SAP SCM 7.01
August 2011
English
SAP SCM DemandPlanning Configuration(Y94)
SAP AGDietmar-Hopp-Allee 1669190 WalldorfGermany
Building Block Configuration Guide
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 2/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 2 of 130
Copyright
© Copyright 2009 SAP AG. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or for any purpose without theexchoose permission of SAP AG. The information contained herein may be changed without prior notice.
Some software products marketed by SAP AG and its distributors contain proprietary software components ofother software vendors.
Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.
IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, Systemz10, System z9, z10, z9, iSeries, pSeries, xSeries, zSeries, eServer, z/VM, z/OS, i5/OS, S/390, OS/390,OS/400, AS/400, S/390 Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+, POWER6,POWER5+, POWER5, POWER, OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS,HACMP, RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX, Intelligent Miner,WebSphere, Netfinity, Tivoli and Informix are trademarks or registered trademarks of IBM Corporation.
Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries.
Oracle is a registered trademark of Oracle Corporation.
UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.
Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks orregistered trademarks of Citrix Systems, Inc.
HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide WebConsortium, Massachusetts Institute of Technology.
Java is a registered trademark of Sun Microsystems, Inc.
JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology inventedand implemented by Netscape.
SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP Business ByDesign, and other SAP productsand services mentioned herein as well as their respective logos are trademarks or registered trademarks ofSAP AG in Germany and other countries.
Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web
Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as theirrespective logos are trademarks or registered trademarks of Business Objects S.A. in the United States and inother countries. Business Objects is an SAP company.
All other product and service names mentioned are the trademarks of their respective companies. Datacontained in this document serves informational purposes only. National product specifications may vary.
These materials are subject to change without notice. These materials are provided by SAP AG and itsaffiliated companies ("SAP Group") for informational purposes only, without representation or warranty of anykind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The onlywarranties for SAP Group products and services are those that are set forth in the exchoose warrantystatements accompanying such products and services, if any. Nothing herein should be construed asconstituting an additional warranty.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 3/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 3 of 130
Icons
Icon Meaning
Caution
Example
Note
Recommendation
Syntax
Typographic Conventions
Type Style Description
Example text Words or characters that appear on the screen. These include fieldnames, screen titles, pushbuttons as well as menu names, paths andoptions.
Cross-references to other documentation.
Example text Emphasized words or phrases in body text, titles of graphics and tables.
EXAMPLE TEXT Names of elements in the system. These include report names,
program names, transaction codes, table names, and individual keywords of a programming language, when surrounded by body text, forexample, SELECT and INCLUDE.
Example text Screen output. This includes file and directory names and their paths,messages, source code, names of variables and parameters as well asnames of installation, upgrade and database tools.
EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or the
ENTER key.
Example text Exact user entry. These are words or characters that you enter in thesystem exactly as they appear in the documentation.
<Example text> Variable user entry. Pointed brackets indicate that you replace these
words and characters with appropriate entries.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 4/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 4 of 130
Content1 Purpose .............................................................................................................................. 6
2 Preparation ......................................................................................................................... 6
2.1 Prerequisites ............................................................................................................ 6
3 Configuration ...................................................................................................................... 6
3.1 Setting up Demand Planning ................................................................................... 6
3.1.1 Creating the Storage Bucket Profile .................................................................... 6
3.1.2 Creating the Time Bucket Profile ......................................................................... 7
3.1.3 Creating the Planning Object Structure ............................................................... 8
3.1.4 Creating the Planning Area .................................................................................. 8
3.1.5 Creating the Forecast Profile ............................................................................. 11
3.1.6 Creating the Diagnosis Group ........................................................................... 13
3.1.7 Maintaining Characteristic Values ..................................................................... 13
3.1.8 Initializing the Planning Area ............................................................................. 14
3.2 Creating the Planning Book and Data View ........................................................... 15
3.2.1 Planning Book – Mass Processing .................................................................... 15
3.2.2 Planning Book – Central Planner ....................................................................... 20
3.2.3 Planning Book – Local Planner .......................................................................... 24
3.2.4 Defining Planning Book – Set Rows to Output Only .......................................... 26
3.2.5 Creating Selection Profiles for the Planning Book ............................................. 27
3.3 Setting up Macros .................................................................................................. 28
3.3.1 Setup Macros for Planning Book YDP_PB_MASS_JOB and Data ViewYDP_DV_DATAPRE ........................................................................................................ 28
3.3.2 Setup Macros for Planning Book YDP_PB_MASS_JOB and Data ViewYDP_DV_FCST ................................................................................................................ 30
3.3.3 Set up Macros for Planning Book YDP_PB_MASS_JOB and Data ViewYDP_DV_MACRO ............................................................................................................ 34
3.3.4 Setup Macros for Planning Book YDP_PB_MASS_JOB and Data ViewYDP_DV_RELEASE ........................................................................................................ 38
3.3.5 Setup Macros for Planning Book YDP_PB_CENTRAL_PLAN and Data ViewYDP_DV_HS_ADJ ........................................................................................................... 39
3.3.6 Set up Macros for Planning Book YDP_PB_CENTRAL_PLAN and Data ViewYDP_DV_FC_REV ........................................................................................................... 44
3.3.7 Set up Macros for Planning Book YDP_PB_LOCAL_PLAN and Data ViewYDP_DV_LOC_ADJ ......................................................................................................... 62
3.4 Setting up the Process Chain ................................................................................ 71
3.4.1 Process Chain – Data Preparation .................................................................... 71
3.4.2 Process Chain – Data Load and Preparation from ECC ................................... 79
3.4.3 Process Chain – Data Load and Preparation from Flat File .............................. 81
3.4.4 Process Chain – Forecast ................................................................................. 82
3.4.5 Process Chain – Consolidate ............................................................................ 86
3.4.6 Process Chain – Release Demand Plan to SAP ECC ...................................... 88
3.4.7 Process Chain – Release Demand Plan to APO-SNP ...................................... 92
3.4.8 Process Chain – Backup Historical Data Correction ......................................... 95
3.4.9 Process Chain – Backup Forecasting.............................................................. 100
3.4.10 Process Chain – Daily Backup Manual Changes ............................................ 106
3.4.11 Grouping Process Chain .................................................................................. 111 3.5 Setting up Alert Profile (Optional) ........................................................................ 112
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 5/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 5 of 130
3.5.1 Set Up Application-Specific Alert Profiles - APO Forecast Alert Profiles ........ 112
3.5.2 Set Up Application-Specific Alert Profiles - APO Supply & Demand Planning Alert Profiles ................................................................................................................... 114
3.5.3 Set Up Overall Alert Profiles ............................................................................ 115
3.5.4 Assign Planners to Alert Profiles (Optional) .................................................... 116
3.6 Setting up Roles and Authorizations .................................................................... 116
3.6.1 Role Overview .................................................................................................. 117
3.6.2 BI Authorization in Demand Planning .............................................................. 118
3.6.3 Authorization Role and Profile Generation ...................................................... 120
3.6.4 Creating SAP SCM Users and Assign Proper Roles ....................................... 126
3.6.5 Assigning User to Planning Book .................................................................... 127
3.7 Setting up Chart Engine (Optional) ...................................................................... 128
3.7.1 Maintaining User Setting .................................................................................. 128
3.7.2 Maintaining Chart Setting ................................................................................ 128
3.7.3 Central Maintaining and Copying Chart Customizing ...................................... 129
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 6/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 6 of 130
SAP SCM Demand Planning Configuration
1 PurposeThe purpose of this document is to describe the general configuration steps required tomanually set up the configuration within the system landscape that has already been installedusing the corresponding installation or configuration guides for installation.
This document supplements the existing Customizing documentation in the ImplementationGuide (IMG) and provides additional information where required.
2 Preparation
2.1 PrerequisitesBefore you start working on this scenario, you must have implemented the prerequisite
building blocks. For more information, see the Building Block Prerequisites Matrix for SAPDemand Planning Analytics rapid-deployment solution. You will find this document in thecontent library, attached to the roadmap.
3 ConfigurationThe following section describes the complete settings for this building block. These settingscan be divided into three main groups:
Prerequisite settings that have to be checked and which were delivered by SAP (aspart of the standard delivery)
The term Check refers to these prerequisite settings.
Settings defined by the customer (in the customer namespace and customer-
specific):
The system uses automation to request individual customer settings during thepersonalization process. These settings can be initial or reused from existingSAP ERP layers and are indicated in the text by <your value>.
Additional settings that need to be made, covered either by automation or manualconfiguration (in the customer namespace)
The term Create refers to these additional settings in the text.
3.1 Setting up Demand Planning
3.1.1 Creating the Storage Bucket Profile
Use A storage buckets profile defines the time buckets in which data based on a given planningarea is saved in Demand Planning or Supply Network Planning. You need a storage bucketprofile before you can create a planning area. You need to define a storage bucket profilebefore you can create a planning area.
