a c f i p t - cityofmadison.com
TRANSCRIPT
A/C air condition
A/E Architect/Engineer
ACT acousticalceiling tile
ADDL additional
ADDM addendum
ADJ adjustable
AFC above finishedcounter
AFF above finished
floor
AFG above finished
gradeAFS above finished
slab
ALT alternate
ALUM aluminum
APPD approved
APT apartmentAP acoustical panel
ASC above suspended
ceiling
BB baseboard
BLDG building
BLT borrowed lite
BLW below
BPL base plateBO bottom of
BOS bottom of steel
CB catch basin,construction bulletin
CF/CI contractor furnished,
contractor installed'
CF/OI contractor furnished,
owner installedCF/VI contractor furnished,
vendor installed
CG corner guard
CIP cast-in-place
CNTR counterCL centerline
CLG ceiling
A
B
C
CLR clear
CM construction
managementCM construction manager
CMU concrete masonry unit
CO cleanout
COL column
CONC concrete
CORR corridorCPT carpet
CSWK casework
CT ceramic tile
CW cold water
CTB ceramic tile base
DEMO demolition
DEPT department
DF drinking fountain
DIA diameterDP decorative panel
DR door
DR FR door frame
DTL detail
DS downspoutDW dishwasher
DWG drawing
E east
EIFS exterior insulation& finish system
EL elevation
EJ expansion joint
ELEC electric
ELEC electricalELEV elevator
EP epoxy
EPS expanded polystyrene
board
EQ equal
ETR existing to remainEXIST existing
EXT exterior
F
G
H
F female
F filler
FA fire alarmFA fluid-applied
FAB fabric
FC file cabinet
FD floor drain
FE fire extinguisherFEC fire extinguisher
cabinet
FHC fire hose cabinet
FLR floor
FM factory mutualFM floor mat
FO finished opening
FP fire protection
FP fireproof
FPL fireplace
FRP fiberglassreinforced plastic
FT fire treated
FTG footing
GA guage
GALV galvanized
GB grab bar
GC general contractor
GL glassGLU LAM glue laminated
wood
GR grade, grading
GT grout
GYP BD gypsum
HB hose bibb
HC hollow core
HM hollow metalHORIZ horizontal
HSKP housekeeping
HGT height
HVAC heating, ventilating
& air conditioningHW hot water
HWY highway
T&M time & materials
TEMP temperature
TEMP temporaryTER terrazzo
TERB terrazzo base
TFF top of finished floor
TKBD tackboard
TO top of
TOB top of beamTOC top of concrete
TOJ top of joist
TOPO topography
TOS top of slab
TOS top of steelTYP typical
UNO unless noted otherwise
VERT vertical
VF/CI vendor furnished,
contractor installed
VF/OI vendor furnished,owner installed
VF/VI vendor furnished,
vendor installed
VNR veneer
VIF verify in field
W west
W/ with
W/O without
WC water closetWC wall covering
WD wood
WDB wood base
WDV wood veneer
WH water heaterWP wall protection
WP work point
WT window treatment
XPS extruded polystyrene
board (insulated)
ID inside diameter
INSUL insulation
INT interior
JS janitor sink
LAM laminateLAV lavatory
LL live load
MAX maximumMC modular carpet tile
MECH mechancal
MFR manufacturer
MICRO microwave
MIN minimumMIN minute
MISC miscellaneous
MJ movement joint
MO masonry opening
MS mop sinkMTL metal
N north
NA not applicableNIC not in contract
NO number
NM nominal
NS no scale
NTS not to scale
OC on center
OD outside diameter
OF/CI owner furnished,
contractor installedOF/OI owner furnished,
owner installed
OF/VI owner furnished,
vendor installed
OH DR overhead doorOPH opposite hand
OPNG opening
PJ panel joint
PLAM plastic laminate
PLYWD plywoodPNL panel
PREFAB prefabricated
PREFIN prefinished
PSI pounds per square
inchPT paint
PTN partition
QT quarry tileQTB quarry tile base
QTZ quartz
RB resilient base
RCP reflected ceiling planRD roof drain
REBAR reinforcing steel bars
REC recess
REF reference
REF refrigeratorRF resilient flooring
REV revision
RFS room finish schedule
RO rough opening
S south
SAN sanitary
SC sealed concrete
SC solid coreSCHED schedule
SCHED scheduled
SF square foot
SIM sim
SS solid surfaceSST stainless steel
ST stain
ST stair
STL steel
STN stoneSTNB stone base
STRUCT structure
C
D
E
I
M
N
J
L
O
Q
R
S
P T
W
X
U
V
TRUE
N
PLAN
N
000
B
000-00
NAME
0000
TYPE
HEIGHT
XXXXX
FLOOR
BASE
WALL
REMARKS
000
000
000
PARTITION TYPE
DOOR
KEYNOTE
FURNITURE
EQUIPMENT
WINDOWXX000
CEILING
CASEWORK
FINISH PLAN
A
B
A
ELEVATION
DATUM
VIEW NUMBER
VIEW NAME
VIEW SCALE
DEMOLITION
GRID AND GRID IDENTIFICATION
1 21 2
A000
00
A000
00
SIM
A000
00
SIM
BUILDING
SECTIONS
OTHER
SECTIONS
CONSTRUCTION PHASES
ELEVATIONS
ROOM
DETAILS
TITLE
1/2" = 1'-0"
DIMENSION REFERENCES
EXISTING NEW
NEW EXISTING
19
SIM
TAGSCALLOUTS GRAPHICS
NORTH ARROW
TO OBJECT CENTER TO OBJECT FACEOR OTHER GEOMETRY
EQ EQ EQ 5'-0" 4'-0"
W" x H" x D"
A000
000
Level
0'-0"
A000-000A1
A2
A3
A4
A000A1
A2
A3
A4
These documents reflect progress and intent and maybe subject to change, including additional detail. These are not final construction documents and shall not be
used for final bidding or construction-related purposes.
