999732002_2009_07_online

100
The Formwork Experts 07/2009 NK GB 999732002 User information Method statement Doka large-area formwork Top50 9732-383-01

Upload: hsaamhsaam-hsaam

Post on 19-May-2017

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 999732002_2009_07_online

The Formwork Experts

07/2009 NK

GB999732002

User informationMethod statement

Doka large-area formwork Top50

9732-383-01

Page 2: 999732002_2009_07_online

2 999732002 - 07/2009 NK

Introduction User information Doka large-area formwork Top50

The Formwork Experts

Introduction

© by Doka Industrie GmbH, A-3300 Amstetten

Page 3: 999732002_2009_07_online

3999732002 - 07/2009 NK

Contents Page

User information Doka large-area formwork Top50 Introduction

The Formwork Experts

Wall formwork............................................................................................... 8System overview ............................................................................................ 8Instructions for assembly and use.................................................................. 9Top 50 element in detail ...............................................................................12Flexibility.......................................................................................................13Form-tie system............................................................................................14Inter-panel connections ................................................................................16Examples of the system in action .................................................................17Length adjustment using closures................................................................18Height adjustment ........................................................................................2090 degree corners ........................................................................................21Acute & obtuse-angled corners ....................................................................24Stop-end formwork .......................................................................................26Vertical stacking of elements........................................................................27Shaft formwork .............................................................................................28Circular formwork ......................................................................................... 33Plumbing accessories...................................................................................34Pouring platforms with single brackets .........................................................38Pouring platforms ......................................................................................... 40Guard rails ....................................................................................................43Ladder system..............................................................................................44Combining different formwork systems ........................................................48Resetting by crane .......................................................................................49Enhanced requirements in respect of Large-area formwork Top 50 ............50

Column formwork.......................................................................................52Design of column formwork..........................................................................53Column formwork with Multipurpose walings WS10 Top50 .........................56Column formwork with Multi-purpose walings WU12 Top50........................58Ladder system..............................................................................................60Instructions for assembly and use................................................................61

Other possible areas of use ......................................................................63Top50 as a superstructure and tunnel formwork ..........................................63Extra functions provided by the Multi-purpose waling WS10 Top50 ............66Top50 combined with . . . .............................................................................67Utilising self-compacting concrete ................................................................69

Element assembly ......................................................................................70Element assembly ........................................................................................70Doka "Ready-to-Use" Service ......................................................................75

Structural design........................................................................................76Deflection diagrams......................................................................................76Top 50 elements...........................................................................................78Struts ............................................................................................................81

General remarks ......................................................................................... 82Doka multi-trip packaging.............................................................................82Cleaning .......................................................................................................84

Component overview .................................................................................85

Page 4: 999732002_2009_07_online

4 999732002 - 07/2009 NK

Introduction User information Doka large-area formwork Top50

The Formwork Experts

Elementary safety warnings

User target groups● This User Information booklet (Method Statement) is

aimed at everyone who will be working with the Doka product or system it describes. It contains informa-tion on the standard design for setting up this sys-tem, and on correct, compliant utilisation of the sys-tem.

● All persons working with the product described herein must be familiar with the contents of this man-ual and with all the safety instructions it contains.

● Persons who are incapable of reading and under-standing this booklet, or who can do so only with dif-ficulty, must be instructed and trained by the cus-tomer.

● The customer is to ensure that the information mate-rials provided by Doka (e.g. User Information book-lets, Instructions for Assembly and Use, Operating Instruction manuals, plans etc.) are available to all users, and that they have been made aware of them and have easy access to them at the usage location.

● In the relevant technical documentation and form-work utilisation plans, Doka shows the workplace safety precautions that are necessary in order to use the Doka products safely in the usage situations shown. In all cases, users are obliged to ensure compliance with national OH&S (occupational health and safety) rules throughout the entire project and to take appro-priate additional or alternative workplace safety pre-cautions where necessary.

Hazard assessment● The customer is responsible for drawing up, docu-

menting, implementing and continually updating a hazard assessment at every job-site. This document serves as the basis for the site-spe-cific hazard assessment, and for the instructions given to users on how to prepare and utilise the sys-tem. It does not substitute for these, however.

Remarks on this document● This User Information booklet can also be used as a

generic method statement or incorporated with a site-specific method statement.

● Many of the illustrations in this booklet show the situation during formwork assembly and are therefore not always complete from the safety point of view.

● Further safety instructions, especially warnings, will be found in the individual sections of this document!

Planning● Provide safe workplaces for those using the form-

work (e.g. for when it is being erected/dismantled, modified or repositioned etc). It must be possible to get to and from these workplaces via safe access routes!

● If you are considering any deviation from the details and instructions given in this booklet, or any application which goes beyond those described in the booklet, then revised static cal-culations must be produced for checking, as well as supplementary assembly instructions.

Rules applying during all phases of the assignment:● The customer must ensure that this product is

erected and dismantled, reset and generally used for its intended purpose under the direction and super-vision of suitably skilled persons with the authority to issue instructions. These persons' mental and physical capacity must not in any way be impaired by alcohol, medicines or drugs.

● Doka products are technical working appliances which are intended for industrial/commercial use only, always in accordance with the respective Doka User Information booklets or other technical docu-mentation authored by Doka.

● The stability of all components and units must be ensured during all phases of the construction work!

● The functional/technical instructions, safety warn-ings and loading data must all be strictly observed and complied with. Failure to do so can cause acci-dents and severe (even life-threatening) damage to health, as well as very great material damage.

● Fire-sources are not permitted anywhere near the formwork. Heating appliances are only allowed if properly and expertly used, and set up a safe dis-tance away from the formwork.

● The work must take account of the weather condi-tions (e.g. risk of slippage). In extreme weather, steps must be taken in good time to safeguard the equipment, and the immediate vicinity of the equip-ment, and to protect employees.

● All connections must be checked regularly to ensure that they still fit properly and are functioning cor-rectly. It is very important to check all screw-type connec-tions and wedge-clamped joins whenever the con-struction operations require (particularly after excep-tional events such as storms), and to tighten them if necessary.

Page 5: 999732002_2009_07_online

User information Doka large-area formwork Top50 Introduction

5999732002 - 07/2009 NK

The Formwork Experts

Assembly● The equipment/system must be inspected by the

customer before use, to ensure that it is in suitable condition. Steps must be taken to rule out the use of any components that are damaged, deformed, or weakened due to wear, corrosion or rot.

● Combining our formwork systems with those of other manufacturers could be dangerous, risking damage to both health and property. If you intend to combine different systems, please contact Doka for advice first.

● The assembly work must be carried out by suitably qualified employees of the client's.

● It is not permitted to modify Doka products; any such modifications constitute a safety risk.

Erecting the formwork● Doka products and systems must be set up in such

a way that all loads acting upon them are safely transferred!

Pouring● Do not exceed the permitted fresh-concrete pres-

sures. Excessively high pouring rates lead to form-work overload, cause greater deflection and risk causing breakage.

Striking the formwork● Do not strike the formwork until the concrete has

reached sufficient strength and the person in charge has given the order for the formwork to be struck!

● When striking the formwork, never use the crane to break concrete cohesion. Use suitable tools such as timber wedges, special pry-bars or system features such as Framax stripping corners.

● When striking the formwork, do not endanger the stability of any part of the structure, or of any scaf-folding, platforms or formwork that is still in place!

Transporting, stacking and storing● Observe all regulations applying to the handling of

formwork and scaffolding. In addition, the Doka slinging means must be used - this is a mandatory requirement.

● Remove any loose parts or fix them in place so that they cannot be dislodged or fall free!

● All components must be stored safely, following all the special Doka instructions given in the relevant sections of this User Information booklet!

Regulations; industrial safety● Always observe all industrial safety regulations and

other safety rules applying to the application and uti-lisation of our products in the country and/or region in which you are operating.

Instruction as required by EN 13374:● If a person or object falls against, or into, the side-

guard system and/or any of its accessories, the side-guard component affected may only continue in use after it has been inspected and passed by an expert.

Maintenance● Only original Doka components may be used as

spare parts.

Symbols usedThe following symbols are used in this booklet:

MiscellaneousWe reserve the right to make alterations in the interests of technical progress.

