Appendix 8 Final Report Voltage Drop Study Details of Each Distribution Line 1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor APPENDIX 8 VOLTAGE DROP STUDY DETAILS OF EACH DISTRIBUTION LINE

Upload: others

Post on 23-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

  • Appendix 8 Final Report Voltage Drop Study Details of Each Distribution Line

    1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor

    APPENDIX 8

    VOLTAGE DROP STUDY DETAILS OF EACH DISTRIBUTION LINE

  • Voltage drop calculation of B1

    Sendingvoltage(V) 22,000 Load (kW) 10,000

    Voltagedrop (V) -912

    Sendingcurrent(A) 262.4

    Voltagedrop rate -4.1%

    Chrak MtesSS~a

    a~LBS 1LBS 1~bManhattan

    SEZ 4th section 5th section 6th section 7th section 8th section 9th section 10th section

    Transmission methodThree-phase

    Three-phase

    Three-phase Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire

    Line type 4 PC-3x300sq 2 AAC-1x240sq 4 PC-3x300sq 2 AAC-1x240sq 2 AAC-1x240sq 4 PC-3x300sq 2 AAC-1x240sq 2 AAC-1x240sq 2 AAC-1x240sq 2 AAC-1x240sqDistance(km) 0.25 8.61 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0Load spread(Refer to loadcharacteristic table) 1 1 1 1 1 1 1 1 1 1Section power factor cosθ 0.95 0.95 0.95 1 1 1 1 1 1 1Section load (kW) 10,000Section voltage drop (V) 17.7 891.1 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0Section end voltage (V) 21,982 21,091 21,088 21,088 21,088 21,088 21,088 21,088 21,088 21,088

    R X

    Loadcharacteri

    sticnumber

    FLoad

    spread

    1 AAC-1x150sq 0.2060 0.2507 1 12 AAC-1x240sq 0.1620 0.2364 2 0.53 PC-3x240sq 0.1620 0.1100 3 0.6674 PC-3x300sq 0.1290 0.1070 4 0.5

    5 0.333

    Center maximum spread load(+End centralized load)

    Sending end maximum spread load(+End centralized load)

    Impedance(Ω /km) Load characteristic table

    Load state

    End centralized loadEquality spread load(+End centralized load)

    End maximum spread load(+End centralized load)

  • Voltage drop calculation of B2

    Sendingvoltage(V) 22,000 Load (kW) 13,627

    Voltagedrop (V) -866

    Sendingcurrent(A) 357.6

    Voltagedrop rate -3.9%

    Chrak MtesSS~a

    a~LBS1LBS1~LBS2 4th section 5th section 6th section 7th section 8th section 9th section 10th section

    Transmission methodThree-phase

    Three-phase

    Three-phase Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire

    Line type 4 PC-3x300sq 2 AAC-1x240sq 2 AAC-1x240sq 2 AAC-1x240sq 2 AAC-1x240sq 2 AAC-1x240sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sqDistance(km) 0.25 1.45 7.15 0.00 0.00 0.1 1.0 1.0 1.0 1.0Load spread(Refer to loadcharacteristic table) 1 2 3 1 1 1 1 1 1 1Section power factor cosθ 0.9 0.9 0.9 0.95 0.9 1 1 1 1 1Section load (kW) 96 13,531Section voltage drop (V) 25.2 111.7 729.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0Section end voltage (V) 21,975 21,863 21,134 21,134 21,134 21,134 21,134 21,134 21,134 21,134

    R X

    Loadcharacteri

    sticnumber

    FLoad

    spread

    1 AAC-1x150sq 0.2060 0.2507 0.3245 1 12 AAC-1x240sq 0.1620 0.2364 0.2865 2 0.53 PC-3x240sq 0.1620 0.1100 0.1958 3 0.6674 PC-3x300sq 0.1290 0.1070 0.1676 4 0.5

    5 0.333

    Center maximum spread load(+End centralized load)

    Sending end maximum spread load(+End centralized load)

    Impedance(Ω /km) Load characteristic table

    Load state

    End centralized loadEquality spread load(+End centralized load)

    End maximum spread load(+End centralized load)

  • Voltage drop calculation of B3

    Sendingvoltage(V) 22,000 Load (kW) 2,989

    Voltagedrop (V) -307

    Sendingcurrent(A) 78.4

    Voltagedrop rate -1.4%

    Chrak MtesSS~a

    a~LBS1LBS1~LBS2

    LBS2~LBS3

    LBS3~bb~EDC

    Svay Rieng 7th section 8th section 9th section 10th section

    Transmission methodThree-phase

    Three-phase

    Three-phase

    Three-phase

    Three-phase

    Three-phase Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire

    Line type 4 PC-3x300sq 2 AAC-1x240sq 2 AAC-1x240sq 2 AAC-1x240sq 2 AAC-1x240sq 4 PC-3x300sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sqDistance(km) 0.26 12.56 8.34 4.58 0.64 1.82 1.0 1.0 1.0 1.0Load spread(Refer to loadcharacteristic table) 1 2 2 2 2 2 1 1 1 1Section power factor cosθ 0.95 0.95 0.95 0.95 1 1 1 1 1 1Section load (kW) 1,079 958 674 278Section voltage drop (V) 5.5 194.3 82.4 22.6 0.7 1.5 0.0 0.0 0.0 0.0Section end voltage (V) 21,994 21,800 21,718 21,695 21,695 21,693 21,693 21,693 21,693 21,693

    R X

    Loadcharacteri

    sticnumber

    FLoad

    spread

    1 AAC-1x150sq 0.2060 0.2507 1 12 AAC-1x240sq 0.1620 0.2364 2 0.53 PC-3x240sq 0.1620 0.1100 3 0.6674 PC-3x300sq 0.1290 0.1070 4 0.5

    5 0.333

    Impedance(Ω /km)

    Equality spread load(+End centralized load)

    End maximum spread load(+End centralized load)

    Center maximum spread load(+End centralized load)

    Sending end maximum spread load(+End centralized load)

    Load state

    End centralized load

    Load characteristic table

  • Voltage drop calculation of B4

    Sendingvoltage(V) 22,000 Load (kW) 7,500

    Voltage drop(V) -1,550

    Sendingcurrent(A) 196.8

    Voltage droprate -7.0%

    1st section 2nd section 3rd section 4th section 5th section 6th section 7th section 8th section 9th section 10th section

    Transmission methodThree-phase

    Three-phase Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire

    Line type 4 PC-3x300sq 5 AAC-1x185sq 2 AAC-240sq 2 AAC-1x240sq 2 AAC-1x240sq 4 PC-3x300sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sqDistance(km) 0.3 27.0Load spread(Refer to loadcharacteristic table) 1 3 1 1 1 1 1 1 1 1Section power factor cosθ 0.95 0.95 1 1 1 1 1 1 1 1Section load (kW) 7,500

    Section voltage drop (V) 16.0 1,534.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Section end voltage (V) 21,984 20,450 20,450 20,450 20,450 20,450 20,450 20,450 20,450 20,450

    R X

    Loadcharacteri

    sticnumber

    FLoad

    spread

    1 AAC-1x150sq 0.2060 0.2507 1 12 AAC-1x240sq 0.1620 0.2364 2 0.53 PC-3x240sq 0.1620 0.1100 3 0.6674 PC-3x300sq 0.1290 0.1070 4 0.55 AAC-1x185sq 0.1840 0.2409 5 0.333

    Center maximum spread load(+End centralized load)

    Sending end maximum spread load(+End centralized load)

    Impedance(Ω /km) Load characteristic table

    Load state

    End centralized loadEquality spread load(+End centralized load)

    End maximum spread load(+End centralized load)

  • Voltage drop calculation of B5

    Sendingvoltage(V) 22,000 Load (kW) 2,500

    Voltage drop(V) -176

    Sendingcurrent(A) 65.6

    Voltage droprate -0.8%

    1st section 2nd section 3rd section 4th section 5th section 6th section 7th section 8th section 9th section 10th section

    Transmission methodThree-phase

    Three-phase Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire

    Line type 4 PC-3x300sq 5 AAC-1x185sq 2 AAC-240sq 2 AAC-1x240sq 2 AAC-1x240sq 4 PC-3x300sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sqDistance(km) 0.3 9.0Load spread(Refer to loadcharacteristic table) 1 3 1 1 1 1 1 1 1 1Section power factor cosθ 0.95 0.95 1 1 1 1 1 1 1 1Section load (kW) 2,500

    Section voltage drop (V) 5.3 170.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Section end voltage (V) 21,995 21,824 21,824 21,824 21,824 21,824 21,824 21,824 21,824 21,824

    R X

    Loadcharacteri

    sticnumber

    FLoad

    spread

    1 AAC-1x150sq 0.2060 0.2507 1 12 AAC-1x240sq 0.1620 0.2364 2 0.53 PC-3x240sq 0.1620 0.1100 3 0.6674 PC-3x300sq 0.1290 0.1070 4 0.55 AAC-1x185sq 0.1840 0.2409 5 0.333

    Center maximum spread load(+End centralized load)

    Sending end maximum spread load(+End centralized load)

    Impedance(Ω /km) Load characteristic table

    Load state

    End centralized loadEquality spread load(+End centralized load)

    End maximum spread load(+End centralized load)