PROGRESS DOCUMENTSNOT FOR CONSTRUCTION
PROJECT MANAGER
PROJECT NUMBER
KEY PLAN
SHEET INFORMATION
PROJECT INFORMATION
ISSUANCE AND REVISIONS
m i l w a u k e e 333 East Chicago StreetMilwaukee, Wisconsin 53202414.271.5350
309 West Johnson Street, Suite 202Madison, Wisconsin 53703608.442.5350
m a d i s o n
1899 Wynkoop Street, Suite 300Denver, Colorado 80202303.595.4500
d e n v e r
PROJECT TEAM
SYMBOL LEGEND
VICINITY MAP
ABBREVIATIONS SHEET INDEX
SOUTHSIDEELEMENTARYADDITION
PROJECTINFORMATION ANDINDEX
T-1
320539-00
PM
501 E Badger Rd,Madison, WI 53713
© 2020 Eppstein Uhen Architects, Inc.
DATE DESCRIPTION06/22/2021 SCHEMATIC DESIGN
EMAIL ADDRESS:DIRECT PHONE:PROJECT CONTACT:
ARCHITECTURALEPPSTEIN UHEN ARCHITECTS, INC.
333 East Chicago StreetMilwaukee, WI 53202
PHONE: (414) 271-5350www.eua.com
Abie Khatchadourian(414) 291-8163
PROJECT LOCATION
EMAIL ADDRESS:DIRECT PHONE:PROJECT CONTACT:
CONSTRUCTION MANAGERJ.H. FINDORFF & SON INC.
300 SOUTH BEDFORD STREETMADISON, WISCONSIN 53703
PHONE: (608) 441-6891
AARON ZUTZ(608) 441-6891
EMAIL ADDRESS:DIRECT PHONE:PROJECT CONTACT:
CIVIL ENGINEERINGWYSER ENGINEERING
312 Main StreetMount Horeb, WI 53572
PHONE: (608) 437-1980
Wade Wyse(608) 843-3388
EMAIL ADDRESS:DIRECT PHONE:PROJECT CONTACT:
LANDSCAPE DESIGNSAIKI LANDSCAPE DESIGN
1110 S. Park StreetMadison, WI 53715
PHONE: (608) 405-8148
Samantha Farrell Folger(608) 405-8160
EMAIL ADDRESS:DIRECT PHONE:PROJECT CONTACT:
STRUCTURAL ENGINEERINGOTIE
1033 N. Mayfair Road, Suite 200Milwaukee, WI 53226
PHONE: (608) 241-6717
James Hall(608) [email protected]
EMAIL ADDRESS:DIRECT PHONE:PROJECT CONTACT:
PLUMBING AND FIRE PROTECTION ENGINEERINGMEP SALAS OBRIEN
1111 Deming Way, Suite 202Madison, WI 53717
PHONE: (608) 218-3790
Tim Coach(715) 832-5680
EMAIL ADDRESS:DIRECT PHONE:PROJECT CONTACT:
MECHANICAL ENGINEERINGMEP SALAS OBRIEN
1111 Deming Way, Suite 202Madison, WI 53717
PHONE: (608) 218-3790
Josh Hinson(608) 239-3996
EMAIL ADDRESS:DIRECT PHONE:PROJECT CONTACT:
ELECTRICAL ENGINEERINGMEP SALAS OBRIEN
1111 Deming Way, Suite 202Madison, WI 53717
PHONE: (608) 218-3790
Paul Culver(608) 848-9556
EMAIL ADDRESS:DIRECT PHONE:PROJECT CONTACT:
DISTRICTMADISON METROPOLITAN SCHOOL DISTRICT
4711 PFLAUM ROADMADISON, WISCONSIN 53718
PHONE: (608) 204-7912
BRANDON HALVERSON(608) 204-7912
EMAIL ADDRESS:DIRECT PHONE:PROJECT CONTACT:
FOODSERVICECAPITAL FOODSERVICE DESIGN
1522 Lake View AveMadison, WI 53704
PHONE: (608) 514-4373
Brian Nelson(608) 514-4373
T-1 PROJECT INFORMATION AND INDEX
L-1 LANDSCAPE PLAN
C-1 SITE PLAN
C-2 AREA PLAN
C-3 SITE PHOTOS
A-1 EXTERIOR ELEVATIONS - B&W
A-2 EXTERIOR ELEVATIONS - B&W
A-3 EXTERIOR ELEVATIONS - COLOR
A-4 EXTERIOR ELEVATIONS - COLOR
A-5 EXTERIOR ELEVATIONS - AXONOMETRIC VIEWS
A-6 EXISTING BUILDING MATERIALSA-7 NEW BUILDING MATERIALS
ST
ST
ST
W
GM
GI
GI
EB
ET
ET
BURDETTE PLAT
LOT 2 LOT 3 LOT 4OUTLOT 1 1ST
AD
DITI
ON
TO
RIM
ROC
K
HEI
GHT
SLOT
4LO
T 5
LOT
6
BLO
CK
1
LOT 1 LOT 2
RIMROCK HEIGHTS
BLOCK 1
1ST
AD
DITI
ON
TO
RIM
ROC
K
HEI
GHT
S
LOT 2
5
CSM #3040LOT 1
10' WIDE LIMITEDHIGHWAY EASEMENTPER CSM #3040 10' WIDE LIMITED
HIGHWAY EASEMENTPER CSM #3040
6' WIDE UTILITYEASEMENT PERCSM #3040
CROSS HATCHED AREAIS WIS. TEL. CO.EASEMENT PER DOC.NO. 1784683
12' WIDE UTILITYEASEMENT PER DOC.NO. 2378410 12' WIDE UTILITY
EASEMENT PER DOC.NO. 2378410
SHADED AREA ISUTILITY EASEMENTPER DOC. NO. 2813394
10' WIDE UTILITYEASEMENT PERDOC. NO. 2468742
APPROXIMATE10' WIDE ELECTRICEASEMENT PER DOC.NO. 8320387
BENCHMARK #1ELEV=864.12
BENCHMARK #3ELEV=862.64
BENCHMARK #4ELEV=866.67
S 00°5
0'12
" W
145.
