a premier project generator · csamt 2d inverted resistivity. 13 newcrest mining chile: gorbea...

24
CHILE / ARGENTINA GOLD / SILVER / COPPER A PREMIER PROJECT GENERATOR Focused On The Next Discovery TSX.V: MRZ mirasolresources.com February 2019 - Update For Further Information: Norm Pitcher, President & CEO Jonathan Rosset, VP Corp Development

Upload: hoangdang

Post on 05-May-2019

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

CHILE / ARGENTINA

GOLD / SILVER / COPPER

A PREMIER PROJECT GENERATORFocused On The Next Discovery

TSX.V: MRZmirasolresources.com

February 2019 - Update

For Further Information:

Norm Pitcher, President & CEOJonathan Rosset, VP Corp Development

Page 2: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

Cautionary Statement

This presentation contains certain statements that may be deemed “forward-looking statements”. All statements in this presentation, other thanstatements of historical fact, that address future operations, resource potential, exploration drilling, exploitation activities and events or developmentsthat the Company expects to occur, are forward looking statements. Forward looking statements are statements that are not historical facts and aregenerally, but not always, identified by the words “expects”, “plans” “anticipates”, “believes”, “intends”, “estimates”, “projects”, “potential” and similarexpressions, or that events or conditions “will”, “would”, “may”, “could” or “should” occur. Information inferred from the interpretation of drilling resultsand information concerning mineral resource estimates may also be deemed to be forward looking statements, as it constitutes a prediction of whatmight be found to be present when and if a project is actually developed. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differmaterially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-lookingstatements include market prices, exploitation and exploration successes, and continued availability of capital and financing, and general economic,market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results ordevelopments may differ materially from those projected in the forward-looking statements. Forward looking statements are based on the beliefs,estimates and opinions of the Company’s management on the date the statements are made. The Company undertakes no obligation to update theseforward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change, except as may be required byapplicable law.

This presentation may use the term “indicated resource”. The Company advises investors that although this term is recognized and required by Canadiansecurities regulations (under National Instrument 43-101 “Standards of Disclosure for Mineral Projects”), however the US Securities and ExchangeCommission does not recognize this term. Investors are cautioned not to assume that any part of or all of the mineral deposits in these categories willever be converted into reserves.

All material project information in this presentation has been previously disclosed to the public by Mirasol.

Stephen Nano (Director, Business Development & Technical Advisor), a “Qualified Person” under National Instrument 43-101, has reviewed and approvedthe scientific and technical information in this presentation.

MIRASOL RESOURCES

Page 3: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

Portfolio Overview: Large High Caliber Gold – Silver – Copper Project Portfolio in Chile and Argentina

3

Confirmed Partner-funded exploration budgets

FY 2019 *

+ Committed Partner-funded

exploration budgets FY 2019 and FY 2020 *

→ Aggressive Programs Planned

Argentina: Claudia JV – OceanaGold

Argentina: Curva JV – OceanaGold

Chile: Altazor JV – Newcrest Mining

CA$ 6 M

2017

2017

2017

Chile: Indra JV – Hochschild Mining 2018

9 Drill Ready Property PackagesChile and Argentina

25 Early Stage Pipeline Projects

Mirasol Funded Exploration StrategyFY 2019 *

+Business Development

Activities

500 km

ATACAMA PUNA GENERATIVE REGION

SANTA CRUZ GENERATIVE REGION

JV Project

Deal Ready /Pipeline Project

Chile: Gorbea JV – Newcrest Mining 2019

* Financial Year (FY) for Mirasol is July to June. Certain contracted exploration commitments are for 18 months with some activities to occur next Financial Year

CA$ 6 M

CA$ 4.3 M

Page 4: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

Strategy: Accelerating drill testing and the Path to Discovery

4

REW

AR

D (

de

po

sit

siz

e,

reta

ine

d in

tere

st)

RISK ($ to test, time, target type)

Mirasol Expanded Exploration Strategy

Self Funded Exploration on select projects

JV Model on Large Scale

Targets

JV Model on smaller scale

targets

Traditional Exploration

model

Expanded Exploration Strategy in place:

→ Retain the Project Generator Model as a central pillar of the business philosophy

→ Self funding of high grade / infrastructure advantaged / lower risk projects

→ Partner funded drill testing of large-scale, high risk / high reward projects

20 to 30%

3 Moz +

100%

1 to 3 Moz

Partner fundedJV Model

Mirasol funded Exploration

Mirasol Retained Project

Funding in place:

→ Completed C$8.6M Placement in June 2018 (70% over-subscribed)

→ C$25M in bank (September 30, 2018)

Page 5: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

Exploration Activities FY2018-2019: An Active Year in progress

5

Altazor Newcrest Surface / Drilling program

Gorbea Newcrest Surface / Drilling program

La Curva OceanaGold 2nd Drill program completed

Claudia OceanaGold Surface program completed

Indra Hochschild Surface program completed

Nico Mirasol Surface + Drilling

Argentina Pipeline Mirasol Surface Exploration

Chilean Pipeline Mirasol Surface Exploration

Projects Funding Planned Activities

Multiple Concurrent Drilling

and Exploration Programs

→ Funding and Partners in place to deliver aggressive exploration programs this year→Opportunity for investors to gain exposure to potential discovery and strong news flow

Page 6: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

Business Development Focus: Focused on Delivering Flow of New Deals

6

Previous Partners Current Partners

→ Track record for strong deals with quality partners on our projects in Chile and Argentina

5 partner funded Projects8 partner funded Projects→ 1 discovery / 7 returned without retained interest by partner

Arge

ntin

aC

hile

Page 7: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

50 km

Gobernador

Gregores

Las Heras

Puerto

Deseado

Fitzroy

Perito

Moreno

San Julian

Bajo

Caracoles Virginia

Sascha-Marcelina

Nico

Homenaje

Espejo

Libanesa

Mirasol Projects: Extensive Gold – Silver - Copper Portfolio in World Class Mining Belts

7

5 Option to JV agreements with producers: Altazor, Gorbea, La Curva, Claudia, Indra → Targeting large scale discoveries

Extensive Portfolio of Drill Ready Projects in Chile and Argentina – Odin, Rubi, Zeus, Nico, Virginia/Sascha, Homenaje/Espejo, Libanesa, Amarillos, IDO Gold

Pipeline Projects includes leading position in the Prospective Mio-Pliocene mineral Belt

Argentina: Santa Cruz Au + Ag 13 Projects / 418,000 ha

La Curva JVOceanaGold

Claudia JVOceanaGold

Jurassic Volcanics

Taltal

Copiapo

El Penon

El Guanaco

Inca de Oro

Relincho

Argentina

Chile

Antofagasta

100km

Taltal

Antofagasta

ChuquicamataCluster

Copiapo

Potrerillos

Gaby

El Salvador

EscondidaCluster

100km

Argentina

Chile

Paleocene Igneous Belt Oligocene Igneous Belt Miocene Igneous Belt

Significant Au Deposit Significant Cu Deposit

Odin

Rubi

CentinelaCluster

Chile: Paleocene Au + Ag7 Projects / 30,000 ha

Chile: Oligocene Cu5 Projects / 42,000 ha

Amarillos

IDO Gold

Indra JVHochschild

Mining

Projects and hectares values are as disclosed in MD&A for September 30, 2018

Salares Norte3.7 Moz Au

49.5 Moz Ag

Veladero

Chile

Alturas8.9 Moz Au

La Coipa

Argentina

100km

Gorbea JVNewcrest Mining

Altazor JVNewcrest Mining

Zeus

MaricungaBelt

El IndioBelt

Chile: Mio-Pliocene Au + Cu21 Projects / 140,000 ha

Iquique

Copiapo

Taltal

Page 8: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

Chile

Exploration and Business Development

Page 9: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

Mantos Blancos

Chimborazo

Escondida

El Peñon

Taca Taca

Gaby

Antofagasta

Argentina

Chile

Taltal

5

475

23

Chañaral

Socaire

La Coipa

Potrerillos

El Salvador

Inca del Oro

50 km

Nueva Esperanza

Altazor JVNewcrest

MiningOdin Cu Project

Rubi Cu Project

Salares Norte*3.7 Moz Au,49.5 Moz Ag

Chile: Building On A Track Record Of Attracting Partners To District Scale Projects

9* Gold Fields Mineral Resource and Mineral Reserve Supplement to the Integrated Annual Report 2017.