  • Voltage drop calculation of P1

    Sendingvoltage(V) 22,000 Load (kW) 6,000

    Voltage drop(V) -1,984

    Sendingcurrent(A) 157.5

    Voltage droprate -9.0%

    IE SS~a a~LBS1 LBS1~ LBS2~ 5th section 6th section 7th section 8th section 9th section 10th sectionTransmission method Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wireLine type 4 PC-3x300sq 2 AAC-1x240sq 2 AAC-1x240sq 4 PC-3x300sq 2 AAC-1x240sq 4 PC-3x300sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sqDistance(km) 0.35 13.30 18.02 0.57 0.6 1.8 1.0 1.0 1.0 1.0Load spread(Refer to loadcharacteristic table) 1 1 1 1 1 1 1 1 1 1Section power factor cosθ 0.95 0.95 0.95 0.95 1 1 1 1 1 1Section load (kW) 6,000

    Section voltage drop (V) 14.9 825.9 1,119.0 24.2 0.0 0.0 0.0 0.0 0.0 0.0Section end voltage (V) 21,985 21,159 20,040 20,016 20,016 20,016 20,016 20,016 20,016 20,016

    R X

    Loadcharacteri

    sticnumber

    FLoad

    spread

    1 AAC-1x150sq 0.2060 0.2507 1 12 AAC-1x240sq 0.1620 0.2364 2 0.53 PC-3x240sq 0.1620 0.1100 3 0.6674 PC-3x300sq 0.1290 0.1070 4 0.5

    5 0.333

    Center maximum spread load(+End centralized load)

    Sending end maximum spread load(+End centralized load)

    Impedance(Ω /km) Load characteristic table

    Load state

    End centralized loadEquality spread load(+End centralized load)

    End maximum spread load(+End centralized load)

  • Voltage drop calculation of P2

    Sendingvoltage(V) 22,000 Load (kW) 6,000

    Voltage drop(V) -533

    Sendingcurrent(A) 157.5

    Voltage droprate -2.4%

    IE SS~a a~LBS×3 3rd section 4th section 5th section 6th section 7th section 8th section 9th section 10th sectionTransmission method Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wireLine type 3 PC-3x240sq 1 AAC-1x150sq 2 AAC-1x240sq 4 PC-3x300sq 2 AAC-1x240sq 4 PC-3x300sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sqDistance(km) 0.44 6.83 18.0 0.6 0.6 1.8 1.0 1.0 1.0 1.0Load spread(Refer to loadcharacteristic table) 1 1 1 1 1 1 1 1 1 1Section power factor cosθ 0.95 0.95 0.95 0.95 1 1 1 1 1 1Section load (kW) 6,000

    Section voltage drop (V) 22.6 510.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Section end voltage (V) 21,977 21,467 21,467 21,467 21,467 21,467 21,467 21,467 21,467 21,467

    R X

    Loadcharacteri

    sticnumber

    FLoad

    spread

    1 AAC-1x150sq 0.2060 0.2507 1 12 AAC-1x240sq 0.1620 0.2364 2 0.53 PC-3x240sq 0.1620 0.1100 3 0.6674 PC-3x300sq 0.1290 0.1070 4 0.5

    5 0.333

    Center maximum spread load(+End centralized load)

    Sending end maximum spread load(+End centralized load)

    Impedance(Ω /km) Load characteristic table

    Load state

    End centralized loadEquality spread load(+End centralized load)

    End maximum spread load(+End centralized load)

  • Voltage drop calculation of K1

    Sendingvoltage(V) 23,600 Load (kW) 7,000

    Voltagedrop (V) -1,532

    Sendingcurrent(A) 171.2

    Voltagedrop rate -7.0%

    Tatay PS~LBS1

    LBS1~LBS2

    LBS2~LBS3

    LBS3~LBS4

    LBS4~aa~Koh

    Kong SEZ 7th section 8th section 9th section 10th section

    Transmission methodThree-phase

    Three-phase

    Three-phase

    Three-phase

    Three-phase

    Three-phase Three-phase three-wire Three-phase three-wire Three-phase three-wire Three-phase three-wire

    Line type 2 AAC-1x240sq 2 AAC-1x240sq 2 AAC-1x240sq 4 PC-3x300sq 2 AAC-1x240sq 2 AAC-1x240sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sq 5 HAL-OC200sqDistance(km) 37.0 5.28 2.60 1.84 4.58 0.13Load spread(Refer to loadcharacteristic table) 1 1 1 1 1 1 1 1 1 1Section power factor cosθ 0.9 0.95 0.95 0.95 0.95 0.95 1 1 1 1Section load (kW) 4,000 3,000Section voltage drop (V) 2,730.7 152.8 75.3 36.5 132.6 3.8 0.0 0.0 0.0 0.0Section end voltage (V) 20,869 20,716 20,641 20,605 20,472 20,468 20,468 20,468 20,468 20,468

    R X

    Loadcharacteri

    sticnumber

    FLoad

    spread

    1 AAC-1x150sq 0.2060 0.2507 1 12 AAC-1x240sq 0.1620 0.2364 2 0.53 PC-3x240sq 0.1620 0.1100 3 0.6674 PC-3x300sq 0.1290 0.1070 4 0.5

    5 0.333

    Center maximum spread load(+End centralized load)

    Sending end maximum spread load(+End centralized load)

    Impedance(Ω /km) Load characteristic table

    Load state

    End centralized loadEquality spread load(+End centralized load)

    End maximum spread load(+End centralized load)

