a next generation ocs agenda of topics august webinar cscape 9.10b now available features,...
TRANSCRIPT
![Page 1: A Next Generation OCS Agenda of Topics August Webinar Cscape 9.10B Now Available Features, enhancements Web Posting Monday Lead Time Updates Trends & Problem](https://reader035.vdocuments.us/reader035/viewer/2022062809/5697bfe31a28abf838cb526c/html5/thumbnails/1.jpg)
A Next Generation OCS
Agenda of Topics
August Webinar
Cscape 9.10B Now Available• Features, enhancements• Web Posting Monday
Lead Time Updates• Trends & Problem Items
New XL10 Controller• Features, Pricing• Commercial Details
![Page 2: A Next Generation OCS Agenda of Topics August Webinar Cscape 9.10B Now Available Features, enhancements Web Posting Monday Lead Time Updates Trends & Problem](https://reader035.vdocuments.us/reader035/viewer/2022062809/5697bfe31a28abf838cb526c/html5/thumbnails/2.jpg)
A Next Generation OCS
Feature Set• 10.4” TFT VGA Display• Same I/O Options as rest
of XL Series• Full Ethernet, USB A&B• CsCAN, microSD• Two RS-232/RS-485 Ports• Slim Profile:
• 1” depth at perimeter• 2” max depth + I/O
Next XL series Controller
New XL10!
Shipping October!
$1995 (102 model)
![Page 3: A Next Generation OCS Agenda of Topics August Webinar Cscape 9.10B Now Available Features, enhancements Web Posting Monday Lead Time Updates Trends & Problem](https://reader035.vdocuments.us/reader035/viewer/2022062809/5697bfe31a28abf838cb526c/html5/thumbnails/3.jpg)
A Next Generation OCS
Features & Benefits
New XL10
10.4” VGAScreen
1” Depth @ Perimeter, 2” Max
Depth
![Page 4: A Next Generation OCS Agenda of Topics August Webinar Cscape 9.10B Now Available Features, enhancements Web Posting Monday Lead Time Updates Trends & Problem](https://reader035.vdocuments.us/reader035/viewer/2022062809/5697bfe31a28abf838cb526c/html5/thumbnails/4.jpg)
A Next Generation OCS
Features & Benefits
New XL10
CsCAN, MJ1 & MJ2
USB Host & Built-in Ethernet
USB Programming & microSD (hidden)
XL Series I/O Options
Full Ethernet with Web Serving, FTP Suppport, Modbus/TCP
Master & Slave
![Page 5: A Next Generation OCS Agenda of Topics August Webinar Cscape 9.10B Now Available Features, enhancements Web Posting Monday Lead Time Updates Trends & Problem](https://reader035.vdocuments.us/reader035/viewer/2022062809/5697bfe31a28abf838cb526c/html5/thumbnails/5.jpg)
A Next Generation OCS
Part Numbers & Pricing
New XL10
10.4” VGA All-in-one from $1995 with I/O
Model Number
Price
HE-XV1E0 $1945
HE-XV1E2 $1995
HE-XV1E3 $2045
HE-XV1E4 $2095
HE-XV1E5 $2175
![Page 6: A Next Generation OCS Agenda of Topics August Webinar Cscape 9.10B Now Available Features, enhancements Web Posting Monday Lead Time Updates Trends & Problem](https://reader035.vdocuments.us/reader035/viewer/2022062809/5697bfe31a28abf838cb526c/html5/thumbnails/6.jpg)
A Next Generation OCS
Important Dates
New XL10
Accepting Orders 9/1/10
• Open for Orders: 9/1• Sales Material Online: 9/7• Demos Available: 9/15• Projected Stock Date:
10/6/10• CE mid-4th Quarter• UL early 1st Quarter
![Page 7: A Next Generation OCS Agenda of Topics August Webinar Cscape 9.10B Now Available Features, enhancements Web Posting Monday Lead Time Updates Trends & Problem](https://reader035.vdocuments.us/reader035/viewer/2022062809/5697bfe31a28abf838cb526c/html5/thumbnails/7.jpg)
A Next Generation OCS
Important Maintenance Release
Cscape 9.10BCscape 9.1B
• Important Bug Fixes• Some New Features• Located on ftp.heapg.com
today (not advertised)• To Be Posted on
www.heapg.com at normal location Monday or Tuesday
![Page 8: A Next Generation OCS Agenda of Topics August Webinar Cscape 9.10B Now Available Features, enhancements Web Posting Monday Lead Time Updates Trends & Problem](https://reader035.vdocuments.us/reader035/viewer/2022062809/5697bfe31a28abf838cb526c/html5/thumbnails/8.jpg)
A Next Generation OCS
New Models Added (XL10e & QX501)
Cscape 9.10B
![Page 9: A Next Generation OCS Agenda of Topics August Webinar Cscape 9.10B Now Available Features, enhancements Web Posting Monday Lead Time Updates Trends & Problem](https://reader035.vdocuments.us/reader035/viewer/2022062809/5697bfe31a28abf838cb526c/html5/thumbnails/9.jpg)
A Next Generation OCS
Connection Wizard
Cscape 9.10B
Addresses one of the biggest difficulties for
new customers: Establishing a
connection with the OCS!
