    A REPORT ON THE WINTERINTERNSHIP AT APOLLO TYRES,

    PERAMBRA, CHALAKKUDY

    SUBMITTED BYKRISHNAKUMAR.E

    ROLL NO 717MBA PART 1

    DEPARTMENT OF MANAGEMENT STUDIESGOA UNIVERSITY

  • 8/2/2019 A Report on the Winter Internship at Apollo Tyre1

    2/17

    INTRODUCTION:-APOLLO TYRES is ranked 18th in the global tyre industry. It has maintained leadership positionin the commercial vehicles tyre segment which generates 70% of the turnover in the Indian TyreIndustry ($3.2BILLION), in terms of value.VISION:-

    A LEADER IN THE INDIAN TYRE INDUSTRY AND A SIGNIFICANT GLOBAL PLAYER,PROVIDING CUSTOMER DELIGHT AND ENHANCING SHAREHOLDER VALUE.PERAMBRA PLANT-IN FOCUS:-APOLLO TYRES, PERAMBRA is the largest truck tyre plant in India. It is known as TheMother Plant. It became operational in the year 1977. This plant has received ISO 9001 QualityCertification.

  • 8/2/2019 A Report on the Winter Internship at Apollo Tyre1

    3/17

    THE BIAS TYRE MANUFACTURING PROCESS:-

    The pneumatic tyre is a composite structure madeout of rubber compounds, textile and wire materials. It has basic components, viz. Tread andSidewall (made out of rubber compounds) and Carcass (made out of rubber compounds, textileand wire materials). The Carcass has components Plies, Bead, Chafer, Flipper etc. The

    process of tyre manufacturing involves mixing of various rubber compounds, dipping of fabric,preparation of various components, assembling the components to form the green tyre andcuring the Green tyre to the final shape. The entire production system has been broadly dividedin to 3 sections, viz. Div. A, Div. B, Div. C. The various steps of manufacturing are describedbelow.

    PROCESSES UNDER DIV. A:-

    MIXING:-All polymers are mixed with filler, process oil and other chemicals to give different grades ofrubber compounds in the 4 Banbury Mixers. 2 Banbury mixers are meant for mixing the MasterBatches. The other 2 are for mixing the Final Batches. In the Master Batch, the rubber is mixedwith carbon, process oil and other chemicals. In the final batch, the master batch rubber isagain mixed with sulphur and other vulcanizing compounds to enhance its cross-linkingproperty at the time of curing. 205 final batches are prepared in one eight-hour shift. I masterbatch corresponds to 1.52 final batches. Hence, only 134 master batches needed to beprepared in 1 eight-hour shift. 1 ready to use batch will be obtained after mixing 2.52 batches (1master batch and 1.52 final batches). 2 minutes are taken for mixing one batch. Therefore, 5minutes are taken for obtaining 1 ready-to-use batch weighing 80 kg. Approx. 2 truck tyres canbe made out of this 1 batch (1 truck tyre weighs 57kg, 85% of which form the rubber

    compounds). The mixed batch is the dropped on a batch-off mill to make it in to sheet form.Each type of rubber compound is specifically compounded for tyre performance. The differentchemicals to be mixed are given particular codes. Detailed process specificationsencompassing the temperature and pressure to be maintained, quantities and codes of differentchemicals to be mixed , speed of mixing(60 rpm for master batch and 40 rpm for final batch) etcare available with the operators. After forming in to sheets a small piece of rubber compound iscut off from each batch and taken to lab for examining whether different chemicals have beendistributed uniformly. Only after getting the approval, it is sent to extruders, calendaring unit etc.FABRIC DIPPING:-The Nylon fabric is treated with latex, resorcinol, formaldehyde etc. , heated, stretched andcooled to increase its adhesiveness with the rubber compounds. It operates continuously for allthe 3 shifts.13000 metres are dipped in an eight-hour shift. Nearly 18 m. is required for 1 trucktyre. The line speed for the dipping unit is 30 yards/minute for the truck tyre. Different nylon

    cords are required for the manufacture of different tyre types. Each type of nylon fabric requiresto be coated with a specific amount of latex. After dipping, the fabric is wrapped and packed in

