Page 1: A MILESTONE WTITH A VIEW · +973 16 51 11 11 sales@naseej.bh canalview.bh Canalview At Dilmunia This report has been published by: Naseej BSC (c) Bahrain Financial Harbour Contact:

PROJECT PROGRESS REFERENCEFEBRUARY 2019

PROGRESS REPORT REFERENCEFEBRUARY 2019

A MILESTONEWTITH A VIEW

Page 2: A MILESTONE WTITH A VIEW · +973 16 51 11 11 sales@naseej.bh canalview.bh Canalview At Dilmunia This report has been published by: Naseej BSC (c) Bahrain Financial Harbour Contact:

WELCOME TO A NEW VIEW

Investing with CanalView offers much more than the brick and mortar space that is defined by the boundary of a single apartment, it provides unlimited access to a lifestyle of luxury.

OUR PROFESSIONAL PARTNERS:

PROJECT NAME

PROJECT NAME ARCHITECT, INTERIOR & DESIGN SUPERVISION

CONSULTANT

PILING CONTRACTOR

PROJECT COMPANY

QUANTITY SURVEYOR

MASTER DEVELOPER

DEVELOPER

PROJECT LOCATION

CanalView

CanalView

SSH Middle East

Bahrain Foundation Construction Company W.L.L

CanalView Development Company S.P.C

DG Jones

Ithmaar Development Company

Naseej BSC ©

Dilmunia

LIFESTYLE OF LUXURY

DEVELOPMENT COMPANY S.P.C

شركة كانال فيو للتطوير ش.ش.و

PRO

GRE

SS R

EPO

RT R

EFER

ENCE

FEBR

UAR

Y 20

19

This document is the property of Naseej BSC (c), it shall not be copied or reproduced in any manner without written consent.

Page 3: A MILESTONE WTITH A VIEW · +973 16 51 11 11 sales@naseej.bh canalview.bh Canalview At Dilmunia This report has been published by: Naseej BSC (c) Bahrain Financial Harbour Contact:

CANALVIEW PROJECTCanalView is a mixed use project located in Dilmunia Health Island. SSH Middle East & Kooheji Contractors were appointed as the Design and Supervision Consultant and Main Contractor respectively. The piling works were completed by Bahrain Foundation Construction Company under the supervision of SSH. After the appointment of Main Contractor in May 2018, around 35,000 m2 of excavated fill was removed and 300 linear meters of retention sheet piling installed to enable basement construction to commence.

1

PRO

GRE

SS R

EPO

RT R

EFER

ENCE

FEBR

UAR

Y 20

19

Page 4: A MILESTONE WTITH A VIEW · +973 16 51 11 11 sales@naseej.bh canalview.bh Canalview At Dilmunia This report has been published by: Naseej BSC (c) Bahrain Financial Harbour Contact:

SUMMARY OF CANALVIEW’SCONSTRUCTION PROGRESS

The project is progressing in a good pace to meet the target milestones.

• Percentage progress as per plan: 9.70%• Percentage progress actual at site: 9.70%

9.7%

2

PRO

GRE

SS R

EPO

RT R

EFER

ENCE

FEBR

UAR

Y 20

19

Progress as per planProgress actual at site

Page 5: A MILESTONE WTITH A VIEW · +973 16 51 11 11 sales@naseej.bh canalview.bh Canalview At Dilmunia This report has been published by: Naseej BSC (c) Bahrain Financial Harbour Contact:

SUMMARY OF CONSTRUCTION WORKS

ON SITE

Work completed and in progress at site till 15th January 2019

Activities expected to complete by end of March 2019

Master Developer updates:

• Concreting of piles complete• Concreting of pile caps complete• Concreting of raft slab foundation complete• Concreting of basement carpark columns in progress (60% complete)• Shuttering works for basement carpark roof slab in progress

• Concreting of basement carpark roof slab • Concreting of upper retail columns

• Main canal ground preperation works complete and canal basin works due to commence.