  • Appendix 9 Final Report List of Collected Data and Documents

    1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor

    APPENDIX 9

    LIST OF COLLECTED DATA AND DOCUMENTS

  • A9 - 1

    APPENDIX 9 : List of Collected Data and Documents

    No. Title Author / Publisher Type

    1 Economy, Trade, Investment Climate and Japanese Company in Cambodia JETRO Hardcopy

    2 SEZ map in Cambodia JETRO Brochure

    3 Master Land-Use Planning of PPSEZ Project-357.3179Ha Phnom Penh SEZ Hard Copy

    4 Welcome to SANCO POI PET SANKO SEZ Brochure

    5 Master Plan of SANKO SEZ SANKO SEZ Brochure

    6 Cambodia Industrial Development Policy 2015-2025 RGC PDF

    7 Statistical Yearbook 2011 MOP CD

    8 Labor Force Report 2012 MOP Booklet

    9 Labor Force and Child labor survey Report 2012 MOP Booklet

    10 Cambodia inter-censual Population survey 2013 MOP Booklet

    11 Cambodia Factsheet June2014 MOP Brochure

    12 Demand, Number and Type of Customer Data (REE areas) EAC Excel

    13 List of Location and Transformer Capacity for JICA's Project in Svay Rieng Province EDC PDF

    14 License Area Map (Bavet, Poipet, Koh Kong) EDC PDF

    15 Transmission Lines Development Plan EDC PDF

    16 GIS Data EDC GIS data

    17 Demand, Number and Type of Customer Data (EDC areas) EDC Excel

    18 Meteorological Data (Bavet, Poipet, Koh Kong) MOWRAM Excel

    19 Distribution System 22kV in Svay Rieng EDC PDF

    20 Annual Report 2012-2014 EDC PDF

    21 Distribution System Diagram in Svay Rieng EDC PDF

    22 Organization Chart (EDC HQ, Head of EDC Svay Rieng, Electricity of Banteay Meanchey) EDC PDF

    23 Record of power failure in YORKS factory YORKS CO., LTD PDF

  • A9 - 2

    No. Title Author / Publisher Type

    24 Pole concrete of Koh Kong RYP Group Co., LTD Hardcopy

    25 IEE Report Rural Energy Pilot Project 2012.2 ADB PDF

    26 Updated Resettlement Plan Rural Energy Pilot Project _2014.12 ADB PDF

    27 IEE Report Medium-Voltage Sub-Transmission Expansion Sector Project (Package 2)_2014.11 ADB PDF

    28 Resettlement Plan Medium-Voltage Sub-Transmission Expansion Sector Project (Package 2) 2014.12 ADB PDF

    29 Resettlement Plan_Medium-Voltage Sub-Transmission Expansion Sector Project (Pacage 1)_2014.11 ADB PDF

    30 Report on Power Sector of the Kingdom of Cambodia 2015 Edition EAC PDF

    31 General Requirements of Electric Power Technical Standards 2004 EAC PDF

    32 General Requirements of Electric Power Technical Standards 2004 EAC PDF

    33 Overall Performance Standards for Electricity Suppliers EAC PDF

    34 Specific Requirements For Transmission and Distribution Facilities EAC PDF

    35 Design standard distribution networks EDC PDF

    36 Drawings of Chrak Mtes substation EDC PDF

    37 Drawings of EDC Bavet switching station EDC PDF

    38 Drawings of IE substation EDC PDF

    39 Drawings of Banteay Meanchey substation EDC PDF

  • Appendix 10 Final Report Route Map of Bavet

    1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor

    APPENDIX 10

    ROUTE MAP OF BAVET

  • #

    #

    ##

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    ##

    #

    #

    #

    ##

    #

    #

    ##

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    # #

    #

    #

    # #

    #

    #

    #

    #

    ##

    #

    #

    #

    #

    #

    #

    #

    #

    ##

    #

    #

    #

    #

    ##

    #

    #

    #

    #

    #

    ##

    #

    #

    #

    #

    #

    #

    ##

    #

    #

    #

    #

    ####

    #

    #

    #

    #

    # #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    ##

    ##

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    ##

    #

    #

    #

    #

    #

    #

    ##

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    ###

    #

    #

    #

    # #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    # ## #

    #

    #

    #

    #

    ÚÚ

    Ú

    Ú Ú

    Ú

    Ú

    Ú

    Ú

    Ú

    ÚÚ

    Ú

    ÚÚ

    Ú

    Ú

    Ú

    Ú

    ÚÚ

    Ú

    Ú

    ÚÚ

    Ú

    Ú Ú

    Ú

    Ú

    Ú

    Ú

    %

    %

    %

    %"T

    "T

    Bati

    Nhor

    Bavet

    Basak

    Chres

    Ksetr

    Samlei

    Popeaek

    Sambuor

    Prasout

    Monourom

    Samyaong

    Samraong

    SangkhoarSvay Toea

    Prey Thum

    Prey Ta Ei

    Svay RiengPou Ta Hao

    Chrak Mtes

    Prey Kokir

    Svay Rumpea

    Prey Chhlak

    Koy Trabaek

    Prey Angkunh

    Svay Ta YeanPreah Ponlea

    Me Sa Thngak

    Reach Montir

    Kandieng Reay

    Banteay Krang

    Romeang Thkaol

    Chantrea

    Svay Teab

    Svay Rieng

    Kampong Rou

    588000

    588000

    590000

    590000

    592000

    592000

    594000

    594000

    596000

    596000

    598000

    598000

    600000

    600000

    602000

    602000

    604000

    604000

    606000

    606000

    608000

    608000

    610000

    610000

    612000

    612000

    614000

    614000

    616000

    616000

    618000

    618000

    620000

    620000

    622000

    622000

    624000

    624000

    1208

    000

    1208

    000

    1210

    000

    1210

    000

    1212

    000

    1212

    000

    1214

    000

    1214

    000

    1216

    000

    1216

    000

    1218

    000

    1218

    000

    1220

    000

    1220

    000

    1222

    000

    1222

    000

    1224

    000

    1224

    000

    1226

    000

    1226

    000

    1228

    000

    1228

    000

    1230

    000

    1230

    000

    1232

    000

    1232

    000±

    0 1.5 30.75

    Kilometers

    SPHEROID........................... EVERESTGRID..................................... 2 KILOMETERUTM...................................... ZONE 48NDATUM................................. WGS84PROJECTION....................... UTM

    1:100,000Scale

    Legend22kV Overhead Line

    22kV Underground Line

    National road

    Provincial road

    Cart track

    Footpath

    "T Substation% District centerÚ Commune center# Phum center

    Manhattan SEZ

    Svay Rieng

    District boundary

    Commune boundary

    Population

    River or stream

    DRAWING TITLE:

    DWG No.DATE SHEETSCALE

    BV-0104-01-2016 011/100,000

    BAVET (Svay Rieng Province)ROUTE MAP

    *Original drawing has A3 size

  • EDC Svay Rieng

    Control Room400kVA

    SCALE

    DRAWING TITLE:

    DATE KEY PAGE DWG No

    BAVET (Svay Rieng Province)PLANE DRAWING

    H:1/3000 04-01-2016

    01

    BV-0201

    LEGEND:

    22kV Overhead Line (New)

    22kV Underground Line (New)

    Transformer (New)

    Load Breaking Switch (New)

    22kV Overhead Line (Exist.)

    22kV Underground Line (Exist.)

    22kV Pole (Exist.)

    LV Pole (Exist.)

    Telecommunication Pole (Exist.)

    Road

    Road Center

    Pond

    House, Cottage

    Bridge

    Ditch

    Pipe Culvert

    Wiremesh Fence

    Brickwall Fence

    N

    JICA PROJECT NAME:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.

    CONTRACTOR:

    *Original drawing has A3 size

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキストCROSS SECTIONSHEET 02, DWG No. BV-03

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキストCROSS SECTIONSHEET 07, DWG No. BV-03SHEET 08, DWG No. BV-03

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキストCROSS SECTIONSHEET 08, DWG No. BV03

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

  • N0+

    000

    0+02

    0

    0+04

    01 1

    PLANSCALE: 1/150

    Existing Pole 22kVExisting LV Pole

    Control Room

    Mainhole Pipe D=600mm

    0+0000+0200+040 CROSS SECTION 1-1Scale: 1/150

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    BAVET (Svay Rieng Province)CROSS SECTION DRAWING

    AS SHOWN BV-030204-01-2016

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • 0+280

    0+300

    PLANSCALE: 1/150

    N

    2 2

    WAI KOR River

    3

    ROAD LEVEL:-2.578mSLOPESLOPE

    WATER LEVEL:-3.728m

    0+280

    Existing Lighting Pole

    CROSS SECTION 2-2Scale: 1/150

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    BAVET (Svay Rieng Province)CROSS SECTION DRAWING

    AS SHOWN BV-030704-01-2016

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • N

    0+280

    0+300

    0+320

    0+340

    2

    3 3

    PLANSCALE: 1/150

    SLOPE

    ROAD LEVEL:-2.578mSLOPE

    Existing Lighting Pole

    SLOPE SLOPE

    Mainhole Mainhole

    0+300 0+320 0+340CROSS SECTION 3-3Scale: 1/150

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    BAVET (Svay Rieng Province)CROSS SECTION DRAWING

    AS SHOWN BV-030804-01-2016

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • 0+660

    0+680

    0+700

    N

    33

    PLANSCALE: 1/150

    ROAD LEVEL:-2.586m

    SLOPE

    Mainhole Mainhole

    Box Culvert

    0+660 0+680 0+700

    Existing Lighting Pole

    CROSS SECTION 3-3Scale: 1/150

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    BAVET (Svay Rieng Province)CROSS SECTION DRAWING

    AS SHOWN BV-031404-01-2016

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • SCALE

    DRAWING TITLE:

    DATE KEY PAGE DWG No

    BAVET (Svay Rieng Province)PLANE DRAWING

    H:1/3000

    02

    BV-0202

    N

    04-01-2016

    LEGEND:

    22kV Overhead Line (New)

    22kV Underground Line (New)

    Transformer (New)

    Load Breaking Switch (New)

    22kV Overhead Line (Exist.)

    22kV Underground Line (Exist.)

    22kV Pole (Exist.)

    LV Pole (Exist.)

    Telecommunication Pole (Exist.)

    Road

    Road Center

    Pond

    House, Cottage

    Bridge

    Ditch

    Pipe Culvert

    Wiremesh Fence

    Brickwall Fence

    JICA PROJECT NAME:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.

    CONTRACTOR:

    *Original drawing has A3 size

    ishiirsタイプライターテキストCROSS SECTIONSHEET 21, DWG No. BV-03

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキストCROSS SECTIONSHEET 26, DWG No. BV-03SHEET 37, DWG No. BV-03

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキストCROSS SECTIONSHEET 28, DWG No. BV-03

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

  • 1+020

    1+040

    1+060

    PLANSCALE: 1/150

    N

    SLOPE

    ROAD LEVEL:-1.695mSLOPE

    WATER LEVEL:-3.732m

    National Road N-1 LEVEL:-1.463m

    WATER TANK TOWER

    3350 3350

    1+040 1+060

    CROSS SECTION 4-4Scale: 1/150

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    BAVET (Svay Rieng Province)CROSS SECTION DRAWING

    AS SHOWN BV-032104-01-2016

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • N

    1+320

    1+340

    1+360

    N

    PLANSCALE: 1/150

    4 4

    WATER LEVEL:-3.732m

    Barrier

    National Road N-1 LEVEL:-1.103m

    20315

    WATER LEVEL:-3.732m

    1+320 1+340 1+360

    CROSS SECTION 4-4Scale: 1/150

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    BAVET (Svay Rieng Province)CROSS SECTION DRAWING

    AS SHOWN BV-032604-01-2016

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • N

    1+400

    9 9

    ColumnPier Cap

    Sidewalk

    Barrier

    Beam

    SLOPE SLOPE

    National Road N-1 LEVEL:-1.103m

    WATER LEVEL:-3.732m WATER LEVEL:-3.732m

    Existing Lighting Pole

    CROSS SECTION 9-9Scale: 1/200

    Water pipe

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    BAVET (Svay Rieng Province)CROSS SECTION DRAWING

    AS SHOWN BV-033704-01-2016

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • N

    1+420

    1+440

    1+460

    44

    PLANSCALE: 1/150

    Tonle Vai Kor Bridge

    20300 20300 20300

    WATER LEVEL:-3.732m WATER LEVEL:-3.732m WATER LEVEL:-3.732m

    Ground LEVEL:-5.103mGround LEVEL:-5.163m

    Ground LEVEL:-5.903m

    SECTION:D-8

    1+420 1+440 1+460CROSS SECTION 4-4Scale: 1/150

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    BAVET (Svay Rieng Province)CROSS SECTION DRAWING

    AS SHOWN BV-032804-01-2016

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Petrol StationPetrol Station

    250kVALBS

    SCALE

    DRAWING TITLE:

    DATE KEY PAGE DWG No

    BAVET (Svay Rieng Province)PLANE DRAWING

    H:1/3000

    03

    BV-0203

    N

    04-01-2016

    LEGEND:

    22kV Overhead Line (New)

    22kV Underground Line (New)

    Transformer (New)

    Load Breaking Switch (New)

    22kV Overhead Line (Exist.)