Important noteFailure to observe this may lead to malfunc-tion or damage.

CAUTION / WARNING / DANGERFailure to observe this may lead to material damage, and to injury to health which may range up to the severe or even life-threaten-ing.

InstructionThis symbol indicates that actions need to be taken by the user.

Sight-checkIndicates that you need to do a sight-check to make sure that necessary actions have been carried out.

TipPoints out useful practical tips.

ReferenceRefers to other documents and materials.

Page 6: 999732002_2009_07_online

6 999732002 - 07/2009 NK

Introduction User information Doka large-area formwork Top50

The Formwork Experts

Eurocodes at DokaIn Europe, a uniform series of Standards known as Eurocodes (EC) was developed for the construction field by the end of 2007. These are intended to provide a uniform basis, valid throughout Europe, for product specifications, tenders and mathematical verification.The EC are the world's most highly developed Stand-ards in the construction field.In the Doka Group, the EC are to be used as standard from the end of 2008. They will thus supersede the DIN norms as the "Doka standard" for product design.

The widely used "Permissible stress design" (compar-ing the actual stresses with the permissible stresses) has been superseded by a new safety concept in the EC.The EC contrast the actions (loads) with the resistance (capacity). The previous safety factor in the permissible stresses is now divided into several partial factors. The safety level remains the same!

Comparison of the safety concepts (example)

Ed Design value of effect of actions (E ... effect; d ... design) Internal forces from action Fd (VEd, NEd, MEd)

Rd Design value of the resistance (R ... resistance; d ... design) Design capacity of cross-section (VRd, NRd, MRd)

Fd Design value of an actionSteel: Rd =

Rk Timber: Rd = kmod ·Rk

Fd = γF · Fk γM γM

(F ... force)Fk Characteristic value of an action

"actual load", service load (k ... characteristic) e.g. dead weight, live load, concrete pressure, wind

Rk Characteristic value of the resistance e.g. moment resistance to yield stress

γF Partial factor for actions (in terms of load; F ... force) e.g. for dead weight, live load, concrete pres-sure, wind Values from EN 12812

γM Partial factor for a material property (in terms of material; M...material) e.g. for steel or timber Values from EN 12812

kmod Modification factor (only for timber – to take account of the moisture and the duration of load action) e.g. for Doka beam H20 Values as given in EN 1995-1-1 and EN 13377

Ed

Rd

Permissible stress design EC/DIN concept

Factual≤ Fpermissible Ed≤ Rd

A Load factor

60 [kN]

60<70 [kN]

115.5 [kN]

� ~ 1.65

Fyield

Fpermissible

Factual

9801

3-10

0

A

90 [kN]

115.5 [kN]

90<105 [kN]

Rk

Rd

Ed

�M

= 1.1

�F

= 1.5

9801

3-10

2

A

The "permissible values" communicated in Doka documents (e.g.: Qpermissible = 70 kN) do not correspond to the design values (e.g.: VRd = 105 kN)!➤ Avoid any confusion between the two!➤ Our documents will continue to state the per-

missible values. Allowance has been made for the following par-tial factors: γF = 1.5 γM, timber = 1.3 γM, steel = 1.1 kmod = 0.9In this way, all the design values needed in an EC design calculation can be ascertained from the permissible values.

Page 7: 999732002_2009_07_online

User information Doka large-area formwork Top50 Introduction

7999732002 - 07/2009 NK

The Formwork Experts

Page 8: 999732002_2009_07_online

8 999732002 - 07/2009 NK

Wall formwork User information Doka large-area formwork Top50

The Formwork Experts

Wall formworkSystem overview

Doka large-area formwork Top50 - for any shape and any loadThe Doka large-area formwork Top50 is designed to be tailored to many very diverse types of task - so it gives you ideal scope for adapting the shapes and sizes of the elements to suit your structure.The element size-grid and tie-hole pattern provide the adaptability needed to accommodate architectural

demands. The large-area elements and exact connec-tions make for a perfect joint pattern.You can choose whichever form-face material best meets your requirements - e.g. for smooth fair-faced concrete, wood-textured surfaces, intensive re-use etc.A range of practical accessories makes work on the site a lot easier and does away with the need for costly in-situ improvisations.Doka will plan the most economical solution for you. Also, having your formwork pre-assembled by the Doka "Ready-to-Use Service" saves time and space on site.

A Form-tie system (Page 14)B Inter-element connections (Page 16)C Length adjustment (Page 18)D 90 degree corners (Page 21)E Acute and obtuse-angled corners (Page 24)F Stop-end formwork (Page 26)G Plumbing accessories (Page 34)H Pouring platforms (Page 38)I Resetting by crane (Page 49)J Element assembly (Page 70)K Ladder system (Page 44)

9732-201-01

A

B

CD

E

FG

H I

J

K

Page 9: 999732002_2009_07_online

User information Doka large-area formwork Top50 Wall formwork

9999732002 - 07/2009 NK

The Formwork Experts

Instructions for assembly and useThe sequence shown here is based on a straight wall. However, you should always start to form from the cor-ner outwards.Ladders must be located so as to create viable "traffic routes" in the horizontal. (On a straight wall, for exam-ple, one ladder on the first element and another on the last).

Pre-assembly➤ Pre-assemble the elements face-down on an

assembly bench (see "Element assembly").

➤ Mount the platforms to the face-down element (see "Pouring-platforms with single brackets").

➤ Mount the ladder system to the face-down element (see "Ladder system").

➤ Mount panel struts to the face-down element (see "Plumbing accessories").

Erecting the formwork➤ Attach the crane suspension tackle to the lifting-

brackets (see "Lifting by crane").

➤ Pick up the element by crane.➤ Spray the ply with release agent (see "Cleaning and

care").

➤ Fly the element to its new location.

➤ Fix the panel struts firmly to the ground (see "Plumb-ing accessories").

➤ Mount the top guard-rail board.

The element is now stable and can be plumbed and aligned exactly, with no need for the crane.

➤ Detach the element from the crane.➤ Continue lining up elements in this way, and link

them together (see "Inter-element connections").

Preconditions for use:

Platforms and all accessories must only be mounted to the element when this is face-down on the ground.

It must be possible for all formwork set-up, pouring and stripping operations to be carried out from safe workplaces.

The professionals from the Doka "Ready-to-Use Service" plan and assemble site-ready and custom formworks exactly to your speci-fications.

A PlatformB Ladder systemC Panel strut

Max. load:1300 kg permitted vertical force per bracket

9732

-384

-01

A

B

C

CAUTIONNever use a sledge-hammer to plumb and align the elements!This would damage the elements.➤ Use only proper plumbing tools (e.g. a spe-

cial pry-bar) that cannot cause any damage.

WARNINGThere is not yet an opposing guard-rail on the formwork!Danger to life from fatal falls!➤ Either use personal protective equipment to

protect against falls or mount an opposing guard-rail to the element while this is still being pre-assembled in a flat position.

9732

-385

-01

Page 10: 999732002_2009_07_online

10 999732002 - 07/2009 NK

Wall formwork User information Doka large-area formwork Top50

The Formwork Experts

Erecting the opposing formwork:Once the reinforcement has been placed, the form-work can be closed.➤ Spray the ply with release agent (see "Cleaning and

care").➤ Lift the opposing formwork by crane to its next loca-

tion.

➤ Working from the ground, insert the bottom rows of form-ties (see "Form-tie system").

➤ Detach the element from the crane.➤ Insert the remaining form-ties. These form-tie loca-

tions can be reached from the platforms.➤ Continue lining up elements in this way, and link

them together (see "Inter-element connections").

Pouring

➤ Pour the concrete.➤ Make only moderate use of vibrators, carefully co-

ordinating the times and locations of vibrator use.

WARNINGThere is not yet an opposing guard-rail on the formwork!Danger to life from fatal falls!➤ Use personal protective equipment to pro-

tect against falls.

Before disconnecting from the crane:➤ If there are no panel struts on the opposing

formwork, do not disconnect the element from the crane until a large enough number of form-ties have been installed to keep it safely in the upright.

9732

-386

-01

☞ ➤ Do not exceed the maximum permissible rate of placing.

➤ See also "Concrete pressure on perpendicu-lar formwork to DIN 18218" in the Doka Cal-culation Guide.

