“A New Build Minimal CostFPSO & FSO Barge Design”

TOP 300 Barge FPSO

Page 2: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Optimised Solution

Page 3: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Main Drivers & Objectives

Traditionally FPSO projects mostly end up over budgetand over schedule!

• Clients are looking for:

- High quality & fit for purpose

- Minimum risk

- Minimum schedule

- Low cost

• InterAfcon can supply:

- Simple, functional and fit for purpose designs

- Best risk management system - elimination, mitigation, management“No Surprises”

- Realistic schedules and schedule management – Meet first oil target

- Procurement management and cost controls – Minimal CAPEX

- Simple manageable interfaces

Simple, Functional & Minimal

Page 4: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Main Features

• Designed for benign deep water environments

• Innovative midships ballast tanks configuration

• Storage capacity and vessel sizing flexibility

• Spread moored system

• High topsides payload capability and flexibility

• Simple, robust, rectangular mild steel construction

• Minimised interfaces

Zero Based Design

Page 5: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Design Details and Benefits

• Wide beam/shallower draught/lower mooring loads

• Bending moment reduction from midship ballast tank

configuration

• Lower stresses permits wide use of mild steel

• Low yield strength steel reduces fatigue problems

• Increased safety factors employed to give up to 15% increase

in fatigue life

Zero Based Design

Page 6: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Design Details and Benefits cont’d

• Single centreline bulkhead

• Narrow wing ballast tanks/Damage condition heel angle small

• Natural period (12 to 13 sec's) tuned to below regional swell

period

• Battered ends/reduced buoyancy

• Capacity range of 150,000 m3 to 400,000 m3

• Range of design between 6 and 16 tanks

Zero Based Design

Page 7: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Design Details and Benefits cont’d

• No turret interface

• Scope split based on skill base

• Marine equipment mostly above deck

• Large topsides modules with functional splits

• Module installation flexibility

Zero Based Design

Page 8: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

TOP 300 General Arrangement

Page 9: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

TOP 300 Base Design Description

• Dimensions: Length = 250.5m Breadth = 69.7m

Depth = 25.5m Draught = 19.0m

• Rectangular purpose designed production barge

• Spread moored using 16 mooring lines

• 12 Cargo Tanks

• 300 000 m3 storage (1.86 M barrels)

• Double side hull structure

• Designed topsides payload of 32,000 tonnes

Purpose Designed FPSO

Page 10: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

TOP 300 Sizing Flexibility

The hull consists of robuststandard tank sections

Storage capacity can bechanged without having tore-engineer the entire design

Flexibility to Change Capacity

Page 11: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

TOP 300 Capacities

*Note: All trim is by the stern

TOP 300-300 Design Range - Full Load Equilibriumand Weights Summary

Page 12: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

TOP 300 Bending Moment Details

Shear Force and Bending Moment Comparison

Page 13: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Bending Moment

Shear Force

-25000

-20000

-15000

-10000

-5000

0

5000

10000

15000

0 20 40 60 80 100 120 140 160

X fwd AP (m)

Sh

ea

rF

orc

e(t

on

ne

s)

12T + B10T8T + B8T6T16T + B

Page 14: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Bending Moment

Bending Moment

-1400000

-1200000

-1000000

-800000

-600000

-400000

-200000

0

0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0

X fwd AP (m)

Be

nd

ing

Mo

me

nt

(to

nn

e.m

)

10T12T + B8T + B8T6T16T + B

Page 15: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Hull Construction

• Hull form and structure optimised for shipyard construction

• 100% stiffened flat panel construction for fully automated

panel line fabrication

• Dry dock erection

• Long lead marine equipment (e.g. generators) placed on

deck allowing early start of fabrication and late delivery of

equipment

Page 16: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

FPSO Design Robustness / UncertaintyManagement

• High margin on topsides payload carrying capacity

• Flexible and robust topsides support arrangements

• Wide deck area to allow improved topsides layouts

• Conservative hull steel scantlings to allow for fatigue and

future changes

• Low yield strength steel used for main structure

Page 17: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Shipyard Scope of Work