    22kV Underground Line (Exist.)

    22kV Pole (Exist.)

    LV Pole (Exist.)

    Telecommunication Pole (Exist.)

    Road

    Road Center

    Pond

    House, Cottage

    Bridge

    Ditch

    Pipe Culvert

    Wiremesh Fence

    Brickwall Fence

    JICA PROJECT NAME:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.

    CONTRACTOR:

    *Original drawing has A3 size

    ishiirsタイプライターテキストCROSS SECTIONSHEET 29, DWG No. BV-03

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

  • N

    55

    PLANSCALE:1/200

    SLOPENational Road N-1 LEVEL:-1.430m

    SLOPE

    Existing Pole 22kV

    Existing Pole 22kVCross Road

    Existing Telecommunication PoleExisting Pole 22kV

    Existing Lighting Pole Existing Lighting Pole

    POSTER

    54625462

    CROSS SECTION 5-5Scale: 1/200

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    BAVET (Svay Rieng Province)CROSS SECTION DRAWING

    AS SHOWN BV-032904-01-2016

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • 115 KV Grid Substatio

    n C

    hra

    k M

    tes

    ControlBuilding

    100kVA

    LBS

    SCALE

    DRAWING TITLE:

    DATE KEY PAGE DWG No

    BAVET (Svay Rieng Province)PLANE DRAWING

    H:1/3000 BV-0226

    N

    26

    04-01-2016

    LEGEND:

    22kV Overhead Line (New)

    22kV Underground Line (New)

    Transformer (New)

    Load Breaking Switch (New)

    22kV Overhead Line (Exist.)

    22kV Underground Line (Exist.)

    22kV Pole (Exist.)

    LV Pole (Exist.)

    Telecommunication Pole (Exist.)

    Road

    Road Center

    Pond

    House, Cottage

    Bridge

    Ditch

    Pipe Culvert

    Wiremesh Fence

    Brickwall Fence

    JICA PROJECT NAME:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.

    CONTRACTOR:

    *Original drawing has A3 size

    ishiirsタイプライターテキストCROSS SECTIONSHEET 30, DWG No. BV-03SHEET 31, DWG No. BV-03SHEET 34, DWG No. BV-03

    ishiirsタイプライターテキスト

  • N

    PLANSCALE: 1/550

    Existing Pole 22kVExisting Pole 22kV

    Existing LV Pole

    MainholeBlocking Curb

    35503550

    Road to Sub-ST Level: -0.232m

    Bamboo

    Barbed FencingBrickwall Fence

    Mango Tree

    CROSS SECTION 6-6Scale: 1/200

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    BAVET (Svay Rieng Province)CROSS SECTION DRAWING

    AS SHOWN BV-0330

    66

    04-01-2016

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • N

    PLANSCALE: 1/550

    SLOPE

    National Road N-1 LEVEL:-0.123m

    SLOPE

    50005000

    Existing Pole 22kV

    Existing LV Pole

    Mango Tree Mango Tree

    Curb-blockBarbed Fencing

    To Sub-Station

    CROSS SECTION 7-7Scale: 1/200

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    BAVET (Svay Rieng Province)CROSS SECTION DRAWING

    AS SHOWN BV-0331

    7 7

    04-01-2016

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • N

    PLANSCALE: 1/550

    SLOPE

    National Road N-1 LEVEL:-0.123m

    SLOPE

    5000 5000

    Existing Pole 22kV

    Existing LV Pole

    Curb-block Barbed Fencing

    To Sub-Station

    CROSS SECTION 8-8Scale: 1/200

    Bamboo

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    BAVET (Svay Rieng Province)CROSS SECTION DRAWING

    AS SHOWN BV-0334

    8 8

    04-01-2016

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • MANHATTAN SPECIAL ECONOMIC ZONE

    Flooding Area

    Flooding Area

    Flooding Area

    Flooding Area

    Flooding Area

    Flooding Area

    Flooding Area

    Flooding Area

    Petroluem Station

    Filling Soil

    Flooding Area

    Filling Soil

    Flooding Area

    160kVA

    LBS

    LBS

    LBS

    LBS

    SCALE

    DRAWING TITLE:

    DATE KEY PAGE DWG No

    BAVET (Svay Rieng Province)PLANE DRAWING

    H:1/3000 BV-0233

    N

    33

    04-01-2016

    LEGEND:

    22kV Overhead Line (New)

    22kV Underground Line (New)

    Transformer (New)

    Load Breaking Switch (New)

    22kV Overhead Line (Exist.)

    22kV Underground Line (Exist.)

    22kV Pole (Exist.)

    LV Pole (Exist.)

    Telecommunication Pole (Exist.)

    Road

    Road Center

    Pond

    House, Cottage

    Bridge

    Ditch

    Pipe Culvert

    Wiremesh Fence

    Brickwall Fence

    JICA PROJECT NAME:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.

    CONTRACTOR:

    *Original drawing has A3 size

    ishiirsタイプライターテキストCROSS SECTIONSHEET 38, DWG No. BV-03

    ishiirsタイプライターテキスト

  • MANHATTAN SPECIAL EC

    ONOMIC ZONE

    National Road No.1

    (LEVEL:-0.44m)

    N

    PLANSCALE:1/500

    10

    10

    Existing undergroundtelecommunication cable

    Existing undergroundtelecommunication cable

    National Road No.1 (LEVEL:-0.44m)

    Existing Pole 22kV

    Existing Lighting PoleFlooding Area(Level: -1.870m)

    1000017390 27595 5405

    Existing Pole 22kV

    Entrance toMANHATTANSPECIAL ECONOMIC ZONE

    30.60m

    CROSS SECTION 10-10Scale: 1/200

    Existing undergroundtelecommunication cable

    Telecommunication manhole

    Telecommunication manhole

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    BAVET (Svay Rieng Province)CROSS SECTION DRAWING

    AS SHOWN 04-01-2016 BV-0338

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Appendix 11 Final Report Route Map of Poipet (1)

    1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor

    APPENDIX 11

    ROUTE MAP OF POIPET (1)

  • #

    ##

    #

    # #

    #

    #

    #

    #

    ##

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    Ú

    Ú

    Ú

    "T

    RunTnaot

    Kandal

    Pongro

    Chambak

    Souriya

    Prey Kob

    Thma Sen

    Ou Chrov

    Khai DanMak Heun

    Kouk Chak

    Nimit Bei

    Nimit Pir

    Koun Trei

    Koub Lech

    Kouk Prich

    Dong Aranh

    Nimit Buon

    Nimit Muoy

    Naka ChhayKoub Kaeut

    Tuol Pongro

    Tomnob Dach

    Nimit Thmei

    Veang Muong

    Yeang thmei

    Andoung Thma

    Souphi TboungSouphi Kandal

    Souphi

    Nimitt

    Ou Bei Choan

    240000

    240000

    242000

    242000

    244000

    244000

    246000

    246000

    248000

    248000

    250000

    250000

    252000

    252000

    254000

    254000

    256000

    256000

    258000

    258000

    260000

    260000

    262000

    262000

    264000

    264000

    266000

    266000

    1506

    000

    1506

    000

    1508

    000

    1508

    000

    1510

    000

    1510

    000

    1512

    000

    1512

    000

    1514

    000

    1514

    000

    1516

    000

    1516

    000

    1518

    000

    1518

    000

    1520

    000

    1520

    000

    1522

    000

    1522

    000

    1524

    000

    1524

    000

    ±0 1 20.5

    Kilometers

    SPHEROID........................... EVERESTGRID..................................... 2 KILOMETERUTM...................................... ZONE 48NDATUM................................. WGS84PROJECTION....................... UTM

    1:75,000Scale

    DRAWING TITLE:

    DWG No.DATE SHEETSCALE

    PP-0104-01-2016 011/75,000

    POI PET (Banteay Mean Chey Province)ROUTE MAP

    Legend22kV Overhead Line

    22kV Underground Line

    Rail road

    "T 115kV Substation% District centerÚ Commune center# Phum center

    National road

    Provincial road

    Cart track

    Footpath

    Banteay Mean Chey

    District boundary

    Commune boundary

    Population

    *Original drawing has A3 size

  • Cassava Field

    CambodiaPower Transmission Line

    Sugar C

    ane

    Cassava

    Field

    Tree 3m up

    Tree 3m up Tree 3m up

    Cassava

    Field

    Cassava

    Field

    SCALE

    DRAWING TITLE:

    DATE KEY PAGE DWG No

    POI PET (Banteay Meanchey Province)PLANE DRAWING

    H:1/3000 04-01-2016

    1

    PP-0201

    N

    LEGEND:

    22kV Overhead Line (New)

    22kV Underground Line (New)

    Load Breaking Switch (New)

    22kV Overhead Line (Exist.)

    22kV Underground Line (Exist.)

    22kV Pole (Exist.)

    LV Pole (Exist.)

    Telecommunication Pole (Exist.)

    Road

    Road Center

    Pond

    House, Cottage

    Bridge

    Ditch

    Pipe Culvert

    Wiremesh Fence

    Brickwall Fence

    JICA PROJECT NAME:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.