➤ Max. pressure of the fresh concrete: Depends on structural design of elements - see also project plan

➤ Concrete compaction by vibration must com-ply with DIN 4235 Part 2.

9732

-387

-01

Page 11: 999732002_2009_07_online

User information Doka large-area formwork Top50 Wall formwork

11999732002 - 07/2009 NK

The Formwork Experts

Striking

➤ Remove any loose items from the formwork and plat-forms, or secure them firmly.

Begin work on striking the formwork on the oppos-ing formwork:➤ Undo the connectors to the adjacent elements.

➤ Take out the form-ties from the top rows of ties. These form-tie locations can be reached from the platforms.

➤ Attach the element (incl. platforms) to the crane.➤ Working from the ground, take out the bottom rows

of form-ties.

➤ Lift the element away and to its next location, or place it face-down for intermediate storage.

➤ Clean residual concrete off the form-ply (see "Clean-ing and care").

➤ Where the element has panel struts attached to it, first attach this element to the crane, and only then detach the floor anchorages of the panel struts.

☞ ➤ Observe the stipulated striking times.

WARNING➤ There must be at least as many form-ties left

in place as are needed to keep the element safely in the upright.

WARNINGThe formwork tends to adhere to the concrete. When stripping the formwork, do not try to break concrete cohesion using the crane!Risk of crane overload.➤ Use suitable tools such as timber wedges or

a special pry-bar to detach the formwork from the concrete.

9732

-388

-01

WARNINGThere is not yet an opposing guard-rail on the formwork!Danger to life from fatal falls!➤ Use personal protective equipment to pro-

tect against falls.

9732

-389

-01

Page 12: 999732002_2009_07_online

12 999732002 - 07/2009 NK

Wall formwork User information Doka large-area formwork Top50

The Formwork Experts

Top 50 element in detail

Form-ply● No restrictions on what form-ply you choose - e.g. for

smooth fair-faced concrete, wood-textured surfaces, repetitive re-use etc.

● The sheets are quick and easy to change● Custom versions possible with profiled timber form-

ers, open formwork and tongue-and-groove form-work

Steel walings (multipurpose wal-ings)● hold the Doka H 20 beams in place and give the ele-

ment rigidity● sustain the forces from the form-ties● make the elements easy to join, using plates and

connecting pins

Doka beam H20 topInnovative end-reinforcement:● reduces damage to the ends of the beams● greatly lengthens the service life

Fastening the beams

See "Element assembly" for alternative ways of fixing the Doka beams.

Crane slinging● possible by mounting the lifting-bracket and a pres-

sure bracing (see "Element assembly")

Tie-holes● can be located anywhere along the middle of the

waling between the Doka beams

Follow the directions in the “Doka formwork sheets” User Information!

9732

-209

-01

a ... 8 cmb ... 20 cm

Follow the directions in the “Doka formwork beams” User Information!

Flange-clamp H20 Beam screw

● Where more frequent alterations are needed

● Can be mounted any-where on the waling

● For bolting the Doka beams directly onto the waling

● Can be mounted any-where on the waling

9767-243-01

9729

-242

-01

a

b

9732-207-01 9732-208-01

9732

-209

-02

Page 13: 999732002_2009_07_online

User information Doka large-area formwork Top50 Wall formwork

13999732002 - 07/2009 NK

The Formwork Experts

Flexibility

SizeTop 50 elements can be assembled in widths of up to 6 m and in heights of up to 12 m.

Pressure of fresh concreteDepending on the concrete pressure required, the Doka beams and the walings are spaced closer together or further apart. This ensures optimum form-work design and the greatest economy of materials.For more information on structural design of Top 50 elements, see "Structural design".

SurfaceAny type of form-face can be used, as required:● Doka formwork sheets 3-SO● Dokaplex formwork sheets● Doka textured formwork sheets● Xlife sheets● Tongue-and-groove board formwork etc.The tie-hole pattern and the element size-grid are eas-ily adapted to suit architectural demands. The large-area elements and exact connections deliver perfect joint patterns.

ShapeCreating complex concrete shapes demands a high degree of formwork flexibility. On the large-area form-work Top50, this is achieved by the use of profiled tim-ber formers.

e.g. concrete pressure 40 kN/m2

e.g. concrete pressure 90 kN/m2

9732

-245

-01

9732

-246

-01

9732

-247

-01

9732

-248

-01

Page 14: 999732002_2009_07_online

14 999732002 - 07/2009 NK

Wall formwork User information Doka large-area formwork Top50

The Formwork Experts

Form-tie system

For correct positioning of the form-ties, see "Top 50 elements" and/or the relevant project plan.Doka also offers economical solutions for creating watertight wall-ties.

Form-tie system 15.0

As an alternative to the plastic tube with universal cone, there is also a distance piece designed as an all-in-one form-tie distance tube.

The plugs for sealing the ends of each distance piece are supplied along with it.

WARNINGSensitive rod steel!➤ Never weld or heat tie-rods.➤ Tie rods that are damaged or have been

weakened by corrosion or wear must be withdrawn from use.

➤ Only use approved tie-rods.

☞ Allow for elongation of long or coupled tie-rods (see "Doka Calculation Guide")!

Spanner for tie-rod 15.0/20.0For turning and holding the tie-rods.

9732

-212

-01

A Top 50 elementB Tie-rod 15.0C Super-plate 15.0D Plastic tube 22mmE Universal cone 22mm

☞ The "Plastic tubes 22mm" left behind in the concrete are sealed off with Plugs 22mm.

A Top 50 elementB Tie-rod 15.0C Super-plate 15.0D Distance piece (ready-to-use for certain wall thicknesses)

Tie-rod 15.0mm:Permitted capacity, allowing a 1.6 : 1 factor of safety against failure: 120 kNPermitted capacity to DIN 18216: 90 kN

9729-246-01

BC

D

A

E

9729-247-01

BC

D

A

Page 15: 999732002_2009_07_online

User information Doka large-area formwork Top50 Wall formwork

15999732002 - 07/2009 NK

The Formwork Experts

Form-ply protectionThe "Form-ply protector for tie-rod 15.0" protects the form-ply from damage at the form-tie points. This is a particular advantage for formwork with high numbers of repeat uses.Possible thicknesses of form-ply: 18 - 27 mmIn order to fit the form-ply protector, a 30 mm diameter hole must be drilled in the form-ply first.If necessary, the form-ply protector fitted into the form-ply can be closed off with the Framax plug R20/25.

Form-tie system 20.0

A Form-ply protector for tie-rod 15.0 (width-across 46 mm)B Universal cone 22mmC Plastic tube 22mmD Form-plyE Tie-rod 15.0

Tr76

8-20

0-01

AC B E

D

A Top 50 elementB Tie-rod 20.0C Super-plate 20.0 BD Plastic tube 26mmE Universal cone 26mm

Tie-rod 20.0mm:Permitted capacity, allowing a 1.6 : 1 factor of safety against failure: 220 kNPermitted capacity to DIN 18216: 150 kN

☞ The "Plastic tubes 26mm" left behind in the concrete are sealed off with "Plugs 26mm".

9732-249-01

D

AC

B

E

Page 16: 999732002_2009_07_online

16 999732002 - 07/2009 NK

Wall formwork User information Doka large-area formwork Top50

The Formwork Experts

Inter-panel connections

The elements are linked and aligned horizontally using Formwork element connectors FF20/50 Z and Con-necting pins 10cm:● fast, tension-proof joints between elements● additionally, the inter-element joint can be pulled

tight in 2 stages● insensitive to soiling● only tool needed is a hammer

The 3 zones of the Connecting pin 10cm:

To fit normally

To pull tight half the way

To pull tight all the way

Note:Only pull tight where there actually is a gap to close!

Other possible types of inter-ele-ment connection● Splice plate Top50 Z - with pull-tight function● Formwork element connector FF20/50 - without pull-

tight function● Anchoring plate FF20/50 - without pull-tight function

(for details of how to use on inside corners, see "90 degree corners")

● Splice plate with join adjustment - with pull-tight function (5 mm and 1.5 mm)

For more information, please contact your Doka techni-cian.

