A Recipe for Success in Implementing CBTC on an Operating Transit System
Presented by:
Dr. Alan F. Rumsey, P.Eng, FIRSE
March 12, 2014
Communications-Based Train Control Conference London, 2014
![Page 2: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/2.jpg)
Why implement CBTC on an Operating Transit System?
Step-change Increase in Operational Performance
Control Centre Modernization
Infrastructure / Systems Upgrades New Vehicles
Upgrade Signalling and Train Control Systems
CBTC Enabling
Technology
Line Upgrade
![Page 3: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/3.jpg)
How do we define “Success” for a CBTC upgrade project …..
Recipe for Success …..
![Page 4: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/4.jpg)
Scope
CostSchedule
Success …..
Success is: Deliver anticipated benefits (scope)on schedule and within budget …..
![Page 5: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/5.jpg)
Scope
CostSchedule
Success …..
Minimum Service Impacts
Success is: Deliver anticipated benefits (scope)on schedule and within budget …..
… with minimum service impacts
![Page 6: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/6.jpg)
Scope
CostSchedule
Success …..
Service- Proven Product
Minimum Service Impacts
Success is: Deliver anticipated benefits (scope)on schedule and within budget …..
… with minimum service impacts
… and service proven product
![Page 7: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/7.jpg)
Standard “V-Curve”
System Requirements
System Integration & Acceptance
Sub-System Requirements
Design Fabrication
Construct / Inspect/TestP
lanning and Design
Verification and Validation
Con
stru
ctio
n an
d In
tegr
atio
n
![Page 8: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/8.jpg)
Real-World “V-Curve”
System Requirements
System Integration & Acceptance
Sub-System Requirements
Design Fabrication
Construct / Inspect/TestP
lanning and Design
Verification and Validation
Con
stru
ctio
n an
d In
tegr
atio
n
Service- Proven Product
![Page 9: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/9.jpg)
Real-World “V-Curve”
System Requirements
System Integration & Acceptance
Sub-System Requirements
Design Fabrication
Construct / Inspect/Test
Planning and D
esign
Verification and Validation
Con
stru
ctio
n an
d In
tegr
atio
n
Service- Proven Product
![Page 10: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/10.jpg)
Real-World “V-Curve”
System Requirements
System Integration & Acceptance
Sub-System Requirements
Design Fabrication
Construct / Inspect/Test
Planning and D
esign
Verification and Validation
Con
stru
ctio
n an
d In
tegr
atio
n
Service- Proven Product
Minimum Service Impacts
![Page 11: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/11.jpg)
Real-World “V-Curve”
System Requirements
System Integration & Acceptance
Sub-System Requirements
Design Fabrication
Construct / Inspect/Test
Planning and D
esign
Verification and Validation
Con
stru
ctio
n an
d In
tegr
atio
n
Service- Proven Product
Minimum Service Impacts
![Page 12: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/12.jpg)
Recipe for Success –System Requirements
System Requirements
System Integration & Acceptance
Sub-System Requirements
Design Fabrication
Construct / Inspect/Test
Planning and D
esign
Verification and Validation
Con
stru
ctio
n an
d In
tegr
atio
n
Service- Proven Product
Minimum Service Impacts
![Page 13: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/13.jpg)
Project Complexity
CostSchedule
Recipe for Success –System Requirements
Line Characteristics
(fixed)
Core System Requirements
(fixed)
Site-Specific Requirements
(variable)
Keep it Simple!
e.g. IEEE
1474.1
![Page 14: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/14.jpg)
Adaptation Risk …..
Site-Specific
Requirements
Service-Proven Product Design
System Requirements for Service-Proven
Product
Adaptation Risk
New/Modified
Requirements
Site-Specific
Design
![Page 15: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/15.jpg)
System Requirements
“… you can't always get what you want, but if you try sometime, you just might find you get what you need …”
Mike Jagger/Keith Richards (Rolling Stones)
![Page 16: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/16.jpg)
System Requirements
Focus on the core business “needs” such as:
Improved service delivery Capacity Trip times Operational flexibility
State-of-good-repair Higher system availability Reduced maintenance
Enhanced safety
Increased levels of automation
![Page 17: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/17.jpg)
System Requirements
Challenge site-specific “wants”
Agency-specific adaptations and new developments E.g. requirements for “secondary” train detection/
protection (“fall-back” systems) E.g. ATS-level functions
Agency-specific historic processes and practices E.g. “we’ve always done it this way”; “it’s part of our
culture”
Agency-imposed systems integration risks
![Page 18: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/18.jpg)
Recipe for Success – Migration Plan
System Requirements
System Integration & Acceptance
Sub-System Requirements
Design Fabrication
Construct / Inspect/Test
Planning and D
esign
Verification and Validation
Con
stru
ctio
n an
d In
tegr
atio
n
Service- Proven Product
Minimum Service Impacts
![Page 19: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/19.jpg)
Minimizing Service Impacts
CostSchedule
Recipe for Success – Migration Plan
Migration Plan
Cost of Service Impact
Cost of avoiding Service Impact
Test & Commissioning
Installation
![Page 20: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/20.jpg)
Migration Plan
The Migration Plan defines a staged cut-over of the new signalling and train control systems both geographically and functionally
Start with the “end-state” railway and work back, driven by business need priorities
![Page 21: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/21.jpg)
Migration Plan
For example: Stage n (final stage):
• Full geographic limits cut-over• Full functionality
Stage n-1:• Full geographic limits cut-over• Core functionality only
Stage n-2:• Core geographic limits cut-over only• Core functionality only
Stage n-3:• Etc.