11'
S 89°09'48" E 75.00'
S 00°5
0'12
" W
179.
15'
N 89°09'48" W
592.01'
N 14°5
1'02"
E
334.17
'
N 89°10'05" W2635.66'
C1/4 CORNERSEC 36-7-9
S1/4 CORNERSEC 36-7-9
2057.39'578.27'
N 0
0°30
'03"
E26
48.12
'
NORTH LINE OF THE SW1/4
EAST
LIN
E O
F TH
E SW
1/4
NE1/4 - SW1/4
TOTAL AREA167,951 Sq. Feet
3.856 Acres
S 89°10'05" E436.09'
8.0'±
7.5'±
SHED CORNERIS 1.5'± EASTOF LOT LINE
SHED CORNERIS 1.0'± EASTOF LOT LINE
SHED CORNERIS 0.5'± SOUTHOF LOT LINE
SHED CORNERIS 1.0'± SOUTHOF LOT LINE
UNDERGROUND ELECTRICCROSSES LOT LINEUNDERGROUND
ELECTRIC IS 0.5'±SOUTH OF LOT LINE
UNDERGROUND ELECTRICCROSSES LOT LINE
UNDERGROUNDELECTRIC IS 1.0'±SOUTH OF LOT LINE
PEDESTAL CORNERSARE 0.5'± WEST OFUTILITY EASEMENT
FENCE END IS 0.5'±NORTH OF LOT LINE
FENCE IS 0.5'± NORTHOF LOT LINE
6' WIDE UTILITYEASEMENT PERCSM #3040
FENCE CORNER IS 0.5'± WESTAND 0.5'± SOUTH OF LOT LINE
FENCE END IS 0.5'±WEST OF LOT LINE
FENCE CORNER IS 0.5'± NORTHAND 0.5'± WEST OF LOT LINE
FENCE CORNER IS0.5'± WEST AND0.5'± SOUTH OFLOT CORNER
FOUND SURVEY SPIKELEANING AND REPLACEDIT WITH 3/4" IRON REBAR
S 00
°50'
12"
W33
.00'
BENCHMARK #2ELEV=866.95
CSM #14510LOT 1
CSM #6504LOT 1
FENCE TEE IS 0.5'±NORTH OF LOT LINE FENCE TEE IS 0.5'±
NORTH OF LOT LINE
FENCE CORNER IS 0.5'±EAST OF LOT LINE
T
EB
X X XX
XX
XX
X X X X X X X XX
XX
XX
XX
XX
XX
XX
XX
X
XX
XX
X
XX
861.70 BC
861.70 EP
861.70 BC
861.70 EP
862.50 SW 864.4± SW
MATCH
865.7± SW
MATCH
861.8± EP
MATCH
862.8± SW
MATCH
865.3± EP
MATCH
865.3± EP
MATCH 870.5
4 BC
870.1
0 EP
864.7 SW
STM
STMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTM
865.1± SW
MATCH
865.1± SW
MATCH
12 PARKING STALLS @ 9'X18' = 108.0005
24.0'
5.0001
STM
STM
STM
STM
STM
24.0000
865.5
5 FFE
865.5
5 FFE
865.55 FEE
865.3± EP
MATCH
STMperf
STM
STM
STM
STM
866.5
8 FG
867.3
8 BC
866.9
4 EP
870.54 BC
870.10 EP
869.74 FG
870.9
8 BC
870.5
4 EP
866.2
0 BC
865.7
6 EP
869.28 BC
868.84 EP
864.19 SW
MATCH
863.97 SW
865.04 BC
864.60 EP
865.60 BC
865.04 EP
865.19 BC
864.75 EP
865.75 BC
865.19 EP 865.04 BC864.60 EP
865.60 BC865.04 EP
866.9
4 FG
867.8
2 FG
867.11 BC866.67 EP
867.67 BC867.11 EP
867.8
4 BC
867.4
0 EP
868.4
0 BC
867.8
4 EP
868.1
9 BC
867.7
5 EP
868.7
5 BC
868.1
9 EP
862.3± SW
MATCH
862.2± SW
MATCH
863.83 SW
863.83 SW
860.94 BC
860.50 EP
860.94 BC
860.50 EP
862.24 SW
865.46 SW
863.38 SW
863.47 SW
863.92 SW
865.55 FFE
861.75±
EP MATCH
861.53±
EP MATCH
860.94 BC
860.50 EP
862.01 BC
861.45 EP
861.84 SW
861.84 SW
862.33 SW
862.24 SW
861.15 BC
860.71 EP
861.34 BC
860.90 EP
863.38 SW
861.91 SW
863.38 SW
865.0 FG
R25.0000
R25.0000
R81.7623
R5.0000
861.32 BC
860.88 EP
861.76 BC
861.32 EP
R30.0000
R40.0000
862.15 SW
862.30 SW
862.15 SW
862.30 SW
859.78±
SW MATCH
R25.0000R25.0000
STM STM
STM
X
SAN
SANSAN
SAN
SANSANSAN
WAT
X X X X
11.1441
865.55 FFE
865.55 FFE
22.0000
16.00007.000010.000010.0000
8.5000
10.0000
24.0000
16.0000
10.0000
EXISTING BUILDING
PROPOSED ADDITION
PROPOSED ADDITION
PROPOSED ADDITION
PROPOSED PLAYGROUND AREA
PROPOSED PARKING
EXISTING PARKING
PROPOSED PARKING
PROPOSED ROPE CLIMBER
PROPOSED SLIDE
PROPOSED SWINGS
PROPOSED SPINNER
PROPOSED EUROFLEX® RUBBER HALF BALLS
PROPOSED NATURE PATH
BIORETENTION BASIN
BIORETENTION BASIN
PROPOSED SEATING: BENCHES & TABLES
PROPOSED BENCHES
