  • LudwigshafenVerbund Site

    n professionaln customer focusedn cost aware

    A General Survey on

    NDT in the Chemical Industry

    ECNDT 2006Berlin, 25.-29. September 2006Fr.1.2.1

    Dr.-Ing. Andreas HechtDipl.-Ing. Peter RostPlant Inspection / Materials Engineering

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 2

    LudwigshafenVerbund SiteChemical Industry:

    Different Plants for all Sorts of Purposes

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 3

    LudwigshafenVerbund SiteThe BASF Site Ludwigshafen –

    the world’s largest integrated chemical complex

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 4

    LudwigshafenVerbund Site

    Rock salt

    About 8.000 commercial productsAbout 8.000 commercial products

    Major basic products and intermediatesMajor basic products and intermediates

    Raw materialsRaw materials

    about 200about 200

    Natural gasSulfurPhosphate Water Air

    Cruide oil Ores

    The “Chemis-Tree”BASF Products

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 5

    LudwigshafenVerbund SiteInvisible contribution. Visible success.

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 6

    LudwigshafenVerbund SiteFrom Naphtha to Napkins:

    Superabsorbers from BASF

    Super-absorbersNaphtha Propylene

    Acrylic acid pure

    Acrylic acidcrude

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 7

    LudwigshafenVerbund SiteObjects in Chemical Plants

    Subject to NDT

    Storage Tank

    High-Pressure Reactor

    Sphere for Pressurized Gas Storage

    Process Piping

    Column

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 8

    LudwigshafenVerbund Site

    Economy(no down-time) Safety

    Legal Requirements

    - European- National

    Why are Inspections of Chemical Equipment Necessary ?

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 9

    LudwigshafenVerbund SiteFocus on Pressure Equipment

    (Vessels, Process Piping)

    Design and Manufacture

    EU - Pressure Equipment Directive (PED)n mandatory for the EU-member-statesn essential safety-requirements of PEDn harmonized standards: e.g. EN 13445-5n national codes: e.g. AD-2000, CODAP 2000n pressure vessels of cat. IV are subject of NDT

    in any casel typically good-workmanship criterial 3rd party is involved

    n responsibility of manufacturer

    OperationManufactureDesign

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 10

    LudwigshafenVerbund SiteFocus on Pressure Equipment

    (Vessels, Process Piping)

    Operation (German View)

    national BetrSichV (safe operation of plants)n inspection periods established by ownerl max. values by BetrSichV (e.g. 5 years)

    n national accredited surveillance organizationsn experienced persons (e.g. owner)n amount and type of NDT settled by owner and

    surveillance organization / experienced personl depends on type of potential damage

    n responsibility of owner / operator

    ManufactureDesign Operation

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 11

    LudwigshafenVerbund SiteExample 1

    Shell & Tube Heat-Exchanger of Cat. IV

    OperationManufactureDesign

    consists ofn shelln 2 end-covers (bonnet, hood)n at least 4 nozzlesn 2 tubesheetsn tubes

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 12

    LudwigshafenVerbund SiteShell & Tube Heat-Exchanger

    NDT of Semi-Finished Products

    n design & materials selection by manufacturerbased on owner´s specs

    n design - approval by notified body (3rd party)n ordering of semi-finished products

    l rolled partsl forged parts (e.g. tubesheet)l tubes: seamless or weldedl flanges, screws, etc.

    n NDT carried out at steel-mill acc. to l EN-standards l customer specs. (manufacturer / operator)

    n materials certificates & incoming goods inspectionn positive materials identification

    OperationManufactureDesign

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 13

    LudwigshafenVerbund SiteShell & Tube Heat-Exchanger

    NDT of Welded Vessel (shell, end-covers, nozzles)

    n acc. to PEDn harmonized standard EN 13445-5n national codes, e.g. AD-2000 HP 5/3n NDT carried out at manufacturers siten EN-standards for NDT of weldsn good workmanship criterian fitness for purpose criteria may be considered

    n responsibility of manufacturern NDT results reviewed by notified body

    OperationManufactureDesign

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 14

    LudwigshafenVerbund SiteShell & Tube Heat-Exchanger

    NDT of Tube-to-Tubesheet Welds

    detection of porosity (potential leakage)n NDT not required by codes or standardsn fitness-for-purpose NDT l to be specified by owner / operatorl carried out at manufacturers sitel RT

