a collection of short stories energy savings performance contracting
TRANSCRIPT
![Page 1: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/1.jpg)
A collection of short stories
Energy Savings Performance Contracting
![Page 2: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/2.jpg)
VRA – Community Investment Workshop Series2
Energy Savings Performance Contracting
EnergySavingsPotential
High
Med
Low
HighMedLow
FacilityUpgrades
Capital PC
HighNeed/Large
Savings
![Page 3: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/3.jpg)
VRA – Community Investment Workshop Series3
Savings Chart
Roanoke CountyCost (Before & After ECMs)
$227,202
$272,643
$218,114 $204,482
$102,233
$112,457
$103,786$95,588
$68,435$90,264
$27,921
$34,901
$29,666
$29,666
$-
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
Present Cost Rate Increase After ECM's(Conservative)
After ECM's(Aggressive)
Ele
ctri
city
, Fu
el a
nd
Wat
er A
nn
ual
$
Electricity Fuel Water Savings
![Page 4: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/4.jpg)
VRA – Community Investment Workshop Series4
(Metric tons of CO2)
Greenhouse Gas Emissions
0
500
1000
1500
2000
2500
Your Facilities - Now Your Facilities - After PC
![Page 5: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/5.jpg)
VRA – Community Investment Workshop Series5
• Improvements are made to generate energy (and other) savings and to further the customer’s mission.
• Municipal Lease for project funding is available from VRA
• Guaranteed Energy savings pays for part or all of the municipal lease
• Legislated in Commonwealth of Virginia, process spelled out by DGS, local flexibility
How Does Performance Contracting Work?
![Page 6: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/6.jpg)
VRA – Community Investment Workshop Series6
A Type of Procurement
• Stretches taxpayer dollars
• Often no new capital dollars required
• Collaborative process between owner and partner
• Faster implementation, lower costs
• Build projects around good stewardship components, making the owner “GREEN”.
![Page 7: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/7.jpg)
VRA – Community Investment Workshop Series7
Two Short Stories
• Wise County
Courthouse
• Wise County Public
Schools
![Page 8: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/8.jpg)
VRA – Community Investment Workshop Series8
Once Upon a Time at Wise County…
The judge says “If
you do not fix the
comfort in this
building (the
courthouse), we are
going to lock up the
County Administrator
(Ed Sealover)”
![Page 9: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/9.jpg)
VRA – Community Investment Workshop Series9
The Solution
• Guaranteed energy
savings of $17,337
annually, or 26% of
existing utility bill.
• Entire building receiving
infrastructure renovation
• Chiller replacement
![Page 10: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/10.jpg)
VRA – Community Investment Workshop Series10
The Solution
• Variable Air Volume box replacement
• Controls upgrade
• Steam system repairs
• Lighting retrofit
![Page 11: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/11.jpg)
VRA – Community Investment Workshop Series11
A Happy Ending
• Savings helped pay for the $476,000 in improvements
• Building comfort and working environment significantly improved due to consistent temperatures and quality lighting.
• Savings exceeding guarantee by over $5,000 annually
![Page 12: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/12.jpg)
VRA – Community Investment Workshop Series12
Once Upon a Time at Wise County Public Schools…
“Parents are complaining about the indoor air quality in two of our schools.
The architects have estimated each school will cost $2 million to renovate, but we only have the money to renovate one school.
Which should we fix?”
![Page 13: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/13.jpg)
VRA – Community Investment Workshop Series13
The Solution
• System improvements made to five schools to generate enough savings to pay for the upgrade of the “second” school.
• LF Addington and Powell Valley Primary School received new mechanical systems
![Page 14: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/14.jpg)
VRA – Community Investment Workshop Series14
A Happy Ending
• Significant improvements to the learning environment
• Reduced maintenance repair part cost by over $5,000 annually.
• The guaranteed savings have been exceeded by $53,658 after three years.
• Wise County Public Schools Phase II performance contract is almost complete, addressing 6 more schools
![Page 15: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/15.jpg)
VRA – Community Investment Workshop Series15
Stewardship of Taxpayer Dollars
![Page 16: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/16.jpg)
VRA – Community Investment Workshop Series16
Energy Awareness
![Page 17: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/17.jpg)
VRA – Community Investment Workshop Series17
Teamwork
![Page 18: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/18.jpg)
VRA – Community Investment Workshop Series18
Teamwork
• 738 Trane employees in Virginia
• 9 Professional Engineers (PEs)
• 30+ LEED Accredited Professionals
• 10 Certified Energy Managers (CEMs)
• 284 Service Technicians
![Page 19: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/19.jpg)
VRA – Community Investment Workshop Series19
Review of the Process
• Improvements are made to generate energy savings and to further the customer’s mission.
• Municipal Lease available from VRA
• Guaranteed Energy savings pays for part or all of the municipal lease
• Legislated in Commonwealth, process spelled out by DGS, local flexibility
![Page 20: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/20.jpg)
VRA – Community Investment Workshop Series20
Your Next Step
• Commonwealth website http://www.dgs.state.va.us (Energy and Building Contracts, then Energy Performance Contracting)
• Steps of Process– Back of the Envelope Audit (BOE)– Detailed Study– Contract (Financing)
• Contact peers
![Page 21: A collection of short stories Energy Savings Performance Contracting](https://reader035.vdocuments.us/reader035/viewer/2022081504/5697bfac1a28abf838c9bafa/html5/thumbnails/21.jpg)