Procedure1. Access the activity, use one of the following navigation options:
Transaction code /SAPAPO/TR32SAP SCM Menu Demand Planning Environment Current settings
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 7/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 7 of 130
Periodicities for Planning Area
2. The screen Maintain Periodicity is displayed. Enter the following values:
Field name User action and values Comment
Stor. buck. prof YDP_SBP_MO
Month
Year
Start date 01.01.2010 Example, maintain according tocustomer requirements
End date 31.12.2013 Example, maintain according tocustomer requirements
You select periodicities in which you want to save data and specify a defaulthorizon for which you want to create a time series. For example, besidesmonthly, you can choose weekly time bucket here according to your ownplanning requirement. You set the actual horizon when you create the timeseries of the planning area for the version.
3. Choose Save. The storage bucket profile is created.
3.1.2 Creating the Time Bucket Profile
UseTime bucket profiles define the historical or future time horizon for Demand Planning orSupply Network Planning, specifically which time buckets are used for planning, how manyperiods of each time bucket are used and the sequence in which the time buckets appear inthe planning table.
Procedure1. Access the activity, use one of the following navigation options:
Transaction code /SAPAPO/TR30
SAP SCM Menu Demand Planning Environment Current settings Maintain TimeBuckets profile for Demand Planning and Supply Network Planning
2. Define the following profiles:
Field name User action and values Comment
Time buckets prfl ID YDP_MON24 The horizon spans 24 months.
Description 24 Months
3. In the Time Buckets Prof. Details Section, enter the following value and choose Enter :
Number Basic periodicity Periv2 Display periodicity
24 M
M
4. Choose Save. The time bucket profile is created.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 8/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 8 of 130
3.1.3 Creating the Planning Object Structure
UseThe planning object structure is the structure to be used for the planning area which forms thebasis on which a demand planning cycle can be executed according to the characteristicswhich have been created earlier.
Procedure1. Access the activity, use one of the following navigation options:
Transaction Code /SAPAPO/MSDP_ADMIN
SAP SCM Menu Advanced Planning and Optimization DemandPlanning Environment /SAPAPO/MSDP_ADMIN - Administration of Demand Planning and Supply NetworkPlanning
2. Choose Planning Area and select Planning Object Structures.
3. Right-click the Plng Object Structures folder and choose Create Planning ObjectStructures. Enter the ID of your master planning object structure: for example, YDP_POS.then choose Enter .
4. On the S&DP Administration - Configure Planning Object Structure screen, enter thedescription in the text field. SNP-possible, SNP scheduling , Char.-based forecasting andDP BOMs relevant are not used.
5. Transfer the following Characteristic from the right part (Copy Fr.) to the left part(Planning Obj. Struct.) of the screen:
By selecting the info objects the navigation attribute is chose automatically
6. Choose Activate, then choose Save. The master planning object structure is created.
If you get the error message Error during SID assignment for characteristic
0REQUID (current value 2), follow the instruction in the SAP Notes 615389.
3.1.4 Creating the Planning Area
Use A planning area is the central data structure of Demand Planning. It groups together theparameters that define the scope of planning activities. It also determines where and how the
planning results are saved in liveCache.
Characteristic Description
ZY93_BC01 Product
ZY93_BC02 Product Line
ZY93_BC03 Location
ZY93_BC04 Customer
ZY93_BC05 Region
ZY93_BC06 Sales Organization
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 9/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 9 of 130
Procedure Access the activity, use one of the following navigation options:
Transaction Code /SAPAPO/MSDP_ADMIN
SAP SCM Menu Advanced Planning and Optimization DemandPlanning Environment /SAPAPO/MSDP_ADMIN - Administration of Demand Planning and Supply NetworkPlanning
1. Right-click the Planning areas folder and choose Create planning area. In the dialog boxCreate Planning Area, enter the following data:
Field name User action and values Comment
Planning area YDP_PA Your planning area
Master plg object structure YDP_POSYour master planningobject structure
Stor. bckts prfl YDP_SBP_MO Your storage bucket profile
Unit of measure EA Your unit of measure
Statistics currency EUR Optional
Exch.rate type M Optional
If you want to change settings of an existing planning area, you need todeinitialize the active planning area.
3. Choose Enter.
4. In the Change Planning Area window, choose the Key figs tab page and transfer the
required Key figs from the right part (Copy Fr.) to the left part (Planning Area) of thescreen.
Key figure Description
ZY93_BK01 Sales Quantity 1
ZY93_BK04 Hist. Sales Corr.
ZY93_BK05 Hist. Sales Override
ZY93_BK06 Corrected Sales Hist
ZY93_BK07 Statistical Forecast
ZY93_BK08 Manual Forecast
ZY93_BK09 Additional demand
ZY93_BK10 Local Fcst. Adj.
ZY93_BK11 Central Fcst. Adj
ZY93_BK12 Demand Plan
ZY93_BK91 Hist Sales w/o add.
ZY93_BK92 Additional KF 2
ZY93_BK93 Additional KF 3
ZY93_BK94 Additional KF 4
ZY93_BK95 Additional KF 5
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 10/130
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 11/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 11 of 130
Do not lock read only key-figures √
8. Choose Save and return to the planning areas overview list.
3.1.5 Creating the Forecast Profile
UseTo run a forecast, a profile needs to be set up. This contains a reference to the key figurecorrected historical on which a forecast can be generated and a target key figure where theforecast results can written to. In this configuration guide an automatic forecasting model willbe chosen based upon the historical data.
Procedure1. To Access the activity, use one of the following navigation option:
Transaction code /SAPAPO/MC96B
SAP SCM Menu Advanced Planning Optimization Demand Planning
Environment Maintain Forecast Profiles
2. On the Maintain Forecast Profile screen, choose the Master prfl. tab page and make thefollowing entries:
Field name User action and values Comment
Basic Settings
Planning area YDP_PA Your planning area
Master prflYDP_MFP
Your master forecast profile
name
Description Master profile Your profile description
Forecast key figureZY93_BK07
The key figure used to keepstatistic forecast result
Additional Settings
Period indicator M Months
Forecast Horizon
Periods24
Define a time period for yourforecast horizon
History Horizon
Periods24
Define a time period for yourhistory horizon
Model Selection
Univariate forecast√
select checkbox for univariateforecast
Univariate forecast profile
YDP_UFP
3. Choose Enter . If the information window with the information the profile does not exist isdisplayed, ignore by choosing Enter.
4. Choose the Univariate prfl tab page and enter the following values:
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 12/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 12 of 130
Field name User action and values Comment
Basic Settings
Text UNIVARIATE, WITH AUTOSELECTION
Read historical data
Key figure ZY93_BK06 Corrected SalesHistory as base datafor forecast
Version 001
Model parameters
Forecast strategy 56 Forecast withautomatic modelselection 2
Alpha 0.35Beta 0.35
Gamma 0.35
Sigma 1.25
Periods 12 Then choose Enter
Error Measure MAD
Alpha Start Value 0.15
Alpha End Value 0.35
Alpha Increment 0.1
Beta Start Value 0.15
Beta End Value 0.35
Beta Increment 0.1
Gamma Start Value 0.15
Gamma End Value 0.35
Gamma Increment 0.1
Control parameters
Outlier Correction None
Forecast Errors
MAD
MSE
RMSE
MAPE
MPE
Error total
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 13/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 13 of 130
Regarding the parameters mentioned in the table above, (that is, Alpha,Beta), here we use dot as decimal point. If you are using comma as decimalpoint, please replace the dot with comma in the table above, to make surethe input can be accepted by the system.
5. Choose Save single profile, and then choose Adopt . The Univariate profile has beenassigned to the master profile.
6. Choose the Mater Prfl. tab page, choose Save. The master forecast profile has beencreated.
3.1.6 Creating the Diagnosis Group
UseThe diagnosis group contains the threshold values, which trigger an alert when they areexceeded.
Procedure1. To Access the activity, use one of the following navigation option:
Transaction code /SAPAPO/MC96B
SAP SCM Menu Demand Planning Environment Maintain ForecastProfiles
2. Input YDP_PA in Planning Area the field, on the Master Prfl. Tab page.
3. Choose the Univariate Profil. tab page, select your Univariate Profile by input help.
4. Then choose Maintain diagnos. Group in the Model Parameters section.
5. In the dialog box Maintain Diagnosis group, maintain the value as follows:
Field name User action and values Comment
Group name
Group name YDP_DG1 Your diagnosis group name
Group Parameters
MAD upper limit 10 Your parameter
MAPE upper limit 30 Your parameter
You can choose the parameters according to your business requirements.
6. Choose Save Group to save the diagnosis group.
7. On the same screen, choose Adopt values. The defined Diagnosis Group has beenassigned to the Univariate Profile.
8. On the Univariate Forecast Profile screen, choose Save Single Profile.
3.1.7 Maintaining Characteristic Values
UseThe purpose of this activity is to determine the master data on which you want to create thedemand pans, a necessary prerequisite of demand planning.