Minimize Service Impacts
Prioritize Business
Needs
![Page 22: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/22.jpg)
Migration Plan
Given Stage “r”, how should Stage “r-1” be defined to get to Stage “r” with minimum Service Impacts?
Minimize Service Impacts
Stage “r-1”
(To be defined)
• Equipment to be installed
• Vehicles required• Tests that must be
conducted• Impacts to safety
case• Etc.
Stage “r”
(Defined)
![Page 23: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/23.jpg)
Migration Plan
Understand the three key characteristics of CBTC systems:
Train-borne train location determination
Train-borne and wayside processors• Vital ATP functions, • Non-vital ATO and
ATS functions• Software-based• Database-driven
Data communications
network
![Page 24: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/24.jpg)
The train is key – start here!
Recognize that to fully commission a CBTC system requires running multiple CBTC trains on revenue track
Minimize revenue track access requirements through prior integrated factory testing and use of a test track
Migration Plan -Train-borne train location determination
![Page 25: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/25.jpg)
Verify the performance, availability and stability of the CBTC data communications networks prior to CBTC functional testing/commissioning (e.g. “shadow-mode” testing)
Include analysis of worse-case conditions that cannot be easily duplicated in the factory or in the field
Migration Plan – Data Communications
![Page 26: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/26.jpg)
Verify the overall stability of the CBTC distributed computer network, including ability to switchover between redundant sets of wayside and/or train-borne CBTC equipment
Final functional testing can only be performed at a systems level with all major CBTC subsystems operational
Migration Plan – Distributed Vital/Non-Vital Processors
Way
sid
e &
Sta
tio
ns
TR
AC
K
PROFIBUS
Op
erat
ion
Co
ntr
ol C
entr
e
CBI(Sicas)
Beacons
Operator Room
Em
erge
ncy
Con
trol
Pan
el
OCC Ethernet LAN
WCC(Cell Controller)
ATC Ethernet Dual Network
PSDauxiliaries
StationLocalPanel
DrivingControl Panel
Train ControlMonitoring
System
CCTV Controller
B Reader
DrivingControl Panel
PassengerEmergency Call
Box
Train Network
Train Line
Radio Controller(Voice & CCTV)
PublicAddress
CarborneRadio Unit Carborne
Radio Unit
CC Carborne Controller
Recording(option)
EventRecorder
SCADATractionLightingPowersubstation
CCTV SystemPublic Address
System
CCTV Monitor
PassengerInformation
System
Passenger InformationDisplay
Emergency CallBox
Call box
FireFighting
Fire AlarmPanel
IntruderAlarm
SCADAFacilities
SupervisionSystem
Ventilation...etc
GPS -Time server
Depot
Space forEmergency OCC
VCP
Operator &SupervisorConsoles
Eth
ern
et
10
0B
ase
Tx
OP phoneset1 2 3
4 5 6
7 8 9
* 8 #
OP mic
SMO LAN Ethernet 100BaseTx
7 56
121110
8 4
21
9 3
Clock Display
Fare Collection
Mimic Panel
OPEmergency
Phone1 2 3
4 5 6
7 8 9
* 8 #
Visitor Console
VisitorGallery
TrainingServers
TraineesConsole(s)
TrainerConsole
Training Room
EPABX
Printers Printers
Server SystemATS
SCADA_elec + Power
ServerCOMMisc.
Farecollection
Server
Technical Room
ATC NMSWCN supervision
SCADA
Communication(MSN
supervision)
NetworkManagement
Operator CentreMaintenanceConsoles &Printer
TimetableGenerator
MaintenanceCentre
ZoneController
(ZC)
WC
N E
the
rne
t L
AN
WREWRE
Ra
dio
Ne
two
rk M
M F
O
Eth
ern
et
10
0B
ase
Tx
CCTV Monitor
RemoteECC
TrackVacancyDetection
ObstacleDetection
Facilities &PSD
Server
SMO Console
Recording(Voice - CCTV - Fire alarm)
MMS
PSD
CCTVWayside
Unit
RadioNetwork & CCTV
Station MasterOffice (SMO)
Phoneset IP
LP/TP_SS
Multiservice Network(MSN)
ATC Ethernet Network (WCN)
EmergencyLogic Unit
UPS
UPS
UPS
BLS
1 2 3
4 5 6
7 8 9
* 8 #
FIRE
BLS
1 2 3
4 5 6
7 8 9
* 8 #
PSDController
Odometer
Signalling EquipmentRoom (SER)
CCTV - PA -Radio etc.