Gorbea JVNewcrest

Mining

Indra JVHochschild

Mining

Under Joint Venture

Business Dev. Focus

Pipeline

Zeus Au Project

Mirasol Properties

→ Competitive technical and operational advantage

→ Demonstrated capacity to deliver high quality, district-scale precious metal projects

→ Seeking additional partnership to accelerate exploration of our portfolio

Positioning:• Portfolio of attractive projects in world-class Au/Cu belts• Exploring for bulk mineable Oxide High Sulfidation Epithermal (HSE) in

Mio-Pliocene Belt since 2010 → early mover advantage• Leading edge geoscience driven approach → identify / secure / test new

targets• Generative, exploration and claims management teams in place

Business Development: • Focused BD effort to attract additional partners:

• Copper: Odin, Rubi• Gold/Silver: Zeus

Mio Pliocene generative effortPaleocene Gold property package

Page 10: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

• Upper levels of a large epithermal precious system

• Two prospects: Agni (large alteration system) and Indra (large vein and breccia zone)

• Prospective geological age, within a favorable structural setting

• Low elevation with year-round access and adjacent to mine infrastructure

• First phase program: detailed geological mapping, rock chip sampling, alteration vectoring studies and ground magnetics to develop drill targets

10

Hochschild Mining Chile: Indra Project – Option to JV Agreement With Program Initiated In Fall 2018

US$ 50K signing payment and US$ 800,000 committed spend over 18 months

Argentina

Chile Bolivia

Chile

SalaresNorte

La Coipa

MarteLobo

Inca de Oro

SpenceSierra Gorda

El Guanaco1.37 Moz Au5.75 Moz Ag1

El Penon6.95 Moz Au 188.1 Moz Ag1

San Cristobal0.99 Moz Au5.4 Moz Ag1

Chuquicamata

Esperanza

Gaby

Escondida

Taca Taca

El Salvador

Potrerillos

El Abra

Toki

Indra Project

Antofagasta

Tocopilla

Taltal

100 km

N

1 S&P Global Market Intelligence

→ Option to JV agreement signed in October 2018

→ Initiated surface exploration program – US$ 250,000 spent to December

→ Targeting multi-million ounce precious metal deposit

MRZ Funded Interest 30%

MRZ Partner Funded Interest 25% PEA

US$ 6M Exploration Expenditures$725,000 option payments

51% 70%75%

FS

60%

+fund

4.5 years 3 years 3 years

Page 11: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

Background image: Ground Magnetics ASVI

open

open

open

Windows of strong outcropping alteration coincident with

moderate to intense ASVI lows.Extending under cover

Alunita

Purichari

Centinela West

Pirofilita

Sulfuros

Centinela East

La Puerta

open

New Altazorclaims

extension

New Altazorclaims

extension

New Altazorclaims

extension

Post mineral flow

Post mineral flow

Post mineral flow

5,000 m

Interpreted extent of alteration zone beneath cover

open

Intense silicification

Phreatic and Hydrothermal Breccias

CSAMT Survey Lines

Interpreted ASVI Lows

Interpreted ASVI Highs

Newcrest Mining Chile: Altazor JV Project Initiating Second Year Exploration Program

11

→ Targeting multi-million ounce HSE gold deposit

→ Completed initial CA$1.8M partner-funded exploration program

→ NCM exercised option to enter in Farm-in phase and paid C$650,000 to Mirasol

→ NCM budgeted CA$4.3M for upcoming exploration program with up to 4,000m of drilling (permit dependant)

MRZ Funded Interest 25%

MRZ Partner Funded Interest 20% PEA

$650k cashUS$ 10M Exploration Expenditures

US$600,000 option payments (paid)

51% 75%

FS$650k

65%

5 years 2 years 2 years

+fund

80%

• NCM acting as operator on the project going forward• Property claim package increased to 33,230 ha• Drill and road access permitting initiated along side with

environmental and community consultant process

Farm-in Phase: • US$8.5M in expenditures over 4 years to earn 51% of the project

Ground Magnetics ASVI Interpretation and Claims Expansion

Analytical SignalVertical IntegralMagnetic High

Magnetic Low

Page 12: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

2,500 m

Post mineral flow

Post mineral flow

Post mineral flow

LIN

E 2

04

00

Alunita

Pirofilita

Sulfuros

La Puerta

Newcrest Mining Chile: Altazor JV Project – 2017/2018 Surface Program Delivers Compelling Drill Targets

12

→ Extensive surface exploration completed with 2nd season work initiated

→ Defined high priority conceptual targets for large scale HSE gold mineralization