    CONTRACTOR:

    *Original drawing has A3 size

    ishiirsタイプライターテキストCROSS SECTIONSHEET 02, DWG No. PP-02

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキストCROSS SECTIONSHEET 03, DWG No. PP-02

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキストCROSS SECTIONSHEET 04, DWG No. PP-02

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキストCROSS SETCITONSHEET 07, DWG No. PP-02

    ishiirsタイプライターテキスト

  • Existing UG LineExisting House

    N

    Existing UG Line

    Existing House

    Ground LevelExisting UG Line

    Existing pole 115kV

    Existing UG Line From Control Building cross access roadCROSS SECTION 1-1SCALE: 1/150

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    AS SHOWN 04-01-2016 PP-0302

    11

    POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Cassava Field

    Cam

    bodi

    aPo

    wer

    Tran

    smis

    sion

    Line

    Exis

    ting

    Hou

    se

    Provincial Road(Under construction)

    N

    PLANSCALE: 1/750

    CPTL

    ExistingPole 115kV

    Control Building

    CROSS SECTION 2-2SCALE: 1/150

    Cable trench

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    AS SHOWN 04-01-2016 PP-0303

    2 2

    POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Cassava Field

    Cam

    bodi

    aPo

    wer

    Tran

    smis

    sion

    Line

    Exis

    ting

    Hou

    se

    Provincial Road(Under construction)

    N

    PLANSCALE: 1/750

    Existing Pole 22kV

    ExistingPole 115kV

    ExistingPole 115kV

    ExistingPole 115kV(Dead End)

    ExistingPole 115kV(Dead End)

    Cassava Field

    CROSS SECTION 2-2SCALE: 1/150

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    AS SHOWN 04-01-2016 PP-0304

    2 2

    POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Cassava Field

    Cam

    bodi

    aPo

    wer

    Tran

    smis

    sion

    Line

    Exis

    ting

    Hou

    se

    Provincial Road(Under construction)

    N

    PLANSCALE: 1/750

    Provincial Road(Under construction, Level: 27m)

    Existing Pole 22kV

    Existing Telecom Pole

    Ditch Cassava Field Cassava Field

    CROSS SECTION 2-2SCALE: 1/150

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    AS SHOWN 04-01-2016 PP-0307

    2 2

    POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Cassava Field

    Cassava Fie

    ld

    Rice Fiel

    d

    Rice F

    ield

    Rice

    Fiel

    d

    Rice

    Fiel

    d

    Rice

    Fiel

    d

    SCALE

    DRAWING TITLE:

    DATE KEY PAGE DWG No

    POI PET (Banteay Meanchey Province)PLANE DRAWING

    H:1/3000 04-01-2016

    3

    PP-0203

    N

    LEGEND:

    22kV Overhead Line (New)

    22kV Underground Line (New)

    Load Breaking Switch (New)

    22kV Overhead Line (Exist.)

    22kV Underground Line (Exist.)

    22kV Pole (Exist.)

    LV Pole (Exist.)

    Telecommunication Pole (Exist.)

    Road

    Road Center

    Pond

    House, Cottage

    Bridge

    Ditch

    Pipe Culvert

    Wiremesh Fence

    Brickwall Fence

    JICA PROJECT NAME:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.

    CONTRACTOR:

    *Original drawing has A3 size

    ishiirsタイプライターテキスト115 kVTransmission Line

  • Rice Field

    Roa

    d 25

    8D

    Roa

    d 25

    8D

    LBS

    LBS

    SCALE

    DRAWING TITLE:

    DATE KEY PAGE DWG No

    POI PET (Banteay Meanchey Province)PLANE DRAWING

    H:1/3000 04-01-2016

    32

    PP-0232

    N LEGEND:22kV Overhead Line (New)

    22kV Underground Line (New)

    Load Breaking Switch (New)

    22kV Overhead Line (Exist.)

    22kV Underground Line (Exist.)

    22kV Pole (Exist.)

    LV Pole (Exist.)

    Telecommunication Pole (Exist.)

    Road

    Road Center

    Pond

    House, Cottage

    Bridge

    Ditch

    Pipe Culvert

    Wiremesh Fence

    Brickwall Fence

    JICA PROJECT NAME:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.

    CONTRACTOR:

    *Original drawing has A3 size

    ishiirsタイプライターテキストCROSS SECTIONSHEET 10, DWG No. PP-03SHEET 11, DWG No. PP-03

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキストCROSS SECTIONSHEET 13, DWG No. PP-03SHEET 14, DWG No. PP-03

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキストCROSS SECTIONSHEET 17, DWG No. PP-03

    ishiirsタイプライターテキスト

  • N

    PLANSCALE: 1/175

    SLOPE

    Road 258D LEVEL: -1.731m

    3000

    SLOPE

    3000

    Existing Pole 22kVExisting Pole 22kV

    Water LEVEL: -2.993m

    Brick Wall

    Existing Pole 22kV

    CROSS SECTION 5-5Scale: 1/175

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING

    AS SHOWN 04-01-2016 PP-0310

    5 5

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Road 258D

    115k

    V

    N

    PLANSCALE: 1/500

    Laterite Road LV: -1.727m

    Existing Pole 22kV

    Existing LV Pole

    Wood Fence

    U-Dranaige

    SLOPESLOPE

    CROSS SECTION 6-6Scale: 1/150

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING

    AS SHOWN 04-01-2016 PP-0311

    6 6

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Road 258D

    115k

    V

    N

    PLANSCALE: 1/500

    SLOPE

    National Road N-5 LEVEL:-1.407m5650

    SLOPE

    5650U-Dranaige

    SLOPE

    Existing LV Pole Existing Pole 115kV

    CROSS SECTION 6-6Scale: 1/150

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING

    AS SHOWN 04-01-2016 PP-0313

    6 6

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Roa

    d 25

    8D

    115kV

    115kV

    115kV115kV

    115kV

    115kV

    115kV

    N

    N

    N

    PLANSCALE:1/175

    PLANSCALE: 1/1000

    MainholePIPE INVERT LV: -3.152m

    National Road LV: -1.482m

    Existing LV PoleExisting LV Pole

    Existing Pole 115kV

    SLOPE SLOPE SLOPE SLOPE

    Existing Pole 115kVCROSS SECTION 7-7Scale: 1/250

    MainholeMainholeMainhole

    HouseHouseHouseHouseHouseHouseHouseHouse HouseHouse House House

    House

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING

    AS SHOWN 04-01-2016 PP-0314

    7 7

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Roa

    d 25

    8D

    115kV

    115kV

    115kV115kV

    115kV

    115kV

    115kV

    N

    N

    N

    PLANSCALE:1/175

    PLANSCALE: 1/1000

    PIPE LV: -2.652m

    PIPE INVERT LV: -3.752m SLOPE SLOPE SLOPE SLOPE

    UG

    Opt

    ic

    Existing Underground Optic Pole

    Existing Pole 115kV

    Existing LV PoleExisting LV PoleExisting LV Pole

    CROSS SECTION 7-7Scale: 1/250

    Existing Pole 115kV

    MainholeMainholeMainholeMainhole

    HouseHouseHouseHouseHouseHouseHouse

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING

    AS SHOWN 04-01-2016 PP-0317

    77

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Appendix 12 Final Report Route Map of Poipet (2)

    1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor

    APPENDIX 12

    ROUTE MAP OF POIPET (2)

  • #

    #

    #

    "T

    Phniet

    Kantuot

    Sala Krau

    282000

    282000

    283000

    283000

    284000

    284000

    285000

    285000

    286000

    286000

    287000

    287000

    288000

    288000

    289000

    1504000

    1504000

    1505000

    1505000

    1506000

    1506000

    1507000

    1507000

    1508000

    1508000

    DRAWING TITLE:

    DWG No.DATE SHEETSCALE

    PP-0104-01-2016 021/20,000

    Legend22kV Overhead Line

    22kV Underground Line

    Rail road

    "T 115kV Substation% District centerÚ Commune center# Phum center

    National road

    Provincial road

    Cart track

    Footpath

    Banteay Mean Chey

    District boundary

    Commune boundary

    Population

    ±0 0.3 0.60.15

    Kilometers

    SPHEROID........................... EVERESTGRID..................................... 1 KILOMETERUTM...................................... ZONE 48NDATUM................................. WGS84PROJECTION....................... UTM

    1:20,000Scale

    POI PET (Banteay Mean Chey Province)ROUTE MAP

    289000

    *Original drawing has A3 size

  • 115kV

    115kV

    115kV

    Telecom UG

    115kV

    115kV

    115kV

    115kV

    115kV

    115kV Telecom UG

    115kV

    115kV

    Substation

    ControlBuilding

    Rice Field

    Rice Field

    Rice Field

    Farm

    Rice Field

    Rice Field

    Rice Field

    115kV

    115kV

    115kV

    Telecom UG

    115kV

    115kV

    115kV

    115kV

    115kV

    115kV Telecom UG

    115kV

    115kV

    Substation

    ControlBuilding

    Rice Field

    Rice Field

    Rice Field

    Farm

    Rice Field

    Rice Field

    Rice Field

    SCALE

    DRAWING TITLE:

    DATE KEY PAGE DWG No

    POI PET (Banteay Meanchey Province)PLANE DRAWING

    H:1/3000 04-01-2016

    33

    N

    PP-0233

    8

    See Section dwg. No. PP-03, Sheet 18 to 24

    8

    LEGEND:

    22kV Overhead Line (New)

    22kV Underground Line (New)

    Load Breaking Switch (New)

    22kV Overhead Line (Exist.)