Section modulus: 21.6 cm3

Moment of inertia: 97.2 cm4

A Head: (hammer)B Shank: (hold)C Cone: (pull tight)

☞ When the connecting pin is used in a horizontal position, secure it with a Spring cotter 5mm.

9732

-213

-01

9729

-216

-01

A

B

C

9732-250-01

9732-251-01

9732-252-01

9732-356-01

5

5

1.51.5

Page 17: 999732002_2009_07_online

User information Doka large-area formwork Top50 Wall formwork

17999732002 - 07/2009 NK

The Formwork Experts

Examples of the system in action

Page 18: 999732002_2009_07_online

18 999732002 - 07/2009 NK

Wall formwork User information Doka large-area formwork Top50

The Formwork Experts

Length adjustment using closures

Adjustable waling extensions are used for obtaining tension-proof and slippage-free links between the Top 50 elements.

For closures of up to 50 cm

with Adjustable waling extension FF20/50 and formwork sheeting in the infill zone

Up to 23 cm

23 - 50 cm

☞ When connecting short elements to the clo-sure zone, watch out for possible collisions between the Adjustable waling extensions and the Formwork element connectors.

Adjustable waling extension FF20/50 and 1.40m Top50:Section modulus: 21.6 cm3

Moment of inertia: 97.2 cm4

9732

-214

-01

A Doka beam H20B Doka formwork sheetC Nailed-on timber stud to add support to the infillD Adjustable waling extension FF20/50E Beam clamp Top50F Connecting pin 10cm

A Adjustable waling extension FF20/50B Where statically necessary - place a tie through the closure.

9732-253-01

B C

D

A

E F

9732-254-01A B

Page 19: 999732002_2009_07_online

User information Doka large-area formwork Top50 Wall formwork

19999732002 - 07/2009 NK

The Formwork Experts

For closures of 50 - 64 cm

with Adjustable waling extension 1.40m Top50 and formwork sheeting in the infill zone

Beam clamp Top50For fastening the Doka beams H20 to the Adjustable waling extensions. The beam clamp is held in place by a Connecting pin 10cm.

For closures of 3 - 11 cm

with Adjustable waling extension FF20/50 and Joint plate in the infill zoneAvailable in heights of 3.0 and 4.0 m, the Joint plates can be placed on top of one another where needed.

A Adjustable waling extension 1.40m Top50B Where statically necessary - place a tie through the closure.

A Beam clamp Top50B Connecting pin 10cmC Adjustable waling extension

9732-255-01

A B

9732

-215

-01

C

A

B

To make the formwork easier to strip: Approx. 2 hours after pouring, loosen the Joint plate and pull it out a short way by crane.

A Joint plateB Adjustable waling extension FF20/50

9732

-216

-01

9732-256-01

B

A

Page 20: 999732002_2009_07_online

20 999732002 - 07/2009 NK

Wall formwork User information Doka large-area formwork Top50

The Formwork Experts

Height adjustment

using "Height adjuster for formwork beams"The "Height adjuster for formwork beams" is used for vertical adjustment of upright Top 50 elements, e.g. on shafts.

Adjusting range a: max. 24.5 cm

Ways of operating:● Hexagon spanner head (width-across 50) and

Reversible ratchet 3/4" (with lengthening-piece where necessary)

● Tie-rod 15.0There are holes in the hexagonal nut of the spindle for inserting a tie-rod.

For custom applications, the footplate can also be fixed on e.g multipurpose walings.

using "Height adjuster for multipur-pose walings"The "Height adjuster for multipurpose walings" is used for vertical adjustment of horizontal Top 50 elements.

Adjusting range a: max. 24.5 cm

Ways of operating:● Hexagon spanner head (width-across 50) and

Reversible ratchet 3/4" (with lengthening-piece where necessary)

● Tie-rod 15.0There are holes in the hexagonal nut of the spindle for inserting a tie-rod.

using Adjusting spindle M36The Adjusting spindle M36 is used for vertical adjust-ment of horizontal Top 50 elements.

Adjusting range a: max. 22 cm

Ways of operating:● Box nut 24 and Reversible ratchet 1/2"

A Height adjuster for formwork beams (incl. nuts & bolts etc.)

B Doka beamC Stiffening board between 2 adjacent beams (site-provided)D Sliding plate (site-provided)

Max. load: 1000 kg

☞ When using the height adjuster on shaft form-work, ensure that the platform decking is ade-quately dimensioned, as the loads act on the decking in a concentrated manner via the spin-dles!Elements can be moved and relocated more easily using sliding plates.

Tr62

0-20

0-06

A

B

C

D

a

A Height adjuster for multipurpose walingsB Connecting pin 10cm and Spring cotter 5mmC Multi-purpose waling

Max. load: 3000 kg

A Adjusting spindle M36 (incl. nuts & bolts etc)B Multi-purpose walingC Steel plate (site-provided), e.g. 150x100x10 mm

Max. load: 1000 kg

a

C

A

Tr69

7-20

0-01

B

Tr69

7-20

1-01

C

A

B

a

Page 21: 999732002_2009_07_online

User information Doka large-area formwork Top50 Wall formwork

21999732002 - 07/2009 NK

The Formwork Experts

90 degree corners

Outside cornersThe elements are clamped together with the Universal angle tie bracket and Tie-rods 15.0.

a ... 23û - 64û

The flange reinforcement prevents the flange of the beam breaking when exposed to high oblique pull from the tie-rod.

9732

-217

-01

A Universal angle tie bracketB Tie-rod 15.0C Wing nut 15.0D Connecting pin 10cmE Flange reinforcementF Plank

CAUTIONRisk of tie overload if not correctly positioned!➤ Make sure that the Universal angle tie

bracket is bolted into the right holes for the Multipurpose waling WS10 Top50 or WU12 Top50, depending on which type of waling is being used!

Bolting holes for Multi-purpose waling WS10 Top50

Bolting holes for Multi-purpose waling WU12 Top50

E Fit 2 flange reinforcements (strips of formwork sheeting) between the flanges of the outside beam, so that the form-ply of the second corner element is supported.

9732-257-01

E

A

C

B

D

9732-258-01

F

A

C

B

D

9732-381-02 9732-381-01

9732

-299

-01

E

Page 22: 999732002_2009_07_online

22 999732002 - 07/2009 NK

Wall formwork User information Doka large-area formwork Top50

The Formwork Experts

Inside corners

with Corner waling 20With the Corner waling 20, it is possible to make a gen-uine inside-corner element. The Doka beams give the element the necessary rigidity, and also ensure dimen-sional accuracy.The adjacent Top 50 elements are fastened with the normal connector components.

with Internal angle plate H20 Top50An economical way of making inside corners with a closure function. (For closures of up to 32 cm in 1 cm increments)By nailing a form-ply to the end face of standard ele-ments, these are turned into corner elements. The con-crete pressure on the end face is transferred by means of reinforcements (e.g. Fastening plate) on the edge beam.

with Shaft corner waling WS10 Top50The Shaft corner waling WS10 Top50 is a 90°-welded steel waling used for making sturdy corner elements. This special waling is custom-built on a project-specific basis.The Shaft corner waling is often used for shaft form-work (see "Shaft formwork").

Formwork sheeting Corner dimension [A]Doka 3-SO 21mm 55.0 cmDoka 3-SO 27mm 55.5 cm

A Where statically necessary - place a tie through the Corner wal-ing 20.

☞ When connecting the Corner waling 20 to adjacent elements, please remember:If the Adjustable waling extension (A) reaches a long way into the Corner waling 20, no Form-work element connector FF20 Z may be used on the 2nd leg. Because of the "pull-tight function hole-grid", it is not possible to mount the Formwork element connector FF20 Z one hole-grid further along.In this case, use an Anchoring plate FF20/50 (B) instead.

☞ See "Element assembly" for more information on how to mount the inside corner.

9732

-263

-01

A

A

A

9732-261-01

B

A

9732

-259

-01

9732

-260

-01

Page 23: 999732002_2009_07_online

User information Doka large-area formwork Top50 Wall formwork

23999732002 - 07/2009 NK

The Formwork Experts

T-junction

with Corner waling 20The Corner waling 20 allows the form-ties to cross over in the corner zone. This avoids an excessively wide spacing a between the form-ties on the opposing ele-ment.