    FABRICDIPPING

    FABRICCALENDARING

    PLY CUTTINGSQUEEGE

    APPLICATION

    RAWMATERIALSTORES

    COMPOUNDMIXING

    TYREBUILDING

    TYRECURING

    FINAL FINISHINSPECTION

    FGSEXTRUSION

    BEADPREPARATION

    CEMENTMIXING

  • 8/2/2019 A Report on the Winter Internship at Apollo Tyre1

    4/17

    polyethylene in order to prevent the absorption of moisture from the atmosphere and stacked inthe near by storage area.CALENDARING:-The dipped fabric is then fed in to 4-roll calendar to apply rubber compounds on both sides. Theadvantage of using 4-roll calendar is that both the sides of the fabric can be coatedsimultaneously and that too with different rubber compounds. The agreed output with the trade

    union in an 8-hour shift is 55 rolls (23800 metres). The calendared fabric is then wound incotton liners to prevent sticking. The line speed is 60 yards/minute for truck tyres.DUAL EXTRUDER:-Components like sidewalls, treads are prepared using extrusion technique. The dual extruderconsists of 2 separate set of mills on which 2 different types of compounds are broken down,heated and fed to 2 different screws. The 2 compounds are then extruded together in acommon head. With the help of a performer and final dies, these emerge in to predeterminedshape. The advantage of using dual extruder is that rubber compounds of completely differentcompositions can be extruded. It takes 15-20 minutes for the rubber compounds to be formedinto a tread. The line speed for the truck tyre is 40 feet per minute. The output is 5 truck treadsper minute. In the case of sidewalls, the output is 1500 sidewalls in eight hours. The dualextruder is considered as the bottleneck in Div. A. 1 tread and pair of sidewalls is required for 1truck tyre. The output for dual extruder is 1920 equivalents. Each type of tyre is assigned a

    factor. The no. of treads prepared (which corresponds to no. of tyres) multiplied by the factorgives the output in equivalents. The sum of the output of the different tyres will be equal to1920 equivalents in eight hours. The line speed is 38 FPM for treads and 16FPM for sidewalls.SQUEEGE APPLICATION:-The calendared fabric is further applied with a layer of rubber compounds using 3-roll calendar.The output is 192 rolls per eight hours. The fabric required for 6 tyres can be obtained from 1roll. 3 such machines are there.PREPARATION OF CHAFERS, BREAKERS AND FLIPPERS:-The rubber compounds required for the above components, mixed in the Banbury is fed to thecorresponding machines. 6150 breakers are obtained in an 8-hour shift. 152 rolls of chafers andflippers each are obtained in eight hours. The components required for 18 tyres are obtainedper roll.PROCESSES UNDER DIVISION B:-

    BIAS CUTTING:-Bias cutters are used for cutting calendared fabrics to specified widths and angles known asplies. Eight plies are required for 1 truck tyre. The width depends upon the type of tyre and theangle of the cut depends on the type of tyre services required. 25 seconds are required to cuteight plies. 6 bias cutters are there. Therefore, plies for 6 tyres are obtained in 25 seconds.From a roll of 430 metres, we will get ply required for 40 truck tyres.BEAD WINDING, FLIPPING AND APEXING:-The function of beads in a tyre is to anchor it while mounting the rim of vehicles. The bead wireis coated with rubber compound in a T-head extruder and wound in to coils of requireddimension. The coiled beads are further applied with rubber and calendared fabrics ofappropriate dimensions. 4 beads are required for a tyre. 5100 beads are prepared in 8 hours in4 machines.

    TYRE BUILDING:-Tyre Building Machine (TBM) has a turret for holding a no. of plies, breakers, chafer rollsbesides tread applying conveyor. According to the size of the tyre to be built, specified buildingdrum is mounted on the shaft (which can rotated at different speeds and in both directions) ofTBM. The fabric layers and bead wires are applied to the drum, which are compressedtogether. After building the cord carcass on the drum, the tread, sidewalls and chafers areapplied. The Green Tyres thus formed are removed from the drum by collapsing the same.PROCESSES UNDER DIV. C:-

    TYRE CURING:-The Green Tyre is prepared for vulcanization by the application of lubricants on the inner and

    outer surfaces for better moulding, awling (the sidewalls are pierced with the needles to releasethe trapped air) and punching. The Bagomatic Curing Press consists of a thin synthetic cured

  • 8/2/2019 A Report on the Winter Internship at Apollo Tyre1

    5/17

    bladder positioned in the centre of the bottom half of the mould over which the green tyres areplaced. The steam pressure is applied in to the bladder and it is increased till the green tyretakes the complete shape of the mould when the press is closed. Curing media like hot water,steam etc are passed through the bladder while the outer surface of the mould is heated by thesteam. The internal pressure is critical for the purpose of obtaining good moulding effects. Theheat to be applied to the different locations of tyre compounds has to be as per specifications.

