a project report on employee satisfaction survey of operative division at bdk engeneering co.pvt ltd
DESCRIPTION
ÂTRANSCRIPT
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
EXECUTIVE SUMMARY.
Title of the project: Employee satisfaction survey of operative division at BDK
ENGENEERING CO.PVT LTD HUBLI.
INDUSTRY PROFILE:
Bdk engineering industries ltd.(bdkei) is situated on Gokul road, Hubli (karanatak state),
opposite to airport, 5 km off pune bangalore nh-4 hubli is about 410 km by road from bangalore
and is connected by road rail and airport.
The plant commenced its manufacture gate valves, globe valves, seing valves, lift check valves,
ball valves, diaphragm valves, butterfly valves, plug valves, ‘b’ series check valves,rubber lined
itmes & mouldings,wafer check valves, needle valves, non-slam check valves & dual plate check
valves, the company caters to the needs of major sector like oil refineries & petroleum
industries,chemical ,process and sugar industries,fertilizer & agrochemicals,nuclear/thermal
power plants, automic energy, steel & metallurgical plants, pulp, paper & fiber industries,
pharmaceutical & laboratories,water treatment plants,sewage & newzealand, malaysia, thailand,
singapore, japan, tajwan, phillippines, indonesia, middle east, italy,germany, france, uk, spian,
denmark, austria,south africa,kenya,usa,canada, etc.
COMPANY PROFILE:
B.D.K Engineering Industry Ltd., which is one of the units of B.D.K. Group of
companies, is situated in Gokul Road in Hubli. It commenced its commercial production in the
year 1984.
B.D.K. Engineering Industry Ltd. Is a public limited company in the field of chemical
fluid valves and pumps under brand name B.D.K.Engineering Industry Ltd., are marketed by
M/s. B.D.K.marketing services and M/s. B.D.K. Equipments Inc.
Babasabpatilfreepptmba.com Page 1
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
It is housed in a lush green area of 5.25 acres currently employing 200 personnel (Appro).
B.D.K.E.I design and manufactures gate valve, globe valve, swing check valve, wafer check
valves, alone slam check valve, dual pate check valve, lift check valve, needle valve to the nubs
of major stored like chemical and fertilizer plants, oil refineries, thermal power plants, nuclear
power plants, etc. and exports its products to Australia, New Zealand, Malaysia, Thailand,
Middle East, Austria, Italy, etc.
Scope of the study : The survey was conducted on Operative Level of BDK ENGENEERING
CO.PVT LTD HUBLI. .The questionnaire for this survey was framed considering those factors
where corrective action can be taken BDK .From the result of the survey the HR department can
take the corrective action to increase employee satisfaction and thereby increase productivity.
Objectives of the study:
To know the employee satisfaction in the different departments.
To know the organization and various departments.
To propose recommendations for enhancing employee satisfaction to improve business
performance.
To know the relationship between supervisors and employee.
METHODOLOGY
Sample unit:
The study is conducted in BDK Engendering Industries PVT LTD. city on following
departments.
Production Planning Department
Marketing Department.
Time office Department.
Account Department
Sales Co-Ordination.
Babasabpatilfreepptmba.com Page 2
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
QA Deaprtment.
Sample size:
Sample Size: 100
Sampling Technique:
The research technique used is Stratified Random Method.
Type of Data:
Data is the fact of an event. Data is the base for every research work. The data is mainly
classified into two groups.
1) Primary Data
Primary data has been collected directly from the respondents and the proprietor of the firm.
This is the first hand information collected with the help of interview through questionnaires.
2) Secondary Data
I collected the information about the history of the Granite industries with the help of
Internet service. And I don’t have any secondary data regarding Pooja granite industries at Ilkal.
Research Techniques:-
Structured Questionnaire
Personal Interviews
Statistical Tools. Tables / Chart
Babasabpatilfreepptmba.com Page 3
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
FINDINGS: 75% of the employees are Agreed to the Supervisor encourages your talent/ intelligence.,
& 24% of the employees are Disagreed to the Supervisor encourages your talent/
intelligence.
74% of the employees are Agreed to the Supervisor provides you with adequate
information to do the work., & 26% of the employees are Disagreed to the Supervisor
provides you with adequate information to do the work.
84% of the employees are Agreed to the Training provided increase knowledge and skill.
& 16% of the employees are Disagreed to the Training provided increase knowledge and
skill.
68% of the employees are Agreed to the Supervisor keeps you well informed about what
is going in the department., & 32% of the employees are Disagreed to the Supervisor
keeps you well informed about what is going in the department.
CONCLUSION
In the study of “impact of training on employee satisfaction”, I have experienced that employee
training has become increasing important as job have become more sophisticated and influenced
by technological changes. Training is learning experience that seeks relatively permanent change
in an individual that will improve his or her ability.
Training is given adequate importance in BEMCO but still there should be improvement in,
1. Clarity in explanation by trainer
2. Language used by the trainer
3. Safety measure provided to the trainees during training period
Babasabpatilfreepptmba.com Page 4
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
Training should be such a way that it should improve, change and mould the employees
knowledge, skill, behaviour, attitude, & aptitude toward the requirement of the job and
organization.
INDUSTRY PROFILE
Bdk engineering industries ltd.(bdkei) is situated on gokul road, hubli (karanatak state),
opposite to airport, 5 km off pune bangalore nh-4 hubli is about 410 km by road from bangalore
and is connected by road rail and airport.
The plant commenced its manufacture gate valves, globe valves, seing valves, lift check valves,
ball valves, diaphragm valves, butterfly valves, plug valves, ‘b’ series check valves,rubber lined
itmes & mouldings,wafer check valves, needle valves, non-slam check valves & dual plate check
valves, the company caters to the needs of major sector like oil refineries & petroleum
industries,chemical ,process and sugar industries,fertilizer & agrochemicals,nuclear/thermal
power plants, automic energy, steel & metallurgical plants, pulp, paper & fiber industries,
pharmaceutical & laboratories,water treatment plants,sewage & newzealand, malaysia, thailand,
singapore, japan, tajwan, phillippines, indonesia, middle east, italy,germany, france, uk, spian,
denmark, austria,south africa,kenya,usa,canada, etc.
Bdkei has documented quality management system to meet the requirements of iso:9001-2000 to
ensure that its order are processed product produced and services rendered to meet the customer
quality management system by m/s,tuv nord, germany.
Bdkei is certified by api & authorized to use api monogram on gate check,ball & plug valves,it is
also certified by m/s.tuv nord,germany for “ce-mark” for gate globe ,check,
ball,butterfly.diaphragm & plug valves according to pressure equipment directive to european
union ped 97/23/ec for exporting itd productds to euroean counters.
Babasabpatilfreepptmba.com Page 5
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
ENVIRONMENTAL,OCCUPATIONAL HEALTH AND SAFETY POLICY
VISSION.
BDK ENIGNEERING INDUSRIES LTD WILL SRIVE FOR CONTINUAL
IMPROVEMENT IN ACHIVING ENVIRONMENTAL, OCCUPATIONAL HEALT AND
SAFETY MANAGEMENT BY PROVIDING GOOD WORKING CONDITON AND
HEALTHIER ENVIRONMENT TO ALL EMPLOYEES.
OPTIMUM USAGE OF NATURAL RESOURCE BY REDUCING, RECYCLING AND
RE USING .
PREVENTION OF POLUTION BY MINIMIZING WEAST GENRATION AND
PROPER DISPOSAL OF WEAST GENRATED BY ALL ACTIVIES,PROCESSED AND
SERVICES.
PREVENTION OF INJURY AND ILL HEALT BY ADOPTING SAFE WORKING
PRACTICES IN ALL OPRATION.
ADHERING TO ALL APPLICABLE ENVIRONMENTAL, OH AND S LEGAL AND
OTHER REQUIREMENTS.
MISSION
THE QUALITY POLICY SAHLL BE TO DESIGHN TO MANUFACTURE
Babasabpatilfreepptmba.com Page 6
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
TO MARKET QUALITY PRODUCTS AT COMPETITIVE PRICES. TO THE ENTIRE
SATISFACTION OF THE CUSTOMER AND THROUGH CONTINUAL
IMPOVEMENT.
COMPANY PROFILE
NAME OF THE UNIT : B.D.K ENGINEERING INDUSTRIES LTD.
CONSTITUTION : LIMITED.
SALES HEAD QUARTERS : 47/48 GOKUL-ROAD, HUBLI.580030 (KARANATAK
STATE)
TELEPHONE : 0836-2331499/2333930
FAX : 0836/2330799/2330899
E-MAIL : [email protected]
REGISTERED OFFICE : A-Block, 8th Floor, Shivasagar Estate,
Dr.A.B.Road, Worli, Mumbai – 400018.
TELEPHONE : 022-24927671/24948589/24938451.
FAX : 022/24950580
E-MAIL : [email protected]
FACTORY AREA : Block 47/48, Gokul Road.