→ Drill testing anticipated for Q2 2019, contingent on permitting process

First-year Surface Exploration Results• Three age date in 7.3 to 7.8 Ma in key “fertile” age bracket• Extensive (75km2) alteration including Steam heated cap, silicification and local

vuggy quartz correlating to large scale magnetic depletions• Alteration mineral assemblage vectoring to CSAMT resistivity anomalies• Multiple breccia complexes mapped along a 15km range front• Anomalous gold, silver, copper, lead, zinc in prospective geological setting• Highly resistive (7,500 to >30,000 Ohm-m) , Predominantly open-ended, CSAMT

geophysical anomalies

PirofilitaBreccia Targets

SulfurosBreccia Target

ResistivityOhm-m

CSAMT Line 20400E 2D Inverted Resistivity(Viewing East)

+10,000

6.3

50

0 m

500 m

Post-mineral cover and flows

CSAMT Resistivity Anomaly

CSAMT survey line

Max Resistivity GridOhm-m +10,00026

open

open

open

open

open

Background image:Max CSAMT Resistivity

CSAMT 2D Inverted Resistivity

Page 13: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

13

Newcrest Mining Chile: Gorbea Project – New Option to Farm in Agreement – Targeting Multi-million Ounce Precious Metal Deposit

US$ 100K signing payment and US$ 4M committed spend over 18 months

a)Gold Fields Mineral Resource and Mineral Reserve Supplement to the Integrated Annual Report, 2017.

b)Barrick Annual Report 2018.

→ Definitive Option to Farm-in agreement executed in January 2019

→ Previous JV Partner spend of CA$10 M on the properties and drilled 11,640 m

→ 950 x 500 x 120 m body of gold mineralization identified

→ Follow up core drilling from Newcrest planned for Q1 2019 along detailed re-mapping, alteration vectoring studies and 60 line-km of CSAMT geophysics

MRZ Funded Interest 25%

MRZ Funded Interest 15% PEA

$650k cashUS$ 19M Exploration Expenditures

US$600,000 option payments

51% 75%

FS

65%

6 years 1 year 2 years

NSR royalty option

85%

Santiago

Alumbrera

Pascua

El Teniente

Pelambres

La Coipa

Mirasol – NewcrestGorbea JV incl. Atlas Project

Alturas (b)

8.9Moz Au

Mirasol – NewcrestAltazor Farm-In

AgreementAntofagasta

El Pachon

Los Azules

El Indio

Veladero

Caspiche

Maricunga

Salares Norte (a)

3.7 Moz Au49.5 Moz Ag

Mirasol Zeus Project

C H I L E

Las Helados

Filo Del Sol Josemaria

Los Bronces

A R G E N T I N A

Caserones

Agua Rica

200 km

Significant Mio-PlioceneCu-Au Deposit

Significant Mio-PlioceneAu-Ag Deposit

MRZ Au-Ag JV Project

Mio-Pliocene AgeVolcanics

MRZ JV Ready Project

→ Confirmed presence of a large, deeply oxidized and strongly mineralized HSE gold system

→ Large-area Au target in the prospective belt → Under-explored opportunity

Page 14: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

14

North West South East

?

?

Open

??

No DataNo Data

No Data

Open

4,300m

4,200m

4,100m

4,000m

3,900m

Transition to zone of strong vuggy quartz-jarosite-alunite

alteration, forming sub-horizontal ‘cap’ to high grade Au

mineralized zone

PhreatomagmaticBreccia

DaciticDome

AndesiteVolcanics

AndesiteMegaclast?

114.1m @ 1.07g/t Auincl. 36m @ 2.49 g/t Au

77.1m @ 0.32 g/t Au incl. 16.5m @ 0.77 g/t Au

Open

AndesiteMegaclast?

Dacitic Domes

Phreatomagmatic Breccia (PBX)

Silicification + Alunite + Jarosite / Cream coloured chalcedony – Jarosite veins and Matrix

Hydrothermal Breccia

Andesite Volcanics & Megaclasts?

Logged / Interpreted Lithology

Alteration & Mineralization

Higher grade Au Mineralization zone, strong vuggy quartz + alunite +/- Fe Oxide/Hydroxides

150 m

Leapfrog >0.1 g/t Au Shell

Steam

Heated

Zone

Atlas Gold

Zone

Viewing North West

Leapfrog >0.25 g/t Au Shell

45.8m @ 0.32 g/t Au

250 m

??