PROPOSED BIKE RACKS
PROPOSED BIKE RACKS
PROPOSED POURED IN PLACE AREA (PIP) AREA
PROPOSED ENGINEERED WOOD FIBER (EWF) AREA
PROPOSED ENGINEEREDWOOD FIBER (EWF) AREA
PROPOSED POURED PLAY HOUSE
PROPOSED NATURE KITCHEN
PROPOSED SMALL SPINNERS
RELOCATED SHED
LEGEND
EXISTING SHADE TREES
EXISTING TREES TO BE REMOVED/TRANSPLANTED
EXISTING FRUIT/ NUT/ ORNAMENTAL TREES
EXISTING EVERGREEN TREES
PROPOSED SEATING AND TRASH/RECRECEPTACLES
BIORETENTION PLUGS
LANDSCAPE AREA: SHRUB/ PERENNIAL BED WITHBARK MULCH & METAL EDGING
BLUEGRASS SEED
TREE PROTECTION
PROPOSED SHADE/ ORNAMENTAL TREESNOTE: TREES TO BE 2-2.5" CAL., MIX OF HONEYLOCUST, ELM,OAK, MAPLE, SERVICEBERRY, IRONWOOD, LONDON PLANE,HACKBERRY, CRABAPPLE, AND KENTUCKY COFFEETREE
PROPOSED EVERGREEN TREES
PROPOSED SHRUBSNOTE: SHRUBS TO BE 3 GAL. OR 5 GAL., MIX OFDOGWOOD, DWARF BUSHHONEYSUCKLE, VIRBURNUM,HAZLENUT, SPIREA, CHOKEBERRY, YEW, AND JUNIPER
ENGINEERED WOOD FIBER PLAY SURFACING (EWF)
POURED IN PLACE RUBBER PLAYSURFACING (PIP)
RECLAIMED & PROPOSED BOULDERS, LOGEDGERS, AND LOGS
These documents reflect progress and intent and maybe subject to change, including additional detail. Theseare not final construction documents and shall not be
used for final bidding or construction-related purposes.
PROGRESS DOCUMENTSNOT FOR CONSTRUCTION
PROJECT MANAGER
PROJECT NUMBER
KEY PLAN
SHEET INFORMATION
PROJECT INFORMATION
ISSUANCE AND REVISIONS
3
E
D
C
B
A
21 654 7
321 654 7
E
D
C
B
A
m i l w a u k e e 333 East Chicago StreetMilwaukee, Wisconsin 53202414.271.5350
309 West Johnson Street, Suite 202Madison, Wisconsin 53703608.442.5350
m a d i s o n
1899 Wynkoop Street, Suite 300Denver, Colorado 80202303.595.4500
d e n v e r
MMSD - RIMROCKSOUTHSIDEELEMENTARY SCHOOL
LANDSCAPE PLAN
L-1
501 E BADGER RDMADISON, WI 53713
© 2021 Eppstein Uhen Architects, Inc.
DATE DESCRIPTION
0 20' 40'
1" = 20'-0" NORTH
06/21/2021 100% SD SET
ST
ST
ST
GI
GI
UP
UP
UP
UP
977 SF
5K1
928 SF
5K2
856 SF
5K3
1,130 SF
5K4
870 SF
1ST5
1,012 SF
4K6
320 SF
OT/PT7
155 SF
CHANGING8
88 SF
TLT9
893 SF
1ST10
873 SF
1ST11
878 SF
1ST12
111 SF
PE OFFICE13
376 SF
GYM STOR14
2,955 SF
COMMONS15
262 SF
GIRLS TLT16
232 SF
BOYS TLT17
390 SF
CAFE STOR18
103 SF
CUSTODIAL19
74 SF
DATA ROOM20
71 SF
FAMILY TLT21
275 SF
NURSE22
54 SF
STOR23
93 SF
NURSE TLT24
340 SF
STAFF LOUNGE25
84 SF
VEST28
130 SF
VEST29
132 SF
OFFICE30
132 SF
OFFICE32
202 SF
CONF33133 SF
PRINCIPAL34
523 SF
RECEPTION35
107 SF
SGI37
107 SF
SGI38
X X XX
XX
XX
X X X X X X X XX
XX
XX
XX
XX
XX
XX
XX
X
XX
XX
X
XX
12 PARKING STALLS @ 9'X18' = 108.0'
24.0'
5.0'
24.0'
R25.0'
R25.0'
R81.8'
R5.0'
R30.0'
R40.0'
R25.0' R25.0'
20.9'
22.0'
16.0'7.0'
10.0'10.0'
8.5'
10.0'
24.0'
16.0'
10.0'
10 PARKING STALLS @ 9'X16' WITH2-FOOT OVERHANG = 100.0'
E BADGER ROADEXISTING 20-FOOT WIDECOMMERCIAL ENTRY TOREMAIN.
ONE 9'X16' VAN ADA STALL 8'X16'STRIPED AREA AND ADA VAN STALLSIGN
STOP SIGN
CONTRACTOR TO FIELD VERIFY ALLEXISTING INTERIOR COLUMN LINESAND TRANSFER COLUMN LINES INTOTHE PROPOSED ADDITION.
BUILDING FOOTPRINT SHOWN BASEDON ARCHITECTURAL FLOOR PLAN ASPROVIDED TO WYSER ENGINEERING ON6/11/21. THIS DRAWING SHOULD NOT BEUSED FOR CONSTRUCTION LAYOUTUNTIL FOUNDATION IS VERIFIED BYFINAL STRUCTURAL PLANS. THIS IS THERESPONSIBILITY OF THE CONTRACTOR.
