a dvanced a llocation s tarts w ith u s ! cao p rogress report 21 st ig m eeting 26 j anuary 2010

21
ADVANCED ALLOCATION STARTS WITH US! CAO PROGRESS REPORT 21 ST IG MEETING 26 JANUARY 2010

Upload: brittany-burke

Post on 18-Jan-2016

214 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

ADVANCED ALLOCATION STARTS WITH US!

CAO PROGRESS REPORT

21ST IG MEETING26 JANUARY 2010

Page 2: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

AGENDA

Interim Solution Auctions Results of External Dry-run Phases Response to Issues Raised by Market

Participants Progress of Internal Dry-run Phases

CAO Freising GmbH 2

Page 3: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

INTERIM SOLUTION AUCTIONS

CAO Freising GmbH 3

Page 4: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

INTERIM PHASE STATUS

CAO has started its operation supporting the interim phase of capacity allocation in 2009:• Introduction of one point of registration for the

auction procedures for the CEE region• Common point bringing information about auction

procedures and its results• Taking over the role of the auction office for 5TSOs,

supported by CEPS with run of the allocation IT (includes full registration process and financial settlement)

• Yearly auction for 2010 and monthly auctions for Jan. and Feb. 2010 successfully organized

CAO Freising GmbH 4

Page 5: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

INTERIM PHASE STATUS

CAO fulfilled all contracted deadlines Experience achieved:

• Operational staff trained for future regional process

• Relationship with market participants established also on working level

• Provision of services after the implementation phase (i.e. since beginning of the year 2010) require minimum efforts and is going smoothly

CAO Freising GmbH 5

Page 6: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

RESULTS OF EXTERNAL DRY-RUN PHASES

CAO Freising GmbH 6

Page 7: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

EXTERNAL DRY-RUN PHASES

Phase I• organized in period 26.08.2009-25.09.2009• goal

− IT solution and its functionalities introduction− testing of bidding strategy (i.e. auction algorithm application)

Phase II• organized in period 18.11.2009-16.12.2009• goal

− introduction of IT solution adjustment− testing of auction algorithm application after publication of

detailed auction algorithm specification

CAO Freising GmbH 7

Page 8: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

EXTERNAL DRY-RUN PHASES

Phase III• planned to be started in January 2010• goal

− testing of bidding strategy with completed parameterization of the technical parameters calculation process

− analysis of available capacities (comparison to NTC)

• postponed due to not finalized internal analysis phase

CAO Freising GmbH 8

Page 9: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

PARTICIPANTS OF DRY-RUN

CAO Freising GmbH 9

0

5

10

15

20

25

30Te

st M

A 1

A

Test

DA

1A

Test

MA

1B

Test

DA

1B

Test

DA

2A

Test

DA

2B

Test

DA

3A

Test

DA

3B

Test

DA

4A

Test

DA

4B

Test

DA

5A

Test

DA

5B

Test

DA

6A

Test

DA

6B

Test

DA

7A

Test

DA

7B

Phase I

Phase II

Number of Dry-run participants

Page 10: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

SUMMARY OF PHASE I EVALUATION (I/III)

Even influenced by low level of available capacities few issues detected• learning effect of bidders (2 auctions with equal

parameters per day)− increase of prices respectively increase of requested

volumes in second auction of the day

• direct bids vs. neighbor to neighbor bids− as shown on picture source-sink bids lead to decrease of

market participants risks (higher efficiency of allocation)

CAO Freising GmbH 10

Page 11: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

SUMMARY OF PHASE I EVALUATION (II/III)

Comparison of auction prices of external dry run Phase I – direct bids vs. neighbour-to-neighbour bids

0

20

40

60

80

100

120

SK --> SI

SK --> CZ

CZ-->DE/AT

DE/AT-->SI

SK-->SI

SK-->CZ

CZ-->DE/AT

DE/AT-->SI

€/MWh

Auction Price

D6b, hour 3 D6b, hour 24Source: CONSENTEC

11CAO Freising GmbH

Page 12: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

SUMMARY OF PHASE I EVALUATION (III/III) Critical effect of bidding behaviour

• unrealistic bidding (extremely high bids or very low amount of requested capacity) has mainly two consequences

− dry run results must not be interpreted as a realistic estimate of future real outcome of the FBA

− any potential improvement of the technical parameters calculation process parameterization should not be assessed on the basis of the External Dry Run data, because the effects due to the bid structure mask the influence of technical aspects

The CAO and the CEE TSOs are performing separate analyses for this purpose.

