A Clash Waiting to Happen October 16, 2019
A Clash Waiting to Happen: At the Intersection of Utility and Transportation InfrastructureGreg Faber, ROW DivisionGabriel Longoria, CRP District Design
October 16, 2019
A Clash Waiting to Happen October 16, 2019
Table of contents
4
5 - 8
9 - 11
12
3Roles within Utility Investigations (SUE)
Clash: 3-D Design and Utility Investigation
Project Successes
A Look into the Future
Questions
1
2
2
3
4
5
A Clash Waiting to Happen October 16, 2019
Roles Within a 3-D Environment
3
Delivery of Projects Aligns with TxDOT goals of “on time, on budget” projects – reduces change orders and costs Assists with the implementation of the AMA strategy Builds partnerships with consultants and utility companies Improves the quality of projects and lives for all Texans!
TxDOT Districts
Develop a process
Who’s involved? (Designer)
What's involved?
Assumptions Document
Develop clear project RFP
Explain the problem
Build workflow for information
Design to construction
Consultants
Assist clients in understanding what can be delivered
What is the best route to deliver the scope?
2-D Product
Foundation of 3-D Deliverable
Data stewardship
Utility Report
Utility Companies
Data stewardship
Benefits from 3-D
Improved collaboration
Less impact to facilities
Accurate data on facilities
A Clash Waiting to Happen October 16, 2019
Clash: 3-D Design and Utility Investigation
TxDOT designing roadways in 3-D
– Need for 3-D Utility Investigations increases
TxDOT Districts have to know what they need
– Limits of the Utility Investigation
» Assumptions Document
– Entire project limits or areas/specific utilities in areas of high risk
Result: Enhances AMA, visualization of conflicts
– Through Microstation File or Google Earth
4
A Clash Waiting to Happen October 16, 2019
Project Successes (US 77 Relief Route in Nueces County)
5
CRP had a level C/D SUE already completed from the advanced planning stage
CRP obtained a contract to acquire level A/B SUE with a 3-D deliverable to be utilized with OpenRoads
– Designer, Utility Coordinator, and Contract PM determined the level A/B needs prior to work authorization using the level C/D SUE
3-D model of the SUE was developed in SUDA by the consultant
3-D SUE was referenced directly into the designer’s 3-D roadway model
Cross Sections cut from the designer’s model would show proposed roadway and existing utilities
– There was a reduced effort for providing cross sections for Utility Coordination with use of 3-D SUE and OpenRoads
A Clash Waiting to Happen October 16, 2019
Project Successes (New Location Conflicts)
6
2-D of major gas conflict 3-D model of proposed roadway & gas line
Cross section provided to gas line owner to show conflict
A Clash Waiting to Happen October 16, 2019
Project Successes (Existing and New Location Conflicts)
7
Cluster located on new ROW adjacent to exist ROW 3-D model of proposed roadway & utility cluster
Cross section provided to gas line owner to show conflict w/ditch & other utilities. Includes riprap cap as option
A Clash Waiting to Happen October 16, 2019
Project Successes (Example)
8
Multiple Conflicts w/Bridge Structure
A Clash Waiting to Happen October 16, 2019
A Look into the Future
Building upon the successes and lessons learned
– The next step in this process is…
• Obtaining As-Built data on adjusted lines
– Incorporating As-Built and Utility Investigation data into the construction plans
– BNSF process
• Utility data repository within new utility management system
9
A Clash Waiting to Happen October 16, 2019
A Look into the Future
Typical Sections showing Existing and Proposed Utilities
10
A Clash Waiting to Happen October 16, 2019
Improved process for Utility conflicts during PS&E– Identification – Communication– Resolution
Improved PS&E for the Contractor to build from– Resolving or mitigating known conflicts earlier– Additional tools to manage known conflicts
Improved Quality of Life for All Texans– Quicker Construction– Improved project costs– Reduction in Construction
delays
11
A Look into the Future
A Clash Waiting to Happen October 16, 2019
Questions
12
A Clash Waiting to Happen October 16, 2019
Questions
13
Without 3-D SUE, this could
be YOU!