PROPERTY BOUNDARY
EASEMENT
BUILDING FOOTPRINT
18" CURB AND GUTTER
ASPHALT PAVEMENT
CONCRETE PAVEMENT
LEGEND (PROPOSED)
GENERAL NOTES
1. UNDERLYING SITE CONTOURS AND INFORMATION BASED ON TOPOGRAPHIC & UTILITY DATA ASPROVIDED TO WYSER ENGINEERING. WYSER ENGINEERING SHALL NOT BE HELD RESPONSIBLEFOR ANY ERRORS OR OMISSIONS THAT MAY ARISE AS A RESULT OF ERRONEOUS OR INCOMPLETEINFORMATION PROVIDED BY OTHERS. CONTRACTOR TO CONFIRM ALL ELEVATIONS, GENERALDRAINAGE AND EARTHWORK REQUIREMENTS PRIOR TO CONSTRUCTION.
2. THE BENCHMARK LOCATIONS ARE SHOWN FOR REFERENCE ONLY ON THIS PLAN. THEBENCHMARKS SHALL BE VALIDATED BY LICENSED LAND SURVEYOR PRIOR TO CONSTRUCTION.CONTRACTOR ASSUMES RISK ASSOCIATED WITH BENCHMARK ELEVATIONS UNTIL CONFIRMED.
3. CONTRACTOR TO OBTAIN APPROPRIATE PERMITS FOR STREET OPENINGS & TO WORK WITHINTHE CITY'S LAND IF REQUIRED.
4. WYSER ENGINEERING SHALL BE HELD HARMLESS AND DOES NOT WARRANT ANY DEVIATIONS BYTHE OWNER OR CONTRACTOR FROM THE APPROVED CONSTRUCTION PLANS THAT MAY RESULTIN DISCIPLINARY ACTIONS BY REGULATORY AGENCIES.
5. IF ANY ERRORS, DISCREPANCIES, OR OMISSIONS WITHIN THE PLAN BECOME APPARENT, IT SHALLBE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO CONSTRUCTION SO THATCLARIFICATION OR REDESIGN MAY OCCUR.
6. ALL MUNICIPAL UTILITY CONNECTIONS, WORK IN ROW, PUBLIC OUTLOTS AND PUBLICEASEMENTS SHALL BE IN ACCORDANCE WITH CITY OF MADISON STANDARD SPECIFICATIONS FORPUBLIC WORKS CONSTRUCTION.
PROPOSEDEXPANSION
33,200 SF±
These documents reflect progress and intent and maybe subject to change, including additional detail. Theseare not final construction documents and shall not be
used for final bidding or construction-related purposes.
PROGRESS DOCUMENTSNOT FOR CONSTRUCTION
PROJECT MANAGER
PROJECT NUMBER
KEY PLAN
SHEET INFORMATION
PROJECT INFORMATION
ISSUANCE AND REVISIONS
3
E
D
C
B
A
21 654 7
321 654 7
E
D
C
B
A
m i l w a u k e e 333 East Chicago StreetMilwaukee, Wisconsin 53202414.271.5350
309 West Johnson Street, Suite 202Madison, Wisconsin 53703608.442.5350
m a d i s o n
1899 Wynkoop Street, Suite 300Denver, Colorado 80202303.595.4500
d e n v e r
SOUTHSIDEELEMENTARYADDITION
SITE PLAN
C-1
320539-00
PM
501 E Badger Rd,Madison, WI 53713
© 2021 Eppstein Uhen Architects, Inc.
DATE DESCRIPTION
EXISTINGBUILDING
EXISTING BIORETENTION TOREMAIN
NEW BIORETENTIONBASIN EXPANSION OF
EXISTING INFILTRATION
EXISTING UNDERGROUNDSTORAGE VAULT AND
RAINWATER REUSE SYSTEMTO REMAIN
370 LF OF FENCING WITH TWOGATES (1 PEDESTRIAN
ACCESS & 1 MAINTENANCEACCESS) TO ENCLOSE
PLAYGROUND AREA
EXISTING POROUS CONCRETE(8 PARKING STALLS)
NEW CONCRETE CONNECTORWALK
NEW BIORETENTION
DEAD END FIRE LANE TO THISPOINT
FIRE LANE
POTENTIAL RELOCATIONOF HOOP HOUSE POTENTIAL RELOCATION
OF HOOP HOUSE
RELOCATION OFEXISTING
BADGER ROCKCENTER SHED
PUBLIC GARDENAND RAISED
GARDEN PLOTRELOCATIONS IN
THIS AREA(~5,000 SF)
ALTERNATEEXPANSION IN
THIS AREA1,350 SF±
RELOCATE EXISTINGMONUMENT SIGN 5" CONCRETE PUBLIC
SIDEWALK
10-FOOT WIDE ASPHALTRECREATIONAL TRAIL
RELOCATION
REMOVE AND REPLACE EXISTING CURB AND GUTTER ANDINSTALL NEW ASPHALT BUMPOUT OF PUBLIC STREET WITHCURB. ALL WORK SHALL BE IN ACCORDANCE WITH CITY OFMADISON ISSUED PLANS AND PUBLIC SPECIFICATIONS.
BUILDING OVERHANG LIMITS
ELECTRIC FACILITY TOREMAIN IN PLACE. NODISTURBANCE ALLOWED.
RAMP WITH RAILING UP TOMAIN ENTRY POINT.
ADA COMPLIANT RAMP
SAWCUT ANDEXPAND EXISTING20-FOOT DRIVEWAYTO 24-FOOT.
REMOVE AND EXISTING NO PARKING SIGNAGE (2)
TWO ELECTRIC VEHICLESTALLS WITH EXPANSION TO
FOUR IN THE FUTURE. SEEELECTRICAL PLANS FOR
CHARGING STATION DETAILS
APPROXIMATELY 10,000 SFPLAYGROUND AREA. SEE
LANDSCAPE PLAN FOR DETAIL.
REPLACE EXISTING WOODCHIP PATH. REFER TO
LANDSCAPE PLAN.
EXISTINGGARDENS TO
REMAIN
ALTERNATE:INSTALL THREE9'X18' STALLS WITHRETAINING WALL.
ALTERNATE: INSTALL SIX9'X18' "BUDDY" STALLS.REQUIRES CITY / MMSDAPPROVAL.