Babasabpatilfreepptmba.com Page 7
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
HUBLI – 580 030. (KARANATAK STATE)
TELEPHONE : 0836-2331499/2333930
FAX : 0836/2330799/2330899
CORPORATE IDENTIFICATION : U28920MH1988PLC 165426 DT,04.05.1979
DATE OF EASTABLISHMENT : 08.04.1984.
FACTORY LICENES : MY/DWR/1039 DT,27.06.1984
CENTRAL EXCISE REGN NO : AAACB736NXM001.
E.C.C NO : AAACB736NXM001.
SALES TAX NO : AAACB7369N.
BANKERS : SYNDICATE BANK. DURGAD BAIL HUBLI.
CONTACT PERSON : M.B.GOUDAR.
DIRECTOR.(09343403802)
AUTHORISED CAPITAL : Rs. 1, 00.00 LAKHS.
SUBSCRIBED & PAID CAPITAL: Rs.888.74 LAKHS
MAN POWER : TECHNICAL STAFF 143
NON-TECHNICAL STAFF 170
SKILLED/SEMI-SKILLED 104
WORKERS
UNSKILLED WORKERS 119
Babasabpatilfreepptmba.com Page 8
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
TOTAL 536
AREA OF THE UNIT : LAND 88,092 SQM.
BUILDING 31,013 SQM.
INSTALLED CAPACITY P.A : 3, 00,000 NOS.OF VALVES + 2 TPM.
RUBBER CONSUMPTION.
TURNOVER FOR LAST 5 YEARS: 2003-04 – Rs.1341.65 LAKHS.
2004-05 – Rs.2726.09 LAKHS.
2005-06 – Rs.3547.38 LAKHS.
2006-07 – Rs.7814.91 LAKHS.
2007-08 – Rs.13822.35 LAKHS
BOARD OF DIRECTORS : MR. BHARATH KHIMIJI.
MR. SACHIN B, KHIMIJI.
MR. BINOY. B.KHIMIJI.
Smt.M.S. KHIMIJI.
MR.K. SUNDARAM. (FINANCE)
MR. M. B.GOUDAR
ISO CERTIFICATION : ISO-9001-2000 CERTIFICATION ENCLOSED
API CERTIFICATION : API-6D CERTIFICATION ENCLOSDED.
“CE MARK”CERTIFICATION : “CE-0045”CERTIFICATION NCLOSED.
BRANCHES : MUMBAI
NEW DELHI
Babasabpatilfreepptmba.com Page 9
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
KOLKAT
CHENNAI
HYDERABAD
BARODA
BANGALORE
PUNE
VIZAG
LUCKNOW
B.D.K. ENGINEERING INDUSTRIES LIMITED
B.D.K Engineering Industry Ltd., which is one of the units of B.D.K. Group of
companies, is situated in Gokul Road in Hubli. It commenced its commercial production in the
year 1984.
B.D.K. Engineering Industry Ltd. Is a public limited company in the field of chemical
fluid valves and pumps under brand name B.D.K.Engineering Industry Ltd., are marketed by
M/s. B.D.K.marketing services and M/s. B.D.K. Equipments Inc.
It is housed in a lush green area of 5.25 acres currently employing 200 personnel
(Appro). B.D.K.E.I design and manufactures gate valve, globe valve, swing check valve, wafer
check valves, alone slam check valve, dual pate check valve, lift check valve, needle valve to the
nubs of major stored like chemical and fertilizer plants, oil refineries, thermal power plants,
nuclear power plants, etc. and exports its products to Australia, New Zealand, Malaysia,
Thailand, Middle East, Austria, Italy, etc.
B.D.K.E.I has a documented quality system to meet the requirements of ISO- 9001/1994
and net specification Q1 to ensure that is orders, processed, products produced and service
rendered meet the customer requirements. The unit is certified for ISO- 9001/1994 during
September 1995 and is rectified in October 1998 by M/s. RW-TUV, Germany.
Babasabpatilfreepptmba.com Page 10
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
Product Range
No. Product Size(mm) Size(mm) Size(mm)
Diaphragm valves 15 to 40 50 to 300 350 to 600
Butterfly valves 15 to 40 50 to 300
Plug valves 40 50 to 300 350 to 600
Wafer check valves 50 to 300 350 to 1600
Non-slam check valve 15 to 100 125 to 200
Dual plate check valve 150 to 300
Lift check valve 15 to 50
Any other products not covered in the above rang is treated as products and they are not covered
under scope of quality system.
Babasabpatilfreepptmba.com Page 11
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
Only gate valve and swing valve of size 50 mm to 300-mm class 150 and 300 are covered under
API 6D specifications.
Organizational Objectives:
The quality objectives of B.D.K Group of Companies
1. To strive for excellence in quality of their products in national and international market
and to be recognized as leading players.
2. To develop necessary competence at all levels of operations and improves the process,
products and services to sustain quality reputation.
3. To seek participation of employees at all levels of operation and to form a motivated
team where they treat each other with mutual trust and respect.
4. To shoulder social responsibility by maintaining a safe, clean and hygienic environment.
PRODUCT PROFILE
Babasabpatilfreepptmba.com Page 12
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
INFRASTRUCTURE FACILITIES
The following are the infrastructure facilities available in the B.D.K.E.I.LTD
1. Designs and development Department:
In addition to conventional facilities the design and development department is equipped
with CAD system to check various design aspects.
Babasabpatilfreepptmba.com Page 13
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
2. Machine Shop:
The shop has facilities for machining the required components. The machines include
conventional machines like center lathes, vertical Terrel lathers, milling machines, drilling
machines, surface grinding machine and welding equipments. There is a tool crib for
manufacturing activities also.
3. Machining:
The machining of all components is established and carried out with our approved sub
contractors.
4. Assembly shop:
Appropriate facilities like lapping machines have been installed for making sub-
assemblies and main-assemblies of valves. There are necessary testing facilities to test the valves
to the required specification.
5. Painting:
Necessary painting facilities are available for painting assembled products or spares. And
also necessary packing and dispatch facilities are available for all the products.
6. Rubber Lining and Molding section:
Facilities for various types of rubber linings for diaphragm valve, bodies, butterfly valves
discs and non-return check valves are provided. For molding of items like diaphragm, BFV seats,
Babasabpatilfreepptmba.com Page 14
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
BFV seals, non-return, valve discs, necessary equipments like steam boiler, mixing mills,
presses, vulcanizes are provided. Require facilities for hand molding and machine molding of
rubber extension joints are provided.
7. Stores:
Stores has required facilities to store raw, semi finished and finished components.
Castings are stored in casting yard. Separate rejection and scrap yards have been proceeded.
8. Inspection and Testing Facilities:
a. In- house facility: B.D.K.P.C have been equipped with various inspections, measuring and
test equipments for incoming, in process, final inspection and testing. The facilities include
instruments and gauger, test equipments for special tests like magnetic particle test, vacuum and
helium leak test, dye penetration test. Testing of rubber parameters like tensile, hardness, spark
and specific gravity.
b. Calibration Room: Well-equipped calibration room for B.D.K. Group of companies has been
established to meet most of the in house calibration requirements. The calibration room is
certified for ISO-9001/1994 quality system.
9. Personnel:
Suitable qualified personnel are employed for performing the required job. However
training programs also organized to meet the training needs of personnel.
10. Verification Resources and personnel:
B.D.K.P.C have been equipped with adequate verification resources for training of
personnel, involved in inspection, testing and monitoring of the design, procurement, production
and servicing processes at relevant functional areas. The required verification
Babasabpatilfreepptmba.com Page 15
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
equipments/documents procedures have been provided and the awareness of relevant standards
and code have been made known to the personnel for internal holding of quality system.
TIME OFFICE DEPARTMENT
The time office plays and important role in B.D.K. Group of companies. It is more or less
similar to personnel department or HRD department. The time office mainly deals with:
Babasabpatilfreepptmba.com Page 16
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
Maintaining attendance records.
Preparation of salary slips.
Maintaining personal records.
Maintaining leave records, etc.
There are nearly 700 employees working in B.D.K Group.
Important functions of Time Office:
Following are some of the important functions of time office.
1. Maintenance of attendance Record;
In B.D.K, they use an electronic machine called “Punching machine”, to record workers
and staff attendance. An attendance slip/card is provided to all the employees every month,
which consists of Employees Ticket no., name and space for entering incoming and outgoing
time. Every employee should compulsorily punch the card at the time of entering the work spot
as well as leaving the work spot. By referring these cards the attendance of every employee is
recorded in the master roll everyday.
2. Preparation of Salary Slip:
Another important responsibility or function of Time office is preparing the salary slip of
every employee of B.D.K.
Earnings Deductions
Basic salary PF Advance
DA VPF Bank Loan
Babasabpatilfreepptmba.com Page 17
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
HRA Profession Tax
Conveyance allowance ESIC
Washing allowance Canteen coupons
Regularity allowance LIC
MISC Medical claim premium
Company loan
Income Tax
LWF
MISC
The salary slip consists of earnings and deductions.