    22kV Underground Line (Exist.)

    22kV Pole (Exist.)

    LV Pole (Exist.)

    Telecommunication Pole (Exist.)

    Road

    Road Center

    Pond

    House, Cottage

    Bridge

    Ditch

    Pipe Culvert

    Wiremesh Fence

    Brickwall Fence

    JICA PROJECT NAME:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.

    CONTRACTOR:

    *Original drawing has A3 size

    ishiirsタイプライターテキストCROSS SECTIONSHEET 24, DWG No. PP-03

    ishiirsタイプライターテキストCROSS SECTIONSHEET 23, DWG No. PP-03

    ishiirsタイプライターテキストCROSS SECTIONSHEET 22, DWG No. PP-03SHEET 18, DWG No. PP-03

    ishiirsタイプライターテキスト

  • 115k

    V115k

    V

    115k

    V

    115k

    V

    115k

    V

    115k

    V115k

    V

    115k

    V

    115k

    V

    115k

    V

    115k

    V

    Tele

    com

    U

    G

    CAMBODIA POWER TRANSMISSION LINES CO.,LTD

    Control Building

    Rice FieldRice FieldRice Field

    CAMBODIA POWER TRANSMISSION LINES CO.,LTD

    UG_22kV LINE

    Existing Pole 22kV

    Existing pole 115kVExisting Pole 22kV

    Wire mesh fence

    CONTROL BUILDING

    GENERATORROOM

    SCALE

    DRAWING TITLE:

    DATE

    POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING

    PLANSCALE: 1/1200

    SECTION G-GSCALE: 1/150

    As Shown 04-01-2016SHEET DWG No

    PP-0324

    8 8

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • 115k

    V115k

    V

    115k

    V

    115k

    V

    115k

    V

    115k

    V115k

    V

    115k

    V

    115k

    V

    115k

    V

    115k

    V

    Tele

    com

    U

    G

    CAMBODIA POWER TRANSMISSION LINES CO.,LTD

    Control Building

    Rice FieldRice FieldRice Field

    UG_22kV LINE

    FRESH WATER SUPPLY PIPE

    UG_22kV LINE

    Existing Pole 22kV Existing Pole 22kV

    Existing pole 115kV

    Barbeded wire fence

    SCALE

    DRAWING TITLE:

    DATE

    POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING

    PLANSCALE: 1/1200

    SECTION E-ESCALE: 1/150

    04-01-2016As ShownSHEET DWG No

    PP-0323

    8 8

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • 115k

    V115k

    V

    115k

    V

    115k

    V

    115k

    V

    115k

    V115k

    V

    115k

    V

    115k

    V

    115k

    V

    115k

    VTe

    leco

    m

    UG

    CAMBODIA POWER TRANSMISSION LINES CO.,LTD

    Control Building

    Farm

    Rice FieldRice FieldRice Field

    Existing Pole 22kV

    UG_22kV LINE

    FRESH WATER SUPPLY PIPE

    GATE

    Existing Pole 22kVExisting pole 22kV

    Existing pole 115kV

    Existing HouseExisting House

    SCALE

    DRAWING TITLE:

    DATE

    POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING

    PLANSCALE: 1/1200

    SECTION B-BSCALE: 1/150

    04-01-2016As ShownSHEET DWG No

    PP-0319

    8 8

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • 115k

    V115k

    V

    115k

    V

    115k

    V

    115k

    V

    115k

    V115k

    V

    115k

    V

    115k

    V

    115k

    V

    115k

    V

    Tele

    com

    U

    G

    CAMBODIA POWER TRANSMISSION LINES CO.,LTD

    Control Building

    Rice FieldRice FieldRice Field

    5.00m5.00m

    Canal Lavel: -14.10 m

    ROAD LEVEL: -10.74m

    CROSS SECTION 8-8SCALE: 1/150

    NATIONAL ROAD No.6LEVEL: -10.65m

    GATE

    30.00m

    Existing Telecommunication Pole

    Existing pole 115kV

    Existing pole 22kV

    Existing Telecommunication Pole

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    POI PET (Banteay Meanchey Province)CROSS SECTION DRAWING

    04-01-2016

    PLANSCALE: 1/1200

    As Shown PP-0318

    8 8

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Rice Field

    Rice Field

    Rice Field

    LBS

    LBS LBS

    SCALE

    DRAWING TITLE:

    DATE KEY PAGE DWG No

    POI PET (Banteay Meanchey Province)PLANE DRAWING

    H:1/3000 04-01-2016

    39

    N

    PP-0239

    LEGEND:

    22kV Overhead Line (New)

    22kV Underground Line (New)

    Load Breaking Switch (New)

    22kV Overhead Line (Exist.)

    22kV Underground Line (Exist.)

    22kV Pole (Exist.)

    LV Pole (Exist.)

    Telecommunication Pole (Exist.)

    Road

    Road Center

    Pond

    House, Cottage

    Bridge

    Ditch

    Pipe Culvert

    Wiremesh Fence

    Brickwall Fence

    JICA PROJECT NAME:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.

    CONTRACTOR:

    *Original drawing has A3 size

  • Appendix 13 Final Report Route Map of Koh Kong

    1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor

    APPENDIX 13

    ROUTE MAP OF KOH KONG

  • #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    #

    Ú

    Ú

    Ú

    Ú

    Ú

    %

    %

    #

    Koh KongKoh Kong

    Kaoh Chak

    Cham Yeam

    Neang Kok

    Preaek Svay

    Phum Ti BeiPhum Ti Pir

    Phum Ti Pir

    Phum Ti Buon

    Phum Ti Muoy

    Phum Ti Muoy

    Stueng Veaeng

    Tuol Kokir Leu

    Boeng Kachhang

    Bak Khlang Bei

    Bak Khlang Pir

    Bak Khlang Muoy

    Smach Mean Chey

    Tuol Kokir Kraom

    Boeng Khun Chhang

    Dang Tong

    Bak Khlang

    Stueng Veaeng

    Tuol Kokir Leu

    Smach Mean Chey

    Smach Mean Chey

    274000

    274000

    276000

    276000

    278000

    278000

    280000

    280000

    282000

    282000

    284000

    284000

    286000

    286000

    288000

    288000

    290000

    290000

    292000

    292000

    294000

    294000

    1276

    000

    1276

    000

    1278

    000

    1278

    000

    1280

    000

    1280

    000

    1282

    000

    1282

    000

    1284

    000

    1284

    000

    1286

    000

    1286

    000

    1288

    000

    1288

    000

    1290

    000

    1290

    000

    ±0 0.9 1.80.45

    Kilometers

    SPHEROID........................... EVERESTGRID..................................... 2 KILOMETERUTM...................................... ZONE 48NDATUM................................. WGS84PROJECTION....................... UTM

    1:60,000Scale

    DRAWING TITLE:

    DWG No.DATE SHEETSCALE

    KK-0104-01-2016 011/60,000

    KOH KONG ROUTE MAP

    Legend22kV Overhead Line22kV Underground Line

    # Provincial center% District centerÚ Commune center# Phum center

    National roadProvincial roadCart trackFootpathDistrict boundaryCommune boundaryPopulationStream systemRiver or stream

    *Original drawing has A3 size

  • KOH KONG SPECIAL ECONOMIC ZONEKOH KONG SPECIAL ECONOMIC ZONE

    LBS

    SCALE

    DRAWING TITLE:

    DATE KEY PAGE DWG No

    KOH KONG PLANE DRAWING

    H:1/3000 04-01-2016

    1

    KK-0201

    N LEGEND:22kV Overhead Line (New)

    22kV Underground Line (New)

    Load Breaking Switch (New)

    22kV Overhead Line (Exist.)

    22kV Underground Line (Exist.)

    22kV Pole (Exist.)

    LV Pole (Exist.)

    Telecommunication Pole (Exist.)

    Road

    Road Center

    Pond

    House, Cottage

    Bridge

    Ditch

    Pipe Culvert

    Wiremesh Fence

    Brickwall Fence

    JICA PROJECT NAME:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.

    CONTRACTOR:

    *Original drawing has A3 size

  • TOLL STATION

    WAT MONDULSEIMARAM

    Sea

    TOLL STATION

    WAT MONDULSEIMARAM

    Sea

    LBS

    SCALE

    DRAWING TITLE:

    DATE KEY PAGE DWG No

    KOH KONG PLANE DRAWING

    H:1/3000 04-01-2016

    5

    KK-0205

    NLEGEND:

    22kV Overhead Line (New)

    22kV Underground Line (New)

    Load Breaking Switch (New)

    22kV Overhead Line (Exist.)

    22kV Underground Line (Exist.)

    22kV Pole (Exist.)

    LV Pole (Exist.)

    Telecommunication Pole (Exist.)

    Road

    Road Center

    Pond

    House, Cottage

    Bridge

    Ditch

    Pipe Culvert

    Wiremesh Fence

    Brickwall Fence

    JICA PROJECT NAME:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.