These documents reflect progress and intent and maybe subject to change, including additional detail. These are not final construction documents and shall not be
used for final bidding or construction-related purposes.
PROGRESS DOCUMENTS
NOT FOR CONSTRUCTION
PROJECT MANAGER
PROJECT NUMBER
KEY PLAN
SHEET INFORMATION
PROJECT INFORMATION
ISSUANCE AND REVISIONS
3
E
D
C
B
A
21 654 7
321 654 7
E
D
C
B
A
m i l w a u k e e 333 East Chicago StreetMilwaukee, Wisconsin 53202414.271.5350
309 West Johnson Street, Suite 202Madison, Wisconsin 53703608.442.5350
m a d i s o n
1899 Wynkoop Street, Suite 300Denver, Colorado 80202303.595.4500
d e n v e r
SOUTHSIDEELEMENTARYADDITION
AREA PLAN
C-2
320539 -00
PM
501 E Badger Rd,Madison, WI 53713
© 2020 Eppstein Uhen Architects, Inc.
DATE DESCRIPTION06/22/2021 SCHEMATIC DESIGN
These documents reflect progress and intent and maybe subject to change, including additional detail. These are not final construction documents and shall not be
used for final bidding or construction-related purposes.
PROGRESS DOCUMENTS
NOT FOR CONSTRUCTION
PROJECT MANAGER
PROJECT NUMBER
KEY PLAN
SHEET INFORMATION
PROJECT INFORMATION
ISSUANCE AND REVISIONS
3
E
D
C
B
A
21 654 7
321 654 7
E
D
C
B
A
m i l w a u k e e 333 East Chicago StreetMilwaukee, Wisconsin 53202414.271.5350
309 West Johnson Street, Suite 202Madison, Wisconsin 53703608.442.5350
m a d i s o n
1899 Wynkoop Street, Suite 300Denver, Colorado 80202303.595.4500
d e n v e r
SOUTHSIDEELEMENTARYADDITION
SITE PHOTOS
C-3
320539 -00
PM
501 E Badger Rd,Madison, WI 53713
© 2020 Eppstein Uhen Architects, Inc.
DATE DESCRIPTION06/22/2021 SCHEMATIC DESIGN
A/C-3
B/C-3
C/C-3
D/C-3
E/C-3
A
MC-01 FB-02
1 2 4 5 76 10 12 143
MC-01FB-01 FB-02 SF MCMP-01 PJ, TYP.
A
MC-01FB-02
MC-01 FB-03 FB-01 SF MCMP-01 PJ, TYP.
HJKLM
MC-01 FB-02 CW
FB-01SF
MC-01FB-01 SF FB-03
These documents reflect progress and intent and maybe subject to change, including additional detail. These are not final construction documents and shall not be
used for final bidding or construction-related purposes.
PROGRESS DOCUMENTS
NOT FOR CONSTRUCTION
PROJECT MANAGER
PROJECT NUMBER
KEY PLAN
SHEET INFORMATION
PROJECT INFORMATION
ISSUANCE AND REVISIONS
3
E
D
C
B
A
21 654 7
321 654 7
E
D
C
B
A
m i l w a u k e e 333 East Chicago StreetMilwaukee, Wisconsin 53202414.271.5350
309 West Johnson Street, Suite 202Madison, Wisconsin 53703608.442.5350
m a d i s o n
1899 Wynkoop Street, Suite 300Denver, Colorado 80202303.595.4500
d e n v e r
SOUTHSIDEELEMENTARYADDITION
EXTERIORELEVATIONS - B&W
A-1
320539-00
PM
501 E Badger Rd,Madison, WI 53713
© 2020 Eppstein Uhen Architects, Inc.
KEYNOTES PER SHEET
7. PJ = INDICATES METAL PANEL JOINT - 1/2" GAP.
6. MJ = INDICATES MOVEMENT JOINT - 1/2" GAP.
5. ALL VERTICAL INSIDE CORNERS TO HAVE 1/2" MOVEMENT JOINT.
4. EXTERIOR SIGNAGE ON BUILDING TO BE COORDINATED AND VERIFIED WITHARCHITECT, DISTRICT AND SIGNAGE VENDOR.
3. ALL INSIDE AND OUTSIDE CORNERS OF PRECAST TRIM TO NOT BE MITERED.
2. PROVIDE CONTINUOUS SEALANT AND BACKER ROD AT ALL PRECAST CONCRETEJOINTS.
1. SEE SHEET A220 FOR EXTERIOR FRAME TYPES AND DIMENSIONS.
SHEET NOTES -
EXTERIOR ELEVATIONS
1/8" = 1'-0" C5EAST 1
1/8" = 1'-0" C2SOUTH 1
1/8" = 1'-0" C1WEST 1
1/8" = 1'-0" A3NORTHWEST
1/8" = 1'-0" A1WEST 2
SF EXTERIOR: STOREFRONT
MCMP-01 EXTERIOR: METAL COMPOSITE MATERIAL PANEL 1
MC-01 EXTERIOR: METAL COPING 1
FB-03 EXTERIOR: FACE BRICK 3
FB-02 EXTERIOR: FACE BRICK 2
FB-01 EXTERIOR: FACE BRICK 1
CW EXTERIOR: CURTAIN WALL
CS-01 EXTERIOR: CAST STONE
EXTERIOR MATERIALS
DATE DESCRIPTION06/22/2021 SCHEMATIC DESIGN
5711 681315 10 9
MC-01 FB-02 MCMP-01 SF PJ, TYP.
MC-01 FB-01
MC-01 FB-01
MC-01 FB-02 CWCW
SF MCMP-01SF
0742-08
0742-08
MC-01 FB-01
MC-01FB-02
0742-08
MC-01FB-02
1214
MC-01 FB-01 SF
F
MC-01 FB-01SF
11 13 14
SF MC-01 FB-01
MC-01 FB-01
These documents reflect progress and intent and maybe subject to change, including additional detail. These are not final construction documents and shall not be
used for final bidding or construction-related purposes.