Important Deductions
Slab Earnings Tax Amount Per month (in rupees)
1st 3,000-4,999 30.00
2nd 5,000-7,999 60.00
3rd 8,000-9,999 100.00
4th 10,000-15,000 150.00
5th Above 15,000 200.00
Babasabpatilfreepptmba.com Page 18
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
1. Provident Fund: Both employer and employee contribute 12% of (BS+DA). The employer
contribution is divided into: 8.33% towards pension fund and 3.67% towards provident fund.
2. LWF (Labor welfare fund): This is the sate government act, yearly Rs. 3 by employees for
non technical and Rs. 6 by employer for technical, in the month of December.
1. Professional Tax: All the employees getting more than Rs. 3000/- salary have to pay
professional tax to state Govt. for rendering the profession.
The personal tax slabs are: As per the Karnataka state rules.
4. ESIC: The employees earning less than Rs. 6500/- salary have to contribute to ESI fund, for
availing the benefits from ESIC. The contribution is an follows:
Employee: 1.75% of BS+DA+HRA
Employer: 4.75% of BS+DA+HRA
Total: 6.5%
5. Canteen coupon: All the employees are issued coupons at a subsidized rate of Rs. 60 to 80
per month, Remaining will be paid by the company that is employee 25% and employer 75% for
meals and breakfast.
Maintaining Personnel Records:
The time office is mainly responsible for maintaining personnel records of individual
employees. The personnel records consist of name, address, qualification, experience, reference,
wage scale, achievements, grade, marital status, etc. These records are kept secret.
In B.D.K.group of companies the performance is the key factor considered by the
directors in promoting the employees to higher posts. The retirement is at the age of 55 years or
30 years of continuous service whichever is early.
Babasabpatilfreepptmba.com Page 19
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
Working time:
Working time of employees is divided into shifts.
Shift-1- 7.30 am. To 11.30 am. 12Noon to 4 pm.
Interval 11.30 to 12.00 noon.
Shift-2 -4 pm. To 8 pm. 8.30 pm. to 12.30 pm.
Interval 8 pm. to 8.30 pm.
Shift-3 -12 am. To 4 am. 4.30 am. To 7.30 am.
Interval 4 am. To 4.30 am.
Date of Payment:
Staff: 1st of every month.
Workers: 5th of every month.
The facilities provided to employees:
The following are the some of the important facilities provided to employees.
1. Leaves: In B.D.K, the following leaves are provided to employees.
1) 10 public holidays.
2) Casual leave.
3) Sick leave.
4) Earned leaves [1 (½) days for every 20 days physical work).
2. Welfare Facility: The company provides
Babasabpatilfreepptmba.com Page 20
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
1. 2 sets of uniform.
2. Shoes and socks.
3. Safety obstacles, gloves, etc to its workers every year.
3. Canteen Facility: All the workers and staff are issued canteen coupons for meals and
breakfast in the canteen at a subsidized rate of employee 25% and employer 75%. The time
office will issue these coupons. All the employees are provided with tea twice in a day at free of
cost
4. Medical service: The medical facility like hospitalization and other medical expenses are
provided to employees and their relatives under ESIC.
5. Loan Facility: The company provides loan to the employees at zero percent interest for some
genuine reasons like medical, education, marriage etc.,
6. Advance: Advance salary / wage is paid to employees in some special occasions or in
emergency and is deducted from their salary / wage.
7. Miscellaneous scheme: The Company provides the miscellaneous schemes like, Pension after
retirement.
PF
DA
Conveyance allowance
Washing allowance
Regularity incentives
Bonus (Maximum 20% Minimum 8.33%)
HRA
Bank installments
LIC Premium.
Are deducted from employees salary and paid to the concerned.
Babasabpatilfreepptmba.com Page 21
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
PRODUCTION, PLANNING AND CONTROL DEPARTMENT
The Production Planning and Control (PPC) Department is known for clustering the
customer requirements depending upon the capacity of the firms production department.
Departmental Objectives :
The main objective of PPC department is to plan and meet the production requirements as
per customer specifications through continuous improvement in planning, procurement, and
processing and optimum resources utilization.
Procedure of PPC Department:
PPC department receives amendment or inter department memo from sales co- ordination.
1. Detail study of work order is done specifications and requirements are studied.
2. Availability of raw materials, semi-finished goods, and finished goods is worked out.
3. If there is shortage then order for material is done.
4. Production plan, inspection plan and dispatch plan are drawn and issued to concerned
departments.
5. Requisition to stores for semi-finished and raw materials to send for processing to sub-
contractors.
6. Requisition to stores for assembling of materials.
7. After assembling production are offered for inspection and testing to the quality
assurance department
8. Cleared products are sent to dispatch section.
9. Cleared products are painted, packed and dispatched to the customers.
The PPC department has the following sections:
Planning
purchase
Babasabpatilfreepptmba.com Page 22
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
process control
Engineering ltd.
Painting, packing and dispatch
product identification and tractability
Product planning:
Production planning is the primary function of the pp c department. Production plan for the
month is prepared in the last week of the previous month in consultation with the sales co-
ordination plan.
1. Work order, which are over due as on last day of current month.
2. Work orders, which are due in the month for which the production is to be made.
3. Work orders, which are due in the next month.
4. Left over work orders from current month's plan.
However, while planning the production plan for the month, preference for processing the
work orders is given, considering the following points.
1. Work orders, due date.
2. Urgency from the sales co-ordination department.
3. Availability of materials of all the components.
Referring the above-mentioned points and considering the monthly production capacity, the
production plan is finalized.
Material planning:
Material planning is another important suction of PPC department. Work orders /
amendments are received from sales co-ordination department. In some cases inter departmental
memo is received from SC department as an advance intimation for materials procurement/
processing.
Babasabpatilfreepptmba.com Page 23
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
The ordering for materials (Indent / PO / Letter of indent) is done considering following
points:
Stock of components.
Pending purchase orders and indents as on date.
Monthly average materials requirements as required.
Requirement for a particular month.
Total material requirement against pending work orders.
Based on the above points the working sheet is prepared for the total requirement and total
shortages considering all pending orders.
The orders quantity is decided based upon the following points.
Procurement time.
Feasibility to procure the given quantity.
Stock, which facilitates speedy execution of work, orders.
Painting, packing and dispatch :
The production department activity comes to and at this section as all the major parts of
the process of production are completed and only some of the formalities like painting,
dispatching, inspecting and packing are left out.
Painting:
The valves are cleared with wire brushed paper made totally free from scales, dust etc.,
the products are thoroughly wiped with solvents lie thinner, petrol, kerosene, etc., to remove
grease and oil from surface.
Babasabpatilfreepptmba.com Page 24
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
The following shades of co lours are used as standard:
Responsibility of PPC Department:
1. To study works, orders and amendments and also to prepare production plan.
2. To release production plan with required specification / drawing / standard.
3. To manufacture the products as per specification using approved manufacturing process ans
suitable equipments.
4. To maintain identification of product.
5. Non-conformance review, disposition and corrective and prevention action.
6. To maintain quality documents and records.
7. To identify training needs and to plan and to organize for the same.
Babasabpatilfreepptmba.com Page 25
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
DESIGN AND DEVELOPMENT DEPARTMENT
An organization needs to have and authoritative design and development department to
meet the changing needs of the market. B.D.K. Group has a well- established design and
development with well-qualified and experienced personnel's to design and develop quality
products that are reliable, economical and satisfying customer needs.
Department objective:
The main objectives of design and development department are:
1. To design and develop quality products which are reliable, economically predicable and
meets the customer requirements.
2. Continuously improve the quality of the product.
The Design and development department will comprise of the following sections based
upon the products.
1. Butterfly valve section.
2. Diaphragm valve section.
3. Plug valve section.
4. Gate valve and globe valve section.
5. Check valve section.
Babasabpatilfreepptmba.com Page 26
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
All these sections will address all the functions and activities connected with design and
development of respective product. They are also responsible for the design and development of
any other new product assigned.
The department performs the design and development activities using the established systems
and procedure. These activities are carried out in the following phases.
1. Design and Development planning:
The planning activities are assigned to qualified personnel with sufficient resources. After
studying the requirements detailed plan is prepared in the prescribed format. The plans are
reviewed periodically. It may be prepared for
A new product.
New extension model of existing proven range.
2. Interface:
The different department, which provides design, input and documented in the design and
development activity chart and design review. The interface with other departments is
documented.
3. Design Input:
Input requirement to design a product will be obtained from customer specification, order
acceptance, contract review, standards confirmed, cost involved etc. the input requirement are
documented and reviewed.
4. Design Output:
Babasabpatilfreepptmba.com Page 27
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
The outputs of design and development activities are that they meet the design input
requirements and give clear specifications for procurement and product shall be procurable and
verifiable. The designs out puts are in the form of drawings, material list and technical
specifications.
5. Design Review:
This is a method of tackling problems. The aim of design review is to identification the
problem areas, inadequacies and take corrective actions to assure that the final design and meet
the specific customer requirements.
6. Design Verification:
It is performed so as to ensure that the design output meets the design-input requirements.