• Hull

• Marine systems segregated from topsides systems

minimising interfaces and allowing shipyard commissioning

• Helideck

Other options for yard SoW:

• Accommodation

• Cranes

Skill Based Scope Division

Page 18: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Main Marine Systems

• Marine control system

• Ballast and bilge systems

• Cargo pumping and export systems

• Diesel fuel system

• Inert gas, tank washing and tank heating systems

• Utilities systems

• Essential and emergency power supplies

• Helifuel system

Page 19: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Marine Systems Locations

AFT MACHINERY SPACEINCORPORATES:

CARGO EXPORT PUMPS3x50%

BALLAST PUMPS 2x50%

INERT GAS GENERATOR2x100%

SELF CONTAINED HVACSYSTEMS

ELECTRICAL SWITCHROOM

VCS

SLOPS TANK

SEA WATER LIFTPUMP CAISSONS

MID SECTIONBALLAST TANK

DIESEL ANDPOTABLE WATERSTORAGE

VESSEL FEATURES:

* STANDARD MARINE SYSTEMS *MINIMUM SYSTEMS INBUILT

VESSEL SCOPE TO INCLUDE:MODULE SUPPORT FRAMESEGRESS TUNNELS(excluding local sections tomodules)AFT CRANELOWER PEDESTAL SECTIONS(for both forward and mid sections)HOSE SUPPORT STRUCTUREAND CHUTE

FIRE PUMPS(Typical port andstarboard sides)

FORWARD(Vessel North)

Page 20: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Midship Section

Page 21: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Transverse Web Section

200x15 F.B.

Page 22: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Hull Engineering Strategy

• Develop from InterAfcon standard design

• Hull design team part of the Project Management Team (IMT)

• InterAfcon develops vessel and main system concepts, carries

out model tests and FE / fatigue analysis and prepares key

specifications

• Design developed by InterAfcon to achieve classification

society main scantling approval

• Key shipyard engineers to work with hull engineering team for

design handover

• Shipyard to prepare fabrication drawings and detailed layouts

with InterAfcon engineering support

Skill Based Scope Division

Page 23: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Comparative Vessel Motions

100 Year Wave Condition

Page 24: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Current Status of Design

• Design basis documentation completed

• Hull sizing completed

• Motion analysis completed

• Intact and damage stability analysis completed

• Marine systems flow diagrams completed

• Preliminary hull structural design completed including

midships cross section, bulkheads and web frames

• Mooring system design in progress

Main Issues Resolved

Page 25: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Other Design Work Part Completed

• Sloshing loads

• Fatigue analysis

• Topsides supports

• F E Strength analysis

• Green water

• Model Testing

• Fwd / Aft structure

• Mooring and other attachments

Page 26: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Mooring Arrangement Options

Page 27: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Typical Mooring Line Arrangement

Page 28: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Example Deep Water Riser Options

Page 29: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Mooring System Description

• Increased barge width yields 17% reduction in mooring loads

• Spread moored using 16 combination chain / wire or polyester

mooring lines

• Passive hydraulic system with 4 chain jacks and 16 chain

stoppers

• 16 Dismountable fairleads

• 16 Suction anchors

• 2 Hydraulic power packs

• 1 Line load monitoring system

Well Proven System

Page 30: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Topsides – Example Topsides Capability

• OIL: 200,000BOPD

• GOR: 500 -1500SCF/BBL

• GAS INJ.: 180MMSCFD

• GAS EXPORT: 190MMSCFD

• WATER INJ.: 300,000BWPD

Production Capability

Page 31: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Topsides Engineering Strategy

• Engineering key to robust concept development

• Conceptual design / feed phase for all elements (hull, topsidesand moorings)

• Utilise FPSO specialist personnel from InterAfcon

• Other project participants co-located in design office from startof project contributing to engineering solutions, including