The Offset plate FF20/50 makes it possible to arrange Multipurpose walings WS10 Top50 in parallel, as a means of reinforcing T-junctions.

Corner connections

Rounded surfaces in corner zones

using Offset plate FF20/50The Offset plate FF20/50 makes it possible to arrange Multipurpose walings WS10 Top50 in parallel, for form-ing large rounded surfaces in corner zones.

a ... 10.2 cm

A Corner waling 20

A Offset plate FF20/50B Connecting pin 10cmC Multi-purpose waling

9732

-264

-01

A A

a

TR59

4-20

1-01

ABC

A In-situ support

☞ On short walls (with high horizontal forces), shoring/tension anchoring is required to restrain the formwork.

A Offset plate FF20/50B Connecting pin 10cmC Multi-purpose waling

9732-262-01

A

9732

-390

-01

a

A

B

A

C

Page 24: 999732002_2009_07_online

24 999732002 - 07/2009 NK

Wall formwork User information Doka large-area formwork Top50

The Formwork Experts

Acute & obtuse-angled cornersFor non-right-angled corners, too, the standard compo-nents of the Large-area formwork Top 50 will always provide an optimum solution.

Outside cornersIn a similar way to the right-angled corners, on outside corners the elements are also mainly connected using Universal angle tie brackets.

Inside corners

with Articulated connecting plate A Top50 ..... °● Can be used on walings of 0.75 m and longer● Makes it possible to set two steel walings at any

angle (in a range between 61° and 299°)● Can be used over and over again

If there are no planned moments that need to be trans-ferred by the connecting plate (i.e. if it is being used as an ordinary user-adjustable form connector), it is suffi-cient to tighten the threaded joint using ordinary tools such as the Reversible ratchet 3/4".In order to achieve the stability required when the form-work is being lifted, a force of approx. 400 N should be applied to the approx. 75 cm long lever arm of a "Reversible ratchet 3/4" (to give a tightening torque of approx. 300 Nm).When used in this way as an ordinary user-adjustable form connector, it is not necessary to insert a new alu-minium locking ring. The hexagonal bolt M30x90 and the nut of the connection must always be greased before being tightened.

with Half splice plateHalf splice plates are used for fabricating low-cost cor-ner plates, with any angle, directly on the site.To make a corner plate in this way, two Half splice plates are needed. After the formwork has been plumbed at the prescribed angle, these two plates must be welded firmly together.

A Articulated connecting plate A Top50 ..... °B Connecting pin 10cmC Multi-purpose walingD Universal angle tie bracket

Permitted load:The Articulated connecting plate A Top50 .....° is designed to transfer a permitted bending moment of 9 kNm. If tensile forces (e.g. ring tensile forces) are to be transferred at the same time, the moment load must be reduced accordingly.

Per

mitt

ed b

endi

ng m

omen

t [kN

m]

Permitted normal force [kN]

9732-266-01

A

B

C

D

9732-100

10

8

6

4

2

00 20 40 60 80 100 120

☞ Important note:● When the angle is re-set, a new Aluminium

locking ring (art.n° 50 0208 020) has to be fitted.

● The angle can only be set at the Doka Cen-tral Plant in Amstetten, Austria.

➤ The user is responsible for the integrity of the welded joint!

A Half splice plateB Connecting pin 10cmC Multi-purpose walingD Universal angle tie bracketE Weld-seam

9732-265-01

A

E

D

B

C

Page 25: 999732002_2009_07_online

User information Doka large-area formwork Top50 Wall formwork

25999732002 - 07/2009 NK

The Formwork Experts

with Swivel joint plateThe Swivel joint plate is an alternative to using two Half splice plates welded onto one another.● Angles of between 45° and 180° are possible.● Rough adjustment is carried out in 35.7 mm incre-

ments (= 1/3 of the hole-grid of the Multipurpose wal-ing).

● Fine adjustment is carried out using the integral adjusting thread, with a max. theoretical formwork deviation of ±2.5 mm.

● Use suitable sealing tapes on any gaps which occur at joints.

Dimensioning diagram

Angular waling WS10 Top50The Angular waling is a welded steel waling used for making strong corner elements. The legs are rigidly fixed at any desired angle other than 90°.This special waling is custom-built on a project-specific basis.

A Swivel joint plateB Connecting pin 10cmC Multi-purpose walingD Universal angle tie bracket

Per

mitt

ed fo

rce

N [k

N]

Angle α

A

98005-226-01

B

C

D

N

N

45

40

35

30

25

20

15

10

5

0

0 20 40 60 80 100 120 140 160 180 200

Tr74

4-10

0-01

45° 90° 135°

155°

180°

A Angular waling WS10 Top50B Connecting pin 10cmC Multi-purpose walingD Universal angle tie bracketE Splice plate

9732-267-01

ABC E

9732-268-01D

ABC E

Page 26: 999732002_2009_07_online

26 999732002 - 07/2009 NK

Wall formwork User information Doka large-area formwork Top50

The Formwork Experts

Stop-end formwork

The Large-area formwork Top 50 is a complete form-work system. As such, it also offers practical solutions for e.g. the stop-end formwork.

Walls up to approx. 20 cm thickPlanks are simply nailed onto the Top50 element and a strip of formwork sheeting is inserted.

Walls thicker than approx. 20 cmThe Anchoring plate FF 20/50 ensures that the loads are safely transferred into the waling system of the Top50 elements.

The tie rods are screwed into the Anchoring plate, and the correct spacing of the stop-end element is adjusted using the Super plate 15.0.

A PlanksB Strip of formwork sheeting

9732

-218

-01

9732-270-01

B

A

Maximum permitted load where 2 Connecting pins 10cm are used: 56 kNSection modulus: 21.6 cm3

Moment of inertia: 97.2 cm4

A Anchoring plate FF20/50B Connecting pin 10cmC Super-plate 15.0D Tie-rod 15.0E Doka beamF Nailed-on plankG Multi-purpose walingH Strip of formwork sheeting

The Anchoring plate FF20/50 can also be used as a normal element connector (no pull-tight function).

Combining a Corner connecting plate 90/50 with an Anchoring plate makes it possible to lift the stop-end element jointly with the wall ele-ment.Anchoring plates are used on one side, and Corner connecting plates on the other.

9732-269-01

AC

B

E

D

F

G

H

Page 27: 999732002_2009_07_online

User information Doka large-area formwork Top50 Wall formwork

27999732002 - 07/2009 NK

The Formwork Experts

Vertical stacking of elementsThe vertical-stacking methods shown here are only suitable for:● lifting● setting down and● crane-handlingthe formwork.

with Stacking plate H20The Stacking plate H20 serves as a bolt-on longitudinal connector for Doka beams, and is used for vertical stacking of formwork elements. The plate is bolted onto the beams through the pre-drilled holes at either end of the beam.

a ... min. 40 cm

The number of Stacking plates H20 needed will depend on the overall height of the gang-form:● Up to an overall height of 6.0m: A Stacking plate

H20 must be fastened to every other beam.● Up to an overall height of 8.0m: A Stacking plate

H20 must be fastened to every beam.In addition, it is advisable to place extra multipurpose walings across the horizontal joins, in order to achieve greater stability.

● Over 8.0 m, up to a max. overall height of 14.0 m: A Stacking plate H20 must be fastened to every beam.In addition, it is absolutely essential to place extra multipurpose walings across the horizontal joins, in order to achieve sufficient stability.

Included in scope of supply:● 4 hexagonal bolts M20x70 (width-across 30 mm)● 4 hexagon nuts M20● 4 spring washers A20

Note:Make sure that the bolted connections are tightened firmly!

with board-platesAn in-situ solution that often works well in practice. The existing holes at the end of the beam can be used for making the bolted connections.

Items needed for each beam join:

*) It is also possible to use strips of 3-SO 21 or 27 mm formwork sheet instead of the planks.

☞ Important note:The vertical stacking joint must not be exposed to loads from concrete pressure or concrete weight. This means:● that the cantilever arms at the beam-joints

must be as short and symmetrical as possi-ble,

● or that users must take all statically required measures (e.g. extra waling level).