PROGRESS DOCUMENTS
NOT FOR CONSTRUCTION
PROJECT MANAGER
PROJECT NUMBER
KEY PLAN
SHEET INFORMATION
PROJECT INFORMATION
ISSUANCE AND REVISIONS
3
E
D
C
B
A
21 654 7
321 654 7
E
D
C
B
A
m i l w a u k e e 333 East Chicago StreetMilwaukee, Wisconsin 53202414.271.5350
309 West Johnson Street, Suite 202Madison, Wisconsin 53703608.442.5350
m a d i s o n
1899 Wynkoop Street, Suite 300Denver, Colorado 80202303.595.4500
d e n v e r
SOUTHSIDEELEMENTARYADDITION
EXTERIORELEVATIONS - B&W
A-2
320539-00
PM
501 E Badger Rd,Madison, WI 53713
© 2020 Eppstein Uhen Architects, Inc.
7. PJ = INDICATES METAL PANEL JOINT - 1/2" GAP.
6. MJ = INDICATES MOVEMENT JOINT - 1/2" GAP.
5. ALL VERTICAL INSIDE CORNERS TO HAVE 1/2" MOVEMENT JOINT.
4. EXTERIOR SIGNAGE ON BUILDING TO BE COORDINATED AND VERIFIED WITHARCHITECT, DISTRICT AND SIGNAGE VENDOR.
3. ALL INSIDE AND OUTSIDE CORNERS OF PRECAST TRIM TO NOT BE MITERED.
2. PROVIDE CONTINUOUS SEALANT AND BACKER ROD AT ALL PRECAST CONCRETEJOINTS.
1. SEE SHEET A220 FOR EXTERIOR FRAME TYPES AND DIMENSIONS.
SHEET NOTES -
EXTERIOR ELEVATIONS
1/8" = 1'-0" C1NORTH
1/8" = 1'-0" A4EAST 2
1/8" = 1'-0" A1SOUTH 2
KEYNOTES PER SHEET0742-08 PREFAB MECHANICAL SCREEN WALL
SF EXTERIOR: STOREFRONT
MCMP-01 EXTERIOR: METAL COMPOSITE MATERIAL PANEL 1
MC-01 EXTERIOR: METAL COPING 1
FB-03 EXTERIOR: FACE BRICK 3
FB-02 EXTERIOR: FACE BRICK 2
FB-01 EXTERIOR: FACE BRICK 1
CW EXTERIOR: CURTAIN WALL
CS-01 EXTERIOR: CAST STONE
EXTERIOR MATERIALS
1/8" = 1'-0" D23RD FLOOR ROOF DECK - NORTH
1/8" = 1'-0" D33RD FLOOR ROOF DECK - EAST
1/8" = 1'-0" D53RD FLOOR ROOF DECK - SOUTH
DATE DESCRIPTION06/22/2021 SCHEMATIC DESIGN
A
MC-01 FB-02
1 2 4 5 76 10 12 143
MC-01FB-01 FB-02 SF MCMP-01 PJ, TYP.
A
MC-01FB-02
MC-01 FB-03 FB-01 SF MCMP-01 PJ, TYP.
HJKLM
MC-01 FB-02 CW
FB-01SF
MC-01FB-01 SF FB-03
These documents reflect progress and intent and maybe subject to change, including additional detail. These are not final construction documents and shall not be
used for final bidding or construction-related purposes.
PROGRESS DOCUMENTS
NOT FOR CONSTRUCTION
PROJECT MANAGER
PROJECT NUMBER
KEY PLAN
SHEET INFORMATION
PROJECT INFORMATION
ISSUANCE AND REVISIONS
3
E
D
C
B
A
21 654 7
321 654 7
E
D
C
B
A
m i l w a u k e e 333 East Chicago StreetMilwaukee, Wisconsin 53202414.271.5350
309 West Johnson Street, Suite 202Madison, Wisconsin 53703608.442.5350
m a d i s o n
1899 Wynkoop Street, Suite 300Denver, Colorado 80202303.595.4500
d e n v e r
SOUTHSIDEELEMENTARYADDITION
EXTERIORELEVATIONS -COLOR
A-3
320539-00
PM
501 E Badger Rd,Madison, WI 53713
© 2020 Eppstein Uhen Architects, Inc.
KEYNOTES PER SHEET
7. PJ = INDICATES METAL PANEL JOINT - 1/2" GAP.
6. MJ = INDICATES MOVEMENT JOINT - 1/2" GAP.
5. ALL VERTICAL INSIDE CORNERS TO HAVE 1/2" MOVEMENT JOINT.
4. EXTERIOR SIGNAGE ON BUILDING TO BE COORDINATED AND VERIFIED WITHARCHITECT, DISTRICT AND SIGNAGE VENDOR.
3. ALL INSIDE AND OUTSIDE CORNERS OF PRECAST TRIM TO NOT BE MITERED.
2. PROVIDE CONTINUOUS SEALANT AND BACKER ROD AT ALL PRECAST CONCRETEJOINTS.
1. SEE SHEET A220 FOR EXTERIOR FRAME TYPES AND DIMENSIONS.
SHEET NOTES -
EXTERIOR ELEVATIONS
1/8" = 1'-0" C5EAST 1
1/8" = 1'-0" C2SOUTH 1
1/8" = 1'-0" C1WEST 1
1/8" = 1'-0" A3NORTHWEST
1/8" = 1'-0" A1WEST 2
SF EXTERIOR: STOREFRONT
MCMP-01 EXTERIOR: METAL COMPOSITE MATERIAL PANEL 1
MC-01 EXTERIOR: METAL COPING 1
FB-03 EXTERIOR: FACE BRICK 3
FB-02 EXTERIOR: FACE BRICK 2
FB-01 EXTERIOR: FACE BRICK 1
CW EXTERIOR: CURTAIN WALL
CS-01 EXTERIOR: CAST STONE
EXTERIOR MATERIALS
DATE DESCRIPTION06/22/2021 SCHEMATIC DESIGN
5711 681315 10 9
MC-01 FB-02 MCMP-01 SF PJ, TYP.