The activities carried out in design verification stage are
Verifying the correctness of calculations.
Confirming the new design by comparing it with a similar proven design.
Justifying the drawings and specifications etc.
7. Design validation:
Design validation activity is carried out so as to ensure that the product conforms to the
defined user needs / requirements. It is done on the final product by subjecting the product to
tests, measurements, observations or other means as applicable.
8. Design Changes:
The design change captivity is carried out, based on the information provided by other
departments or customer or the improvements in process / Product performance or other
consideration such as cost and material procurement. These information are studied and
necessary changes are made in drawings, specifications etc.
Babasabpatilfreepptmba.com Page 28
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
Functions of Design and Development Department:
The functions and activities of design and development department are as follows:
1. Design and development of new products, extension model / size of existing proven range and
standard product with some additional features as per customer requirements.
2. Preparation, release, revision and control of manufacturing drawings, seas drawings, material
lists general assembly drawings, technical specifications and directories.
3. Assisting SC department in contract review when requested.
4. Assisting PPC department for their requirements for Jigs, Fixtures, gages and other tooling
when requested.
5. Assisting material department in the department of investment, casting dies and other item
when requested.
6. Disposal of design concessions through non-conformity review committee.
7. Maintenance and updating of national and international standards.
8. Attending customer complaints, technical discussion with customers where referred to.
9. Co-ordination with other department for development activity.
Babasabpatilfreepptmba.com Page 29
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
QUALITY ASSURANCE DEPARTMENT
The organization success largely depends on the smooth functioning of the quality
assurance department, moreover it can be rightly said as, quality Assurance department is the
mainstream for smooth running of the firm. Accordingly, keeping in view, the quality policy of
the organization. The B.D.K. Group of companies set up the QA department to assist it in
promoting quality products to its customers.
Departmental Objectives:
The main objectives of quality assurance department are:
1. Maintain consistent and correct appraisal of quality of the product at all the stages of
manufacturing till the product is dispatched, such that the required product quality is
achieved, maintained and improved.
2. Develop necessary competence in the department for meeting specific quality
requirements.
Inspecting and Testing:
Babasabpatilfreepptmba.com Page 30
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
The inspection and testing is conducted in the following phases:
1. Incoming Material Inspection.
2. In process inspection.
3. Final inspection and testing.
4. Painting and Dispatch.
5. Record.
1. Incoming Material Inspection:
The objective of IMI is to ensure that all the incoming materials meet goods receipts,
inspection report and purchase order requirements.
The incoming material inspection starts when the raw material viz. Sand casting,
investment casting, graphical set, etc. are received from the vendors, the materials so received
are checked against the purchase order placed by planning and purchase department. If the mater
rials comply with the purchase order only then, the goods receipt rate (GRR) is prepared.
Thereafter two inspection process are carried out, they are:
A. Dimensional inspection.
B. visual inspection
A. Dimensional Inspection:
Under dimensional inspection the following tests are carried out on the samples
representing the respective raw material.
1. Destructive testing.
2. non-destructive testing.
Babasabpatilfreepptmba.com Page 31
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
3. mechanical testing.
4. Dye-penetrative testing.
5. Radiography and X-ray testing.
6. Ultrasonic testing.
7. Magnetic particle testing.
Apart from these they also carry out liquid penetration test Helium leak test Ultra low vacuum,
Cryogenic, fire safe, Hot oil and standard cyclic tests.
B. Visual Inspection:
Under visual inspection the surface defects such as sand inclusion, rough surfaces, blow
holes, etc are detected visually.
2.In process inspection:
The in process inspection is carried out before assembling the product. Its objective is to
ensure that in process inspection in catted out as pet the drawings and given specification. The IP
procedure is as follows.
a) Product under process is verified as per job card and drawings.
b) After completion of each operation dimensional inspection is done as per the respective
drawings and special instruction.
c) Visual inspection is done for surface defects.
d) Inspection status is put on the components for each operation and results are recorded in the
job card.
e) Products that are non-conforming to specified requirements are identified with respective
status and conformance report is prepared.
Babasabpatilfreepptmba.com Page 32
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
f) Non-Conformance Review Committee (NCRC) reviews non-conforming products.
g) Products, which are reworked, are re-inspected and re-tested.
h) All components are verified for completion of all the operations as per the job card and
drawings before credited to stores and stamped as B.D.K.
3.Final Inspection and Testing:
The final inspection and testing is carried out after assembling the product. There are
three important tests carried out in final inspection and testing, they are
a) Hydro seat.
b) Hydro shell.
c) Pneumatic shell.
Under these tests the final product is subjected to water pressure and air pressure for
testing the leakage defects. After accomplishing the testing jobs the respective confirmed
products are segregated and co lour coded. The rejected products by NCRC are returned to
vendors. The confirmed product is proceeding to stores.
4.Packing and Dispatch:
Before being packed, the product shall be inspected for proper painting, usage of proper
packing materials, usage/application of proper preservation of material, making as per the
requirements and verify that the contents being packed are as per the packing slip and authorized.
No product shall be dispatched until all these activities are completed satisfactorily as per the
documented procedure.
5.Record:
Inspection and test records shall be prepared, verified and maintained at all stages of
manufacturing as per documentary procedure.
Babasabpatilfreepptmba.com Page 33
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
This inspection color code status:
1. Accepted
2. Accepted on deviation.
3. Rework
4. Rejected
Departmental Functions:
The following are the important function of QA department.
1. To draw quality plans/ inspection plans.
2. Inspection of incoming and in process products.
3. Final product inspection and testing.
4. Inspection and testing status.
5. Calibration and control of inspection, measuring and test equipments and to
maintain identification and trace ability for the same.
6. Identification and trace ability of product.
Babasabpatilfreepptmba.com Page 34
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
7. To plan for inspection and test resources.
8. Non conformance review, disposition and corrective and prevention action.
9. Maintenance of quality documentation and records.
10. To identify training needs and to plan, organize for the same.
MATERIAL DEPARTMENT
Material department plays an important role in smooth running of the organization by
plan and procures materials and stores in a scientific manner.
Departmental Objectives:
The main objective of material department is:
1. To plan and procure materials and services conforming to specified requirements.
2. Store and preserve materials till they are issued for use.
Functions of Materials Department:
The following are the important function of material department:
1. Evaluation and approval of subcontractor.
Babasabpatilfreepptmba.com Page 35
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
2. Procurement from approved subcontractor.
3. Performance rating of subcontractor.
4. Receipts, storage, handling, preservation and issue of materials.
5. Verification, identification and trace ability of products.
6. Non-conformance review, disposition and corrective and preventive action.
7. To maintain quality document and records.
8. To identify training needs and to plan and to organize for the same.
Subcontractor selection and Approval:
The material department is respond sidle for selection and approval of subcontractors for
supply of materials and services to meet the specified requirements.
Subcontractors are classified according to supply of casting, services and bought our
materials. The list of approved subcontractors is prepared on the basis of previous demonstrated
capabilities.
The material department shall furnish the periodic performance rating, once in 4 months
to the subcontractor based on quality performance data complied by material department.
Rating Category Grade
85% and above Excellent A
75% to 84% Good B
60% to 74% Fair C
Below 60% Poor D
The sub contractors are classified into four categories for the purpose of rating.
Babasabpatilfreepptmba.com Page 36
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
The sub contractors whose rating is above 60% are included as Approved sub contractors.
Control of Non-conforming product:
To ensure that only conforming products are stored and issued for further processing and excise
the control over the non-conforming products.
The executive directors nominate a non-conformance review committee for review and
disposition of non-conforming products.
The NCRC reviews materials and decisions are taken for corrective and preventive
actions required by the concerned department.
Handling, Storage, Preservation:
The stores department identifies and designates suitable areas for receipts and storage of
materials so as to avoid damages scratches and dent marks. Further they are applied with rust
preventive solutions so as to avoid rusting. Thereafter the components along with the
identification tags are sent to inspection review.
Identification:
Raw materials such as castings, bar stocks and rubber components are identified with a
material co lour code. Machined components are identified with a material co lour code or
engraved for material identification.
Materials stored in designated stores are identified with the identification tag. Material
identification co lour code charts are displayed for reference at stores, machine shop and
assembly shop.
Traceability:
Babasabpatilfreepptmba.com Page 37
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
For the purpose of traceability castings are identified with the serial number and record of
the same is maintained in the “Casting Traceability Register”, in the stores department. Machine
components produced from bar stock are identified with the branch number for the purpose of
traceability record. The batch code numbers are engraved/punched on the machined components.
Purchase Order:
Purchase orders are released on approved sub contractors. Purchase order shall contain
data clearly describing the material order and shall content the prices information of type, size,
class, specification, grade, make, drawing numbers and other relevant data.
Major Suppliers of raw materials
Raw materials Suppliers
Carbon, steel, alloy steel, casting Mal and Alloy casting Pvt, Ltd.shimoga
Cast Iron's, Giron castings AKP Foundries pvt. Ltd.
