438.00

Project: EDD 78000-205742 Engineer Estimate: $541,072.28

Local Agreement: 19-5126 Pct Over/Under Estimate: -13.98 %

Start Date: 10 days after award Completion Date: October 31, 2019

Description:

3.84 mi of hot mix asphalt overlay, aggregate shoulders and pavement markings on Heimbach Road from US-131 to M-60, St. Joseph County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedMichigan Paving and Materials Company $465,438.00Rieth-Riley Construction Co., Inc. $520,228.00

Total Number of Bidders: 2

Page 96: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 096 Low Bid: $1,040,868.75

Project: STUL 03005-133174 Engineer Estimate: $931,070.50

Local Agreement: 19-5140 Pct Over/Under Estimate: 11.79 %

Start Date: July 8, 2019 Completion Date: September 13, 2019

Description:

0.43 mi of hot mix asphalt reconstruction, concrete curb, gutter, sidewalk and ramps, sanitary sewer, water main and pavement markings on North Sherwood Avenue from M-89 (E. Bridge Street) to Main Street in the city of Plainwell, Allegan County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedPeters Construction Co. $1,040,868.75Milbocker and Sons, Inc. $1,043,834.46Kamminga & Roodvoets, Inc. $1,057,837.65Schippers Excavating, Inc. $1,158,236.50Al's Excavating, Inc. $1,320,199.00

Total Number of Bidders: 5

Page 97: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 097 Low Bid: $416,440.79

Project: STUL 11000-133009 Engineer Estimate: $421,743.77

Local Agreement: 19-5053 Pct Over/Under Estimate: -1.26 %

Start Date: 10 days after award Completion Date: August 30, 2019

Description:

0.78 mi of hot mix asphalt resurfacing, trench widening, guardrail and aggregate shoulders on Red Arrow Highway from Boyer Road to the west city limits of Coloma, Berrien County. This is a Local Agency project.

2.00 % DBE participation required

Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $416,440.79Michigan Paving and Materials Company $495,191.90

Total Number of Bidders: 2

Page 98: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 098 Low Bid:

Project: 70000-130778pp Engineer Estimate:

Local Agreement: Pct Over/Under Estimate:

Start Date: 10 days after award Completion Date: November 1, 2019

Description:

1.50 mi of hot mix asphalt resurfacing, machine grading, aggregate base, concrete driveway, curb and gutter, storm sewer, retaining wall, signing and pavement markings on North Shore Drive from Grand Haven city limit to Main Street and from the Ferrysburg city limit to North Shore Park and Piney Pointe Drive from North Shore Drive to Cul de sac in the city of Grand Haven, Ottawa County. This is a Local Agency project.

3.00 % DBE participation required

This proposal has been postponed.

Page 99: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 099 Low Bid: $688,823.53

Project: STL 16555-130317 Engineer Estimate: $764,953.80

Local Agreement: 19-5125 Pct Over/Under Estimate: -9.95 %

Start Date: April 22, 2019 Completion Date: August 30, 2019

Description:

2.54 mi of hot mix asphalt base crushing and shaping, resurfacing, concrete curb and gutter, culverts, sewer, guardrail and pavement markings on Mann Road from M-33 east to Pallister Road, Cheboygan County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedJ & N Construction, LLC $688,823.53Rieth-Riley Construction Co., Inc. $689,126.60Elmer's Crane and Dozer, Inc. $769,054.54Payne & Dolan Inc. $796,723.20

Total Number of Bidders: 4

Page 100: A s -S u b m itte d R e s u lts R e p o rt v1 · 5.04.2019  · m e d ia n ca b le b a rrie r a n d p a ve m e n t m a rkin g s o n I-9 4 e a stb o u n d fro m e a st o f C o unty

Letting of April 05, 2019

Letting Call: 1904 100 Low Bid: $2,377,773.95

Project: TAL 41000-131354 Engineer Estimate: $2,371,892.40

Local Agreement: 19-5127 Pct Over/Under Estimate: 0.25 %

Start Date: 10 days after award Completion Date: August 16, 2020

Description:

24.22 mi of hot mix asphalt shared use path includes aggregate base, modification of trail bridge, precast concrete

box, concrete sidewalks and ramps, drainage, culverts and timber piles on Flat River Valley Trail from M-57 to

Grand River Avenue in the city of Greenville, Kent, Ionia and Montcalm Counties. This is a Local Agency project.

5.00 % DBE participation required

Bidder As-SubmitttedD. J. McQuestion & Sons, Inc. $2,377,773.95C L Trucking & Excavating, LLC $2,777,913.00Dean's Landscaping & Excavating, Inc. $3,049,268.40Davis Construction, Inc. $3,187,639.57Kamminga & Roodvoets, Inc. $3,304,915.20

Total Number of Bidders: 5