    – isotope– X-ray-tube

    l UT

    n responsibility of owner / operator

    OperationManufactureDesign

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 15

    LudwigshafenVerbund SiteShell & Tube Heat-Exchanger

    Leak Test (LT)

    n not required by PED or by harmonized standard

    n pressure test is no leak testn fitness-for-purpose NDTl bubble testl tracer gas methods (e.g. He)

    n it has to be specified early, if LT is under responsibility ofl manufacturerl owner / operator

    OperationManufactureDesign

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 16

    LudwigshafenVerbund SiteShell & Tube Heat-Exchanger

    Final Inspection – Acceptance (cat. IV, Modul G)

    final inspection for acceptancen manufacturer provides

    l CE-marking on the heat-exchangerl declaration of conformityl technical documentation

    n notified body carries out „unit verfication“l examination of technical documentation

    – verify approval of NDT personnel– examine NDT test reports– ..........

    l final inspectionl certificate of conformity

    n final acceptance by owner

    OperationManufactureDesign

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 17

    LudwigshafenVerbund SiteShell & Tube Heat-Exchanger

    In-Service-Inspections (German View)

    BetrSichV (safe operation of plants)n internal inspection at least every 5 yearsn internal inspection may be replaced or

    complemented by NDT

    n amount and type of NDT depends on type of potential damage

    n settled by 1. owner 2. owner and experienced person3. owner and surveillance organization (ZÜS)

    ManufactureDesign Operation

    1 2

    3

    vessel for gas - fluid group 1

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 18

    LudwigshafenVerbund SiteShell & Tube Heat-Exchanger

    In-Service-Inspections (German View)

    amount and type of NDT depends on type of potential damage

    n LT of complete structure if necessaryn outer shell typically UT

    l wall-thickness measurement (corrosion)l main welds (cracking)

    n tube-to-tubesheet welds typically PT or MTn tubes typically ET, VT, UT-IRIS

    baseline inspection during fabrication recommended

    ManufactureDesign Operation

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 19

    LudwigshafenVerbund SiteShell & Tube Heat-Exchanger

    Who carries out NDT ?

    n Annex I, 3.1.3 of PED requires approved personnel for NDT of welds at cat. III -and cat. IV – vessels

    n approval of personnel by recognized third-party organizations (article 13)actual list:http://ec.europa.eu/enterprise/newapproach/nando

    n harmonized and supporting standards require personnel certified acc. to EN 473

    n no accreditation of NDT-company required

    n PED does not applyn national regulations applyn NDT based on

    l NDT EN-standardsorl NDT qualification procedure

    n NDT personnel certified acc. to EN 473 if required

    n accreditation of NDT-company based on EN ISO 17025 recommended / required ?

    OperationManufactureDesign

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 20

    LudwigshafenVerbund SiteShell & Tube Heat-Exchanger

    Who carries out NDT ?

    n Annex I, 3.1.3 of PED requires approved personnel for NDT of welds at cat. III -and cat. IV – vessels

    n approval of personnel by recognized third-party organizations (article 13)actual list:http://ec.europa.eu/enterprise/newapproach/nando

    n harmonized and supporting standards require personnel certified acc. to EN 473

    n no accreditation of NDT-company required

    n PED does not applyn national regulations applyn NDT based on

    l NDT EN-standardsorl NDT qualification procedure

    n NDT personnel certified acc. to EN 473 if required

    n accreditation of NDT-company based on EN ISO 17025 recommended / required ??

    ManufactureDesign Operation

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 21

    LudwigshafenVerbund SiteExample 2

    Process Piping

    n transport of fluids, steam or gases

    n typically pressurizedoften hot and insulated

    n 3 categories acc. to PED

    n process piping consists ofl tubesl bendsl welded seamsl flangesl valvesl gasketsl ......