Gun Metal Casting Essen aluminum, Belgaum.
Babasabpatilfreepptmba.com Page 38
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
Bar Stock Asia steel, Mumbai
Forgings MGM Industries
Fasteners Fasteners and Allied products ltd.
Gaskets IGP Engineering Pvt. Ltd. Chennai.
Gland packings and grafoil flings Me ch. Packing Mumbai.
SALES CO-ORDINATION DEPARTMENT
The sales co-ordination department plays and important role in synchronize and
harmonize the activities of all departmental units of an organization towards the accomplishment
of organization of objectives.
The B.D.K. Group consists of two important marketing and service oriented units.
Babasabpatilfreepptmba.com Page 39
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
1. B.D.K Marketing service Pvt. Ltd:
It is the marketing organization to sell the products available from the B.D.K. Group of
companies and to render prompt and efficient services. The B.D.KMS has 10 branch
offices and HUBLI is the Head office.
2. B.D.K. Process Equipments Inc.:
It is the merchant exporter engaged in exporting products manufactured by B.D.K Group
as well as associated companies.
Departmental Objectives:
The important objectives of sales department are:
1. To understand customer requirements fully and resolve deviations if any before
acceptance of order.
2. To translate mutually agreed customers' requirements into work order.
3. To co-ordinate with customer and concerned departments for prompt execution of the
order.
4. To attend the customer complaints promptly and co-ordinate to prevent recurrence.
Some of the important function of Sales Co-ordination of Department:
1. Contract Review.
2. Control of customer supplied product.
3. Servicing.
4. Customer complaints.
Contract Review:
Babasabpatilfreepptmba.com Page 40
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
The objective of sales co-ordination department in contract review is to ensure that customer
needs are clearly identified, understood, documented and activities are co- ordinate for effective
execution of contract.
The products covered in product drawing and price lists are termed as standard products
drawings ans price lists are called special products. M/s. B.D.KMS on behalf of B.D.K.E.I
handles all standard products. Sales co-ordination in consultation with concerned departments
shall ensure that for each contract.
Control of Customer Supplied Product:
The objective is to ensure that customer-supplied product is controlled regarding
verification, storage, maintenance and incorporation into the product and notification to the
customer on observed non-conformities.
Whenever customer requires incorporating his supplied product in final scope of supply,
sales co-ordination shall maintain the record of such item and inform concerned departments
about the receipt. Customer supplied products are verified upon receipt as per “incoming
material inspection and testing procedure”, such products duly identified are stored separately
and maintained to avoid damage deterioration.
Servicing:
The objective is to organize for providing for service support and where contractually
agreed to provide installation and commissioning service to customer.
Design and development department prepares installation, operation and maintenance
manual (IOM) and update. This IOM have all necessary instructions for installation, operation,
and maintenance. It will contain safety precautions and list of recommended spares. Io M's
dispatched with each consignment. If contractually, agreed, the installation and commissioning
services will be provided to the customer. Beyond the guarantee period service may be provided
as per the agreed terms.
Babasabpatilfreepptmba.com Page 41
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
Customer Complaints:
The sales co-ordination department keeps service registers of the customer complaints,
study the complaints and reports to the concerned HOD for further action and attends to
customer complaints analyze it and takes corrective and prevention action. A monthly report for
customer complaints is prepared and submitted to HOD and MR.
Working of Sales Co-ordination Department:
Sales co-ordination department receives order from its zonal offices or directly from the
customers. These inquiries or orders may be for standard products or special orders to be made
as per the client specifications.
The Sales co-ordination department after receiving inquiry, it analysis and suggest the
type of valve that might wait the customer requirement. The details are sent to the zonal offices,
in case of special orders, Sales co-ordination department before preparing the contract review
consults design and development department and costing department.
A contract review is prepared which contains all necessary details of purchase order
placed by the client, such as type of valve, quantity, price due date, commercial terms such as
freight, insurance, taxed, mode of payment and all other information. Sales co-ordination
department in co-ordination with production planning and control department finalizes the due
date in contract review.
Once the contract review is done then order acceptance is prepared and the copies of it
are distributed to the concerned department soon after these work orders are issued to execute the
order. The goods manufactured are inspected as per contract and dispatched to client.
In case, if the goods are not delivered to the customers as per the due date in contract
review, then customer may claim a penalty of 0.5% - 5% per week on the value of the goods.
Products marketed by B.D.K holds a guarantee period ranging from 12-18 months.
Twice in a year, sales conference is held. All the zonal managers are called upon for the
review of the 6 months performance of the company's sales. Based on the up coming projects,
Babasabpatilfreepptmba.com Page 42
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
government policies etc., the sales target for next 6 months is set. The future demand is estimated
by analyzing the past sales, current orders and new projects.
Sales promotion:
Sales promotion plays an important role in increasing the demand for the product, market share
profits, etc.
The B.D.K group conducts the following sales promotion activities:
One to one approaching
Advertising in industrial magazine like chemical finder.
Conducting seminars and
Participation in exhibition.
Major Market for the Industry:
Basic chemical Industry.
End user chemical user.
Food and Beverage Industry.
Mining Industry.
Nuclear/Thermal Power plant.
Pharmaceuticals Industry.
Pulp and Paper Industry.
Water Treatment Plant.
Pollution control equipment manufacturer.
Oil Refineries.
Petrochemical Industry.
Miscellaneous Industry.
Overseas Market.
Babasabpatilfreepptmba.com Page 43
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
List of Major Clients:
CHEMICAL PROCESS INDUSTRIS
Asian Paints India Ltd., Munbai.
Jkay Industries Ltd., New Delhi.
Hindustan Liver Ltd., Karwar.
FERTILIZER AND AGROCHEMICALS
Countermand fertilizers Visakhapatnam's.
Osawal Argo Chemical New Delhi.
Madras Fertilizer Ltd., Jagadishpur.
PHARMACEUTICAL AND LABORATORIES
Galxo lab ltd Mumbai.
Chemicals Industries and Pharmaceuticals Lab, Bangalore.
Smith Kline Bungler.
Parke Devis Ltd., Mumbai.
Malladi Drugs and Pharmaceuticals Ltd., Hosur.
OIL REFINERIES AND PETRO CHEMICAL INDUSTRIES
Bharat Petroleum Corporation Ltd., Mumbai.
Madras Refiners Ltd., Chennai.
Babasabpatilfreepptmba.com Page 44
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
Reliance Petroleum, patalganga.Indian Oil Corporation, Delhi.
Responsibilities of Sales Co-Ordination Department:
The following are the important responsibilities of S C department:
1. To perform contract review activities and to communicate customer requirements clearly
and accurately within the organization through order acceptance cum work order and
amendments.
2. To co-ordinate with concerns of various departments and give feedback
B.D.KMS/customer regarding status of ordered and also to organize clients inspection
whenever required.
3. To attend to customer complaints promptly.
4. Non-conformance review, disposition and corrective and preventive action.
5. To maintain quality documentation and records.
6. To identify need and to plan organize for the same.
Babasabpatilfreepptmba.com Page 45
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
ACCOUNTS DEPARTMENT
Introduction:
Accounts department is playing a vital role by providing and maintaining the entire
details of each and every financial activities of the company.
Objectives:
1. To provide accurate, complete and systematic information about financial activities.
2. To maintain all the books of accounts and other financial documents.
3. To prepare financial statements of the company like profit and loss accounts and balance
sheet.
Functions:
1. Preparation of daily cashbook and bankbook.
2. Receipts and payments.
3. Maintenance of sales register and purchase register
4. Preparation of sales Tax Returns.
5. Maintenance of various ledgers like
6. General ledger
7. Sundry debtors and creditors ledgers.
Babasabpatilfreepptmba.com Page 46
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
BALANCE SHEET
SOURCES OF FUNDS 2008 2007
Share holders funds
Capital
Reserves and surplus
Loan funds
Secured loans
Unsecured loans
Deferred tax liability
Application of funds:
Fixed assets
Cost
Less:Accumulateddepreciation
Net block
Capital work-in-progress
Investments
Current assets loans and advances
Inventories
Sundry debtors
Cash and bank balance
Loans and advances
Less: current liabilities and
provisions
8,88,73,650
256634130
133434142
13860000
46975057
539766979
315605199
86780397
228824802
13946399
7200
155795411
329593565
33319033
180244113
698952122
326258813
76537709
43881000
161752997
133719182
1386000
46850525
400063704
289678889
49911452
239767437
2304607
7200
60555100
233627031
65570878
83978676
443731685
252298323
33448902
Babasabpatilfreepptmba.com Page 47
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
Liabilities
Provisions
Net current assets
Miscellaneous expenses
402796522
296155600
832978
539766979
285747225
157984460
nil
400063704
Babasabpatilfreepptmba.com Page 48
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
ORGANIZATION CHART
Babasabpatilfreepptmba.com Page 49
C.E.O
EXE.DIRECTOR
EXE WORKER M.E
PERSONAL DEPT
QUALITY ASSURENCE DEPT
DESIGN & DEVELOPMENT DEPT
SALE CO-ORDINATION DEPT
MARKETING DEPT
P.P.C DEPT
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
RESEARCH METHODOLOGY
Sample unit:
The study is conducted in BDK Engendering Industries PVT LTD. city on following
departments.