Procedure1. Access the activity, use one of the following navigation options:
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 14/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 14 of 130
Transaction Code /SAPAPO/MC62
SAP SCM Menu Advanced Planning and Optimization Master Data
Application Specific Master data Demand Planning Maintain Characteristic Values
2. On the Maintain Planning-Relevant characteristic combinations view, enter the followingdata:
Field Name User Action and Values Note
Master Planning ObjectStructure
YDP_POS
3. In the Maintain Characteristic Combinations section, choose Create CharacteristicCombination.
4. On the Create Characteristic Combinations screen, create the following entries:
Field Name Entry Value
Create Characteristic CombinationsGenerate Immedtly X
Data Source
Load Data From: InfoProvider
InfoProvider ZY93_IC01
Data from For example, Current date – two years
To For example, Current date
Action Selection
Results Log X
5. Choose Execute.
ResultYou have generated the master data for demand planning. You can check the characteristicscombination you have just generated by using the Display characteristics combinations optionin the Maintain Planning-Relevant characteristic combinations view.
3.1.8 Initializing the Planning Area
Use
The purpose of this activity is to initialize the planning area and to create time series objects.
Procedure1. Access the activity using the following navigation options:
Transaction Code /SAPAPO/MSDP_ADMIN
SAP SCM Menu Advanced Planning and Optimization Demand Planning
Environment Administration of Demand Planning andSupply Network Planning
2. Right-click the planning area you created (for example, YDP_PA).
3. Choose Create Time Series Objects.
4. Enter the following data :
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 15/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 15 of 130
Field Name User Action and Values Notes
Plng Version 001
Start Date For example, current date – two year
End Date For example, current date + two years5. Choose Execute.
6. If an Information dialog box appears, choose Continue (Enter).
7. Go back.
ResultThe planning area YDP_PA has been successfully initialized.
3.2 Creating the Planning Book and Data View
Use A planning book defines the content and layout of the interactive planning screen. You useplanning books in Demand Planning and Supply Network Planning. They allow you to designthe screen to suit individual planning tasks. A planning book is based on a planning area.
You create one or more data views for the planning book. You need at least one view in orderto use the planning book.
In Configuration, you can assign planning books and data views to users; you can also definewhether or not a user is able To access other planning books and data views. Typically, aview is used by one demand planner or by a group of demand planners with a common
business goal. In the data view you specify the planning horizon, which means that planninghorizons can be user-specific. You can create several user-specific data views in a planningbook based on the same data.
Here we will create three Planning Books each with one or multiple data views for differentplanning activities.
3.2.1 Planning Book – Mass Processing
UseThis planning book is used for system background job, which can be scheduled to run during
non-working period, for example during night. It includes 4 data views. To create planningbook execute the following steps:
Procedure1. Access the activity, use one of the following navigation options:
Transaction code /SAPAPO/SDP8B
SAP SCM Menu Advanced Planning and Optimization Demand
Planning Environment Current settings DesignPlanning Books
2. On the SDP: Interactive Planning – Initial Screen screen, check the radio button for
Planning Book , then enter the following data:
Field name User action and values Comment
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 16/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 16 of 130
Planning Book YDP_PB_MASS_JOB Your planning book name
Then choose Create.
3. In the Planning Book Wizard dialog box, make the following entries:
Field name User action and values Comment
Planning Book text Planning book for mass job Your planning book description
Planning area YDP_PA Your planning area name
4. Choose Enter . And continue to enter the following data:
Field name User action andvalues
Comment
Include standard functions
Manual ProportionMaintenance
X
Navigate to views
Univariate forecast X
5. Choose Continue to go to the Key Figures tab page.
6. On the Key Figures tab page, assign the following key figures from Planning Area at theright side to Planning Book at the left side via drag and drop or choose Add all new KeyFigures to add all key figures:
Key figure Description
ZY93_BK01 Sales Quantity 1
ZY93_BK04 Hist. Sales Corr.
ZY93_BK05 Hist. Sales Override
ZY93_BK06 Corrected Sales Hist
ZY93_BK07 Statistical Forecast
ZY93_BK08 Manual Forecast
ZY93_BK09 Additional demand
ZY93_BK10 Local Fcst. Adj.
ZY93_BK11 Central Fcst. Adj
ZY93_BK12 Demand Plan
ZY93_BK91 Hist Sales w/o add.
The Proportional factor APODPDANT key figure is automatically added to your planningarea when you create the planning area. You do not have to add this key figure yourselfand assign it to the planning book in this step. When you create the respective view, thiskey figure will be automatically there for your selection.
7. Choose Continue to go to the Characteristics tab page.
8. On the Characteristics tab page, assign the following characteristics from the Planning Area at the right side to the Planning Book at the left side via drag and drop:
Characteristic Description
ZY93_BC01 Product
ZY93_BC02 Product Line
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 17/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 17 of 130
The
characteris
tic9AVE RSIO
N(APO Planning Version) is automatically created in the planning book.
9. Choose Continue to go to the Data View tab page to create data views for this planningbook.
3.2.1.1 Data View - YDP_DV_DATAPREUseThis data view is used to calculate the key figure Historical Sales without additional demand by subtracting Additional demand from Sales Quantity 1, the key figure Historical saleswithout additional demand will then be used as the base for statistical forecast run.
Procedure1. Go to the Data View tab page and enter the following values:
Field name User action and values Comment
Data View YDP_DV_DATAPRE
Data view Descr. DATA PREPARATION
Status 3 Changeable
Period Information
TB Profile ID(Future)
YDP_MON24 24 months in future, your timebucket profile.
TB Profile ID(History)
YDP_MON24 24 months in history, your timebucket profile.
Visible / from 01.05.2009 (first period) choose enter if the field is noteditable
Input / from 01.05.2009 (first period) choose enter if the field is noteditable
Title
Table 1 DP_DV_DATAPRE
Unit Column
Unit column Unit of measure visible
2. Choose Continue to go to the Key figures tab page and assign the following key figuresfrom the Planning Book area at right side to the Data View area at the left side via dragand drop:
Key Figures Description
ZY93_BC03 Location
ZY93_BC04 Customer
ZY93_BC05 Region
ZY93_BC06 Sales Organization
ZY93_BC08 Customer classification
ZY93_BC09 Area
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 18/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 18 of 130
ZY93_BK01 Sales quantity
ZY93_BK09 Additional demand
ZY93_BK91 Sales quantity without additional demand
You can use the up and down pushbuttons to move key figure up and down tochange the key figure display sequence in the data view.
3. Click complete.
3.2.1.2 Data View - YDP_DV_FORECASTING
UseThis data view is used to determine the statistical forecast based upon the historical sales
without additional demand key figure.
Procedure1. Go to the Data View tab page and enter the following values:
Field name User action and values Comment
Data View YDP_DV_FORECAST
Data view Descr. FORECASTING
Status 3 Changeable
Period Information
TB Profile ID(Future) YDP_MON24 24 months in future, your timebucket profile.
TB Profile ID(History)
YDP_MON24 24 months in history, your timebucket profile.
Visible / from 01.05.2009 (first period) choose enter if the field is noteditable
Input / from 01.05.2009 (first period) choose enter if the field is noteditable
Title
Title 1st GridI DPA_DV_FORECASTING
Unit Column
Unit column Unit of measure visible
2. Choose Continue to go to the Key figures tab page and assign the following key figuresfrom the planning book area at right side to the data view area at the left side via dragand drop:
Key Figures Description
ZY93_BK91 Historical Sales without additional demand
ZY93_BK04 Historical Sales Correction
ZY93_BK05 Historical Sales Override
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 19/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 19 of 130
ZY93_BK06 Corrected Sales History
ZY93_BK07 Statistical Forecast
ZY93_BK08 Manual Forecast
You can use the up and down pushbuttons to move key figure up and down tochange the key figure display sequence in the data view.
3. Choose complete.
3.2.1.3 Data View - YDP_DV_MACRO
UseThis data view is used to consolidate all input to get the final demand plan which can be
released to ECC or SNP for further planning.
Procedure1. Go to the Data View tab page and enter the following values:
Field name User action and values Comment
Data View YDP_DV_MACRO
Data view Descr. MACRO
Status 3 Changeable
Period Information
TB Profile ID(Future) YDP_MON24 24 months in future, your timebucket profile.
TB Profile ID(History)
YDP_MON24 24 months in history, your timebucket profile.
Visible / from 01.05.2009 (first period) choose enter if the field is noteditable
Input / from 01.05.2009 (first period) choose enter if the field is noteditable
Title
Title 1st GridI DPA_DV_MACRO
Unit Column
Unit column Unit of measure visible
2. Choose continue to go to the Key figures tab page and assign the following key figuresfrom the planning book area at right side to the data view area at the left side via Dragand drop:
Key Figures Description
ZY93_BK07 Statistical Forecast
ZY93_BK08 Manual Forecast
ZY93_BK10 Local Planners Forecast Adjustment
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 20/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 20 of 130
ZY93_BK09 Additional demand
ZY93_BK11 Central Planners Forecast Adjustment
ZY93_BK12 Demand Plan
You can use the up and down pushbuttons to move key figure up and down tochange the key figure display sequence in the data view.
