a framework of bim-based construction project monitoring system for owner

15
06/18/2022 1 A FRAMEWORK OF BIM-BASED CONSTRUCTION PROJECT MONITORING SYSTEM FOR OWNERS Advisor : Associate Professor Veerasak Likhitruangsilp, Ph.D. Student : Souksavath Losavanh Department of Civil Engineering Faculty of Engineering Chulalongkorn University

Upload: souksavath-losavanh

Post on 20-Jun-2015

260 views

Category:

Engineering


2 download

DESCRIPTION

A presentation on topic "A Framework of BIM-Based Construction Project Monitoring System for Owner" by Souksavath Losavanh, The Twenty-Sixth KKHTCNN Symposium on Civil Engineering November 18-20, 2013, Singapore

TRANSCRIPT

Page 1: A Framework of BIM-Based Construction Project Monitoring System for Owner

04/13/2023 1

A FRAMEWORK OF BIM-BASED

CONSTRUCTION PROJECT MONITORING

SYSTEM FOR OWNERS

Advisor :  Associate Professor Veerasak Likhitruangsilp, Ph.D.Student : Souksavath Losavanh

Department of Civil Engineering Faculty of Engineering

Chulalongkorn University

Page 2: A Framework of BIM-Based Construction Project Monitoring System for Owner

04/13/2023 2

# Building Information Modeling (BIM) comes to be concerned issue of the AEC Industry.

Source: Hooper, M. 2011

Background

# Transformation in construction information exchange

Page 3: A Framework of BIM-Based Construction Project Monitoring System for Owner

04/13/2023 3

# BIM is increase productivity and improve the final project outcomes.

# Construction monitoring is the key elements to success of construction

project.

# Owners need BIM.

BIM + Construction Monitoring

HOW ???

Page 4: A Framework of BIM-Based Construction Project Monitoring System for Owner

04/13/2023 4

Research Objective

Develop the framework of a BIM-based Construction monitoring

system for construction projects to owners.

Scope of Research

Develop and implement framework of BIM-based.

Apply to high-rise building ( Chamchuri 10 Building )

The software that used in this thesis: ● Revit 2013. ● MS Excel 2010.

Page 5: A Framework of BIM-Based Construction Project Monitoring System for Owner

04/13/2023 5

Construction Project

Building Model

Components

Visuanlisation

Information

Composition of BIM Requirement information

Planing and Design

• Identity data- ID Code- Mark Number- OmniClass Number- Work discipline• Design data- Category(Family)- Name(Type)- Dimension- Material- Cost- Level• Planning data- Phase- Plan start date- Plan finish date

Construction

• Construction- Actual Start date- Actual finish date- Percent of complet- Site photo

• - Comment

Operation

• FM- Room- Space- Function

Research Methodology

Page 6: A Framework of BIM-Based Construction Project Monitoring System for Owner

04/13/2023 6

BIM-based Construction monitoring system for construction project to

owners

Owner Office Construction Site

Transfer

SyncSync

Cloud Storage

Designer office

Documents

MEP Engineer

Structural Engineer

Architect

Designer Owner

Page 7: A Framework of BIM-Based Construction Project Monitoring System for Owner

04/13/2023 7

BIM-based Construction monitoring system for construction

project including of two stages and four part.

Stage 1: Pre-Construction

Stage 2: Construction

Part 1: Design

Part 2: Prepare for monitoring

Part 3: Construction and Monitoring

Part 4: Progress report

Stage: Part:

Page 8: A Framework of BIM-Based Construction Project Monitoring System for Owner

04/13/2023 8

Part 1: Design

Workflow:

Owner OfficeDesigner office

Documents

MEP Engineer

Structural EngineerArchitect

A

Start

Owner identify necessary information for project monitoring

Owner establish an information packet for project monitoring to

designer

Designer create a packet of information to BIM-

Design model

Owner verifyBIM-Design model

BIM-Master modelYes

No

B

Page 9: A Framework of BIM-Based Construction Project Monitoring System for Owner

04/13/2023 9

Part 2: Prepare for monitoring

Workflow:

Start

Designer transfer BIM-Design model to Owner (Arc, St and MEP file)

Owner create BIM-Master

Owner upload BIM-Design model to

database

Owner link BIM-Model files to BIM-Master file

Owner share BIM-Master files to owner

site office

Finish

B C

Owner OfficeDesigner office

Documents

MEP Engineer

Structure Engineer

Architect

Page 10: A Framework of BIM-Based Construction Project Monitoring System for Owner

04/13/2023 10

Workset file

BIM-Master model database

Workset Link Master file

MEP

STR

ARC

ARCH P1-03-03-13 ARCH P2-05-04-13 ARCH P3-05-05-13

STRUCT P1-03-03-13 STRUCT P2-05-04-13 STRUCT P3-05-05-13

MEP P1-03-03-13 MEP P2-05-04-13 MEP P3-05-05-13

Owner office

CC10-STR-2013.03.03

Date

Type

Project

Page 11: A Framework of BIM-Based Construction Project Monitoring System for Owner

04/13/2023 11

Workflow:

MEP

STR

ARC

ARC P1-03-03-13 ARC P2-05-04-13 ARC P3-05-05-13

STR P1-03-03-13 STR P2-05-04-13 STR P3-05-05-13

MEP P1-03-03-13 MEP P2-05-04-13 MEP P3-05-05-13

Owner office

MEP

STR

ARC

Construction site

Start

Import BIM-Master file from site office to

tablet PC

Engineer select project phase

Engineer select object to update

Take site photo

Input current progress information

Upload to cloud storage

Generate image URL

Construction phase updated

Finish

Updated all items

Yes

No

Export BIM file to site

officeC D

Part 3: Construction and monitoring

Page 12: A Framework of BIM-Based Construction Project Monitoring System for Owner

04/13/2023 12

Part 4: Progress report

Workflow:

MEP

STR

ARC

Project progress report

ARCH P1-03-03-13 ARCH P2-05-04-13 ARCH P3-05-05-13

STRUCT P1-03-03-13 STRUCT P2-05-04-13 STRUCT P3-05-05-13

MEP P1-03-03-13 MEP P2-05-04-13 MEP P3-05-05-13

Owner office

Plan

Actual

In progress

SIT F16-C10-03-03-13 SIT F16-C11-03-03-13

SIT F16-C12-03-03-13 SIT F16-C13-03-03-13

Start

Import files from Site office

Filter InformationCombine BIM-Record model to BIM-Master

Export information to text file

Import text file Excel temple file

Report of project progress

Finish

D E

Page 13: A Framework of BIM-Based Construction Project Monitoring System for Owner

04/13/2023 13

Tablet PC for collecting and updating

information on construction site Current construction site image

F16-A-03 F16-E-04

F16-F-08 F16-B-04

Report screen of project progress report at the owner office

Page 14: A Framework of BIM-Based Construction Project Monitoring System for Owner

04/13/2023 14

Conclusion

# This research has developed a framework of BIM-based construction monitoring system for the high

rise building construction project to the owners that can be used by the owner to monitoring project

progress.

# The purpose of this framework is shows the BIM-based construction monitoring system that reduce the

errors and omissions in paper on the paper-based modes of communication.

# This research data collected only reinforcement concrete structural system that included column, beam

and slab.

# This research were develop after project start.

Page 15: A Framework of BIM-Based Construction Project Monitoring System for Owner

04/13/2023 15

THANK YOU VERY MUCHFOR YOUR ATTENTION