    CONTRACTOR:

    *Original drawing has A3 size

    ishiirsタイプライターテキストCROSS SECTIONSHEET 33, DWG No. KK-03SHEET 34, DWG No. KK-03

  • Water level -17.0728

    -12.00

    -11.00

    -10.00

    -13.00

    -14.00

    -15.00

    -16.00

    19.98 19.79

    Water level -17.0728

    -9.00

    -8.00

    -7.001+710 1+720 1+730 1+740 1+750

    MV Pole

    Cable 3x185, 3 wires

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    KOH KONG SECTIONAL DRAWING

    1/150 04-01-2016 KK-0333

    Suspended Fresh water pipe Ø300

    Plane

    Longitudinal section

    To Southeast To Northwest

    Suspended 22kV cable

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Suspended22kV cable

    SuspendedFresh water pipe

    Telecommunication wire support

    1.20

    1.00

    7.80

    Water level -17.0728

    0.95

    0.50

    3.10

    1.90 4.00 1.90

    CROSS SECTION AT CHAINAGE 0+144

    Suspended22kV cable

    SuspendedFresh water pipe

    Telecommunication wire support

    1.20

    1.00

    7.80

    Water level -17.0728

    0.95

    0.50

    1.79 1.90 4.00 1.90

    CROSS SECTION AT CHAINAGE 0+464

    Suspended22kV cable

    SuspendedFresh water pipe

    Telecommunication wire support

    1.20

    1.00

    7.80

    0.95

    0.50

    1.20 1.90 4.00 1.90

    CROSS SECTION AT CHAINAGE 1+524

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    KOH KONG SECTIONAL DRAWING

    1/150 04-01-2016 KK-0334

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Tamab Guest house &Restaurant

    Garage 3595‘ ‘

    3594

    Adve

    rtisi

    ng P

    ole

    Bun MouyMaterial Constructon Supply

    SEK CHHOUNGarage 3620

    Flat Houses

    Raksmey RatanakGuest House

    KOH KONG NEW MAKETACLEDABank. PlcKoh KongBrance

    Prasak Microfinance PlcKoh Kong Brance

    KOH KONG COURT

    POST ANDTELECOMUNICATIONSKOH KONG PROVINCE

    KOH KONGPROVINCIAL HALL

    DEPARTMENT OF PLANNING

    DEPARTMENT OFCULT AND RELIGION

    OFFICE OFLAWS MAKER

    Adve

    rtisi

    ng P

    ole

    Adve

    rtisi

    ng P

    ole

    Adve

    rtisi

    ng P

    ole

    Adve

    rtisi

    ng P

    ole

    Raksmey Ratanak Guest House

    Flat Houses

    Sea

    Tamab Guest house &Restaurant

    Garage 3595‘ ‘

    3594

    Adve

    rtisi

    ng P

    ole

    Bun MouyMaterial Constructon Supply

    SEK CHHOUNGarage 3620

    Flat Houses

    Raksmey RatanakGuest House

    KOH KONG NEW MAKETACLEDABank. PlcKoh KongBrance

    Prasak Microfinance PlcKoh Kong Brance

    KOH KONG COURT

    POST ANDTELECOMUNICATIONSKOH KONG PROVINCE

    KOH KONGPROVINCIAL HALL

    DEPARTMENT OF PLANNING

    DEPARTMENT OFCULT AND RELIGION

    OFFICE OFLAWS MAKER

    CINEMA / GUALARIESBUILDING

    Adve

    rtisi

    ng P

    ole

    Adve

    rtisi

    ng P

    ole

    Adve

    rtisi

    ng P

    ole

    Adve

    rtisi

    ng P

    ole

    Raksmey Ratanak Guest House

    Flat Houses

    SeaLBS

    SCALE

    DRAWING TITLE:

    DATE KEY PAGE DWG No

    KOH KONG PLANE DRAWING

    H:1/3000 04-01-2016

    7

    KK-0207

    N

    LEGEND:

    22kV Overhead Line (New)

    22kV Underground Line (New)

    Load Breaking Switch (New)

    22kV Overhead Line (Exist.)

    22kV Underground Line (Exist.)

    22kV Pole (Exist.)

    LV Pole (Exist.)

    Telecommunication Pole (Exist.)

    Road

    Road Center

    Pond

    House, Cottage

    Bridge

    Ditch

    Pipe Culvert

    Wiremesh Fence

    Brickwall Fence

    JICA PROJECT NAME:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.

    CONTRACTOR:

    *Original drawing has A3 size

    ishiirsタイプライターテキストCROSS SECTIONSHEET 02, DWG No. KK-03

    ishiirsタイプライターテキスト

    ishiirsタイプライターテキストCROSS SECTIONSHEET 35, DWG No. KK-35

    ishiirsタイプライターテキストCROSS SECTIONSHEET 36, DWG No. KK-03

    ishiirsタイプライターテキスト

  • LV Pole

    Poster Pole

    MV Pole

    Existing 22kV Underground cable

    12.89 1.47 20.61 20.02

    Water level -17.0728 Water level -17.0728

    ±0.00CHAINAGE:

    -12.00

    -11.00

    -10.00

    -13.00

    -14.00

    -15.00

    -16.00

    -9.00

    -8.00

    -7.00

    0+10 0+20 0+30 0+40 0+50

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    KOH KONG SECTIONAL DRAWING

    1/150 04-01-2016 KK-0302

    Suspended Fresh water pipe Ø300

    Suspended 22kV cable

    Plane

    Longitudinal section

    To Southeast To Northwest

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • 2

    National Road No.48National Road No.48

    2

    PLANSCALE: 1/250

    N

    12.60mROAD LEVEL: -14.85m

    12.60m

    CROSS SECTION 2-2

    SLOPERoad curb Road curb

    SLOPE

    Existing Pole 22kVExisting Pole 22kVExisting Lighting Pole

    Existing LV Pole

    Brick wall fence

    Tree

    SCALE: 1/150

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    KOH KONG CROSS SECTION DRAWING

    AS SHOWN 04-01-2016 KK-0335

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Adve

    rtisi

    ng P

    ole

    ACLEDA Bank. Plc

    Koh Kong Brance

    3 3

    PLANSCALE: 1/400

    N

    8.70mROAD LEVEL: -14.22m

    8.70m

    SLOPERoad curb

    SLOPE

    Existing LV Pole

    ACLEDA Bank. PlcKoh Kong Brance

    Existing Pole 22kV

    CROSS SECTION 3-3SCALE: 1/150

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    AS SHOWN 04-01-2016 KK-0336

    KOH KONG CROSS SECTION DRAWINGJICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Stream

    Flooding Area

    Flooding Area

    Flooding Area

    Flooding Area

    Flooding Area

    Stream

    Flooding Area

    Flooding Area

    Flooding Area

    Flooding Area

    LBS

    SCALE

    DRAWING TITLE:

    DATE KEY PAGE DWG No

    KOH KONG PLANE DRAWING

    H:1/3000 04-01-2016

    9

    KK-0209

    N

    LEGEND:

    22kV Overhead Line (New)

    22kV Underground Line (New)

    Load Breaking Switch (New)

    22kV Overhead Line (Exist.)

    22kV Underground Line (Exist.)

    22kV Pole (Exist.)

    LV Pole (Exist.)

    Telecommunication Pole (Exist.)

    Road

    Road Center

    Pond

    House, Cottage

    Bridge

    Ditch

    Pipe Culvert

    Wiremesh Fence

    Brickwall Fence

    JICA PROJECT NAME:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.

    CONTRACTOR:

    *Original drawing has A3 size

    ishiirsタイプライターテキストCROSS SECTIONSHEET 37, DWG No. KK-03

  • Flooding Area

    National Road No.48

    44

    PLANSCALE: 1/400

    N

    Existing Pole 22kVCrossing Road No.48

    Existing Pole 22kVCrossing Road No.48

    ROAD LEVEL: -13.35m

    4.84m 4.84m

    CROSS SECTION 4-4SCALE: 1/150

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    AS SHOWN 04-01-2016 KK-0337

    KOH KONG CROSS SECTION DRAWINGJICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Swampland

    Swampland

    Swampland

    Swampland

    Stream

    Stream

    Stream

    Stream

    Swampland

    Swampland

    Swampland

    Swampland

    Stream

    Stream

    Stream

    Stream

    SCALE

    DRAWING TITLE:

    DATE KEY PAGE DWG No

    KOH KONG PLANE DRAWING

    H:1/3000 04-01-2016

    10

    KK-0210

    N

    LEGEND:

    22kV Overhead Line (New)

    22kV Underground Line (New)

    Load Breaking Switch (New)

    22kV Overhead Line (Exist.)

    22kV Underground Line (Exist.)

    22kV Pole (Exist.)

    LV Pole (Exist.)

    Telecommunication Pole (Exist.)

    Road

    Road Center

    Pond

    House, Cottage

    Bridge

    Ditch

    Pipe Culvert

    Wiremesh Fence

    Brickwall Fence

    JICA PROJECT NAME:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.