Open

0.5 – 5.520.25 – 0.50.1 – 0.25

Drill Assays AuEq60*

0.01 – 0.1B.D.L – 0.01

* AuEq60 = Au + (Ag/60)

Newcrest Mining Chile: Gorbea Project – Data Review And Re-interpretation Deliver New Drill Targets

→ Integrated review of data completed, upgrading model and understanding

Outcomes includes:

• Recognition of a large breccias complex at Atlas that is host to the better gold mineralization

• Previous drill holes with anomalous gold/silver assays may have been terminated early above the potentially better mineralized zone

• New target areas identified where gold mineralization may occur closer to surface

Page 15: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

MIRASOL RESOURCES LTD

Focused on gold & silver discovery

Argentina

Exploration and Business Development

Page 16: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

50 km

Gobernador

Gregores

Las Heras

Puerto

Deseado

Fitzroy

Perito

Moreno

San Julian

San JoseHochschild/McEwen Mining

Cerro NegroGoldcorp

Cerro VanguardiaAngloGold/Formicruz

COSEPan American

Claudia JVOceanaGold

Bajo

Caracoles

La Curva JVOceanaGold

Joaquin Pan American

Homenaje

Espejo

Argentina: Large Portfolio of High Grade Gold - Silver Projects

16

Santa Cruz

Province

Argentina

Chile

Libanesa

Road

TownAu/Ag Mine/Resource

Ag Mine/Resource

Jurassic Volcanics

LEGEND

Under Joint VentureJV/Drill Ready Pipeline

MRZ PropertiesProcessing Plant

Trucking radius to operating mines

Mirasol funded exploration

→ Mining Province 6 >> 7 operating mines

→ Mirasol’s leading project portfolio in Santa Cruz

→ 13 Gold - Silver properties totalling + 400,000 ha

• Drilling at high grade Nico Project• 2 JVs with strong partner - OceanaGold• 3 additional Drill Ready projects• Large Pipeline of early stage projects

• Mirasol Exploration focused on near mine high grade projects → infrastructure advantage

• Nico: Drill Test• Libanesa: Additional surface work

• Business Development focus on:• Virginia• Sascha - Marcelina• Homenaje

MarthaHunt

Mining

Virginia

Don NicolasCiminas

Cerro MoroYamana Gold

TranquiloPatagonia Gold

Manantial EspejoPan American Silver

Nico

Sascha-Marcelina

Page 17: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

OceanaGold Argentina: Targeting High Grade Low SulfidationGold – Silver in Argentina

17

→ Targeting standalone high-grade gold and silver deposits

→ Committed CA$1.56M budget to December 2018 for Claudia exploration and 3,000m drilling program at Curva

• First drilling program completed at Curva: Results released. Phase II drill completed → results pending

• First drilling program at Claudia completed: Results released. Plans and budgets for the remaining of the field season are under review

Cerro Vanguardia8.9 Moz Gold &~137 Moz Silver(approximate reserves and historic production)

10km

Claudia Project

2.5km

*Gold Equivalent = Gold + Silver / 60

LA CASTORA TREND

La Curva Project

CURVA WEST

RIO SECO

CELINE

CURAHUE

La Curva

MRZ Funded Interest 30%

MRZ Partner Funded Interest 25% PEA

US$ 7M Exploration Expenditures$1.25M option payments

4 years 4 years

51% 70%75%

FS

60%

Min

e D

ecis

ion

65%

Claudia

+fund

MRZ Funded Interest 30%

MRZ Partner Funded Interest 25% PEA

US$ 10.5M Exploration Expenditures$1M option payments

4 years 4 years

51% 70%75%

FS

60%

Min

e D

ecis

ion

65%

+fund

Page 18: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

18

→ Phase II drill program completed –result pending

→ Phase I confirmed presence of alarge epithermal gold system

First program showed that two distinct stages ofgold mineralization:

Stage 1: broad zones of lower-grade

47.9 m at 0.48 g/t Au and 2.1 g/t Ag (CC-DDH-01)106.2 m at 0.61 g/t and 2.7 g/t Ag (SW-DDH-02)

Stage 2: overprinting phase of higher-gradeepithermal veins and veinlets

individual assays up to 0.8 m grading 12.72 g/tAu and 145.4 g/t Ag (SW-DDH-02)

1 to 66.8

0.5 to 10.25 to 0.50.1 to 0.25

Rock chip geochemistry Gold Equivalent g/t (Au+(Ag/60))