Production Planning Department
Marketing Department.
Time office Department.
Account Department
Sales Co-Ordination.
QA Deaprtment.
Sample size:
Sample Size: 100
Sampling Technique:
The research technique used is Stratified Random Method.
Type of Data:
Data is the fact of an event. Data is the base for every research work. The data is mainly
classified into two groups.
1) Primary Data
Primary data has been collected directly from the respondents and the proprietor of the firm.
This is the first hand information collected with the help of interview through questionnaires.
2) Secondary Data
I collected the information about the history of the Granite industries with the help of
Internet service. And I don’t have any secondary data regarding Pooja granite industries at Ilkal.
Babasabpatilfreepptmba.com Page 50
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
Research Techniques:-
Structured Questionnaire
Personal Interviews
Statistical Tools. Tables / Chart
Babasabpatilfreepptmba.com Page 51
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
1. The Infrastructure provide in dept enables to do my job Better.
80
20
0
10
20
3040
50
60
70
80
Agree disagree
INTERPRETAION:
According to the above graph shows that 80% of the employees are Agreed to the
infrastructure provide in dept enables to do my job better, & 20% of the employees are
Disagreed to the infrastructure is not provide in dept enables to do my job better
Babasabpatilfreepptmba.com Page 52
S.no Respondance
No Of
Respondence %in
1 Agree 80 80%
2 disagree 20 20%
TOTAL 100 100%
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
2. Materials & equipments provided at the right time and at the right place
64
64%
36
36%
0
10
20
30
40
50
60
70
Agree disagree
INTERPRETAION:
According to the above graph shows that 64% of the employees are Agreed to the
Materials & equipments provided at the right time and at the right place, & 36% of the
employees are Disagreed to the Materials & equipments not provided at the right time and
at the right place
Babasabpatilfreepptmba.com Page 53
S.no Respondance No of Respondence % In
1 Agree 64 64%
2 Disagree 36 36%
TOTAL 100 100%
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
3. Materials and equipments provided at the right time and at the right place
86
14
0
20
40
60
80
100
Agree disagree
Options
Materials & Equipments Provide at the right time & right place
INTERPRETAION:
According to the above graph shows that 86% of the employees are Agreed to the materials and
equipments provided at the right time and at the right place, & 14% of the employees are
Disagreed to the materials and equipments provided at the right time and at the right place
Babasabpatilfreepptmba.com Page 54
S.no Respondance No of
Respondence % In
1 Agree 86 86%
2 Disagree 14 14%TOTAL 100 100%
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
4. The safety measures in department are good.
78
22
0
10
20
30
40
50
60
70
80
Agree disagree
INTERPRETAION:
According to the above graph shows that 78% of the employees are Agreed to the the safety
measures in department are good., & 22% of the employees are Disagreed to the the safety
measures in department are good.
Babasabpatilfreepptmba.com Page 55
S.no Respondance No of Respondence % In
1 Agree 78 78%
2 Disagree 22 22%
TOTAL 100 100%
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
5. Opportunity is given to do which you are good at.
54
46
42
44
46
48
50
52
54
Agree disagree
No of Respondence
INTERPRETAION:
According to the above graph shows that 54% of the employees are Agreed to the Opportunity is
given to do which you are good at., & 46% of the employees are Disagreed to the Opportunity is
given to do which you are good at.
Babasabpatilfreepptmba.com Page 56
S.no Respondance No of Respondence % In
1 Agree 54 54%
2 Disagree 46 46%TOTAL 100 100%
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
6. The grievances and complaints are handled in time and satisfactorily.
60
40
0
10
20
30
40
50
60
Agree disagree
No of Respondence
INTERPRETAION:
According to the above graph shows that 60% of the employees are Agreed to the The
grievances and complaints are handled in time and satisfactorily, & 40% of the employees are
Disagreed to the The grievances and complaints are handled in time and satisfactorily
Babasabpatilfreepptmba.com Page 57
S.no RespondanceNo of
Respondence % In
1 Agree 60 60%
2 Disagree 40 40%TOTAL 100 100%
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
7. Opportunity
is given to learn and
glow in the work place.
72
28
0
10
20
30
40
50
60
70
80
Agree disagree
Options
Oppertunity is given to learn & glow in the work place.
INTERPRETAION:
According to the above graph shows that 72% of the employees are Agreed to the Opportunity is
given to learn and glow in the work place. & 28% of the employees are Disagreed to the
Opportunity is given to learn and glow in the work place.
Babasabpatilfreepptmba.com Page 58
S.no Respondance No of Respondence % In
1 Agree 72 72%
2 Disagree 28 28%
TOTAL 100 100%
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
8. The communication meeting has help to me in the canteen is useful.
84
16
0
20
40
60
80
100
Agree disagree
opations
The communication meeting has help to me in the canteen is useful.
INTERPRETAION:
According to the above graph shows that 84% of the employees are Agreed to the The
communication meeting has help to me in the canteen is useful., & 16% of the employees are
Disagreed to the The communication meeting has help to me in the canteen is useful.
Babasabpatilfreepptmba.com Page 59
S.no Respondance No of
Respondence % In
1 Agree 84 84%
2 Disagree 16 16%TOTAL 100 100%
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
9. I get clear communication from the notice board.
S.no Respondance No of Respondence % In
1 Agree 94 94%
2 Disagree 6 6%
TOTAL 100 100%
94
6
0
20
40
60
80
100
Agree disagree
options
I get clear communication from the notice board
INTERPRETAION:
According to the above graph shows that 94% of the employees are Agreed to the I get clear
communication from the notice board., & 6% of the employees are Disagreed to the I get clear
communication from the notice board.
Babasabpatilfreepptmba.com Page 60
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
10. The welfare facilities provided in company are adequate and well maintained.
S.no Respondance No of
Respondence % In
1 Agree 70 70%
2 Disagree 30 30%TOTAL 100 100%
70
30
0
10
20
30
40
50
60
70
Agree disagree
options
The welfare facility are adquate & well maintained.
INTERPRETAION:
Babasabpatilfreepptmba.com Page 61
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
According to the above graph shows that 70% of the employees are Agreed to the The welfare
facilities provided in company are adequate and well maintained, & 30% of the employees are
Disagreed to the The welfare facilities provided in company are adequate and well maintained
11. The transport facility is good and timely.
S.no Respondance No of
Respondence % In
1 Agree 80 80%
2 Disagree 20 20%
TOTAL 100 100%
80
20
0
10
20
30
40
50
60
70
80
Agree disagree
Options
Transport facility are good & timly
INTERPRETAION:
Babasabpatilfreepptmba.com Page 62
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
According to the above graph shows that 80% of the employees are Agreed to the The transport
facility is good and timely., & 20% of the employees are Disagreed to the The transport facility
is good and timely.
12. The fringe benefits are good.
S.no Respondance No of
Respondence % In
1 Agree 30 30%
2 Disagree 70 70%TOTAL 100 100%
The fringe benfits are good.
30
70 Agree disagree
INTERPRETAION:
Babasabpatilfreepptmba.com Page 63
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
According to the above graph shows that 30% of the employees are Agreed to the The fringe
benefits are good., & 70% of the employees are Disagreed to the The fringe benefits are good.
13. The medical facility provided are good.
S.no RespondanceNo of
Respondence % In
1 Agree 90 90%
2 Disagree 10 10%TOTAL 100 100%
The medical facility are good
90
10
Agree
disagree
Babasabpatilfreepptmba.com Page 64
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
INTERPRETAION:
According to the above graph shows that 90% of the employees are Agreed to the The medical
facility provided are good., & 10% of the employees are Disagreed to the The medical facility
provided are good.
14. The unit has bright future.
S.no Respondance No of
Respondence % In
1 Agree 40 40%
2 Disagree 60 60%TOTAL 100 100%
The unit has bright future.
40
60
Agree
disagree
INTERPRETAION:
Babasabpatilfreepptmba.com Page 65
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
According to the above graph shows that 40% of the employees are Agreed to the The unit has
bright future., & 60% of the employees are Disagreed to the The unit has bright future.
15. The canteen facility provided are good.
S.no RespondanceNo of
Respondence % In
1 Agree 90 90%
2 Disagree 10 10%TOTAL 100 100%
90
10
0102030405060708090
Agree disagree
canteen facility are good
INTERPRETAION:
Babasabpatilfreepptmba.com Page 66
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
According to the above graph shows that 90% of the employees are Agreed to the canteen
facility provided are good., & 10% of the employees are Disagreed to the canteen facility
provided are good.
16. Supervisor keeps you well informed about what is going in the department.
S.no RespondanceNo of
Respondence % In
1 Agree 68 68%
2 Disagree 32 32%TOTAL 100%
68
32
010203040506070
Agree disagree
Options
Supervisor keeps you will informed about what going on in the department.
