  • 8/14/2019 A Choice Between Energy and Water

    1/32

    SHORTAGE&

    DISEMPOWERING SOLUTIONSWilson M. FortalezaFreedom From Debt Coalition

    June 23, 2009, Davao City

    A FORUM ON THE DCWD-HEDCOR ISSUEBATTLE OVER THE PANIGAN-TAMUGAN

    RIVERS OF DAVAO CITY

    SHORTAGE&

    DISEMPOWERING SOLUTIONS

  • 8/14/2019 A Choice Between Energy and Water

    2/32

    FDC frameworks

    On Power The power industry, due to its inherentnature, should be placed at the realm ofpublic domainand its products and services

    remain aspublic goods.

    The principle strongly pursues theprogressive role of the State that it cannotand should not consign the industry entirely

    to private hands and let the marketdetermine what is good for the public.

    FDC is also for a power shift from dirtyto clean and renewable power

  • 8/14/2019 A Choice Between Energy and Water

    3/32

    FDC frameworks

    On Water

    Upholding the peoples right

    to water

    Water, the same with power,are public goods that shouldremain in public domain

  • 8/14/2019 A Choice Between Energy and Water

    4/32

    Power Situation

    As of Dec. 2007

    Installed generating capacity is15,937 MW

    Dependable capacity is 13,205

    MW

    Source: DOE

  • 8/14/2019 A Choice Between Energy and Water

    5/32

    Power Situation

    PEAK DEMAND

    Source: PDP-DOE

  • 8/14/2019 A Choice Between Energy and Water

    6/32

    Power Situation

    ENERGY CONSUMPTION

    Source: PDP-DOE

  • 8/14/2019 A Choice Between Energy and Water

    7/32

    Power Situation

    GRID CONSUMPTION

    Source: PDP-DOE

  • 8/14/2019 A Choice Between Energy and Water

    8/32

    Power Sales

    Source: DOE Power Development Plan,

    7,890

    GWh

  • 8/14/2019 A Choice Between Energy and Water

    9/32

    Demand forecast

    Grid 2006

    2007

    2008

    2009 2010

    Luzon 6,72

    8

    6,98

    1

    7,25

    2

    7,552 7,878

    Visayas 1,154

    1,214

    1,289

    1,364 1,448

    Mindanao 1,293

    1,363

    1,440

    1,525 1,620

    PHILIPPINES

    9,175

    9,558

    9,981

    10,441

    10,946

    Source: Transmission Development Plan,

  • 8/14/2019 A Choice Between Energy and Water

    10/32

    Demand forecast(Mindanao)

    Source: DOE Power Development Plan,

  • 8/14/2019 A Choice Between Energy and Water

    11/32

    How is demand

    projected? Historically, governments demandprojection is poor (Top to bottom approach).Poor planning is also a factor.

    DOE makes use of an aggregation of thedemand projection from the DistributionDevelopment Plans(DDPs) from distributionutilities plus projections from directly-connected non-utilities.

    TransCos forecast is based oneconometric modeling with Gross DomesticProduct (GDP) as main explanatory variable.

  • 8/14/2019 A Choice Between Energy and Water

    12/32

    Supply-Demandforecast

    Source: DOE Power Development Plan,

  • 8/14/2019 A Choice Between Energy and Water

    13/32

    Supply-Demandforecast

    Source: Transmission Development Plan,2007

    Demand projection is always onthe High Demand Case

    Both cases show a radical declinein the demand forecast for Luzon,owing to the very low projection ofthe Meralco, which demand covers

    around 70% of the aggregate demandin the Luzon grid.