    Less temperature will result in under cure condition and more temperature will result indeterioration of rubber compounds. Afterwards, the tyre is taken out, mounted on a speciallydesigned rim and inflated to required pressure, while it is still hot. This is to prevent the loss ofshape when it is suddenly brought to room temperature after relieving the pressure. The tyre iscooled under inflation (for almost double the time taken for curing). This is known as Post CureInflation (PCI). The truck tyre takes 43 minutes for curing and 80 minutes for PCI. The no. ofPCI presses are double the no. of curing presses. 48 cavities are there for truck tyres. 10 tyresare cured per cavity in eight hours. The achieved capacity is 92 metric tons per shift whichconsists of other tyres also.INSPECTION AND WAREHOUSING:-The cured tyre is then trimmed off flashes, inspected and warehoused.

    THE HR DEPARTMENT

    Human Resources and Administration Department facilitates the smooth working of theorganization. It is divided in to 3 sections namely 1) Industrial Relation 2) Security 3)Administration.Among the three sections, Industrial Relation is the biggest section having 3sub-sections looking in to arrival and departure, welfare and safety of the employees.ORGANIZATIONAL STRUCTURE OF HR DEPT.:-

    1) PERSONNEL AND IR:-

    a) Recruitment:-

    HEAD-HR AND

    ADMINISTRATION

    MANAGER-

    PERSONNEL AND IR

    GENERAL MANAGER-

    SECURITY

    MANAGER-

    ADMINISTRATION

    EXECUTIVE EXECUTIVE

    ASSO. MANAGER

    TIME OFFICE

    ASSO. MANAGER

    SAFETY

    ASSO. MANAGER

    WELFARE

    EXECUTIVE EXECUTIVE EXECUTIVE

  • 8/2/2019 A Report on the Winter Internship at Apollo Tyre1

    6/17

    Recruitment is done through advertisement in newspapers. A good opportunity is given to thechild of the worker. This increases the loyalty of the employees family towards the company.They are called for the interview and the chief executive take final decision.Selection Procedure;-Management Staff- 1) Technical- Fresh Graduate Engineers from all the streams with 70%marks throughout the period of education. 2) Non-technical- Candidates holding degrees like

    CA/ICWA/MSW/MBA/MA (PM)Criteria for Selection: -a) Consistency in Academic Performance b) Performance in GD c) Performance in PersonalInterview.Induction Plan:-Blue Collar Workers-2 days.Management Staff-15 days.Employee Children Skill Development Scheme: -1 year training is given to children of interested employees in production processes. Theminimum qualification required is a pass in 10th STD.b) Training:-The organization provides training for both managers and workers. Training programs formanagers consist of both internal and external programs. The workers have internal programs

    only. The training systems include a) Need Identification b) Validation of Needs c) AnnualTraining Plan d) Selection and Preparation e) Fix Training Program f) Training ImpactAssessment

    Areas Covered:-1) For Management Staff: - a) Conceptual b) Functional c) Cross-functional d) Behavioural2) For Workers:- a) Systems b) Technical aspects c) Work Culture d) Specialized Training ForTrade Unionsc) Industrial Relations:-

    A good industrial relation exists in the organization. The management and employees jointlyfind the solutions for the problems. There exists a good relation between employees. There are4 main trade unions recognized by the company1) Apollo Tyres Staff and Worker Union.2) Apollo Tyres Employees Union.3) Apollo Tyres Mazdoor Sangh.

    4) Apollo Tyres Workers Movement.The trade unions which get at least 20% vote of total strength of employees are recognized bythe management. The management has introduced a Long Term Settlement Plan which isnothing, but a collective bargaining agreement. The decisions are taken jointly by the tradeunion and the management.d) Welfare:-The company runs a subsidized canteen on contract basis. Rest rooms with locker and washingfacility, arts and sports club, well-maintained library are other facilities provided. Propertransportation facilities are given to all the employees from different destinations. All employeesdrawing a salary less than Rs. 10000 are covered under group accident policy and Mediclaimpolicy. Taking health aspects of employees working in night shifts in to consideration, 200 mlare given to them for every night shift. 3 soaps each are given to employees in the productiondept. for cleanliness.