Doka beams H20 top or H20 eco Doka formwork beams H20 N or H20 P

Permitted moment:● with Doka beams H20 top or H20 eco (distance of

the outermost hole from the edge of the beam 9 cm): 2.0 kNm

● with Doka beams H20 N or H20 P (distance of the outermost hole from the edge of the beam 5 cm): 1.5 kNm

9772

-201

-01

a

9772

-201

-01

a

a ... 22.4 cm b ... 18.0 cm c ... 11.5 cm

d ... min. 80.0 cm

Permitted moment: 0.7 kNm

Plank*) 115/25, lmin = 80.0 cm 2 pcs.Hexagonal bolt M20x110 4 pcs.Hexagon nut M20 4 pcs.Washer 22 4 pcs.

9732

-273

-01

d

aa

bc

9732

-274

-01

Page 28: 999732002_2009_07_online

28 999732002 - 07/2009 NK

Wall formwork User information Doka large-area formwork Top50

The Formwork Experts

Shaft formwork

Shaft formwork with Stripping cor-ner I and Transition plateWith the Stripping corner I, the entire shaft formwork unit is detached from the wall, in one piece, before being lifted and reset by crane.Product features:● No negative impression in the concrete.● Formwork set-up and stripping function integrated in

the inside corner (no need for crane – uses stripping spindles).

● Entire shaft formwork unit is lifted and reset in one piece (with lifting-brackets and four-part lifting chain).

Two different types of stripping spindle can be used for setting up and stripping the formwork:● Framax stripping spindle I with ratchet● Framax stripping spindle IThe Transition plate makes it possible to use the Framax stripping corner I with Large-area formwork Top 50.

Vertical stacking of Framax stripping corners I1) Pull out the coupling bolt.2) Manoeuvre the Stripping corner I into place so that

it is flush with the one below it.3) Push the coupling bolt back in.4) Bolt the Stripping corners I together with 2 hexago-

nal bolts M16x45.

Mounting the Framax stripping spindles IThese mounting instructions apply to both Stripping spindles I and Stripping spindles I with ratchet.1) Pull out the U-bolt from the stripping spindle.2) Place the stripping spindle on the centering stud of

the stripping corner.3) Twist the stripping spindle clockwise until fully

engaged.4) Position the ratchet or spindle nut between the

holes in the push-rod.5) Fix the stripping spindle with the U-bolt.

Operating the Framax stripping spindle I with ratchet➤ Screw a Tie-rod 15.0mm into the Weldable coupler

15.0 of the ratchet.➤ Setting up:

- shift the change-over lever into the "L" position - turn the ratchet clockwise

➤ Stripping: - shift the change-over lever into the "R" position - turn the ratchet anti-clockwise.

A Coupling boltB Stripping corner IC Hexagonal bolt M16x45

9764

-281

-01

A

B

C

A Framax stripping spindle I or Framax stripping spindle I with ratchet

B U-boltC Centering stud of stripping cornerD Ratchet or spindle nutE Push-rod

A Tie-rod 15.0mmB Weldable coupler 15.0C RatchetD Change-over lever

Tr750-202-01

A

C

B

E

1

2

Tr750-203-01

D

5

3

Tr750-203-02

B

Tr70

6-20

2-01

A

D

C

Page 29: 999732002_2009_07_online

User information Doka large-area formwork Top50 Wall formwork

29999732002 - 07/2009 NK

The Formwork Experts

Operating the Framax stripping spindle I➤ Push a Tie-rod 15.0mm through one of the holes in

the spindle nut.➤ Setting up: Twist the spindle nut clockwise.➤ Stripping: Twist the spindle nut anti-clockwise.

Adjustment range of Transition plate

a ... 42.5 - 55.0 cmb ... Adjusting range 12.5 cm, in 2.5 cm increments

Possible sizes of shaft

Connections

Supporting the plywood face

Max. spacing c [cm] between 2 transition plates (form-ply not supported by Framax moulded timber or squared timber)

Number of quick-acting clamps RU needed (form-ply supported by Framax moulded timber or squared timber)

A Tie-rod 15.0mmB Spindle nut

A Multi-purpose walingB Transition plate 18mm or 21mmC Connecting pin 10cm and Spring cotter 5mmD Framax stripping corner IE Quick-acting clamp RU

Length of WS10 Top50 waling [cm]

Width of shaftmin. [cm] max. [cm]

75 160 185100 185 210125 210 235150 235 260175 260 285200 285 310225 310 335250 335 360275 360 385300 385 410

Tr75

0-20

4-01

B

A

Tr709-201-01

b

a

E

DBA C

D Framax quick-acting clamp RUE Connecting pin 25 cm with spring cotterF Framax screws (not included in scope of supply)

☞ In order to obtain the full available stripping-play, make sure that the Framax quick-acting clamps RU are mounted at staggered heights (i.e. not opposite one another).

Permitted formwork pres-sure

[kN/m2]Formwork sheet 30 40 50 60 703-ply sheet 21mm 15 10 10 -- --Multi-ply sheet 18mm 40 30 25 20 15Multi-ply sheet 21mm 50 40 35 30 25

Spacing c [cm] N° of quick-acting clamps RU

Max. 30 1Max. 60 2Max. 90 3

A Transition plateB Framax quick-acting clamp RUC Moulded timber or squared timber

D

E

F

Tr70

9-20

1-04

Tr70

9-20

1-02

c

A

C

B

Page 30: 999732002_2009_07_online

30 999732002 - 07/2009 NK

Wall formwork User information Doka large-area formwork Top50

The Formwork Experts

Shaft formwork closed ready for pour

Form-tie zones:

x ... 16.5 - 22.0 cm

Shaft formwork stripped ready for lifting

Stripping play:

a ... 3.0 cm b ... 6.0 cm

☞ Important note:● Only tie through the waling.

It is not permitted to tie through the Transition plate.

● The outside and inside formwork must be dimensioned in line with the structural-design requirements for the Large-area formwork Top 50 and a permitted waling load of 90 kN/m!

9732-391-01

9732-391-02

x

9732-392-01

9732

-392

-02

a

b

Page 31: 999732002_2009_07_online

User information Doka large-area formwork Top50 Wall formwork

31999732002 - 07/2009 NK

The Formwork Experts

Resetting by crane

β ... max. 15°

Shaft formwork with Corner spindle, Shaft waling squaring plate and Inside corner plate

For inside formwork in narrow cross-sections (e.g. lift shafts, stairwells etc.), the● Corner spindle,● Shaft waling squaring plate and● Inside corner platecan be used to enable rapid striking of the formwork and lifting of the complete shaft formwork, in one piece.

a ... 6 cm b ... 10 cm

The elements of the inside formwork incorporate:● Shaft corner walings or● Multipurpose walings with Corner walings 20

A Lifting-bracketB Four-part lifting chain

The crane hook on the Stripping corner I is not allowed to be used for lifting the shaft form-work.➤ The shaft formwork must only be lifted

using lifting-brackets, or in one piece with the shaft platform.

Permitted weight of the shaft formwork:4000 kg with 4 lifting-bracketsReason: 15° oblique pull in in both directions

9785-202-01

A

B

A Corner spindleB Shaft waling squaring plateC Connecting pin 10cmD Inside corner plateE Form-tie

9732-291-01

9732-293-01E

D

A

a

b

B

C

Page 32: 999732002_2009_07_online

32 999732002 - 07/2009 NK

Wall formwork User information Doka large-area formwork Top50

The Formwork Experts

Striking the formwork

➤ Loosen the form-ties on one half of the formwork.➤ Remove the form-ties from the other half of the form-

work.➤ Remove all 4 connecting pins from the Shaft waling

squaring plates.➤ Loosen the Corner spindles and Inside corner plates.➤ Pull out the Inside corner plates by crane.➤ Use the Corner spindles to pull the Inside formwork

approx. 2 - 3 cm together.➤ Remove the remaining form-ties.➤ Use the Corner spindles to pull the Inside formwork

approx. 2 - 3 cm further together.➤ Lift and reposition the entire inside formwork.

Resetting by craneUse suitably long lifting-chains or 3 two-part lifting chains in order to avoid oblique pull (depending on the size of the shaft).

If there is too much oblique pull, a stiffening reinforce-ment will be needed.For further information, see the section headed "Reset-ting by crane".