  • 8/14/2019 A Choice Between Energy and Water

    14/32

    Supply-Demandforecast

    Source: DOE Power Development Plan,

  • 8/14/2019 A Choice Between Energy and Water

    15/32

    Supply-Demandforecast

    Source: DOE Power Development Plan,

  • 8/14/2019 A Choice Between Energy and Water

    16/32

    Supply-Demandforecast

    Source: DOE Power Development Plan,

  • 8/14/2019 A Choice Between Energy and Water

    17/32

    Dependable Capacity inMindanao

    Source: DOE Power Development Plan,

  • 8/14/2019 A Choice Between Energy and Water

    18/32

    Teetering intorecession

    SOURCE: NSCB MAY 2009

  • 8/14/2019 A Choice Between Energy and Water

    19/32

    Sharp FallGDP AND GNP (in million PhP)

    SOURCE: NSCB MAY 2009

  • 8/14/2019 A Choice Between Energy and Water

    20/32

    All industryperformance

    GDP by industry origin (in million PhP)

    SOURCE: NSCB MAY 2009

  • 8/14/2019 A Choice Between Energy and Water

    21/32

    The cost of wrongprojections Consumers are made to pay thefull cost of installed capacitieswhether they are consumed or not, or

    even those that were not generatedat all.

    We also pay for all the risks

    The case of the IPP contractswhich we were made to pay throughthe PPA.

  • 8/14/2019 A Choice Between Energy and Water

    22/32

    The Mindanao Grid

    Source: Transmission Development Plan,

  • 8/14/2019 A Choice Between Energy and Water

    23/32

    The Mindanao Grid

    Source: Transmission Development Plan,2007

    In TransCos CAPEX Program approved bythe ERC, the program is mainly driven byload growth .

    Of the estimated P56.23-B, 82% or P46-B

    are for projects necessary to meet loadgrowth within the planning horizon. (40% forLuzon, 28% for Visayas, and 32% forMindanao.

    For the projects for implementation,however, Capex driven by load growth is notas high as the ongoing projects as itaccounts for only 58%.

    In Mindanao, all of the projects for

  • 8/14/2019 A Choice Between Energy and Water

    24/32

    Dropped inter-connectionproject

    Source: Transmission Development Plan,2007

  • 8/14/2019 A Choice Between Energy and Water

    25/32

    TransCos ongoingprojects in the Mindanao

    Grid

    Source: Transmission Development Plan,

    Abaga-Kirahon 230 kV Transmission Line toprovide additional transmission corridor to the676.4 MW Agus Hydro Complex which accountsfor 70% of total dependable capacity for the

    Mindanao Grid. The Agus 2-Kibawe and Abaga-Togoloan 138 kV lines serve as Agus link to thegrid.

    The bombing of Agus 2-Kibawe line resulted in

    huge power swing to the other corridor. TheAbaga-Togoloan line will not be able to carry70% of the 90% load as a result of the Agus 2-Kibawe outage.

    The project is expected to be completed June2008 and would serve as initial step in

  • 8/14/2019 A Choice Between Energy and Water

    26/32

    Power planning/PlantSitting Choosing as site for a new powerplant is an important part of electricsystem planning. There are plants thatare site-specific such as hydro,

    geothermal, wind among others.

    Social-acceptability must also be

    considered.

  • 8/14/2019 A Choice Between Energy and Water

    27/32

    War over water

    "The wars of thenext centurywill be aboutwater."Ismail Serageldin,Vice president of the WorldBank

  • 8/14/2019 A Choice Between Energy and Water

    28/32

    Water for ALL

    Power can beproduced from manysources

    Although the globeis made up mainly ofwater, potable wateris not a finiteresources.

    Availablefreshwater amountsto less than one-halfof 1 percent of all the

    water on earth. The

    Global consumptionof water is doublingevery 20 years, morethan twice the rate ofhuman population

    growth.

  • 8/14/2019 A Choice Between Energy and Water

    29/32

    Making a choice

    Why make us choose between a darkand waterless future when the answer isobviously clear:

    Nobody desires suchkind of world!

  • 8/14/2019 A Choice Between Energy and Water

    30/32

    Is there a win-winsolution?

    Kung ayaw may

    dahilan,Kung gusto maraming

    paraan

  • 8/14/2019 A Choice Between Energy and Water

    31/32

    A proposal for a Multi-

    StakeholdersDevelopment

    Planning Process Panay Case (SeparatePresentation)

    Naga Case (ParticipatoryPlanning)

  • 8/14/2019 A Choice Between Energy and Water

    32/32

    Thank You!

    End of presentation