Jura

ssic

Age

Un

its

Legend

Structure

Interpreted structure

Phase 1 DrillingDrill hole collar and trace

La CurvaProject

CurvaWest

CastoraTrend

3

Hig

hw

ay

SouthWestDrilling: Six holes totalling 907m

Best Drill Intercept: SW-02 26.7m @ 0.83g/t Au & 2.2g/t Ag

Inc. 3.20m @ 2.04g/t Au & 3.6g/t Ag6.20m @ 2.33 g/t Au & 31.1 g/t Ag

Inc. 1.80m @ 6.88 g/t Au & 84.9 g/t Ag

Cerro ChatoDrilling: Seven holes totalling 1,131m

Best Drill Intercept: CC-0119.65m @ 0.72g/t Au & 2.6g/t Ag

Inc. 0.80m @ 6.12g/t Au & 18.6g/t Ag5.75 m @ 1.24 g/t Au & 2.0 g/t AgInc. 0.85m @ 5.99 g/t Au & 5.9 g/t Ag

Loma ArthurDrilling: Five holes totalling 512m

Best Drill Intercept: LA-0413m @ 1.22g/t Au & 0.7g/t Ag

Inc. 7.4m @ 1.81g/t Au & 0.7g/t Ag

Santa

Cruz

Province

Argentina

Chile

Mapped Geology

OceanaGold Argentina : Castora Trend Phase II DDH program completed

Page 19: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

Gold Equivalent = Gold + (Silver / 60)

→ High grade intermediate sulfidationepithermal silver-gold district

→ Within trucking distance to nearby mines with 4 prospects identified to date

→ C$1.5M exploration program to June 2019, including drill testing

• Large, under explored land package

• 12 targets zones identified by high grade silver – gold vein-breccia rock chip assays

• Peak grades from rock chip sampling: up to 35 g/t Au; Up to 6,000 g/t Ag

Mirasol Project Argentina: Nico Project - Drilling a New Bonanza Grade Silver – Gold District

1 2002-2012 Martha production figures derived from Coeur D’Alene Annual Reports, 2002-2012.

Martha resource located 45 km to south, displayed at same scale for reference 1

→ 700 m strike 20.8 million oz Ag & and 26,729 oz Au 2

→ Avg. Ag grade = 1087.6 g/t Ag→ Avg. Au grade = 1.39 g/t Au 1500m

Aurora Vittoria

Endeavour

Resolution

1,500m

4

5 k

m

5.0 to 103

2.5 to 5

2.0 to 2.5

Rock Chip Assays Gold Equivalent Au+(Ag/60)

1.0 to 2.0

0.5 to 1.0

0 to 0.5

Target area fordetailed exploration

ResT1

Nico ProjectResolution Prospect

Aurora and Vittoria

Prospects

Endeavour Prospect

Page 20: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

Mirasol Drill Test: Nico Project, Resolution Prospect – Bonanza Grade Gold - Silver

20

58o

60o

78o

61o

250 m

N

Nico Project78,000 ha Resolution

Prospect

Aurora and Vittoria

Prospects

Endeavour Prospect

Geology

Au/Ag Vein Trend

Interpreted Structure

Salt Pan/Alluvial

Soil Cover

Porphyritic Sub-volcanic Dacite

Basalt Capping Flows

Hydrothermal Alteration

Strike and DipMeasurement

↑ Post Mineral

5.0 to 103.1

2.5 to 5

2.0 to 2.5

1.0 to 2.0

0.5 to 1.0

BDL to 0.5

Resolution Main Structure Zoom

500 m

15 km

7.9 g/t AuEq60

471.6 g/t Ag,0.13 g/t Au

8.1 g/t AuEq60

485.9 g/t Ag,0.05 g/t Au

6.62 g/t AuEq60

397.9 g/t Ag,BDL Au

26.2 g/t AuEq60

1,275.5 g/t Ag,4.92 g/t Au

27.6 g/t AuEq60

1,319.5 g/t Ag,5.59 g/t Au

103.1 g/t AuEq60

6,181.4 g/t Ag,0.1 g/t Au

48.5 g/t AuEq60

2,332.3 g/t Ag,9.62 g/t Au

Rock Chip AssaysGold Equivalent 60Au+(Ag/60)