CAO Freising GmbH 12

Page 13: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

RESPONSE TO ISSUES RAISED BY MARKET PARTICIPANTS

CAO Freising GmbH 13

Page 14: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

ISSUES RAISED BYMARKET PARTICIPANTS (I/IV) Availability of information on scheduling

• TSOs supported by CAO published requested information in agreed time

• A workshop was organized on 15.10.2009 in Munich (Germany), for market participants in order to discuss and explain the published specifications.

• After the workshop TSOs supported by CAO published amended information on individual market rules changes as requested during the workshop – including XML files examples and contact details of TSOs scheduling experts.

CAO Freising GmbH 14

Page 15: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

ISSUES RAISED BYMARKET PARTICIPANTS (II/IV) Availability of information on CAO IT interfaces

• CAO published specification of CAO IT interfaces on 21.09.2009 (i.e. in agreed time)

• A workshop was organized on 15.10.2009 in Munich (Germany), for market participants in order to discuss and explain the published specification.

• After the workshop CAO published answers to issues raised at the workshop under Frequently Asked Question (FAQ) on the web page.

CAO nevertheless agrees that more detailed documentation of the interfaces would be useful for market participant and undertakes the task of improving it.

CAO Freising GmbH 15

Page 16: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

ISSUES RAISED BYMARKET PARTICIPANTS (III/IV) Effects of CAO IT development

• CAO-IT and its interfaces are based on software already presented on some other regional auction offices across Europe.

• CAO did, and will in the future, follow the good practice implemented in CEE regional auction offices and abroad. This way the changes for market participant will have less affected and the adoption will be eased.

• CAO-IT is a growing system and will stay that way in the future. However this doesn’t mean that the functionalities will change without informing, testing and clear description to market participant.

• CAO will establish a management process of tracking change and offering test with purpose of adaption of changes.

• Manual processing of the data is not necessary.

CAO offer possibility of bilateral test procedures to be organized according to agreed schedule with individual market participants.

CAO Freising GmbH 16

Page 17: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

ISSUES RAISED BYMARKET PARTICIPANTS (IV/IV) Auction Rules

• Auction Rules have been provided to market participants via national regulatory authorities for consultation process.

• Results of consultation process delivered to CAO and CEE TSOs are subject of evaluation and will be subject of the discussion with regulatory authorities.

CAO Freising GmbH 17

Page 18: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

PROGRESS OF INTERNAL DRY-RUN PHASES

CAO Freising GmbH 18

Page 19: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

STATUS OF IT IMPLEMENTATION During the internal dry-run process and efficiency

analysis supported by Consentec TSOs and CAO identified need of some adjustments/corrections in process of Technical Parameters Calculation.• Final Acceptance of IT is planed for February 2010• Few updates to be implemented after the

acceptance• Source of potential additional updates –

requirements for changes in auction rules

CAO Freising GmbH 19

Page 20: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

EFFICIENCY ANALYSIS

As identified also by market participants during the first phase of the external dry-run low level of available capacities was detected in first technical parameters calculations

CAO and TSOs with support of Consentec made analysis of this problem• Adjustment of process of CGM creation• Complications in process parameterization• Unequal risk level applied by individual TSOs

CAO Freising GmbH 20

Page 21: A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

Thank you for your attention!

ADVANCED ALLOCATION STARTS WITH US!

CAO Freising GmbH 21