3. Choose complete.
3.2.1.4 Data View - YDP_DV_RELEASE
UseThis data view is used to transfer the final demand plan key figure for the release to SCM or
ECC.
Procedure1. Go to the Data View tab page and enter the following values:
Field name User action and values Comment
Data View YDP_DV_RELEASE
Data View Descr. RELEASE DEMAND PLAN
Status 3 Changeable
Period Information
TB Profile ID(Future) YDP_MON24 24 months in future, your timebucket profile.
Title
Title 1st GridI DPA_DV_RELEASE
Unit Column
Unit column Unit of measure visible
4. Choose continue to go to the Key figures tab page and assign the following key figuresfrom the planning book area at right side to the data view area at the left side via dragand drop:
Key Figures Description
ZY93_BK12 Demand Plan
5. Choose complete.
3.2.2 Planning Book – Central Planner
Use A separate planning book for the central planner is defined with 2 data views. One forreviewing and correcting historical sales data and another for adjusting forecast datacentrally.
Procedure
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 21/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 21 of 130
1. Access the activity, use one of the following navigation options:
Transaction code /SAPAPO/SDP8B
SAP SCM Menu Advanced Planning and Optimization Demand
Planning Environment Current settings Design
Planning Books
2. In the SDP: Interactive Planning – Initial Screen window, check the radio button forPlanning Book , then enter the following data:
Field name User action and values Comment
Planning Book YDP_PB_CENTRAL_PLAN Your planning book name
Then choose Create.
3. The dialog box Planning Book Wizard is displayed. Enter the following data:
Field name User action and values Comment
Planning Book text Planning book for central
planner
Your planning book description
Planning area YDP_PA Your planning area name
4. Choose enter .
5. In the Planning Book Wizard , enter the following data:
Field name User action andvalues
Comment
Include standard functions
Manual ProportionMaintenance
X
Navigate to views
Univariate forecast X
6. Choose Continue to go to Key figures tab page.
7. On the Key figures tab page, assign the following key figures from planning area to planning book via drag and drop:
Key figure Description
ZY93_BK01 Sales Quantity 1
ZY93_BK04 Historical Sales Correction
ZY93_BK05 Historical Sales OverrideZY93_BK06 Corrected Sales History
ZY93_BK07 Statistical Forecast
ZY93_BK08 Manual Forecast
ZY93_BK09 Additional demand
ZY93_BK10 Local Planners Forecast Adjustment
ZY93_BK11 Central Planners Forecast Adjustment
ZY93_BK12 Demand Plan
ZY93_BK91 Historical Sales without additional demand
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 22/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 22 of 130
The Proportional factor APODPDANT key figure is automatically added to your planningarea when you create the planning area. You do not have to add this key figure yourselfand assign it to the planning book in this step. When you create the respective view, thiskey figure will be automatically there for your selection.
10. Choose Continue to go to Characteristics tab page.
11. On the Characteristics tab page, assign the following characteristics from the planningarea to the planning book via drag and drop:
The characteristic 9AVERSION (APO Planning Version) is automatically createdin the planning book.
3.2.2.1 Data View - YDP_DV_HS_ADJ
UseThis data view in the planning book Central Planner is used to review and to maintain thehistorical sales data key figures.
Procedure1. Go to the Data View tab page and enter the following values:
Field name User action and values Comment
Data View YDP_DV_HS_ADJ
Data view Descr. HISTORICAL DATA ADJUSTMENT
Status 3 Changeable
Period Information
TB Profile ID(Future)
YDP_MON24 24 months in future, yourtime bucket profile.
TB Profile ID(History)
YDP_MON24 24 months in history, yourtime bucket profile.
Visible / from 01.05.2009 (first period) choose enter if the field isnot editable
Input / from 01.05.2009 (first period) choose enter if the field isnot editable
Title
Characteristic Description
ZY93_BC01 Product
ZY93_BC02 Product Line
ZY93_BC03 Location
ZY93_BC04 Customer
ZY93_BC05 Region
ZY93_BC06 Sales Organization
ZY93_BC08 Customer classification
ZY93_BC09 Area
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 23/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 23 of 130
Table 1 DPA_DV_HS_ADJ
Unit Column
Unit column Unit of measure visible
2. Choose continue to go to the Key figures tab page and assign the following key figuresfrom the planning book area at right side to the data view area at the left side via dragand drop:
Key Figures Description
ZY93_BK01 Sales Quantity 1
ZY93_BK91 Historical Sales without additional demand
ZY93_BK04 Historical Sales Correction
ZY93_BK05 Historical Sales Override
ZY93_BK06 Corrected Sales History
You can use the up and down pushbuttons to move key figure up and down tochange the key figure display sequence in the data view.
3. Choose complete.
3.2.2.2 Data View - YDP_DV_FC_REV
UseThis data view is used to review the statistical forecast key figure and maintain the manualforecast key figures.
Procedure1. Go to the Data View tab page and enter the following values:
Field name User action and values Comment
Data View YDP_DV_FC_REV
Data view Descr. FORECAST REVIEW
Status 3 Changeable
Period Information
TB Profile ID(Future)
YDP_MON24 24 months in future, yourtime bucket profile.
TB Profile ID(History)
YDP_MON24 24 months in history, yourtime bucket profile.
Visible / from 01.05.2009 (first period)
Input / from 01.05.2009 (first period)
Title
Title 1st GridI DPA_DV_FC_REV
Unit Column
Unit column Unit of measure visible
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 24/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 24 of 130
2. Choose continue to go to the Key figures tab page and assign the following key figuresfrom the planning book area at right side to the data view area at the left side via dragand drop:
Key Figures Description
ZY93_BK01 Sales Quantity 1
ZY93_BK91 Historical Sales without additional demand
ZY93_BK07 Statistical Forecast
ZY93_BK08 Manual Forecast
ZY93_BK10 Local Planners Forecast Adjustment
ZY93_BK09 Additional demand
ZY93_BK11 Central Planners Forecast Adjustment
ZY93_BK12 Demand Plan
3. Choose Complete.
3.2.3 Planning Book – Local Planner
Use A separate planning book for the local planner is defined with 1 data view for reviewing andadjusting local forecast data.
Procedure1. Access the activity, use one of the following navigation options:
Transaction code /SAPAPO/SDP8B
SAP SCM Menu Advanced Planning and Optimization Demand
Planning Environment Current settings DesignPlanning Books
2. In the SDP: Interactive Planning – Initial Screen window, check the radio button forPlanning Book , then enter the following data:
Field name User action and values Comment
Planning Book YDP_PB_LOCAL_PLAN Your planning book name
3. Choose Create.
4. In the Planning Book Wizard dialog box, make the following entries:
Field name User action and values Comment
Planning Book text Planning book for localplanner
Your planning book description
Planning area YDP_PA Your planning area name
5. Choose Enter .
6. In the Planning Book Wizard , continue to enter the following data:
Field name User action andvalues
Comment
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 25/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 25 of 130
Include standard functions
Manual ProportionMaintenance
X
Navigate to views
Univariate forecast X
7. Choose Continue to go to Key figures tab page.
8. On the Key figures tab page, assign the following key figures from planning area to planning book via drag and drop:
Key figure Description
ZY93_BK07 Statistical Forecast
ZY93_BK08 Manual Forecast
ZY93_BK09 Additional demand
ZY93_BK10 Local Planners Forecast Adjustment
ZY93_BK11 Central Planners Forecast Adjustment
ZY93_BK12 Demand Plan
The Proportional factor APODPDANT key figure is automatically added to your planningarea when you create the planning area. You do not have to add this key figure yourselfand assign it to the planning book in this step. When you create the respective view, thiskey figure is automatically there for your selection.
9. Choose Continue to go to Characteristics tab page.
10. On the Characteristics tab page, assign the following characteristics from the planning
area to the planning book via drag and drop:
The characteristic 9AVERSION (APO Planning Version) is automatically createdin the planning book.
3.2.3.1 Data View - YDP_DV_LOC_ADJ
UseThis data view is used to review and to maintain the local forecast adjustment and additionaldemand key figures.
Characteristic Description
ZY93_BC01 Product
ZY93_BC02 Product Line
ZY93_BC03 Location
ZY93_BC04 Customer
ZY93_BC05 Region
ZY93_BC06 Sales Organization
ZY93_BC08 Customer classification
ZY93_BC09 Area
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 26/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 26 of 130
Procedure1. Go to the Data View tab page and enter the following values:
Field name User action and values Comment
Data View YDP_DV_LOC_ADJ
Data view Descr. FORECAST LOCAL ADJUSTMENT
Status 3 Changeable
Period Information
TB Profile ID(Future)
YDP_MON24 24 months in future, yourtime bucket profile.