2.9

30.2

Ch

arge

abili

ty m

V.V

49.3 g/t AuEq60

2,954.5 g/t Ag,0.08 g/t Au

Base Image – PDP-IP Chargeability 50m Depth Slice on Quickbird Imagery

→ 2.1 km x 230 m vein zone: Priority drill target high grade silver- gold mineralization

→ Bonanza grade silver – gold assays from systematic rock chip sampling of coliform banded veins over 1.2km long sections of main vein breccia

• Better assays from oxidised veins includes:

• 6,181.4 g/t Ag and 0.1 g/t Au (103.1 g/t AuEq60)

• 9.62 g/t Au and 2,332.3 g/t Ag (48.5 g/t AuEq60)

• Prospective down dip electrical IP electrical geophysical anomaly

• Potential for significant sulfide mineralization down dip of high grade vein-breccias

32.9 g/t AuEq60

1,484.7 g/t Ag,8.15 g/t Au

25.3 g/t AuEq60

1,435.9 g/t Ag,1.37 g/t Au

Page 21: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

Mirasol Drill Test: Nico Project, Aurora Gold - Silver Prospect Reconnaissance Rock chip Sampling

21

• Rock chip samples assays up to 35.09 g/t Au and 2,095.9 g/t Ag

• Exploration to started in late September 2018 with systematic mapping and sampling

• To be drill tested this field season

500 m

New Vein Trends Discovered

Aurora Prospect

Tertiary Basalt

Jurassic Ignimbrites

JurassicFlow Dome

5.0 to 37.6

2.5 to 5.0

1.0 to 2.50.5 to 1.00.25 to 0.5

Rock chip assays (g/t) AuEq60 = Au+(Ag/60)

Alteration/ Mineralization Trend

0 to 0.25BDL

Jurassic Flow Dome

Jurassic Volcanics

→ Aurora Prospect: 9 priority targets for high grade gold - silver mineralization

→ 4 x 2.1 km area with multiple vein trends defined by high grade rock chip assays

250 m

15.1 g/t AuEq60

256.7 g/t Ag,10.8 g/t Au

Rhyolitic Flow Dome

28.9 g/t AuEq60

454.1 g/t Ag,21.4 g/t Au

37.6 g/t AuEq60

856.9 g/t Ag,23.3 g/t Au

8.7 g/t AuEq60

449.8 g/t Ag,1.2 g/t Au

15.3 g/t AuEq60

7.8 g/t Ag,15.2 g/t Au

22.5 g/t AuEq60

262.4 g/t Ag,18.1 g/t Au

35.6 g/t AuEq60

30.3 g/t Ag,35.1 g/t Au

Jurassic Ignimbrite

s

Jurassic Ignimbrite

s

35.1 g/t AuEq60

2,095.9 g/t Ag,0.14 g/t Au

Page 22: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

In Summary

Page 23: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

Mirasol Resources Looking Ahead: News Flow

23

• Pending: Exploration results from OceanaGold funded work at Curva and Claudia (drilling and surface)

• Pending: Exploration Results from Mirasol funded exploration at Nico

• Pending: Exploration Results from Zeus Surface Exploration Program

• News flow from business development strategy for deals on JV ready projects

• News flow from aggressive JV and Mirasol funded exploration and drilling

Strong News flow from planned FY 2019 to 2020 programs in Chile and Argentina

→ Multiple partner-funded drilling and exploration programs

→ Mirasol funded exploration

→ Continued Business Development initiatives to deliver new property deals

Page 24: A PREMIER PROJECT GENERATOR · CSAMT 2D Inverted Resistivity. 13 Newcrest Mining Chile: Gorbea Project –New Option to Farm in Agreement –Targeting Multi-million Ounce Precious

Mirasol Resources: Corporate Summary

24

Cap

ital

Str

uct

ure

Po

rtfo

lioSk

ills

• Well-funded • C$ 25M cash

• Conservative share structure • 54 M shares outstanding• 3.1 M Stock options outstanding• 110,000 RSUs• 2.2 M warrants outstanding (C$ 3.00, expiring June, 2020)

• Aligned interest with ~30% insider position

Please visit our website and register to follow the Mirasol story

www.mirasolresources.com

• Multiple Active JVs – strong partners, strong projects, strong deals

• Large portfolio of drill-ready projects

• Pipeline of early stage projects in Chilean / Argentine world-class mineral belts

• Leading-edge technology and discovery team

30%

25%

45%

InsidersInstitutional InvestorsHNW and Retail Investors

Share DistributionAs at September 30, 2018