To Bus OCC& Road OCC
VCP: CCTV
Track & power network
To CCTV(in technical room)
BLS
1 2 3
4 5 6
7 8 9
* 8 #
Radio NetworkWayside Unit
Way
sid
e &
Sta
tio
ns
TR
AC
K
PROFIBUS
Op
erat
ion
Co
ntr
ol C
entr
e
CBI(Sicas)
Beacons
Operator Room
Em
erge
ncy
Con
trol
Pan
el
OCC Ethernet LAN
WCC(Cell Controller)
ATC Ethernet Dual Network
PSDauxiliaries
StationLocalPanel
DrivingControl Panel
Train ControlMonitoring
System
CCTV Controller
B Reader
DrivingControl Panel
PassengerEmergency Call
Box
Train Network
Train Line
Radio Controller(Voice & CCTV)
PublicAddress
CarborneRadio Unit Carborne
Radio Unit
CC Carborne Controller
Recording(option)
EventRecorder
SCADATractionLightingPowersubstation
CCTV SystemPublic Address
System
CCTV Monitor
PassengerInformation
System
Passenger InformationDisplay
Emergency CallBox
Call box
FireFighting
Fire AlarmPanel
IntruderAlarm
SCADAFacilities
SupervisionSystem
Ventilation...etc
GPS -Time server
Depot
Space forEmergency OCC
VCP
Operator &SupervisorConsoles
Eth
ern
et
10
0B
ase
Tx
OP phoneset1 2 3
4 5 6
7 8 9
* 8 #
OP mic
SMO LAN Ethernet 100BaseTx
7 56
121110
8 4
21
9 3
Clock Display
Fare Collection
Mimic Panel
OPEmergency
Phone1 2 3
4 5 6
7 8 9
* 8 #
Visitor Console
VisitorGallery
TrainingServers
TraineesConsole(s)
TrainerConsole
Training Room
EPABX
Printers Printers
Server SystemATS
SCADA_elec + Power
ServerCOMMisc.
Farecollection
Server
Technical Room
ATC NMSWCN supervision
SCADA
Communication(MSN
supervision)
NetworkManagement
Operator CentreMaintenanceConsoles &Printer
TimetableGenerator
MaintenanceCentre
ZoneController
(ZC)
WC
N E
the
rne
t L
AN
WREWRE
Ra
dio
Ne
two
rk M
M F
O
Eth
ern
et
10
0B
ase
Tx
CCTV Monitor
RemoteECC
TrackVacancyDetection
ObstacleDetection
Facilities &PSD
Server
SMO Console
Recording(Voice - CCTV - Fire alarm)
MMS
PSD
CCTVWayside
Unit
RadioNetwork & CCTV
Station MasterOffice (SMO)
Phoneset IP
LP/TP_SS
Multiservice Network(MSN)
ATC Ethernet Network (WCN)
EmergencyLogic Unit
UPS
UPS
UPS
BLS
1 2 3
4 5 6
7 8 9
* 8 #
FIRE
BLS
1 2 3
4 5 6
7 8 9
* 8 #
PSDController
Odometer
Signalling EquipmentRoom (SER)
CCTV - PA -Radio etc.
To Bus OCC& Road OCC
VCP: CCTV
Track & power network
To CCTV(in technical room)
BLS
1 2 3
4 5 6
7 8 9
* 8 #
Radio NetworkWayside Unit
![Page 27: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/27.jpg)
Software development process does not end until the system is verified to be operating correctly in the field
Multiple software releases typically required and need to be planned for
Migration Plan – Software-based and Database-driven
Application-specific infrastructure data and train- data has to be verified as an element of the functional test/commissioning process
![Page 28: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/28.jpg)
Factory testing Exhaustively test every CBTC function/sub-function in the factory
Test internal and external interfaces
Simulate a realistic range of message latencies and equipment response times
Perform system stress testing with fully integrated CBTC system
Run a wide range of operating scenarios
Simulate failure modes
Migration Plan - Functional Testing of CBTC Systems
e.g. IEEE
1474.4
![Page 29: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/29.jpg)
For a CBTC upgrade project, a CBTC test track is mandatory to: Confirm vehicle interfaces/characteristics
Confirm wayside interfaces/characteristics
Verify vehicle/wayside data communication links
Dry-run tests to be performed on revenue track
Test cut-over strategies between legacy and new systems
Migration Plan - Functional Testing of CBTC Systems
e.g. IEEE
1474.4
![Page 30: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/30.jpg)
Migration Plan - Commissioning CBTC Systems
Minimize Service Impacts
CBTC Functional Tests
Revenue Track Tests
Factory Tests
Test Track Tests
CBTC Data Comm Network
CBTC Computer Network
Fixed Equipment
Mobile Equipment
CBTC Network Stability
“Shadow Mode” Tests
![Page 31: A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based](https://reader038.vdocuments.us/reader038/viewer/2022110401/56649de65503460f94adf63b/html5/thumbnails/31.jpg)
Recipe for Success …..
System Requirements
System Integration & Acceptance
Sub-System Requirements
Design Fabrication
Construct / Inspect/Test
Planning and D
esign
Verification and Validation
Con
stru
ctio
n an
d In
tegr
atio
n
Service- Proven Product
Minimum Service Impacts
S
S
U
C
C
E
S