• Other developments in Dilmunia island

3

PRO

GRE

SS R

EPO

RT R

EFER

ENCE

FEBR

UAR

Y 20

19

1

2

3

Page 6: A MILESTONE WTITH A VIEW · +973 16 51 11 11 sales@naseej.bh canalview.bh Canalview At Dilmunia This report has been published by: Naseej BSC (c) Bahrain Financial Harbour Contact:

4

WORK COMPLETED AND IN PROGRESS AT SITE TILL 15TH JANUARY 2019

Concreting of piles complete

Concreting of pile caps complete

Concreting of raft slab foundation complete

1PR

OG

RESS

REP

ORT

REF

EREN

CEFE

BRU

ARY

2019

Page 7: A MILESTONE WTITH A VIEW · +973 16 51 11 11 sales@naseej.bh canalview.bh Canalview At Dilmunia This report has been published by: Naseej BSC (c) Bahrain Financial Harbour Contact:

5

Concreting of basement carpark columns in progress (60% complete)

Shuttering works for basement carpark roof slab in progress

PRO

GRE

SS R

EPO

RT R

EFER

ENCE

FEBR

UAR

Y 20

19

Page 8: A MILESTONE WTITH A VIEW · +973 16 51 11 11 sales@naseej.bh canalview.bh Canalview At Dilmunia This report has been published by: Naseej BSC (c) Bahrain Financial Harbour Contact:

6

WORK EXPECTED TO BE COMPLETED BY END OFMARCH 2019

2

Concreting of basement carpark roof slab

Concreting of upper retail columns

PRO

GRE

SS R

EPO

RT R

EFER

ENCE

FEBR

UAR

Y 20

19

Page 9: A MILESTONE WTITH A VIEW · +973 16 51 11 11 sales@naseej.bh canalview.bh Canalview At Dilmunia This report has been published by: Naseej BSC (c) Bahrain Financial Harbour Contact:

7

MASTER DEVELOPER UPDATES

3

Preparation of the main canal

PRO

GRE

SS R

EPO

RT R

EFER

ENCE

FEBR

UAR

Y 20

19

Ithmaar Development Company (IDC), the Development Manager for Dilmunia at Bahrain announced the award of the early works package for the Dilmunia Grand Canal & Marina. The Grand Canal will cut through the entire stretch of Dilmunia in a semi-circular route, making it Bahrain’s largest man-made water body and providing breathtaking vistas to surrounding developments within Dilmunia, and one of Bahrain’s longest continuous promenades to residents and visitors of the island.

Page 10: A MILESTONE WTITH A VIEW · +973 16 51 11 11 sales@naseej.bh canalview.bh Canalview At Dilmunia This report has been published by: Naseej BSC (c) Bahrain Financial Harbour Contact:

8

PRO

GRE

SS R

EPO

RT R

EFER

ENCE

FEBR

UAR

Y 20

19

Canal Bed Soil Improvement in Process

Other projects progress in Dilmunia island

Page 11: A MILESTONE WTITH A VIEW · +973 16 51 11 11 sales@naseej.bh canalview.bh Canalview At Dilmunia This report has been published by: Naseej BSC (c) Bahrain Financial Harbour Contact:

9

PRO

GRE

SS R

EPO

RT R

EFER

ENCE

FEBR

UAR

Y 20

19

Dilmunia mall progress

Page 12: A MILESTONE WTITH A VIEW · +973 16 51 11 11 sales@naseej.bh canalview.bh Canalview At Dilmunia This report has been published by: Naseej BSC (c) Bahrain Financial Harbour Contact:

STAY CONNECTED WITHCANALVIEW

A project by:

+973 16 51 11 11 [email protected]

canalview.bh

www.canalview.bh

Canalview At Dilmunia

This report has been published by:Naseej BSC (c)

Bahrain Financial HarbourContact: +973 16 557999