OSGP - Open Smart Grid Protocol A Modern Standard for a Modern Grid
Mark OsselBoardmemberOSGP Alliance
VP Echelon EMEA APJ
![Page 2: A Modern Standard for a Modern Grid Mark Ossel Boardmember OSGP Alliance VP Echelon EMEA APJ](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649e4c5503460f94b411ad/html5/thumbnails/2.jpg)
Global, non-profit industry/user association ◦ Membership open to any company or individual
Membership represents entire smart grid value chain◦ Utilities, solution providers, enterprise software vendors,
device and meter manufacturers Working together to realize the next generation of
the smart grid by standardization Accepted a.o. by the European Commission as
Stakeholder for smart grid, smart metering
Introduction to the OSGP Alliance
![Page 3: A Modern Standard for a Modern Grid Mark Ossel Boardmember OSGP Alliance VP Echelon EMEA APJ](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649e4c5503460f94b411ad/html5/thumbnails/3.jpg)
OSGP: supported by :
3
CIAC
![Page 4: A Modern Standard for a Modern Grid Mark Ossel Boardmember OSGP Alliance VP Echelon EMEA APJ](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649e4c5503460f94b411ad/html5/thumbnails/4.jpg)
OSGP - A Modern Standard For A Modern Grid
Smart Grid is
More Than Just Smart
Meters
Focus On
Efficiency,
Reliability,
Scalability,
Expandability
Designed Fr
om
Day 1 For a
Networke
d
World
![Page 5: A Modern Standard for a Modern Grid Mark Ossel Boardmember OSGP Alliance VP Echelon EMEA APJ](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649e4c5503460f94b411ad/html5/thumbnails/5.jpg)
Now: Electricity Is Essential To All We Do
Reliable supply is an economic and national security concern
Concerns over C02
Move to renewable, intermittent sources of supply
Distributed generation Electrical Vehicles Service quality, cash collection,
non-technical losses, Grid topology insight, loadcontrol LV, asset management
5
► Meeting these demands requires a smarter grid & change in behaviorNeed to combine information, manage and control,while minimizing datatraffic, communication & storage.
![Page 6: A Modern Standard for a Modern Grid Mark Ossel Boardmember OSGP Alliance VP Echelon EMEA APJ](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649e4c5503460f94b411ad/html5/thumbnails/6.jpg)
NEW? Enel’s Project In Italy, 2001World’s largest advanced metering deployment
Over 27 million homes and buildings installed with smart meters
Projected cost of €2.1 billion Projected annual savings of €500 million and achieved
Echelon Power Line technology
Management Center
IP
Meter with Echelon technology
Echelon Data Concentrator
Vision- smart grid- services- communication- architecture
![Page 7: A Modern Standard for a Modern Grid Mark Ossel Boardmember OSGP Alliance VP Echelon EMEA APJ](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649e4c5503460f94b411ad/html5/thumbnails/7.jpg)
OSGP smart meter projects in EuropeOutside Italy, installed/Under Contract >4 Mil Smart meters
Sweden> 1 Million smart meters
Denmark> 1 Million smart meters
Russia500 000 smart meters
Netherlands75 000 smart meters
Germany55 000 smart meters
Austria> 300 000 smart meters
Finland550 000 smart meters
Norway> 100 k smart meters
Poland350 000 smart meters
![Page 8: A Modern Standard for a Modern Grid Mark Ossel Boardmember OSGP Alliance VP Echelon EMEA APJ](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649e4c5503460f94b411ad/html5/thumbnails/8.jpg)
A Global Utility Customer BaseThe technology deployed in > 35M meters and growing!OSGP implemented in >4 Million smart meters
NetherlandsJune 2006: 75 000 meters
Sweden 2005 -2007: 600 000 meters(300k+200k+100k)
Austria April 2007: 75 000 meters + 75 000 option
RussiaAug 2007: 90 000 meters + 275 000
DenmarkAug 2007: 50 000 meters
Sweden June 2006: 370 000 meters Denmark
April 2008: 170 000 meters
SwedenFeb 2008: 38 000 meters
ENERGOAUDITCONTROL (EAC)
SEAS DenmarkJuly 2008: 390 000 meters
DenmarkJuly 2008: 200 000 meters
United StatesJan 2008: 100 000 meters
GermanySept 2008: 10 000 meters
FinlandSept 2009: 550 000 meters(120 000 smart meters – in Norway)
Italy 2001 - 2006: 30 000 000 meters
![Page 9: A Modern Standard for a Modern Grid Mark Ossel Boardmember OSGP Alliance VP Echelon EMEA APJ](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649e4c5503460f94b411ad/html5/thumbnails/9.jpg)
OSGP Powerline communication ?
Lower cost investment Lower operating cost
◦ Communication cost (daily on-going communication) Reliability, performance
◦ Proven, up to 99.8% ->99.94%-100%◦ Daily, including Load profiles
Technical information ◦ Phase, Grid◦ Outage detection◦ Grid Topology
LV Transformer centric approach◦ Be able to run applications within a LV area
(the next generation DC: Edge Control Node)
9
1. Robust & reliable PLC(EC, CRC, )
2. Efficient protocol OSGP3. Not only meters4. Repeating algorithms
![Page 10: A Modern Standard for a Modern Grid Mark Ossel Boardmember OSGP Alliance VP Echelon EMEA APJ](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649e4c5503460f94b411ad/html5/thumbnails/10.jpg)
OSGP Field Proven ReliabilityCustomer Reliability Load Profile
DataReadings # of Meters
99 –100% Extended PQDaily/Hourly 600,000
99.7 – 100%
Extended PQDaily/Hourly 400,000
99.94– 100%
Extended PQDaily/
15 min 200,000
99.7 – 100%
ExtendedDaily/Hourly 170,000
99.8%Extended
Daily/15 Min 550.000
and firmware
![Page 11: A Modern Standard for a Modern Grid Mark Ossel Boardmember OSGP Alliance VP Echelon EMEA APJ](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649e4c5503460f94b411ad/html5/thumbnails/11.jpg)
Low Voltage Grid Stress Points
Three main categories of stress: 1. Distribution transformer failures2. Outages & power quality issues impact service to
customers3. Losses (technical and non-technical)
![Page 12: A Modern Standard for a Modern Grid Mark Ossel Boardmember OSGP Alliance VP Echelon EMEA APJ](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649e4c5503460f94b411ad/html5/thumbnails/12.jpg)
Brings high-performance and reliability TODAY◦ Best-in-class CENELEC A-band power line performance ◦ Highly efficient and scalable communications and control
protocol◦ Adaptive and directed meshing
Provides headroom to grow and support future applications
Built-in, mandatory security and privacy for every data exchange
Interoperability with other standards◦ Enables technology evolution while preserving past
investments
OSGP Is Built For a Networked Grid
![Page 13: A Modern Standard for a Modern Grid Mark Ossel Boardmember OSGP Alliance VP Echelon EMEA APJ](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649e4c5503460f94b411ad/html5/thumbnails/13.jpg)
ProvenOpen StandardsMulti-Application
www.osgp.org
![Page 14: A Modern Standard for a Modern Grid Mark Ossel Boardmember OSGP Alliance VP Echelon EMEA APJ](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649e4c5503460f94b411ad/html5/thumbnails/14.jpg)