    OperationManufactureDesign

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 22

    LudwigshafenVerbund SiteProcess Piping

    NDT of Pressure Equipment Parts

    OperationManufactureDesign

    n materials selection by owner based onstresses and corrosivity of media

    n ordering of pressure equipment partsby fabricator / manufacturerl tubes (seamless or welded, EN 10216 or EN 10217)l flangesl valve-housingsl gaskets, etc.

    n NDT carried out at steel-mill acc. to l EN 10246, part 1 - part 18 (UT, ET, MT,..)l customer specs à options of EN 10216/10217

    n materials certificates & incoming goods inspection (e.g. PMI)

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 23

    LudwigshafenVerbund SiteProcess Piping

    NDT of Welds (mainly circumferential)

    OperationManufactureDesign

    n acc. to PEDn harmonized standard EN 13480-5n national codes, e.g. AD-2000 HP 5/3n NDT carried out at fabricators /

    manufacturers siten EN-standards for NDT of weldsn good workmanship criterian fitness for purpose criteria may be

    considered

    n fabricator(s) à manufacturern responsibility of manufacturer

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 24

    LudwigshafenVerbund SiteProcess Piping

    Final Acceptance & Leak Test

    OperationManufactureDesign

    final inspection for acceptancen manufacturer provides

    l declaration of conformityl technical documentation

    n for category IIInotified body carries outl examination of technical documentation

    – verify approval of NDT personnel– examine NDT test reports– ..........

    l final inspection (incl. pressure test)l certificate of conformity

    n final acceptance by owner

    n LT not required by PED or by harmonized standard

    n pressure test is no leak testn fitness-for-purpose NDT

    l bubble testl tracer gas methods

    (e.g. He)

    n it has to be specified early, if LT is under responsibility ofl manufacturerl owner / operator

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 25

    LudwigshafenVerbund Site

    BetrSichV (safe operation of plants)n visual inspection at least every 5 yearsn pressure test at least every 5 yearsn pressure test may be replaced or

    complemented by NDT

    n amount and type of NDT depends on type of potential damage

    n settled by 1. owner 2. owner and experienced person3. owner and surveillance organization (ZÜS)

    Process Piping

    In-Service-Inspections (German View)

    ManufactureDesign Operation

    process piping for inflammable and hazardous gases

    1

    2

    3

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 26

    LudwigshafenVerbund SiteProcess Piping

    In-Service-Inspections (Selection of Methods)

    n amount and type of NDT depends on type of potential damage (ID or OD)l wall-thickness reductionl localized corrosionl crackingl deposits, blockagel .......

    n off-stream methods require removal of insulation

    n on-stream methods are appliedduring service (media, temperature,through insulation, etc.)

    ManufactureDesign Operation

    UT wall-thickness measurement off-stream

    RT wall-thickness measurement on-stream

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 27

    LudwigshafenVerbund SiteProcess Piping

    In-Service-Inspections (Methods)

    ManufactureDesign Operation

    Detection of defective insulationby infrared – testing on-stream

    Detection of blockage byAcoustic Ranger Blockage Detectoroff-stream

    Verification of valve-seat positionby RT and Phosphor Imaging Plateon-stream

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 28

    LudwigshafenVerbund SiteProcess Piping

    In-Service-Inspections (on-Stream Methods)

    ManufactureDesign Operation

    Detection of corrosionunder pipe-supportMagna-Tec

    VT corrosion scanningCorrScan

    Detection of corrosionunder insulationIncotest

    Detection of corrosionover long distancesTeletest

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 29

    LudwigshafenVerbund SiteMethods and NDT-Equipment

    used for In-Service-Inspections Validation / Qualification

    n routine-NDT is typically based on EN-standardsl if an EN-standard applies,

    NDT-validation is not required or neccesary

    n on-stream NDT methods / systems are typically not covered by standards:l in this case:

    validation / qualification of an NDT system is required acc. to EN ISO 17025

    l CEN technical report CEN/TR 14748:2004Methodology for qualification of non-destructive tests

    ManufactureDesign Operation

  • Andreas Hecht + Peter Rost, BASF AG ECNDT-Berlin, Sept. 2006, Fr.1.2.1 30

    LudwigshafenVerbund SiteNDT in the Chemical Industry

    Summary

    n NDT in the chemical industry is NDT of equipment (e.g. vessels, tanks, piping)

    n NDT during manufacturing is different from NDT during operation

    n NDT during manufacturing has to follow provisions of European PED with respect to future operation conditions

    l good workmanship criteria apply

    l NDT acc. to well known codes and standards (RT, UT, PT, MT)

    n NDT during operation has to follow provisions of national regulations

    l NDT depends on type of defect estimated

    l acceptance criteria depend individually from type of object

    n Qualification / Validation of new methods required

    OperationManufactureDesign