    Different Welfare Schemes:-For Management Staff

    MUTUAL TRUST UNDERSTANDING

    TEAM WORK

  • 8/2/2019 A Report on the Winter Internship at Apollo Tyre1

    7/17

    1) Group Hospitalization Scheme: - a) Executives 20000/person. b) Middle Level Managers-40000/ person. c) Senior Level Managers- 60000/person. The premium is completely met bythe employees. It is meant for a 4-member family.2) Group Personal Accident Policy.3) 2-wheeler Loan Scheme: - 40% of the amount required is provided by the company.4) Car Loan Scheme: - 40% of the amount is provided by the company. It is only meant for

    employees who are asst. managers and above.For Workers1) Group Personal Accident Policy: - 100% premium is paid by the company. The total amountfor which the employee is insured corresponds to 48 months of his salary.2) Mediclaim: - 50% of the premium is met by the company and the rest by the employees. 6-member family is covered under the insurance. Under this scheme each member can get Rs.40,000 per year to meet the hospital expenses.3) Housing Loans at Subsidized Interests: - 50% of the amount required is provided by thecompany.4) 2-wheeler Loans at Subsidized Interests: - 70% of the amount required is provided by thecompany.5) Free Periodical Medical Check-ups.6) Co-operative society to provide financial assistance.

    7) Bonuses in the range of Rs.12000-18000 are given if the annual average production > 90%,depending upon the attendance of the respective employees.8) Gratuity can be received at the successful completion of 5 continuous years in the company.9) Employees P.F. and Family Pension Scheme: - The contribution of employees towards P.F.and F.P.S. is 12% of the monthly salary.10) E.S.I.:- Employees receiving salary less than Rs. 6500 will be covered under scheme.Employee contribution is 4.75% of his salary.e) Time Office:-It is concerned with registering the time in and out of the workers and the purpose lies in themaintenance of discipline in attendance, calculation of wages for time-workers etc. differentregisters are kept for different shifts for the effective functioning. Apart from it, a punchingsystem is also maintained. Each employee has to punch his badge in the electronic punchingsystem maintained, both at the times of arrival and departure. Attendance is cross-checked with

    the attendance report of the workman and the attendance registers maintained at varioussections for staff and managerial persons. Performance reports are maintained in each section.These are done with a view to reduce the absenteeism in employees. A leave book ismaintained and it contains leave credited, leave balance, leave awaited. The daily attendancereport is verified by the supervisor, shift engineer, shift superintendent and dept. head.

    Working HoursA-Shift- 6AM TO 2PM.B-Shift-2PM TO 10PM.C-Shift-10PM TO 6AM.D-Shift-9AM TO 5PM.f) Safety:-The organization follows all the provisions under the Factories Act 1948. The plant is well-

    equipped with safety machines like fire extinguishers at reachable points and directions andtraining are given for operating the same. Safety directions are placed at noticeable points inand around the plant premises. Those who work in production unit are given masks, safetygowns and shoes. Here, a separate safety book is given to each employee, which prescribescertain procedures and rules to avoid accidents.The company follows the policy of SHE.S- SAFETY ASPECTSH- HEALTHThe company has. Full Time Doctor.. Ambulance.. Dispensary.. Periodical Medical Checkups.

    E- ECOFRIENDLY SURROUNDINGS AND POLLUTION FREE WORK PRACTICESg) Security:-

  • 8/2/2019 A Report on the Winter Internship at Apollo Tyre1

    8/17

    Major Functions1) Monitor and control all inward and outward movement of vehicles, material and personnel.2) Deployment of contract workforce to various departments for routine as well as projectworks.3) Maintain the database of the entire indirect workforce.4) Ensure higher degree of liaison with police, local administration, fire force and govt.

    authorities.5) Upkeep of Environment Management system including housekeeping of the plant.6) Keeping strict vigilance, gathering and assimilating intelligence in a unionized environment.

    h) Other Administrative Activities:-1)Performance Appraisal:-1) Employees development review in the period of Mar-Apr.2) Three Tier Systems in which the performance is evaluated by the employee himself, hisimmediate boss and bosss boss.3) Helps in setting individual/ term goals.4) Rated in respect of the achievements.5) Mid year review of the goals.6) Personal attributes are considered.