Doka shaft platformWith its telescopic shaft beams, this platform can accommodate any dimension of structure. The inside formwork can be "parked" on the platform and reposi-tioned together with the platform.

To make the formwork easier to strip: Approx. 2 hours after pouring, loosen the Inside corner plate and pull it out a short way by crane.

9732-292-01

9732-294-01

9727

-358

-01

Follow the directions in the "Doka shaft plat-form" User Information booklet.

Page 33: 999732002_2009_07_online

User information Doka large-area formwork Top50 Wall formwork

33999732002 - 07/2009 NK

The Formwork Experts

Circular formworkCurved structures can be formed with Half splice plates or Swivel joint plates. For more detailed information on these plates, see the section headed "Acute and obtuse-angled corners".Curb timbers are placed between the Doka beams and the form-ply to provide the desired shape.

Minimum bending radii of Doka formwork sheets:

with Half splice plate

Example - formwork for a circular tank

with Swivel joint plate

Formwork sheet Grain direction of face layer

Min. radius [m]

Dokaplex 9mmTransverse 2.0Longitudinal 3.5

Dokaplex 18mmTransverse 4.0Longitudinal 7.0

Dokaplex 21mmTransverse 5.0Longitudinal 8.0

Doka 3-SO 21mmTransverse 3.5Longitudinal 8.0

Doka 3-SO 27mmTransverse 5.0Longitudinal 10.0

Smaller radii can be achieved by cutting into the formwork sheets or by using strips of formwork sheeting.

A Half splice plateB Connecting pin 10cmC Curb timberD Doka beamE Multi-purpose walingF After plumbing and aligning the formwork, weld here

9732-295-01

AB

CD

E

F

9732-296-01

A Swivel joint plateB Connecting pin 10cmC Curb timberD Doka beamE Multi-purpose waling

A

98005-227-01

BE

C

D

Page 34: 999732002_2009_07_online

34 999732002 - 07/2009 NK

Wall formwork User information Doka large-area formwork Top50

The Formwork Experts

Plumbing accessories

Panel struts, Eurex 60 550 and Adjustable plumb-ing struts secure the elements against wind loads, and make it easier to plumb and align the formwork.

Permitted spacings [m] of the plumbing accesso-ries:

The values apply where the wind pressure we = 0.65 kN/m2. This results in an impact pressure qp of 0.5 kN/m2 (120 km/h) where cp, net = 1.3. In cases where higher wind pressure is encountered, the number of props must be determined by statical calculation.

Note:Every gang-form must be supported by at least 2 panel struts.

Example: Where the formwork height is 7.00 m, the fol-lowing are needed for every 8.00 m wide gang-form:● 2 Panel struts 340● 2 Eurex 60 550 / Adjustable plumbing struts

Possible ways of connecting to the multipurpose waling

Fixing to the ground➤ Anchor the plumbing accessories in such a way as to

resist tensile and compressive forces!

Drilled holes in the footplates

a ... ø 26 mm b ... ø18 mm c ... ø 28 mm d ... ø 18 mm e ... Slotted hole ø 18x38 mm f ... ø 35 mm

☞ Important note:The formwork panels must be held stable in every phase of the construction work!Please observe all applicable safety regula-tions!

For more information (wind loads etc.) see the section headed "Vertical and horizontal loads" in the Doka Calculation Guide.

Formwork height [m]Panel strut

Eurex 60 550 / Adjustable plumb-

ing strut340 540

3.00 4.004.00 3.005.00 3.006.00 2.007.00 4.00 4.008.00 3.00 4.00

For more information, see the Calculation Guide "Wind loads to the Eurocodes".

9732

-219

-01

Horizontal walingVertical waling

Variant 1 Variant 2

A Connecting pin 10cm + Spring cotter 5mm

CAUTION➤ Variant 1 is not allowed on Adjustable

plumbing struts!

Panel strut 340, 540 Eurex 60 550 Adjustable plumb-ing strut

Anchor x2!

9729-280-01 9729-279-01 A9729-281-01

A

9727-343-01

ba

9745-214-01

c d d

9727-344-01

fe

Page 35: 999732002_2009_07_online

User information Doka large-area formwork Top50 Wall formwork

35999732002 - 07/2009 NK

The Formwork Experts

Anchoring the footplateThe Doka Express anchor can be re-used many times over - the only tool needed for screwing it in is a ham-mer.

Panel struts

A Doka Express anchor 16x125mmB Doka coil 16mm

Characteristic cube compressive strength of the con-crete (fck,cube): min. 25 N/mm2 or 250 kg/cm2 (C20/25 grade concrete)

Follow the Fitting Instructions!

Required load-bearing capacity of alternative dowels: Rd≥ 20.3 kN (Fperm.≥ 13.5 kN)Follow the manufacturer's applicable fitting instruc-tions.

TR632-201-01

A

B

Product features:● Can be telescoped in 8 cm increments● Fine adjustment by screw-thread● All parts are captively integrated - including the tel-

escopic tube (has safety stop to prevent dropout)

Panel strut 340 Panel strut 540

a ... 193.0 - 340.9 cmb ... 128.3 - 181.6 cm

a ... 309.0 - 550.0 cmb ... 224.2 - 281.6 cm

9732

-275

-01

a

b

9732

-278

-01

a

b

Page 36: 999732002_2009_07_online

36 999732002 - 07/2009 NK

Wall formwork User information Doka large-area formwork Top50

The Formwork Experts

Eurex 60 550 used as a shoring & plumbing accessoryAs the "Doka plumbing strut Eurex 60 550" - fitted with the appropriate accessories - this prop can also be used for shoring high wall formwork.● Can be connected directly – without modification – to

Doka framed formwork and Doka timber-beam form-work

● The "Adjusting strut 540 Eurex 60" makes handling much easier, especially when the formwork is being transferred.

● Can be telescoped in 10 cm increments, with contin-uous fine adjustment.

Example of a possible combination of Type 4

a ... 359.2 - 601.3 cm

Follow the directions in the "Eurex 60 550" User Information!

Type

Leng

th e

xten

ded

L [m

]

Plu

mbi

ng s

trut E

urex

60

550

(A)

Ext

ensi

on E

urex

60

2.00

m (B

)

Cou

pler

Eur

ex 6

0 (C

)

Con

nect

or E

urex

60

(D)

Plu

mbi

ng s

trut s

hoe

Eur

ex 6

0 (E

)

Adj

ustin

g st

rut 5

40 E

urex

60

(F)

Pro

p he

ad (G

)

Wei

ght [

kg]

1 3.79 - 5.89 1 --- --- 1 1 1 2 91.12 5.79 - 7.89 1 1 --- 1 1 1 2 112.43 7.79 - 9.89 1 2 --- 1 1 1 2 133.74 7.22 - 11.42 2 --- 1 1 1 1 2 142.55 9.22 - 13.42 2 1 1 1 1 1 2 163.8

9745-208-011 2 3 4 5

A Plumbing strut Eurex 60 550B Extension Eurex 60 2.00mC Coupler Eurex 60D Connector Eurex 60E Plumbing strut shoe Eurex 60F Adjusting strut 540 Eurex 60G Prop headH Panel strut 340I Panel strut 540

A good rule of thumb here is:

The length of the shoring & plumbing accessory (i.e. the complete Eurex 60 550 plumbing-strut assembly) = the height of the element to be shored.

9732

-359

-01

a

G

D

A

C

A

E

FG

I H

Page 37: 999732002_2009_07_online

User information Doka large-area formwork Top50 Wall formwork

37999732002 - 07/2009 NK

The Formwork Experts

Adjustable plumbing strut

See table below for required numbers and types of intermediate pieces

Note:The Spindle head must be secured to the waling with a Connecting pin 10cm and Spring cotter 5mm!

1 ... Permitted axial load under tension = 40 kN 2 ... On timber-beam formwork: Also allow for the Connecting pin 10cm and the Spring cotter 5mm 3 ... Included in scope of supply

A Spindle headB Spindle element without hinged end-plateC Intermediate piece 2.40mD Intermediate piece 3.70mE Spindle element with hinged end-plate

9732

-277

-01

A

C

B

D

E

A Connecting pin 10cm + Spring cotter 5mm

Universal dismantling toolThe easy way to turn the spindle nuts.