– Fabricators

– Key system and package suppliers

– Commissioning

– Operations

• Maximise topsides system segregation from hull systems tominimise interfaces

• Internal engineering interfaces and data management keyInterAfcon focus

• External engineering interfaces and data transfer

Page 32: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Basic Layout

FLARE

POWERGENERATIONMODULE

UTILITIESMODULE

PROCESSMODULE

FORWARDCRANE

HELIDECK

ACCOMMODATION

FORWARD

(VESSEL NORTH)

FLARE KODRUMS

RAISED TUNNEL WITHINTEGRAL PIPERACKBETWEEN PROCESS ANDFLARE

FLARE

POWERGENERATIONMODULE

UTILITIESMODULE

PROCESSMODULE

FORWARDCRANE

HELIDECK

ACCOMMODATION

FORWARD

(VESSEL NORTH)

FLARE KODRUMS

RAISED TUNNEL WITHINTEGRAL PIPERACKBETWEEN PROCESS ANDFLARE

Page 33: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Topsides Layout Scope

SeawaterFirewaterPotable WaterInstrument AirDrains – OpenDieselStabilised CrudeAviation FuelNitrogen

Production RisersWater InjectionGas InjectionGas ExportHP FlareLP FlareFuel GasMethanolDieselHeating MediumSeawater

SeawaterInstrument AirNitrogenFirewaterDrainsHeating MediumInjection ChemicalsWater InjectionPotable Water

Fuel gasDieselFirewaterOpen DrainsHeating MediumSeawaterNitrogenInstrument AirPotable WaterDrains

Minimal Hook-ups

Piping Hook-up Scope

Page 34: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Execution Plan Options

Page 35: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Essential Route to FPSO Completion

• Integrated HUC / Operations Team

• Minimum Vessel to Topsides Hook-Up

• Minimum module to module Hook-Up

• Maximise Onshore Commissioning

• Minimise Integration Yard Hook-Up

• Minimise Integration Yard Commissioning

Page 36: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Interface Register Set-up Process

All Stakeholders Need to Participate

Page 37: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Example Interface Data Request Flow

Page 38: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Hull & Topsides Integration Philosophy

Interface Management

Page 39: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Guiding Principals

• Define interface as early as possible

• Complete engineering early

• Complete module fabrication with NO outstanding punch list

• Minimize/simplify the interface of ALL major components

(especially after the placement of hull order)

• Manage proactively rather than reactively (especially after the

placement of hull order)

• Manage the interface with a realistic sized team and budget

• Develop contingency plan to compensate for unforeseen events

• Enroll fabricators/contractors

Page 40: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Vessel & Topsides Fabrication & Installation

• Topsides arranged into minimum number of modules formaximum quayside completion and minimum module/modulehook-up on vessel

• Simple barge shaped vessel with no complicated in-builtsystems for easy construction

• Topsides/vessel configured for trailer loadout of modules ontovessel

• Maximum segregation of topsides and vessel systems

• Vessel builders scope strictly limited to core competency

• Brown & Root to provide managerial/technical support to achieveparticular FPSO technical/quality standards

Fundamental Characteristics

Page 41: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Example Topsides Layout

FORWARD(VESSELNORTH)

AFTMACHINERYSPACE

RISERBALCONY

POWERGENERATION 2782 te(Gross)UTILITIES MODULE

2332 te (Gross)

PROCESS MODULE6030 te (Gross)

FLARE

556 te(Gross)NON-MODULAR

EQUIPMENT

1321te (Gross)

TOTAL GROSSTOPSIDES WEIGHT13021 te

Page 42: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Modules Installation

Page 43: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Module Installation Options

Page 44: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Module Installation

Page 45: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

High Level Schedule Example

Page 46: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Summary

Page 47: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

Summary cont’d

InterAfcon?

InterAfcon Design

Page 48: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum
Page 49: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum

“A New Build Minimal CostFPSO & FSO Barge Design”

TOP 300 Barge FPSO

Page 50: “A New Build Minimal Cost FPSO & FSO Barge Design”interafcon.com/images/barge_design_exple_pres_rev_a.pdf · “A New Build Minimal Cost FPSO & FSO Barge Design ... • Minimum