    2)Absenteeism Management:-a) System:-1) Daily Follow Up.2) If the employees are absent for 3 days consecutively, they are asked to meet HR managerbefore going to the workplace. After 6 days, they are not allowed to work. After 10 days, HRofficials visit employees at the home and counsel them.b) Task Force:-12 task forces are set up for 116 members. Each constitutes 1 HR official and 1 line personnel.A no. of employees showed remarkable improvement in their attendance after task forces weresetup.3) Salary Payment:-1) Supervisors will have to open an account with the South Indian Bank and intimate theaccount no. to the accounting dept. which in turn will remit the salary in the bank.

    2) For technical and service staff, the salary is paid on the last working day of the month.3) For engg. and prodn. workmen, the salary is paid on the 7th working day of the next month.i) Other Relevant Information:-1) There are 5 national holidays and 8 festival holidays given in a year.2) The employees are given 1 day off after 48 hours of work.3) The retirement age is 58 years.4) The pay scale is revised annually in consultation with trade unions.5) The employees can take 1 day leave after 20 consecutive days of work.6) 3 categories of leave that the employees get are 1) sick leave 2) casual leave 3) privilegeleave.7) Promotion for management staff is purely based on performance. For workmen, it is basedon seniority.

    THE STORES DEPARTMENT

    RAW MATERIALS STORES(RMS):-PROCESS: - Receipt, handling, storage, packaging, forwarding and delivery of material tointernal and external customers with proper documentation to meet their requirements.PURPOSE: - To supply right material in right time to produce right quality product without anyinterruption.ACTIVITY DESCRIPTION:- 1) Upon the receipt of raw materials, the documents related totransporter and supply are verified to ensure the authenticity.2) Identification of the supply with full details of material code, date of receipt, suppliers nameand truck reg.no. will be carried out and it will be transferred to pre-decided location.3) Upon receipt of raw materials, GR will be prepared.4) Based on GR, quality assurance will collect the samples as per the predetermined frequencyand approve the materials, if the results are conforming to the requirements.

  • 8/2/2019 A Report on the Winter Internship at Apollo Tyre1

    9/17

    5) The materials, if rejected from lab will be sent back to supplier and all the accepted materialwill be accounted in the inventory.6) Issue of raw materials will be carried out to internal (mixing centres, extruders etc) andexternal (other units of Apollo) customers based on their requests.Various Raw Materials Used:-1) Polymers: - Natural and synthetic rubbers.

    2) Fillers, carbon black, reinforcing clays.3) Process oil.4) Curing agents/sulphur.5) Accelerators/activators.6) Antioxidants/antiozonents.7) Ret ardors.8) Peptizers.9) Fabrics.10) Bead wire spools.11) Solvents for cements and solutions.12) Miscellaneous items like paints, colours, scrap flakes etc.RECEIPT OF RAW MATERIALS:-Verification of Documents at Security Gate: - Serial No., suppliers name, description of the

    item, receipt quantity, receipt No. and date, truck reg. No., date and time of arrival anddeparture must be noted down.Weighing:- Security will inform the RMS about the arrival of the vehicles at the gate. Thesecurity officer and a representative from RMS will record the weight of the truck jointly. Theweigh slip will indicate the following; - Serial No., Date and Time of Receipt, Suppliers Name,Gross Weight with Materials. After recording the above details in the computerized weighingbalance, the vehicles are directed to the respective unloading bay. Both security and RMSpersonnel will sign on the weigh slip. One copy is sent to RMS along with delivery challan andsecond copy will be retained by security dept.Verification of Documents at RMS:- The receipt in charge will verify the documents toascertain the no. of packages, materials code and the weight. Discrepancy, if any, will bereported orally to the officer concerned before unloading. He in turn will take apt decision. Thedispatch documents include:- Delivery Challan, Invoice, Sales Tax Papers, Packing List &

    Duplicate Copy of Invoice for Transporter of Invoice for availing MODVAT credit. If any of theseare not received, the consignment will not be downloaded.