    CONTRACTOR:

    *Original drawing has A3 size

    ishiirsタイプライターテキストCROSS SECTIONSHEET 38, DWG No. KK-03

    ishiirsタイプライターテキスト

  • Swam

    pland

    Swam

    pland

    Natio

    nal R

    oad N

    o.48

    Prov

    inci

    al R

    oad

    Nation

    al Road

    No.48

    5 5

    PLANSCALE: 1/400

    N

    4.25mROAD LEVEL: -13.13m4.25m

    Existing Telecommunication Pole Existing Telecommunication Pole

    Existing Telecommunication Cable

    National Road No.48National Road No.48Provincial Road

    SwamplandSwampland

    LEVEL: -16.20m LEVEL: -16.20m

    CROSS SECTION 5-5SCALE: 1/150

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    AS SHOWN 04-01-2016 KK-0338

    KOH KONG CROSS SECTION DRAWINGJICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Tree H>6m Rubber H>6mRubber H>6m

    Tree H>6m

    Rubber H>6mSugar Farm

    Rubber H>6m Tree H>6mTree H>6m

    Tree H>6m Rubber H>6mRubber H>6m

    Tree H>6m

    Rubber H>6mSugar Farm

    Rubber H>6m Tree H>6mTree H>6m

    LBS

    Connect to existing Line

    SCALE

    DRAWING TITLE:

    DATE KEY PAGE DWG No

    KOH KONG PLANE DRAWING

    H:1/3000 04-01-2016

    14

    KK-0214

    N

    LEGEND:

    22kV Overhead Line (New)

    22kV Underground Line (New)

    Load Breaking Switch (New)

    22kV Overhead Line (Exist.)

    22kV Underground Line (Exist.)

    22kV Pole (Exist.)

    LV Pole (Exist.)

    Telecommunication Pole (Exist.)

    Road

    Road Center

    Pond

    House, Cottage

    Bridge

    Ditch

    Pipe Culvert

    Wiremesh Fence

    Brickwall Fence

    JICA PROJECT NAME:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc.THE CHUGOKU ELECTRIC POWER CO., INC.

    CONTRACTOR:

    *Original drawing has A3 size

    ishiirsタイプライターテキストCROSS SECTIONSHEET 39, DWG No. KK-03

    ishiirsタイプライターテキスト

  • Nat

    iona

    l Roa

    d N

    o.48

    6 6

    N

    PLANSCALE: 1/150

    5.00mROAD LEVEL: -15m

    5.00m

    Existing Pole 22kV

    Existing Telecommunication Pole Existing Telecommunication Pole

    18.14m5.10m 6.32mCROSS SECTION 6-6

    SCALE: 1/150

    SCALE

    DRAWING TITLE:

    DATE SHEET DWG No

    AS SHOWN 04-01-2016 KK-0339

    KOH KONG CROSS SECTION DRAWINGJICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

    *Original drawing has A3 size

  • Appendix 14 Final Report Chrak Mtes Substation

    1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor

    APPENDIX 14

    CHRAK MTES SUBSTATION

  • 2xLGJ-240/30 2xLGJ-240/30

    SA .,

    os

    CT

    SA ..

    LGJ-300/40

    SA

    CT' P2~~~ Pl

    CB

    OS

    CT

    j

    ·,rt!ff.. ~} os:--1

    I BUS \",!;.,;,yy:; I " "

    2x(NRLH58GJ-630/80)

    CVT r'H··

    C B A C B A C S A ~ TO #1 TRANSFORMER

    CHINA EXrM BANK

    Loan No. pac No. 2014(11) TOTAL No. (311)

    Contract No. EDC-2MV EXT. 2

    o -"PPROVED CY APPROVED with CONDITIONS

    RETURNED for CORRECTIONS

    DRAWINGS for WORKS

    ~ ~~cP .~

    ELECTRICITE D

    ~~ LEGEND OF 115kV EQUIPMENT

    115kVit.i-m ~

    MARK(IfJ5j;)

    .• H::3 Surge Arrester itilli

    SF6 Three Phose Circuit Breaker SF6.::;ffi~;u$f"

    Switch

    Y10W-102/266 lOkA

    TYD J 11 O.2/0.5(3P)/3P

    115/J3/0.11/J3/0.11 lkV

    GW4A-l 126kV 2000A 31

    GW4A-126D(GW) 126kV 31.5kA

    LVB-115W3 600~1200/1 O.5s/5P30/5P30/5P30/0.2s PI

    . LVB-115W3 200N400/1A

    P2

    ! O.5s/5P30/5P30/5P30/5P30/0.2s Pl---- P2

    LW36-126F 126kV 2000A 31.5kA

    LW36-126 126kV 2000A 31.5kA

    SYMBlE{U)

    SA

    CVT

    DS

    DS'

    CT

    CB

    CS'

    REVlSION I REVD I CHKD I fMlfJ: APPRD PROJECT: TRANSMISSION UNES AND SUBSTAnONS FROt.! PHNOt.! PENH TO BAVEr

    EDC-TSPB

    ElECTRICITE DU CAMBODGE (EDC)

    ELECTRIC SINGLE UNE OF I15kV SWrrCHYARD 115kVIU.Ht"i:itli

    2015-04-20 I[I1)!ING 00. I 605381 $-D0301-02 IREV I A

  • Appendix 15 Final Report EDC Svay Rieng Switching Station

    1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor

    APPENDIX 15

    EDC SVAY RIENG SWITCHING STATION

  • 22 kV METALCLAD SWITCHGEAR ROOM(OUTLINED DIMENSION)

    EDC SVAY RIENG

    EHV-J0122kV

    IncomingNo. 1

    VN1

    EHV-J0322kVVT-1

    Panel

    EHV-J0522kV

    OutgoingF1

    ToMarket

    EHV-J0722kV

    Capacitor1

    (Blank)

    EHV-J0922kV

    Outgoing

    ToP05 &VN2

    EHV-J1122kVBus

    Section

    EHV-J1022kV

    Bus Riser& VT-2Panel

    EHV-J0822kV

    OutgoingF2

    ToIce

    Factories

    EHV-J0622kV

    Capacitor2

    (Not used)

    EHV-J0422kV

    OutgoingF4

    ToOld District

    Hall

    FromPhnomPenh

    EHV-J0222kV

    IncomingNo. 2

    VN2

    SpareSpace

    SpareSpace

    BatteryCharger &

    BankAC Distribution Panel

    Front Front

    12780

    5800

    850 800 800 800 800 800 800 800 800 800 850 800850

    1330

    1130 1100

    1150

    380

    1380

    1460

    100

    450 800 900 2000 4480 2000 2150

    300

    800

    2370

    1800

    1800

    Note:(1) All dimensions are in millimeter.(2) 22kV Cubicles are of LG.

    SCALE

    DRAWING TITLE:

    DATE KEY PAGE DWG No

    BAVET (Svay Rieng Province)EDC 22kV Switchgear Room

    1/50 08/12/2015 PP-03

    JICA PROJECT NAME:

    SUB CONTRACTOR:

    Preparatory Survey for Southern Economic CorridorDistribution Expansion Project

    NEWJEC Inc., THE CHUGOKU ELECTRIC POWER CO., INC.Cheang Engineering Consultants, Co. Ltd.

    CONTRACTOR:

  • Appendix 16 Final Report IE Substation

    1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor

    APPENDIX 16

    IE SUBSTATION

  • Dell 3nd JIB CWNNew Stamp

  • Appendix 17 Final Report Banteay Meanchey Substation

    1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor

    APPENDIX 17

    BANTEAY MEANCHEY SUBSTATION

  • Appendix 18 Final Report MV Pole Arrangement

    1 The Preparatory Survey for the Project for Expansion of Distribution Lines in Southern Economic Corridor

    APPENDIX 18

    MV POLE ARRANGEMENT

  • GLGL

    Arm Tie

    Pin Type Insulators

    2000

    String Insulators1000 1000

    250

    12000

    2000

    250

    12000

    900 400

    700

    Arm Tie

    Foundation Foundation

    1300

    7001300

    1000 1000

    *

    *

    *

    *

    *: Size of concrete foundation depends

    on soil condition.

  • CHAPTER B3 / 25 to 160 kVA pole mounted substation

    Version 1.2 7,1

    II - 25 to 160 kVA pole mounted substation

    1) Presentation : - For three phase transformer, whose capacity from 50 KVA to 160 KVA

    - For single phase transformer, whose capacity from 25 KVA to 50 KVA

    Figure : pole mounted substation on single pole

    MV Fuse

    LV Fuse

    MV fuse switch

    MV / LV transformer

    MV lightning arrester

    LV network

    Grounding

    2m height of protective cover

    LV Meter Box

    Not less than 5.0 m

    MV fuse switch

    MV / LV transformer

    MV lightning arrester

    LV network

    LV circuit breaker

    Grounding

    2m height of protective cover

    LV Meter Box

    Not less than 5.0 m

  • CHAPTER B3 / 200 to 400 kVA pole mounted substation

    Version 1.2 9,1

    III - 200 to 400 kVA pole mounted substation

    1) Presentation :

    Figure III-1: pole mounted substation on double poles

    LV network

    CT

    Meter cabinet

    LV board cabinets

    MV lightning arresters

    LV network

    LV network Grounding

    2m high of Protective device

    MV fuse switch

    Main switch

    4 protected feeders by HPC fuses 2 m

    Not

    less

    than

    5.0

    m

    3 m

  • APPENDICESAppendix 8 : Voltage Drop Study Details of EachDistribution LineAppendix 9 : List of Collected Data and DocumentsAppendix 10 : Route Map of BavetAppendix 11 : Route Map of Poipet (1)Appendix 12 : Route Map of Poipet (2)Appendix 13 : Route Map of Koh KongAppendix 14 : Chrak Mtes SubstationAppendix 15 : EDC Svay Rieng Switching StationAppendix 16 : IE SubstationAppendix 17 : Banteay Meanchey SubstationAppendix 18 : MV Pole Arrangement