MC-01 FB-01
MC-01 FB-01
MC-01 FB-02 CWCW
SF MCMP-01SF
0742-08
0742-08
MC-01 FB-01
MC-01FB-02
0742-08
MC-01FB-02
1214
MC-01 FB-01 SF
F
MC-01 FB-01SF
11 13 14
SF MC-01 FB-01
MC-01 FB-01
These documents reflect progress and intent and maybe subject to change, including additional detail. These are not final construction documents and shall not be
used for final bidding or construction-related purposes.
PROGRESS DOCUMENTS
NOT FOR CONSTRUCTION
PROJECT MANAGER
PROJECT NUMBER
KEY PLAN
SHEET INFORMATION
PROJECT INFORMATION
ISSUANCE AND REVISIONS
3
E
D
C
B
A
21 654 7
321 654 7
E
D
C
B
A
m i l w a u k e e 333 East Chicago StreetMilwaukee, Wisconsin 53202414.271.5350
309 West Johnson Street, Suite 202Madison, Wisconsin 53703608.442.5350
m a d i s o n
1899 Wynkoop Street, Suite 300Denver, Colorado 80202303.595.4500
d e n v e r
SOUTHSIDEELEMENTARYADDITION
EXTERIORELEVATIONS -COLOR
A-4
320539-00
PM
501 E Badger Rd,Madison, WI 53713
© 2020 Eppstein Uhen Architects, Inc.
7. PJ = INDICATES METAL PANEL JOINT - 1/2" GAP.
6. MJ = INDICATES MOVEMENT JOINT - 1/2" GAP.
5. ALL VERTICAL INSIDE CORNERS TO HAVE 1/2" MOVEMENT JOINT.
4. EXTERIOR SIGNAGE ON BUILDING TO BE COORDINATED AND VERIFIED WITHARCHITECT, DISTRICT AND SIGNAGE VENDOR.
3. ALL INSIDE AND OUTSIDE CORNERS OF PRECAST TRIM TO NOT BE MITERED.
2. PROVIDE CONTINUOUS SEALANT AND BACKER ROD AT ALL PRECAST CONCRETEJOINTS.
1. SEE SHEET A220 FOR EXTERIOR FRAME TYPES AND DIMENSIONS.
SHEET NOTES -
EXTERIOR ELEVATIONS
1/8" = 1'-0" C1NORTH
1/8" = 1'-0" A4EAST 2
1/8" = 1'-0" A1SOUTH 2
KEYNOTES PER SHEET0742-08 PREFAB MECHANICAL SCREEN WALL
SF EXTERIOR: STOREFRONT
MCMP-01 EXTERIOR: METAL COMPOSITE MATERIAL PANEL 1
MC-01 EXTERIOR: METAL COPING 1
FB-03 EXTERIOR: FACE BRICK 3
FB-02 EXTERIOR: FACE BRICK 2
FB-01 EXTERIOR: FACE BRICK 1
CW EXTERIOR: CURTAIN WALL
CS-01 EXTERIOR: CAST STONE
EXTERIOR MATERIALS
1/8" = 1'-0" D23RD FLOOR ROOF DECK - NORTH
1/8" = 1'-0" D33RD FLOOR ROOF DECK - EAST
1/8" = 1'-0" D53RD FLOOR ROOF DECK - SOUTH
DATE DESCRIPTION06/22/2021 SCHEMATIC DESIGN
These documents reflect progress and intent and maybe subject to change, including additional detail. These are not final construction documents and shall not be
used for final bidding or construction-related purposes.
PROGRESS DOCUMENTSNOT FOR CONSTRUCTION
PROJECT MANAGER
PROJECT NUMBER
KEY PLAN
SHEET INFORMATION
PROJECT INFORMATION
ISSUANCE AND REVISIONS
3
E
D
C
B
A
21 654 7
321 654 7
E
D
C
B
A
m i l w a u k e e 333 East Chicago StreetMilwaukee, Wisconsin 53202414.271.5350
309 West Johnson Street, Suite 202Madison, Wisconsin 53703608.442.5350
m a d i s o n
1899 Wynkoop Street, Suite 300Denver, Colorado 80202303.595.4500
d e n v e r
SOUTHSIDEELEMENTARYADDITION
EXTERIORAXONOMETRICVIEWS
A-5
320539-00
PM
501 E Badger Rd,Madison, WI 53713
© 2020 Eppstein Uhen Architects, Inc.
KEYNOTES PER SHEET
A3ADDITION ISOMETRIC 1
B3ADDITION ISOMETRIC 2
D4ADDITION ISOMETRIC 3
DATE DESCRIPTION06/22/2021 SCHEMATIC DESIGN
320539-00
07/13/21SOUTHSIDE ELEMENTARY ADDITION
© 2020 Eppstein Uhen Architects, Inc.
A-7EXISTING BUILDING MATERIALS
MAIN NORTH ELEVATION
METAL PANEL
CEMENTBOARD PANEL
BRICK
METAL PANEL CEMENTBOARD PANEL
BRICK
METAL PANELBRICKMETAL PANELBRICKCEMENT BOARDPANEL
NORTH EAST ELEVATION SOUTH WEST ELEVATION NORTH WEST ELEVATION
320539-00
07/13/21SOUTHSIDE ELEMENTARY ADDITION
© 2020 Eppstein Uhen Architects, Inc.
FB-1: SIOUX CITY BRICK - MIDTOWN
IRONSPOT SMOOTH
FB-2: INTERSTATE BRICK-
ALMOND L-4
FB-3: INTERSTATE
BRICK- PEWTER
MCMP-01: METAL
COMPOSITE MATERIAL
PANEL- SILVER
SF: STOREFRONT- CLEAR
ANODIZED ALUMINUM WITH
CLEAR GLASS
A-6NEW BUILDING MATERIALS