A good rule of thumb here is:

The length of the Adjustable plumbing strut should be the same as the height of the formwork to be sup-ported.

9732

-276

-01

A

Type Length L [m]

Permitted axial load [kN]

under compression 1)

Spindle ele-ment with

hinged end-plate

Intermediate pieces

Spindle ele-ment without hinged end-

plate

Spindle head 2)

Hexagonal bolts M16 x 60 8.8

Nut M16 8Spring washer A16 3)

Weight[kg]

min. L half L max. L short2.40 m

long3.70 m

1 6.0 - 7.4 40.0 40.0 27.8 1 — 1 1 1 8 153.92 7.1 - 8.5 40.0 38.2 24.3 1 2 — 1 1 12 183.73 8.4 - 9.8 40.0 35.6 21.7 1 1 1 1 1 12 209.14 9.7 - 11.1 40.0 31.7 19.0 1 — 2 1 1 12 234.55 10.8 - 12.2 40.0 27.8 16.1 1 2 1 1 1 16 264.36 12.1 - 13.5 34.2 24.1 13.4 1 1 2 1 1 16 289.77 13.4 - 14.8 27.1 21.5 12.2 1 — 3 1 1 20 315.78 14.5 - 15.9 20.8 17.5 9.5 1 2 2 1 1 20 344.9

Page 38: 999732002_2009_07_online

38 999732002 - 07/2009 NK

Wall formwork User information Doka large-area formwork Top50

The Formwork Experts

Pouring platforms with single brackets

Doka brackets can be used to make pouring platforms that can easily be assembled by hand.They can be attached to any point on the Doka beam. This also makes it possible to erect intermediate plat-forms.

Universal brackets

Possible ways of fixing Universal brackets in the Doka beam H20

Preconditions for use:

Observe all applicable safety regulations.

Only fix the pouring platform onto formwork construc-tions that are sufficiently stable to transfer the expected loads.

Ensure that the formwork gang has sufficient stiff-ness.

Shore the formwork in a windproof manner when erecting it and when it is temporarily placed in the standing position.

☞ The brackets must be secured against acciden-tal lift-out

9732

-220

-01

Width b Height hUniversal bracket 90 87 160Universal bracket 60 57 106

Permitted service load: 1.5 kN/m2 (150 kg/m2)Load Class 2 to EN 12811-1:2003Max. influence width: 2.00 m

WARNINGRisk of accidental lift-out if the Universal bracket is fixed to a multipurpose waling!➤ Fix the bottom strut of every bracket with

28x60 nails or a hexagon screw M10x140 and hexagon nut M10, on both sides of the strut.

In upper hole in beam In lower hole in beam In multipurpose wal-ing

a ... 9 cm

CAUTION➤ In the case of H20 N and P Doka beams

where the first drilled hole is 5 cm from the end of the beam, it is not allowed to fix the bracket in the top hole in the beam!

9732

-285

-01

b

h

9732

-287

-01

a

9732

-288

-01

9732

-289

-01

Page 39: 999732002_2009_07_online

User information Doka large-area formwork Top50 Wall formwork

39999732002 - 07/2009 NK

The Formwork Experts

Deck and guardrail boardsPlank thicknesses for support centres of up to 2.50 m:● Deck-boards min. 20/5 cm● Guard-rail boards min. 20/3 cm

Note:Wooden platform components must, as a minimum, comply with strength grade C24 to EN 338.In Germany, wooden platform components must also bear the "Ü-symbol" mark of conformity.

Universal bracket 90Deck and guardrail boards: Per 1 metre length of platform, 0.9 m2 of floor decking and 0.8 m2 of guard-rail boards are needed (in-situ).Fastening the floor decking: with 5 square bolts M 10x70 and 1 square bolt M10x180 per bracket (included with product).Fastening the guard-rail boards: with 4 nails per bracket (not included with product).

Universal bracket 60Deck and guardrail boards: Per 1 metre length of platform, 0.6 m2 of floor decking and 0.6 m2 of guard-rail boards are needed (in-situ).Fastening the floor decking: with 3 square bolts M 10x120 per bracket (not included in scope of supply).Fastening the guard-rail boards: Use nails

Using scaffolding tubes

Tools: Fork spanner 22 for mounting the couplers and scaffolding tubes.

Top scaffold bracket L

b ... 62 cm h ... 115 cm

Possible ways of fixingSee "Universal brackets"

Deck and guardrail boardsPlank thicknesses for support centres of up to 2.50 m:● Deck-boards min. 20/5 cm● Guard-rail boards min. 20/3 cm

Note:Wooden platform components must, as a minimum, comply with strength grade C24 to EN 338.In Germany, wooden platform components must also bear the "Ü-symbol" mark of conformity.

Deck and guardrail boards: Per 1 metre length of platform, 0.65 m2 of floor decking and 0.6 m2 of guard-rail boards are needed (in-situ).Fastening the floor decking: with 3 square bolts M 10x120 per bracket (not included with product).Fastening the guard-rail boards: Use nails

Using scaffolding tubes

Tools: Fork spanner 22 for mounting the couplers and scaffolding tubes.

A Screw-on couplers 48mm 95B Scaffolding tube 48.3mm

9705

-226

-01

A

B

Permitted service load: 1.5 kN/m2 (150 kg/m2)Load Class 2 to EN 12811-1:2003Max. influence width: 2.00 m

A Scaffold tube connectorB Scaffolding tube 48.3mmC Screw-on couplers 48mm 50D Hexagon screw M14x40 + hexagon nut M14 (not included with

product)

9732

-286

-01

b

h

9705-227-01

A

B

D

C

Page 40: 999732002_2009_07_online
Page 41: 999732002_2009_07_online
Page 42: 999732002_2009_07_online
Page 43: 999732002_2009_07_online
Page 44: 999732002_2009_07_online
Page 45: 999732002_2009_07_online
Page 46: 999732002_2009_07_online
Page 47: 999732002_2009_07_online
Page 48: 999732002_2009_07_online
Page 49: 999732002_2009_07_online
Page 50: 999732002_2009_07_online
Page 51: 999732002_2009_07_online
Page 52: 999732002_2009_07_online
Page 53: 999732002_2009_07_online
Page 54: 999732002_2009_07_online
Page 55: 999732002_2009_07_online
Page 56: 999732002_2009_07_online
Page 57: 999732002_2009_07_online
Page 58: 999732002_2009_07_online
Page 59: 999732002_2009_07_online
Page 60: 999732002_2009_07_online
Page 61: 999732002_2009_07_online
Page 62: 999732002_2009_07_online
Page 63: 999732002_2009_07_online
Page 64: 999732002_2009_07_online
Page 65: 999732002_2009_07_online
Page 66: 999732002_2009_07_online
Page 67: 999732002_2009_07_online
Page 68: 999732002_2009_07_online
Page 69: 999732002_2009_07_online
Page 70: 999732002_2009_07_online
Page 71: 999732002_2009_07_online
Page 72: 999732002_2009_07_online
Page 73: 999732002_2009_07_online
Page 74: 999732002_2009_07_online
Page 75: 999732002_2009_07_online
Page 76: 999732002_2009_07_online
Page 77: 999732002_2009_07_online
Page 78: 999732002_2009_07_online
Page 79: 999732002_2009_07_online
Page 80: 999732002_2009_07_online
Page 81: 999732002_2009_07_online
Page 82: 999732002_2009_07_online
Page 83: 999732002_2009_07_online
Page 84: 999732002_2009_07_online
Page 85: 999732002_2009_07_online
Page 86: 999732002_2009_07_online
Page 87: 999732002_2009_07_online
Page 88: 999732002_2009_07_online
Page 89: 999732002_2009_07_online
Page 90: 999732002_2009_07_online
Page 91: 999732002_2009_07_online
Page 92: 999732002_2009_07_online
Page 93: 999732002_2009_07_online
Page 94: 999732002_2009_07_online
Page 95: 999732002_2009_07_online
Page 96: 999732002_2009_07_online
Page 97: 999732002_2009_07_online
Page 98: 999732002_2009_07_online
Page 99: 999732002_2009_07_online
Page 100: 999732002_2009_07_online