Babasabpatilfreepptmba.com Page 67
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
INTERPRETAION:
According to the above graph shows that 68% of the employees are Agreed to the Supervisor
keeps you well informed about what is going in the department., & 32% of the employees are
Disagreed to the Supervisor keeps you well informed about what is going in the department.
17. Supervisor spends adequate time in your development.
S.no RespondanceNo of
Respondence % In
1 Agree 52 52%
2 Disagree 48 48%TOTAL 100 100%
52
48
46
47
48
49
50
51
52
Agree disagree
Options
Supervisor spends adquate time in your department.
Babasabpatilfreepptmba.com Page 68
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
INTERPRETAION:
According to the above graph shows that 52% of the employees are Agreed to the Supervisor
spends adequate time in your development., & 48% of the employees are Disagreed to the
Supervisor spends adequate time in your development.
18. Supervisor encourages your talent/ intelligence.
S.no RespondanceNo of
Respondence % In
1 Agree 76 76%
2 Disagree 24 24%TOTAL 100 100%
75
24
01020304050607080
Agree disagree
Opt
Superviso encourages your tallent/inonstelligent.
Babasabpatilfreepptmba.com Page 69
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
INTERPRETAION:
According to the above graph shows that 75% of the employees are Agreed to the Supervisor
encourages your talent/ intelligence., & 24% of the employees are Disagreed to the Supervisor
encourages your talent/ intelligence.
19. Supervisor provides you with adequate information to do the work.
S.no RespondanceNo of
Respondence % In
1 Agree 74 74%
2 Disagree 26 26%TOTAL 100 100%
74%
26%
0%
20%
40%
60%
80%
1
Option
HOD provide adequate iformation to do work
Babasabpatilfreepptmba.com Page 70
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
INTERPRETAION:
According to the above graph shows that 74% of the employees are Agreed to the Supervisor
provides you with adequate information to do the work., & 26% of the employees are Disagreed
to the Supervisor provides you with adequate information to do the work.
20. Training provided increase knowledge and skill.
S.no RespondanceNo of
Respondence % In
1 Agree 84 84%
2 Disagree 16 16%TOTAL 100 100%
84%
16%
0%
20%
40%
60%
80%
100%
1
Option
Taining provide enough knowledge/skill
Babasabpatilfreepptmba.com Page 71
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
INTERPRETAION:
According to the above graph shows that 84% of the employees are Agreed to the Training
provided increase knowledge and skill. & 16% of the employees are Disagreed to the Training
provided increase knowledge and skill.
Babasabpatilfreepptmba.com Page 72
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
FINDINGS
80% Of The Employees are agree to the infrastructure provide in dept enables to do my
job better. & 20% Of the Employees are Disagree to the infrastructure is not provide in
dept enables to do my job better.
64% Of The Employees are agree to Doing job in alternatives ways is encouraged in
department. & 36% Of the Employees are Disagree for Doing job in alternatives ways is
encouraged in department.
86% Of The Employees are agree to the Materials & equipments are provided at right
time & right place. & 24% Of The Employees are Disagree the Materials & equipments
are provided at right time & right place.
78% Of The Employee are agree to The safety measures in department are good. & 22%
Of The Employee are Disagree The safety measures in department are not good.
54% Of The Employees are agree to Opportunity is given to do which you are good at. &
46% Of The Employees are Disagree to Opportunity is given not to do which you are
good at.
60% Of the Employee are agree to The grievances & complaints are handled in time &
satisfactorily. & 40% Of the Employee are Disagree The grievances & complaints are not
handled in time & satisfactorily.
78% Of The Employee are agree to Opportunity is given to learn & glow in the work
place.& 22% Of The Employee are Disagree Opportunity is given to learn & glow in the
work place.
Babasabpatilfreepptmba.com Page 73
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
84% Of The Employee are agree to The communication meeting has help to me in the
canteen is useful. & 26% Of the Employee are Disagree The communication meeting has
help to me in the canteen is useful
94% Of The Employees are agree to I get clear communication from the notice board. &
6% Of The Employees are Disagree to I am not getting celar communication from the
notice board.
70% Of the Employees are agree to The welfare facility provided In company are
adequate & well maintained. & 30% Of the Employees are Disagree to The welfare
facility is not provided In company are adequate & well maintained.
80% Of The Employees are agree to The transport facility is good & timely. & 20% Of
the Employees are Disagree the transport facility is not available good & timely.
30% Of The Employees are agree to The fringe benefits are good & 70% Of The
Employees are Disagree The fringe benefits are not good
95% Of the Employees are agree to The medical facility provided are good. & 22% Of
the Employees are Disagree to The medical facility are not provided in good.
40% Of the Employees are agreed to the unit has bright future. & 22% Of the Employees
are Disagree to The unit has no bright future.
90% Of The Employees are agreed to The canteen facilities provided are good & 10%
Of The Employees are Disagree to The canteen facilities provided are good
68% Of the Employees are agreed to Supervisor you well informed about what is going
on in the department. & 32% Of the Employees are Disagree to Supervisor you well not
informed about what is going on in the department.
Babasabpatilfreepptmba.com Page 74
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
52% Of the Employees are agreed to Supervisor spends adequate time in your
department. & 48% Of the Employees are Disagree to Supervisor spends adequate time
in your department.
76% Of the Employees are agreed to Supervisor encourages your talent/intelligence. &
24% Of the Employees are Disagree to the Supervisor is not encourages your
talent/intelligence.
74% Of the Employees are agreed to Supervisor provides you with adequate information
to do the work. & 26% Of the Employees are Disagree to the Supervisor provides you
with not adequate information to do the work.
84% Of The Employees are agreed to the Training provides increase knowledge & skill.
& 16% Of The Employees are Disagree to the Training provides not increase knowledge
& skill.
Babasabpatilfreepptmba.com Page 75
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
SUGGESTION
The supervisor/HOD should give regular feedback on performance by holding informal
meetings with each individual.HOD should appreciate and encourage employees to work
hard.
If the top management is not able to keep any promises it should give the reason why it
has not able to keep promises .This information should be communicated to all
employees.
All the employees should be treated equally and there should not be any bias treatment.
If an employee has gained additional skill he should be assigned task so that he can
utilize his skills.
HR should convince the employees and make them believe that HR department is for
their well being. Besides staff meetings HR should conduct social gatherings for all
departments so that the relation between HR and the employees will improve .This will
help the employees to express their problems freely and frankly.
The training needs of the employees should be reviewed at least twice a year. Based on
that training programs should be conducted to all the employees.
Day to day work related training should be provided that is 80% job related and 20% on
management skills.
Conduct the workshop on team development. So that all employees are aware of the
benefits of teamwork.
yet more concentration or more measures should be taken for the safety.
If the employees request for facilities such as phone, printer etc; it should be checked
whether it this really necessary and it should be provided.
Opportunity should be given to the employees to express their views, ideas. Cultural
activities should be held to further motivate the employees to attain the goal.
Babasabpatilfreepptmba.com Page 76
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
Communication method should be improved; it should be easily under stable by each
employee.
CONCLUSION:
Employee satisfaction is the realizing the direct relationship between happy and unhappy
employees.
Following are the dimensions of employee satisfaction
Employee retention
Productivity
Customer satisfaction
Profitability.
All the above mentioned factors are obtained only if the employees are satisfied .This is
because satisfied employees tend to be more creative ,tend to accept challenging jobs which
is an promotional opportunity to them .They tend to be more productive.
Employees with higher job satisfaction: believe that the organization will be satisfying in the
long run .
care about the quality of their work
are more committed to the organization
Have higher retention rates, and
are more productive.
To attain the long run goal employees should be treated equally , and should have opportunity
to express their views, ideas and opinions. They should be updated and accessible to all the
employees so that the employees are aware of all policies of the organization. The supervisor
should have the good leadership qualities and should give positive feedback at regular interval.