    ENGINEERING GOODS STORES (EGS):-EGS is responsible for storing the necessary spare parts and components required for thesmooth functioning of the plant. The inventory management is based on an economic orderquantity, re-order level and safety stock. Another system followed in engineering stores isVendor Maintain Inventory. In VMI, the raw materials are stored in large quantities and thepayment is made only for consumed items. At present, the total no. of item codes in the storesis 38500 out of which 23500 are spares (vary with machine, make and model) and 15000 areconsumables (bearings belts etc.).It is decided to 1) Identify common equipments by same make and model. 2) Assign uniformcodes to equipments make and model wise which is common across the plants. 3) Assign

    respective plant spares with codes of equipments.

    FINISHED GOODS STORES (FGS):-All the finished goods after final inspection are kept at the transferring area in each shift. Thestaff of final finishing will prepare a finished goods transfer notes in triplicate which will becountersigned by the staff of FGS. After verification, these will be serially numbered and havethe following details: - Material code, Description, Quantity. The original copy will be issued toCentral Excise Wing after entering the details in stock statement. The duplicate will be givenback to production dept. as their file copy. The triplicate will be issued to Production PlanningDept. 1 staff; each from PD and FGS will separately verify the quantity, size, ply rating of thefinished goods and compare with the entry in the transfer note.The finished goods for dispatch kept at the transferring area will be removed to the loading bayand the remaining will be removed to the stores after packing these.

    FGS has the function of receiving, storing and dispatching as per Supply Chain requirements,and communicating daily stock levels.

  • 8/2/2019 A Report on the Winter Internship at Apollo Tyre1

    10/17

    QUALITY ASSESSMENT:-The basic purpose of Plant Quality Assessment is to1) Establish universal scale of comparison for manufacturing excellence among various tyremanufacturing units of the Apollo Group.2) Identify improvement opportunities in manufacturing at system level ensuring strong

    foundation for World Class Manufacturing.3) Prioritize improvement opportunities based on their impact on overall performance of theorganization.11 FOCUS AREAS ARE 1) OPERATIONS 2) MAINTENANCE & INSTRUMENTATION 3)HOUSEKEEPING 4) EMPLOYEE SKILLS AND SATISFACTION 5) RAW MATERIALS 6)MATERIAL HANDLING AND LAYOUT 7) QUALITY MANAGEMENT 8) SAFETY, HYGIENE &POLLUTION CONTROL 9) VISUAL MANAGEMENT 10) FG DESPATCH 11) CUSTOMERFOCUS.13 CELLS UNDER ASSESSMENT 1) RMS 2) DIPPING 3) CALENDARING 4) MIXING 5)EXTRUDING 6) BIAS CUTTING 7) BEAD WINDING 8) TYRE BUILDING 9) TYRE CURING 10)FINAL FINISH 11) FGS 12) ENGG. 13) HR.Each of these cells is having almost 100 parameters to be assessed.

    Scoring methodology:-All parameters are graded in to 5 levels.Score 1:- Existence of system as documented policy (slips or logbooks) with demonstrablesupport ensuring execution. The score is given based on the fact that the knowledge of systemexists within the assessed area.Score 2:- System is followed at many places, which covers about 50% or more of applicableareas. This score is given based on the fact that the system is developing in the assessed areaand it is consistently followed.Score 3:- Roles and responsibilities for various aspects of systems are clarified andcommunicated across. This score is given based on the fact that the triple roles in the system(customer, supplier and processor of information, product or services) are clear to all theconcerned employees.Score 4:- Gaps in performance and controls are identified and corrective actions are taken

    resulting in to improved efficiency of system. The identified gaps are sealed permanently andthere is minimal chance of recurrence. The score is given based on the fact that over a periodof time, system is made more efficient (less cost, better quality, consistency, timely operationsetc.).Score 5:- Continuous improvement in performance parameters (effectiveness of the system) isseen over last few years. All important performance parameters are measured. The score isgiven based on the fact that system has contributed towards significant business benefitsand/or customer satisfaction.