Title
Table 1 DPA_DV_LOC_ADJ
Unit Column
Unit column Unit of measure visible
2. Choose continue to go to the Key figures tab page and assign the following key figuresfrom the planning book area at right side to the data view area at the left side via dragand drop:
Key Figures Description
ZY93_BK07 Statistical Forecast
ZY93_BK08 Manual Forecast
ZY93_BK10 Local Planners Forecast Adjustment
ZY93_BK11 Central Planners Forecast Adjustment
ZY93_BK09 Additional demand
ZY93_BK12 Demand Plan
You can use the up and down pushbuttons to move key figure up and down tochange the key figure display sequence in the data view.
3. Choose Complete
3.2.4 Defining Planning Book – Set Rows to Output Only1. Access the activity, use one of the following navigation options:
Transaction Code /SAPAPO/SDP8B
SAP SCM Menu Advanced Planning and Optimization Demand Planning
Environment Current Settings Define Planning Book
2. On the SDP: Interactive Planning – Initial Screen screen, choose the planning bookYDP_CENTRAL_PLAN and data view YDP_DV_HS_ADJ , choose combo Data View, andthen choose Change.
3. Select the row Sales Quantity 1, then right-click, and choose Select rows Output only .
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 27/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 27 of 130
4. Repeat the same change to other rows as following table:
Planning Book Data View Output Only Rows
YDP_PB_CENTRAL_PLAN
YDP_DV_HS_ADJSales Quantity 1
Historical Sales without additional demand
YDP_DV_FC_REV
Sales Quantity 1
Historical Sales without additional demand
Statistical Forecast
Additional Demand
Local Planner Forecast Adjustment
YDP_PB_LOCAL_PLAN YDP_DV_LOC_ADJ
Statistical Forecast
Manual Forecast
Central Planner Forecast Adjustment
5. When you have finished all the rows in each data view, choose Save.6. On the Confirmation prompt screen, choose Save and go back.
3.2.5 Creating Selection Profiles for the Planning Book
UseFor your planning process, you need to make a selection that restricts the range of productsand locations. To do this, you create one or more selection profiles. The demand planneruses the selection profile to quickly access frequently used selections.
Here we will create one selection profile for mass process job, 3 profiles for InteractivePlanning by each local planner, another 1 profile for Interactive Planning by central planner.
PrerequisitesYou need to have initialized the planning version 001 for your planning area.
Procedure
1. To access the planning book choose one of the following navigation options:
Transaction code /SAPAPO/SDP94
SAP SCM menu Advanced Planning and Optimization Demand Planning
Planning Interactive Demand Planning
2. On the Planning Book screen, choose one Planning Book and Data View , in the thirdwindow from above on the left side. If the No valid version exists for planning area'9ADP0 Do you want to initialize a planning version? d ialog box is displayed, choose No in the Initialize planning version?
3. Choose Data View .
4. Choose Selection window in the left screen area. The Object Selection dialog box isdisplayed.
5. From the possible entries list in the Show field, select Product .
6. The planning version 001 is automatically assigned in the field to the right of the APO
Planning Version field.
7. In the second row, restrict the range of products by specifying only those products thatyou actually need for your planning task. To do this, select Product and choose Multiple
Selection for Object . On the Select Single Values tab page, enter the following productswith extensions, for example:
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 28/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 28 of 130
L*
S*
……
8. In the third row, restrict the range of products by specifying only those areas that you
actually need for your planning task. To do this, select Area and choose MultipleSelection for Object . On the Select Single Values tab page, enter the following productswith extensions, for example:
AME
APJ
EU
9. In the Objects Selection dialog box, choose Save selection.
10. Enter YDP_MP_ALL_PROD_LOC as the selection description, and choose Save.
11. Choose Adopt.
12. To store the saved selection in your selection profile, choose Maintain selection profile inthe second window from above in left screen area. In the Maintain Selection Profiles for
Users dialog box, use drag and drop to transfer the saved selection from the right area toyour selection profile on the left.
13. Choose Save and Copy .
14. To display objects that belong to a selection profile, choose the selection. The systemdisplays the objects in the upper left screen area.
15. Repeat the steps 2 - 14 to create the other selection profiles, according to the followingtable:
Selection Description Area (for step 8)
YDP_IP_CENTRAL_ALL AME, APJ, EU
YDP_IP_LOC_AME AME
YDP_IP_LOC_APJ APJ
YDP_IP_LOC_EU EU
Result All selection profiles have been created.
3.3 Setting up Macros
3.3.1 Setup Macros for Planning Book YDP_PB_MASS_JOB
and Data View YDP_DV_DATAPREProcedure1. Access the activity, use one of the following navigation options:
SAP SCM menu Advanced Planning and Optimization Demand Planning Environment Current settings Macro Workbench
Transaction code /SAPAPO/ADVM
2. Choose the row of the planning book: YDP_PB_MASS_JOB and data view YPD_DV_DATAPRE
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 29/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 29 of 130
3.3.1.1 Macro: Calc. Hist . Sales w ithou t add. demand
UseCalculate the key figure Historical Sales without additional demand by subtracting Additionaldemand from Sales Quantity 1
Procedure
When you create the macros, follow the instructions below. Be very careful if youcopy something directly from this document into the Macro Workbench, some ofthe symbol formats are changed when saved in Microsoft Word. For example, -
becomes- in some cases. Check carefully in the Macro Workbench.
1. Right-click the node Macros in Macro Book below the planning table and choose Create
New Macro Add macro . In the APO Macro Builder dialog box, enter a descriptive textfor the macro, Calc. Hist. Sales without add. demand. Choose Continue.
2. Right-click the macro and choose Add macro Element Step . In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, First Step, then choose Past in Processing Area, and chooseContinue.
3. Right-click the macro step and choose Add Element (Result Level) Add resul ts row .In the APO Macro Builder dialog box, choose Historical Sales without additional demandin the Row field. Choose Adopt.
4. Right-click the operator/function you have just created and chooseAd d Element (Argum ent Level) Planning Table Element Add argument row . Inthe APO Macro Builder dialog box, choose Sales Quantity 1 in the Row field, and chooseContinue.
5. Right-click the result row you have just created and choose
Add Element (Argument Level) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ -“ , and choose Continue.
6. Right-click the operator/function you have just created and chooseAd d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Additional demand in the Row field,and choose Continue.
7. Select the macro and choose Check to check it. Generate the macro by choosingGenerate.
8. Move the macro by using drag and drop to the Events section and to the Start folder in
the upper right screen area.
9. If you want to continue with the configuration, proceed with the next activity to create newmacros.
If you want to discontinue the configuration at this point, we recommend that you saveyour settings.
Result
Title Level 1 Level 2 Level 3
Calc. Hist. Sales without add. demand
New step : ( 24 Iterations : M 06.2009; M 05.2011 )
Row: Historical Sales without additional demand ( Frm M 06.2009 ) =
Row: Sales Quantity 1 ( Frm M 06.2009 )
-
Row: Additional Demand ( Frm M 06.2009 )
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 30/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 30 of 130
The Final Events list (on the top left of Macro Workbench) for the data viewYDP_DV_DATAPRE should be like this:
Event Macro
Default
Level Change
Start Calc. Hist. Sales without add. demand
Exit
3.3.2 Setup Macros for Planning Book YDP_PB_MASS_JOBand Data View YDP_DV_FCST
Procedure1. Access the activity, use one of the following navigation options:
SAP SCM menu Advanced Planning and Optimization Demand Planning Environment Current settings Macro Workbench
Transaction code /SAPAPO/ADVM
2. Choosethe row of planning book: YDP_PB_MASS_JOB and data view YPD_DV_FCST
3.3.2.1 Macro: Ini t ial val: calc to co rr his t sales
UseCalculate key figure Corrected Sales History, It equals to Historical Sales Override if this keyfigure is not initial, otherwise, it equals Historical Sales without additional demand minusHistorical Sales Correction.
Procedure1. Right-click the macro node below the planning table and choose Create New Macro
Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Initial val: calc to corr hist sales. Choose Continue.
2. Right-click the macro and choose Add macro Element Step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, First Step, choose Past in Processing Area, and chooseContinue.
3. Right-click the macro step and choose Add Element (Resul t Level) Add contro l
statement .In the APO Macro Builder dialog box, choose IF . Choose Continue.
4. Right-click the result row you have just created and chooseAd d Element (Result Level) App end Condi t ion .In the APO Macro Builder dialog box, input Description Sales override = Initial , andchoose Continue.
5. Right-click the operator/function you have just created and chooseAdd Element (Argument Level) Add Operator /Funct ion . In the APO Macro Builder
dialog box, choose “IS_INITIAL(“ . Choose Continue.
6. Right-click the operator/function you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 31/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 31 of 130
row . In the APO Macro Builder dialog box, choose Historical Sales Override in the Row field, and Row Attributes in Data field in the part of Data Source: Value or Row/Column Attributes. Choose Continue.
7. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .
In the APO Macro Builder dialog box, choose “ ) = 1”. Choose Continue.8. Right-click the condition you have created in step 4 and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Corrected Sales History in the Row field. Choose Adopt.