The working environment should be good so that the employees will have sense of pride in
working for the organization and should be provided with the necessary facilities and adequate
Babasabpatilfreepptmba.com Page 77
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
space work efficiently. Loyalty and performance should be rewarded by providing opportunities
for career development
QUESTIONNAIRE
Employee Satisfaction Survey1. The infrastructure provided in dept enables to do my job better
a) Agree
b) Disagree
2. Doing job in alternative ways is encouraged in department.
a) Agree
b) Disagree
3. Materials & equipments provided at the right time and at the right place.
a) Agree
b) Disagree
4. The safety measures in department are good
a) Agree
b) Disagree
5. Opportunity is given to do which you are good at.
a) Agree
b) Disagree
6. The grievances & complaints are handled in time & satisfactorily.
a) Agree
b) Disagree
7. Opportunity is given to learn and glow in the work place.
a) Agree
b) Disagree
8. The communication meeting has help to me in the canteen is useful
a) Agree
b) Disagree
9. I get clear communication from the notice Board.
a) Agree
b) Disagree
Babasabpatilfreepptmba.com Page 78
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
10. The welfare facilities provided in company are adequate & well maintained.
a) Agree
b) Disagree
11. The transport facility is good and timely.
a) Agree
b) Disagree
12. The fringe benefits are good
a) Agree
b) Disagree
13. The medical facilities provided are good.
a) Agree b) Disagree
14. The unit has a bright future. a) Agree
b) Disagree
15. The canteen facilities provided are good a) Agree
b) Disagree
16. Supervisor keeps you well informed about what is going on in the department.
a) Agree
b) Disagree
17. Supervisor spends adequate time in your development.. a) Agree
b) Disagree
18. Supervisor encourages your talent/intelligence.a) Agree
b) Disagree
19. Supervisor provides you with adequate information to do the work. a) Agree
b) Disagree
20. Training provided increases knowledge & skill. a) Agree
Babasabpatilfreepptmba.com Page 79
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
b) Disagree
BIBOLOGRAPHY
Books:
Personnel and Human Resource Management
-P.Subba Rao
Company Manuals
Websites:
www.google.com
Babasabpatilfreepptmba.com Page 80
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
CODE SHEETSL NO
Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12
Q13 Q14
Q15 Q16 Q17 Q18
1 1 1 1 2 2 1 2 1 1 1 1 2 1 1 1 1 1 12 1 2 1 2 1 1 1 1 1 1 1 2 1 2 2 1 1 13 1 1 1 1 2 2 1 2 1 1 1 2 1 2 1 1 1 14 1 2 1 1 1 1 1 1 2 1 1 2 1 1 2 1 1 15 1 1 1 1 1 2 1 1 2 2 1 2 1 1 1 1 1 16 1 1 1 2 2 1 2 1 1 1 1 1 1 2 2 1 1 17 1 1 1 1 1 1 1 1 2 1 1 2 1 1 1 1 1 18 1 1 1 1 1 2 1 1 2 1 1 2 1 1 2 1 1 19 2 2 1 1 2 1 1 1 1 1 2 1 2 1 2 1 1 1
10 1 1 1 1 2 2 1 1 1 1 1 2 1 1 1 2 1 111 1 1 1 1 2 1 1 1 1 1 1 1 1 2 2 1 1 112 1 2 1 1 2 1 1 1 1 1 1 2 1 1 1 2 1 113 1 2 1 1 2 2 1 1 1 1 1 1 1 1 2 2 2 114 1 1 1 2 2 2 1 1 1 1 1 2 1 2 1 1 1 115 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 2 2 116 2 2 1 1 2 1 1 1 1 1 1 2 1 2 1 1 1 117 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 118 1 1 1 1 2 1 2 1 1 1 1 2 1 1 2 1 1 119 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 120 1 1 1 1 1 1 1 1 1 2 1 1 1 2 1 2 1 121 1 1 1 1 1 2 1 1 1 2 1 2 1 2 2 2 1 222 1 1 1 2 1 1 2 1 1 1 1 1 2 1 2 1 2 123 1 2 1 1 2 2 1 1 1 1 1 2 1 1 2 1 1 224 1 1 1 1 2 2 1 1 2 1 1 2 1 1 2 1 1 125 1 2 1 1 2 1 1 1 1 1 2 1 1 1 2 2 1 126 1 1 1 1 1 1 1 1 2 1 1 2 1 1 1 1 1 127 1 1 2 1 1 1 2 1 1 2 1 2 1 1 1 1 1 228 1 1 1 1 1 2 1 1 2 1 1 2 1 1 1 1 2 129 1 1 2 1 1 2 1 1 2 1 1 2 1 2 2 1 1 130 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 131 2 2 1 1 2 1 1 1 1 1 1 1 1 1 2 2 2 232 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 133 2 1 2 1 2 1 1 1 1 1 1 1 1 1 1 1 1 134 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 2 1 135 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 136 1 1 2 1 1 2 1 1 2 2 2 2 1 1 2 1 1 137 1 2 1 1 2 2 1 1 1 1 1 1 1 2 2 1 2 138 1 2 1 2 1 1 1 1 1 1 1 2 2 2 2 1 1 239 2 2 2 1 2 2 1 1 1 1 1 2 1 2 2 1 2 140 1 2 1 2 2 1 2 1 1 1 1 2 1 2 2 1 1 141 2 1 1 1 1 1 1 1 1 1 1 2 1 1 1 2 1 142 1 1 1 2 2 1 1 2 2 1 1 2 1 1 1 2 1 243 1 1 1 1 1 2 1 1 2 1 1 1 1 1 1 1 1 1
Babasabpatilfreepptmba.com Page 81
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
44 1 1 1 1 1 1 1 1 1 2 2 1 2 2 2 2 2 245 1 2 1 2 2 2 1 1 1 1 1 2 1 1 2 1 1 146 1 2 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 147 1 1 1 2 2 1 1 1 1 1 1 2 1 1 2 1 1 148 1 2 1 1 2 2 1 1 1 1 1 1 1 1 2 2 2 149 1 1 1 2 2 2 1 1 1 1 1 2 1 2 1 1 1 150 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 2 2 151 1 1 1 2 2 1 2 1 1 1 1 2 1 1 1 1 1 152 1 2 1 2 1 1 1 1 1 1 1 2 1 2 2 1 1 153 1 1 1 1 2 2 1 2 1 1 1 2 1 2 1 1 1 154 1 2 1 1 1 1 1 1 2 1 1 2 1 1 2 1 1 155 1 1 1 1 1 2 1 1 2 2 1 2 1 1 1 1 1 156 1 1 1 2 2 1 2 1 1 1 1 1 1 2 2 1 1 157 1 1 1 1 1 1 1 1 2 1 1 2 1 1 1 1 1 158 1 1 1 1 1 2 1 1 2 1 1 2 1 1 2 1 1 159 2 2 1 1 2 1 1 1 1 1 2 1 2 1 2 1 1 160 1 1 1 1 2 2 1 1 1 1 1 2 1 1 1 2 1 161 1 1 1 1 2 1 1 1 1 1 1 1 1 2 2 1 1 162 1 2 1 1 2 1 1 1 1 1 1 2 1 1 1 2 1 163 1 2 1 1 2 2 1 1 1 1 1 1 1 1 2 2 2 164 1 1 1 2 2 2 1 1 1 1 1 2 1 2 1 1 1 165 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 2 2 166 2 2 1 1 2 1 1 1 1 1 1 2 1 2 1 1 1 167 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 168 1 1 1 1 2 1 2 1 1 1 1 2 1 1 2 1 1 169 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 170 1 1 1 1 1 1 1 1 1 2 1 1 1 2 1 2 1 171 1 1 1 1 1 2 1 1 1 2 1 2 1 2 2 2 1 272 1 1 1 2 1 1 2 1 1 1 1 1 2 1 2 1 2 173 1 2 1 1 2 2 1 1 1 1 1 2 1 1 2 1 1 274 1 1 1 1 2 2 1 1 2 1 1 2 1 1 2 1 1 175 1 2 1 1 2 1 1 1 1 1 2 1 1 1 2 2 1 176 1 1 1 1 1 1 1 1 2 1 1 2 1 1 1 1 1 177 1 1 2 1 1 1 2 1 1 2 1 2 1 1 1 1 1 278 1 1 1 1 1 2 1 1 2 1 1 2 1 1 1 1 2 179 1 1 2 1 1 2 1 1 2 1 1 2 1 2 2 1 1 180 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 181 2 2 1 1 2 1 1 1 1 1 1 1 1 1 2 2 2 282 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 183 2 1 2 1 2 1 1 1 1 1 1 1 1 1 1 1 1 184 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 2 1 185 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 186 1 1 2 1 1 2 1 1 2 2 2 2 1 1 2 1 1 187 1 2 1 1 2 2 1 1 1 1 1 1 1 2 2 1 2 188 1 2 1 2 1 1 1 1 1 1 1 2 2 2 2 1 1 289 2 2 2 1 2 2 1 1 1 1 1 2 1 2 2 1 2 190 1 2 1 2 2 1 2 1 1 1 1 2 1 2 2 1 1 191 2 1 1 1 1 1 1 1 1 1 1 2 1 1 1 2 1 192 1 1 1 2 2 1 1 2 2 1 1 2 1 1 1 2 1 293 1 1 1 1 1 2 1 1 2 1 1 1 1 1 1 1 1 194 1 1 1 1 1 1 1 1 1 2 2 1 2 2 2 2 2 295 1 2 1 2 2 2 1 1 1 1 1 2 1 1 2 1 1 196 1 2 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 197 1 1 1 2 2 1 1 1 1 1 1 2 1 1 2 1 1 198 1 2 1 1 2 2 1 1 1 1 1 1 1 1 2 2 2 1
Babasabpatilfreepptmba.com Page 82
Employee satisfaction survey of operative division at BDK ENGENEERING CO.PVT LTD HUBLI
99 1 1 1 2 2 2 1 1 1 1 1 2 1 2 1 1 1 1100 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 2 2 1
Babasabpatilfreepptmba.com Page 83