  • 8/2/2019 A Report on the Winter Internship at Apollo Tyre1

    11/17

    BASIC

    AWARENE

    SS OF

    SYSTEM

    AMONG

    KEY

    EMPLOYE

    ES

    SIGNS OF

    SYSTEMS

    AT

    VARIOUS

    PLACES

    CAN BE

    SEEN

    MOST

    EMPLOYE

    ES AT

    SHOP

    FLOOR

    AWARE

    OF THE

    SYSTEM

    SCORE 1SCORE 2

    START

    ROLES

    OF

    EMPLOY

    EES ARE

    CLEAR

    AND

    KNOWN

    GAPS

    IN

    EFFICI

    ENCY

    IDENTI

    FIED/R

    EMOV

    ED

    SIGNIF

    ICANT

    IMPRO

    VEMEN

    T IN

    EFFEC

    TIVEN

    ESS

    SCORE 3

    SCORE 4

    YES

    NO

    SCORE 0

    NO

    N

    O

    YES

    N

    O

    YES

    NO

    YES

    NO

    YES

    SCORE 5

    YES

  • 8/2/2019 A Report on the Winter Internship at Apollo Tyre1

    12/17

    ANNEXURES:-

    machine utilization-fabric dipping

    87.4

    91 91

    83.9

    92.1

    88.4

    91.9

    82.5

    76788082848688909294

    2006-

    07

    target

    2007-

    08

    Apr-

    07

    May-

    07

    Jun-

    07

    Jul-07 Aug-

    07

    Sep-

    07

    Series1

    machine utilization-four roll calendar

    94.2 9687.4

    79.792.7 94.3 90.8 91.1

    0

    20

    40

    60

    80

    100

    120

    2006-

    07

    target

    2007-

    08

    Apr-

    07

    May-

    07

    Jun-

    07

    Jul-

    07

    Aug-

    07

    Sep-

    07

    %

    Series1

  • 8/2/2019 A Report on the Winter Internship at Apollo Tyre1

    13/17

    machine utilization-two roll calendar

    96.699

    74.481.3

    98.596.9 96.4 95.5

    0

    20

    40

    60

    80

    100

    120

    2006-

    07

    target

    2007-08

    Apr-

    07

    May-

    07

    Jun-

    07

    Jul-

    07

    Aug-

    07

    Sep-

    07

    tyre curing-utilization

    93

    97

    92.61

    85.13

    93.83 94.4

    92.293.65

    7880828486

    889092

    949698

    2006-

    07

    target

    2007-

    08

    Apr-

    07

    May-

    07

    Jun-

    07

    Jul-07 Aug-

    07

    Sep-

    07

    %

  • 8/2/2019 A Report on the Winter Internship at Apollo Tyre1

    14/17

    machine utilization-dual extruder

    96.494

    87.4

    83.6

    95.9 94.8 94.5 94.9

    75

    80

    85

    90

    95

    100

    2006-

    07

    target

    2007-

    08

    Apr-

    07

    May-

    07

    Jun-

    07

    Jul-07 Aug-

    07

    Sep-

    07

    machine utilzation-bias cutters

    96.08 9696.85

    88.86

    96.7697.8 97.81 97.25

    84

    86

    88

    90

    92

    94

    96

    98

    100

    2006-

    07

    target

    2007-

    08

    Apr-

    07

    May-

    07

    Jun-

    07

    Jul-

    07

    Aug-

    07

    Sep-

    07

  • 8/2/2019 A Report on the Winter Internship at Apollo Tyre1

    15/17

    machine utilization- mixing

    90.2 92

    87.1

    81.8

    94.195.7

    89.6 90.5

    70

    75

    80

    85

    90

    95

    100

    2006-

    07

    target

    2007-

    08

    Apr-

    07

    May-

    07

    Jun-

    07

    Jul-

    07

    Aug-

    07

    Sep-

    07

    pareto chart- downtime analysis- four

    roll calendar

    4

    1.9 1.9 1.8

    1

    0.237.03

    54.62

    72.21

    88.87

    98.12 99.97

    0

    0.51

    1.52

    2.53

    3.54

    4.5

    othe

    rdelay

    s

    mech

    dela

    ys

    abse

    nteeis

    mpm

    elec

    tricald

    elay

    materials

    sho

    rt 0

    20

    40

    60

    80

    100

    120

    %

  • 8/2/2019 A Report on the Winter Internship at Apollo Tyre1

    16/17

    downtime analysis- dual extruder

    21.6

    1.3 1.20.9

    100

    87.13

    69.99

    51.42

    28.57

    0

    0.5

    1

    1.5

    2

    2.5

    pm

    oth

    erdelay

    m

    ech

    dela

    abs

    ente

    eis

    mate

    rials

    horta

    0

    20

    40

    60

    80

    100

    120

  • 8/2/2019 A Report on the Winter Internship at Apollo Tyre1

    17/17