9. Right-click the result row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Add argument row . Inthe APO Macro Builder dialog box, choose Historical Sales without additional demand inthe Row field. Choose Continue.
10. Right-click the operator/function you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ +”.Choose Continue.
11. Right-click the operator/function you have just created and choose
Add Element (Argument Element) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Historical Sales Correction in the Row field. Choose Continue.
12. Right-click the result row you have created in step 8 and choose
Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ELSE” and choose Continue.
13. Right-click the control statement you have just created and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Corrected Sales History in the Row field. Choose Adopt.
14. Right-click the result row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Historical Sales Override in the Row field. Choose Continue.
15. Right-click the result row you have created in step 13 and choose
Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue.
16. Select the macro and choose Check to check it. Generate the macro by choosingGenerate.
17. If you want to continue with the configuration, proceed with the next activity to create thenext macro.If you want to discontinue the configuration at this point, we recommend that you save
your settings.
Result
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 32/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 32 of 130
Title Level 1 Level 2 Level 3
Initial val: calc to corr hist sales
First Step : ( 24 Iterations : M 06.2009; M 05.2011 )
IF
Sales override = InitialIS_INITIAL(
Row: Historical Sales Override ( Frm M 06.2009 )
) = 1
Row: Corrected Sales History ( Frm M 06.2009 ) =
Row: Historical Sales without additional demand ( Frm M 06.2009 )
+
Row: Historical Sales Correction ( Frm M 06.2009 )
ELSE
Row: Corrected Sales History ( Frm M 06.2009 ) =
Row: Historical Sales Override ( Frm M 06.2009 )
ENDIF
3.3.2.2 Macro: Copy stat . fcst to man. fcst
UseCopy Key Figure Statistical Forecast to Manual Forecast . Key figure Statistical Forecast will
not be changed any more in the future processing steps.
Procedure
1. Right-click the macro node below the planning table and choose Create New Macro Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Copy stat. Fcst to man. fcst. Choose Continue.
2. Right-click the macro and choose Add macro Element Step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, First Step, choose Future in Processing Area, and chooseContinue.
3. Right-click the step row you have just created and choose
Add Element (Resul t Level) Add Contro l Statement .
In the APO Macro Builder dialog box, choose“ IF” and choose Continue.
4. Right-click the control statement you have just created and chooseAd d Element (Result Level) App end Condi t ion .In the APO Macro Builder dialog box, inputs Description Manual F/C fixed , and chooseContinue.
5. Right-click the condition you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “IS_FIXED(“. Choose Continue.
6. Right-click the Operator/Function you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Manual Forecast in the Row field andRow Attribute in Data field. Choose Continue.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 33/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 33 of 130
7. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) = 1”. Choose Continue.
8. Right-click the condition you have created in step 4 and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the
APO Macro Builder dialog box choose Manual Forecast in the Row field. Choose Adopt. 9. Right-click the result row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Add argument row . Inthe APO Macro Builder dialog box, choose Manual Forecast in the Row field. ChooseContinue.
10. Right-click the result row you have created in step 8 and choose
Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ELSE” and choose Continue.
11. Right-click the control statement you have just created and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Manual Forecast in the Row field. Choose Adopt.
12. Right-click the result row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Statistical Forecast in the Row field. Choose Continue.
13. Right-click the result row you have created in step 11 and choose
Add Element (Resul t Level) Append Contro l Statement .
In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue.
14. Select the macro and choose Check to check it. Choose Generate to generate the macro.
15. Choose Save.
Result
Title Level 1 Level 2 Level 3
Copy stat. Fcst to man. fcst
First Step : ( 24 Iterations : M 06.2011; M 05.2013 )
IF
Manual F/C fixed
IS_FIXED(
Row: Manual Forecast ( Frm M 06.2011 )
) = 1
Row: Manual Forecast ( Frm M 06.2011 ) =
Row: Manual Forecast ( Frm M 06.2011 )
ELSE
Row: Manual Forecast ( Frm M 06.2011 ) =
Row: Statistical Forecast ( Frm M 06.2011 )
ENDIF
The Final Events list (on the top left of Macro Workbench) for the data viewYDP_DV_FCST should be like this:
Event Macro
Default
Level Change
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 34/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 34 of 130
Start
Exit
3.3.3 Set up Macros for Planning Book YDP_PB_MASS_JOBand Data View YDP_DV_MACRO
Procedure1. Access the activity, use one of the following navigation options:
SAP SCM menu Advanced Planning and Optimization Demand Planning Environment Current settings Macro Workbench
Transaction code /SAPAPO/ADVM
2. Choose the row of the planning book: YDP_PB_MASS_JOB and data view
YPD_DV_MACRO.
3.3.3.1 Macro: Clear data for demo - start ing po int
UseClear all the data in the key figures of the planning area.
This macro is only used in testing scenario. Never use it in the production system!
Procedure
1. Right-click the macro node below the planning table and choose Create New Macro Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Clear data for demo - starting point. Choose Continue.
2. Right-click the macro and choose Add macro Element Step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, First Step, choose Total in Processing Area, and chooseContinue.
3. Right-click the step you have just created and choose
Add Element (Resul t Level) Add resul t row . In the APO Macro Builder dialog box
choose Local Planners Forecast Adjustment in the Row field, and choose Initialization inChange mode field. Choose Adopt.
4. Right-click the result row you have just created and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Statistical forecast in the Row field, and chooseInitialization in Change mode field. Choose Adopt.
5. Right-click the result row you have just created and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Central Planner Forecast Adjustment in the Row field, and choose Initialization in Change mode field. Choose Adopt.
6. Right-click the result row you have just created and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the
APO Macro Builder dialog box choose Additional demand in the Row field, and chooseInitialization in Change mode field. Choose Adopt.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 35/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 35 of 130
7. Right-click the result row you have just created and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Demand Plan in the Row field, and chooseInitialization in Change mode field. Choose Adopt.
8. Right-click the result row you have just created and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Manual Forecast in the Row field, and chooseInitialization in Change mode field. Choose Adopt.
9. Select the macro and choose Check to check it. Choose Generate to generate the macro.
10. Choose Save.
Result
Title Level 1 Level 2 Level 3
Clear data for demo - starting point
Step1: clear KF values except Hist.Sales : ( 48 Iterations : M 06.2009; M 05.2013 )Row: Statistical Forecast ( Frm M 06.2009 ) = Initial
Row: Additional Demand ( Frm M 06.2009 ) = Initial
Row: Local Planners Forecast Adjustment ( Frm M 06.2009 ) = Initial
Row: Central Planners Forecast Adjustment ( Frm M 06.2009 ) = Initial
Row: Demand Plan ( Frm M 06.2009 ) = Initial
Row: Statistical Forecast ( Frm M 06.2009 ) = Initial
Row: Manual Forecast ( Frm M 06.2011 ) =
3.3.3.2 Macro: Copy stat . fcst to man. fcst
UseCopy Key Figure Statistical Forecast to Manual Forecast . Key figure Statistical Forecast willnot be changed any more in the future processing steps.
ProcedureThe macro is exactly the same with macro in Planning Book YDP_PB_MASS_JOB, ViewYDP_DV_FCST, you don‟t need to create the macro step by step again, but import from theview YDP_DV_FCST, just like copying.
1. Choose Menu Edit and then choose Import Macro(s)
2. Choose Macro Book YDP_PB_MASS_JOB View (YDP_DV_FCST), and choose Macro
Copy stat. fcst to man. fcst. And choose Continue.
3. When a warning message appears, choose Continue or choose Enter.
4. Select the macro and choose Check to check it. Choose Generate to generate the macro.
5. Choose Save.
Result
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 36/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 36 of 130
Title Level 1 Level 2 Level 3
Copy stat. Fcst to man. fcst
First Step : ( 24 Iterations : M 06.2011; M 05.2013 )
IF
Manual F/C fixedIS_FIXED(
Row: Manual Forecast ( Frm M 06.2011 )
) = 1
Row: Manual Forecast ( Frm M 06.2011 ) =
Row: Manual Forecast ( Frm M 06.2011 )
ELSE
Row: Manual Forecast ( Frm M 06.2011 ) =
Row: Statistical Forecast ( Frm M 06.2011 )
ENDIF
3.3.3.3 Macro: Determin e KF FORECAST ADJ.CENTRAL
UseCopy the key figure Local Planners Forecast Adjustment to Central Planner Forecast Adjustment , if Planners Forecast Adjustment is not initial and Central Planner Forecast Adjustment is initial.
Procedure
1. Right-click the macro node below the planning table and choose Create New Macro Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Determine KF FORECAST ADJ.CENTRAL. Choose Continue.
2. Right-click the macro and choose Add macro Element Step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, First Step, choose Future in Processing Area, and chooseContinue.
3. Right-click the step row you have just created and choose
Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ IF” and choose Continue.