![Page 10: A Next Generation OCS Agenda of Topics August Webinar Cscape 9.10B Now Available Features, enhancements Web Posting Monday Lead Time Updates Trends & Problem](https://reader035.vdocuments.us/reader035/viewer/2022062809/5697bfe31a28abf838cb526c/html5/thumbnails/10.jpg)
A Next Generation OCS
Semi-Automatic Web Updates
Cscape 9.10B
Users with Internet Access can check for
updates, and automatically install
those updates if desired
![Page 11: A Next Generation OCS Agenda of Topics August Webinar Cscape 9.10B Now Available Features, enhancements Web Posting Monday Lead Time Updates Trends & Problem](https://reader035.vdocuments.us/reader035/viewer/2022062809/5697bfe31a28abf838cb526c/html5/thumbnails/11.jpg)
A Next Generation OCS
Important Maintenance Release
Cscape 9.10BThe communication medium (Serial/Ethernet/Modem/USB/Can) is now indicated in the status bar
The Connection Method/Details is now indicated on the Status
Bar
![Page 12: A Next Generation OCS Agenda of Topics August Webinar Cscape 9.10B Now Available Features, enhancements Web Posting Monday Lead Time Updates Trends & Problem](https://reader035.vdocuments.us/reader035/viewer/2022062809/5697bfe31a28abf838cb526c/html5/thumbnails/12.jpg)
A Next Generation OCS
IEC Editor Enhancements
Cscape 9.10BUser can also configure the compilation sequence of multiple blocks in main loop modules area of an IEC Program by accessing the “IEC Modules Compilation Sequence Configuration” Dialog.
User can now access the main SFC Logic and its secondary editors simultaneously.
User can now have access to the secondary editors set of multiple step/transition blocks of an SFC Logic Module simultaneously.
User can now debug the main SFC Logic as well as the secondary logic and view them simultaneously.
![Page 13: A Next Generation OCS Agenda of Topics August Webinar Cscape 9.10B Now Available Features, enhancements Web Posting Monday Lead Time Updates Trends & Problem](https://reader035.vdocuments.us/reader035/viewer/2022062809/5697bfe31a28abf838cb526c/html5/thumbnails/13.jpg)
A Next Generation OCS
Bug Fixes
Cscape 9.10BVarious fixes and Enhancements to the printing functionality.
Various fixes to the font editor, including font size matching, and improved usability.
Fixes to DeviceNet for Smartload, node zero usage and slave nodes with no data not being automatically deleted.
Fix to Bitmap compression algorithm which could lock up the firmware.
Fix for automatic I/O recognition not loading default module settings.
Fixed Remote terminal not working over ethernet.
Fixed firmware update wizard not allowing adding/removing QX backpack.
Fixed C/F selection on SmartRail RTD and THM modules not correct.
Fixed IEC program variable window limited width
Fixed RCX filenames and loader IDs.
Reverted to non Unicode build to fix problems caused by download image size increase.
Release Version number is shown on Splash screen again.
Fix for failure to save when two identically named programs are in the same project.
Fixed Search window pop's up after closing Gredit
Fixed firmware update wizard for J1939 options.
Restore registers correctly restores all registers.
![Page 14: A Next Generation OCS Agenda of Topics August Webinar Cscape 9.10B Now Available Features, enhancements Web Posting Monday Lead Time Updates Trends & Problem](https://reader035.vdocuments.us/reader035/viewer/2022062809/5697bfe31a28abf838cb526c/html5/thumbnails/14.jpg)
A Next Generation OCS
Review of Current Status
Lead TimesXLt
• High Demand Globally, along with a tight electronics supply chain – have taken us well outside our 2-4 week window
• XLts will be allocated during September on a need basis
• 2-4 Week window probably will not be regained until late Oct
XL Series 105 I/O Option• We’ve been running outside the
2-4 week window• By mid-to-late September, we
should be back to a 2-4 week level
12 DC In, 12 DC Out, 2 +2 Universal Analog I/O
105 I/O
![Page 15: A Next Generation OCS Agenda of Topics August Webinar Cscape 9.10B Now Available Features, enhancements Web Posting Monday Lead Time Updates Trends & Problem](https://reader035.vdocuments.us/reader035/viewer/2022062809/5697bfe31a28abf838cb526c/html5/thumbnails/15.jpg)
A Next Generation OCS
Review of Current Status
Lead TimesSmartStix I/O
• Have Been Running outside of 2-4 week normal lead time
• Situation improving for now• Distributor Stocking Orders
HIGHLY RECOMMENDED for September
LX Controller (Mature)• Completely out of HE-LX280 &
HE-LX280C100• Only a few HE-LX300 & HE-
LX300C100 left• Replaced by HE-XL1M0 & HE-
XL100, respectively
![Page 16: A Next Generation OCS Agenda of Topics August Webinar Cscape 9.10B Now Available Features, enhancements Web Posting Monday Lead Time Updates Trends & Problem](https://reader035.vdocuments.us/reader035/viewer/2022062809/5697bfe31a28abf838cb526c/html5/thumbnails/16.jpg)
A Next Generation OCS
Review for New Products
Lead TimesHE-RX371
• Have Been Running 8-10 weeks
• All orders filled by 9/10
HE-CX251• Have Been Running 8-10
weeks• All orders filled by 9/10
SmartRail• Running 2-4 weeks• CsCAN October
SmartBlock• THM & ACM only ship
next month• Balance 4th/1st Quarters
![Page 17: A Next Generation OCS Agenda of Topics August Webinar Cscape 9.10B Now Available Features, enhancements Web Posting Monday Lead Time Updates Trends & Problem](https://reader035.vdocuments.us/reader035/viewer/2022062809/5697bfe31a28abf838cb526c/html5/thumbnails/17.jpg)
A Next Generation OCS
Select Agenda Items
Next MonthQX OCS
• New 10.4” QX Model
SmartRail• New CsCAN I/O Base
Wireless• New Wireless option
for Ethernet-based Controllers
SmartBlock• Thermocouple & AC
Power Monitor Details