4. Right-click the control statement you have just created and chooseAd d Element (Result Level) App end Condi t ion .
In the APO Macro Builder dialog box, input Description Central Adj. is Initial & Local Adj.is not initial , and choose Continue.
5. Right-click the condition row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .
In the APO Macro Builder dialog box, choose “ IS_INITIAL(”. Choose Continue.
6. Right-click the Operator/Function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Central Planners Forecast Adjustmentin the Row field, and Row Attributes in the Data field. Choose Continue.
7. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) = 1 AND IS_INITIAL(”.Choose
Continue.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 37/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 37 of 130
8. Right-click the Operator/Function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Local Planners Forecast Adjustment inthe Row field, and Row Attributes in the Data field. Choose Continue.
9. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) = 0”. Choose Continue.
10. Right-click the condition you have created in step 4 and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row field. Choose Adopt.
11. Right-click the result row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Add argument row . Inthe APO Macro Builder dialog box, choose Local Planners Forecast Adjustment in theRow field. Choose Continue.
12. Right-click the result row you have created in step 10 and choose
Add Element (Resul t Level) Append Contro l Statement .
In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue.
13. Select the macro and choose Check to check it. Choose Generate to generate the macro.
14. Choose Save.
Result
Title Level 1 Level 2 Level 3
Determine KF FORECAST ADJ.CENTRAL
New step : ( 24 Iterations : M 06.2011; M 05.2013 )
IF
Central Adj. is Initial & Local Adj. is not initial
IS_INITIAL(
Row: Central Planners Forecast Adjustment ( Frm M 06.2011 )
) = 1 AND IS_INITIAL(
Row: Local Planners Forecast Adjustment ( Frm M 06.2011 )
) = 0
Row: Central Planners Forecast Adjustment ( Frm M 06.2011 ) =
Row: Local Planners Forecast Adjustment ( Frm M 06.2011 )
ENDIF
3.3.3.4 Macro: Calc. Demand Plan
UseCalculate the key figure Demand Plan by adding the following key figures together: ManualForecast, Central Planner Forecast Adjustment , and Additional Demand .
Procedure
1. Right-click the macro node below the planning table and choose Create New Macro Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,
Calc. Demand Plan. Choose Continue.2. Right-click the macro and choose Add macro Element Step .
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 38/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 38 of 130
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, First Step, choose Future in Processing Area, and chooseContinue.
3. Right-click the step you have just created and choose
Ad d Element (Result Level) Planning Table Element Add resul t row . In the
APO Macro Builder dialog box choose Demand Plan in the Row field. Choose Adopt. 4. Right-click the result row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Add argument row . Inthe APO Macro Builder dialog box, choose Manual Forecast in the Row field. ChooseContinue.
5. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .
In the APO Macro Builder dialog box, choose “ +”.Choose Continue.
6. Right-click the Operator/Function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Central Planners Forecast Adjustmentin the Row field. Choose Continue.
7. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ +”. Choose Continue.
8. Right-click the Operator/Function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Additional demand in the Row field.
9. Select the macro and choose Check to check it. Choose Generate to generate the macro.
10. Choose Save.
Result
Title Level 1 Level 2 Level 3
Calc. Demand Plan
New step : ( 24 Iterations : M 06.2011; M 05.2013 )
Row: Demand Plan ( Frm M 06.2011 ) =
Row: Manual Forecast ( Frm M 06.2011 )
+
Row: Central Planners Forecast Adjustment ( Frm M 06.2011 )
+
Row: Additional Demand ( Frm M 06.2011 )
The Final Events list (on the top left of Macro Workbench) for the data viewYDP_DV_MACRO should be like this:
Event Macro
Default
Level Change
Start
Exit
3.3.4 Setup Macros for Planning Book YDP_PB_MASS_JOB
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 39/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 39 of 130
and Data View YDP_DV_RELEASE
No Macro is necessary in this data view.
3.3.5 Setup Macros for Planning Book YDP_PB_CENTRAL_PLAN and Data View YDP_DV_HS_ADJ
1. Access the activity, use one of the following navigation options:
SAP SCM menu Advanced Planning and Optimization Demand Planning Environment Current settings Macro Workbench
Transaction code /SAPAPO/ADVM
2. Choose the row of the planning book: YDP_PB_CENTRAL_PLAN and data view YPD_DV_HS_AD
3.3.5.1 Macro: His Sale overrid e > 30% -BG Colo r =RED
UseThis macro gives warning if the key figure Historical Sales Override deviates from HistoricalSales without additional demand more than 30% by changing the background color of the cellto RED.
Procedure
1. Right-click the macro node below the planning table and choose Create New Macro Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,His Sale override > 30% -BG Color =RED. Choose Continue.
2. Right-click the macro and choose Add macro Element Step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Change color if percentage > 30%, choose Past in Processing Area, and choose Continue.
3. Right-click the step row you have just created and choose
Add Element (Resul t Level) Add Contro l Statement .In the APO Macro Builder dialog box, choose “ IF” and choose Continue.
4. Right-click the result row you have just created and chooseAd d Element (Result Level) App end Condi t ion .
In the APO Macro Builder dialog box, input Description Is Sales override Initial , andchoose Continue.
5. Right-click the result row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ IS_INITIAL(”.Choose Continue.
6. Right-click the operator/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Historical Sales override in the Row field and Row Attributes in Data field in the part of Data Source: Value or Row/Column Attributes. Choose Continue.
7. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) = 1”. Choose Continue.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 40/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 40 of 130
8. Right-click the condition row you have created in step 4 and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Historical Sales Override in the Row field and Attribute change in Change mode field. Choose Adopt.
9. Right-click the result row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_BG( 2 )”. Choose Continue.
10. Right-click the result row you have created in step 8 and choose
Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ELSEIF” and choose Continue.
11. Right-click the control statement row you have just created and chooseAd d Element (Result Level) Append Cond i t ion .In the APO Macro Builder dialog box, input Description Percentage > 30%, and chooseContinue.
12. Right-click the condition row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .
In the APO Macro Builder dialog box, choose “ ABS( (”. Choose Continue.
13. Right-click the operator/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Historical Sales Override in the Row field. Choose Continue.
14. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ /”. Choose Continue.
15. Right-click the operator/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Historical Sales without additionaldemand in the Row field. Choose Continue.
16. Right-click the argument row you have just created and chooseAdd Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) – 1 ) * 100 > 30”. Choose
Continue.
17. Right-click the condition you have created in step 11 and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Historical Sales Override in the Row field and Attribute Change in Change mode field. Choose Adopt.
18. Right-click the result row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_BG( 26 )”. Choose Continue.
19. Right-click the result row you have created in step 17 and choose
Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ELSE” and choose Continue.
20. Right-click the control statement row you have just created and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Historical Sales Override in the Row field and Attribute Change in Change mode field. Choose Continue.
21. Right-click the result row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_BG( 2 )”. Choose Continue.
22. Right-click the result row you have created in step 20 and choose
Add Element (Resul t Level) Append Contro l Statement .
In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue.
23. Select the macro and choose Check to check it. Choose Generate to generate the macro.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 41/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 41 of 130
24. Use drag and drop and move the macro to the Events section and to the Default folder inthe upper right screen area.
25. Choose Save.
ResultTitle Level 1 Level 2 Level 3
His Sale override > 30% -BG Color =RED
Change color if percentage > 30% : ( 24 Iterations : M 06.2009; M 05.2011 )
IF
Is Sales Override initial
IS_INITIAL(
Row: Historical Sales Override ( Frm M 06.2009 )
) = 1
Row: Historical Sales Override ( Attributes ) =
CELL_BG( 2 )
ELSEIF
Percentage > 30%
ABS( (
Row: Historical Sales Override ( Frm M 06.2009 )
/
Row: Historical Sales without additional demand ( Frm M 06.2009 )
) - 1 ) * 100
> 30
Row: Historical Sales Override ( Attributes ) =
CELL_BG( 26 )ELSE
Row: Historical Sales Override ( Attributes ) =
CELL_BG( 2 )
ENDIF
3.3.5.2 Macro: Cor . Sale / HIS Sale >30% BG COL=RED
UseThis macro gives warning if the key figure Historical Sales Correction is greater than 30% of Historical Sales without additional demand by changing the background color of the cell toRED.
Procedure
1. Right-click the macro node below the planning table and choose Create New Macro Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Cor. Sale / HIS Sale >30% BG COL=RED. Choose Continue.
2. Right-click the macro and choose Add macro Element Step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Change color if percentage > 30%, choose Past in Processing Area, and choose Continue.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 42/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 42 of 130
3. Right-click the step row you have just created and choose
Add Element (Resul t Level) Add Contro l Statement .In the APO Macro Builder dialog box, choose “ IF” and choose Continue.
4. Right-click the control statement row you have just created and chooseAd d Element (Result Level) App end Condi t ion .
In the APO Macro Builder dialog box, input Description Percentage > 30%, and chooseContinue.
5. Right-click the condition row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ABS( (”.Choose Continue.
6. Right-click the operator/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Historical Sales Correction in the Row field. Choose Continue.
7. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .
In the APO Macro Builder dialog box, choose “ /”.Choose Continue.
8. Right-click the operator/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Historical Sales without additionaldemand in the Row field. Choose Continue.
9. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) * 100 ) > 30”. Choose Continue.
10. Right-click the condition you have created in step 4 and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Historical Sales Correction in the Row field and Attribute Change in Change mode field. Choose Adopt.
11. Right-click the result row you have just created and chooseAdd Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_BG( 26 )”. Choose Continue.
12. Right-click the result row you have created in step 10 and choose
Add Element (Resul t Level) Append Contro l Statement .
In the APO Macro Builder dialog box, choose “ ELSE” and choose Continue.
13. Right-click the control statement row you have just created and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Historical Sales Correction in the Row field and Attribute Change in Change mode field. Choose Adopt.
14. Right-click the result row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .
In the APO Macro Builder dialog box, choose “ CELL_BG( 2 )”. Choose Continue.15. Right-click the result row you have created in step 13 and choose
Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue.
16. Select the macro and choose Check to check it. Choose Generate to generate the macro.
17. Use drag and drop and move the macro to the Events section and to the Default folder inthe upper right screen area.
18. Choose Save.
Result
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 43/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 43 of 130
Title Level 1 Level 2 Level 3
Cor. Sale / HIS Sale >30% BG COL=RED
Change color if percentage > 30% : ( 24 Iterations : M 06.2009; M 05.2011 )
IF
Percentage > 30%ABS( (
Row: Historical Sales Correction ( Frm M 06.2009 )
/
Row: Historical Sales without additional demand ( Frm M 06.2009 )
) * 100 ) > 30
Row: Historical Sales Correction ( Attributes ) =
CELL_BG( 26 )
ELSE
Row: Historical Sales Correction ( Attributes ) =
CELL_BG( 2 )
ENDIF
3.3.5.3 Macro: Ini t ial val: calc to co rr his t sales
UseCalculate the key figure Corrected Sales History, It equals to Historical Sales Override if thiskey figure is not initial, otherwise, it equals Historical Sales without additional demand minusHistorical Sales Correction.
Procedure
The macro is exactly the same with macro in Planning Book YDP_PB_MASS_JOB, ViewYDP_DV_FCST. You don‟t need to create the macro step by step again, but import from theview YDP_DV_FCST, just like copying.
1. Choose Menu Edit and then choose Import Macro(s)
2. Choose Macro Book YDP_PB_MASS_JOB View (YDP_DV_FCST), and choose MacroInitial val: calc to corr hist sales. And choose Continue.
3. When a warning message appears, choose Continue or choose Enter.
4. Select the macro and choose Check to check it. Choose Generate to generate the macro.
5. Use drag and drop and move the macro to the Events section and to the Default folder in
the upper right screen area.
6. Choose Save.
Result
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 44/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 44 of 130
Title Level 1 Level 2 Level 3
Initial val: calc to corr hist sales
First Step : ( 24 Iterations : M 06.2009; M 05.2011 )
IF
Sales override = InitialIS_INITIAL(
Row: Historical Sales Override ( Frm M 06.2009 )
) = 1
Row: Corrected Sales History ( Frm M 06.2009 ) =
Row: Historical Sales without additional demand ( Frm M 06.2009 )
+
Row: Historical Sales Correction ( Frm M 06.2009 )
ELSE
Row: Corrected Sales History ( Frm M 06.2009 ) =
Row: Historical Sales Override ( Frm M 06.2009 )
ENDIF
The Final Events list (on the top left of Macro Workbench) for the data viewYDP_DV_HS_ADJ should be like this:
Event Macro
Default Cor. Sale / HIS Sale >30% BG COL=RED
His Sale override > 30% -BG Color =RED
Initial val: calc to corr hist sales
Level Change
Start
Exit
3.3.6 Set up Macros for Planning Book YDP_PB_CENTRAL_PLAN and Data View YDP_DV_FC_REV
1. Access the activity, use one of the following navigation options:
SAP SCM menu Advanced Planning and Optimization Demand Planning Environment Current settings Macro Workbench
Transaction code /SAPAPO/ADVM
2. Choose the row of the planning book: YDP_PB_CENTRAL_PLAN and data view YPD_DV_FC_REV
3.3.6.1 Macro: Read Plannin g Status
UseWe use a field in the table to control the planning status. There are 3 macros that are created
to modify the value of the field to indicate the current planning status: No Planning, LocalPlanner, and Central Planner.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 45/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 45 of 130
This macro is used to read the value in the table, and modify the attribute of some key figurerows according to the planning status.
Procedure1. Right-click the macro node below the planning table and choose Create New Macro
Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Read Planning Status. Choose Continue.
2. Right-click the macro and choose Add macro Element Step .
3. In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, TS_GET, choose User-Defined in Processing Area, choose 1 inIterations, and choose Continue.
4. Right-click the step you have just created and choose
Add Element (Resul t Level) Add act ion box . In the APO Macro Builder dialog box,input Description TS_GET. Choose Continue.
5. Right-click the action box row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ LAYOUTVARIABLE_SET( ’LV_CYCLE’ ;TS_GET(”.Choose Continue.
6. Right-click the operator/function row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ 'DEMAND_PLANNING' ;'PLANNING_CYCLE' ; '*' ; '*' ; 1”. Choose Continue.
7. Right-click the operator/function row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ; 1 ) )”. Choose Continue.
8. Right-click the step row you have created in step 2 and choose
Add Element (Step Level) Append Contro l Statement for steps .In the APO Macro Builder dialog box, choose “ IF” and choose Continue.
9. Right-click the control statement row you have just created and chooseAd d Element (Step Level) Append Cond i t ion for steps .In the APO Macro Builder dialog box, input Description LOCAL, and choose Continue.
10. Right-click the condition row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .
In the APO Macro Builder dialog box, choose “ LAYOUTVAR_VALUE( ‘LV_CYCLE’ ) =1”. Choose Continue.
11. Right-click the condition row you have created in step 9 and choose Add Elem ent (Step
level) Append macro step . In the APO Macro Builder dialog box, in the descriptivetext section, enter a name for the macro step, for example, Local, choose User-Defined inProcessing Area, choose 1 in Iterations, and choose Continue.
12. Right-click the step row you have just created and choose
Ad d Element (Result Level) Planning Table Element Add resul t row . In the APO Macro Builder dialog box choose Local Planner Forecast Adjustment in the Row field and Attribute Change in Change mode field. Choose Adopt.
13. Right-click the result row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_INPUT( 1 )”. Choose Continue.
14. Right-click the result row you have created in step 12 and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Local Planner Forecast Adjustment in the Row field and Attribute Change in Change mode field. Choose Adopt.
15. Right-click the result row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_BG( 48 )”. Choose Continue.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 46/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 46 of 130
16. Right-click the step row you have created in step 11 and choose Ad d Element (Step
level) Append macro step . In the APO Macro Builder dialog box, in the descriptivetext section, enter a name for the macro step, for example, Central, choose User-Defined in Processing Area, choose 1 in Iterations, and choose Continue.
17. Right-click the step row you have just created and choose
Ad d Element (Result Level) Planning Table Element Add resul t row . In the APO Macro Builder dialog box choose Central Planner Forecast Adjustment in the Row field and Attribute Change in Change mode field. Choose Adopt.
18. Right-click the result row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_INPUT( 0 )”. Choose Continue.
19. Right-click the result row you have created in step 17 and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Central Planner Forecast Adjustment in the Row field and Attribute Change in Change mode field. Choose Adopt.
20. Right-click the result row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .
In the APO Macro Builder dialog box, choose “ ROW_BG( 17 )”. Choose Continue.
21. Right-click the step row you have created in step 16 and choose Ad d Element (Step
level) Append macro step . In the APO Macro Builder dialog box, in the descriptivetext section, enter a name for the macro step, for example, Output Pop-up, choose User-Defined in Processing Area, choose 1 in Iterations, and choose Continue.
22. Right-click the step you have just created and choose
Add Element (Resul t Level) Add act ion box . In the APO Macro Builder dialog box,input Description Output Pop-up. Choose Continue.
23. Right-click the action box row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ OUTPUT_POPUP( 'CYCLE' ;'STATUS' ; 'Local_Planner' )”. Choose Continue.
24. Right-click the step row you have created in step 21 and choose
Add Element (Step Level) Append Contro l Statement for steps .In the APO Macro Builder dialog box, choose “ ELSEIF” and choose Continue.
25. Right-click the control statement row you have just created and chooseAd d Element (Step Level) Append Cond i t ion for steps .In the APO Macro Builder dialog box, input Description CENTRAL, and choose Continue.
26. Right-click the condition row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ LAYOUTVAR_VALUE( ‘LV_CYCLE’ ) =2”. Choose Continue.
27. Right-click the control statement row you have created in step 24 and choose Add
Element (Step level) Ap pend macro step . In the APO Macro Builder dialog box, inthe descriptive text section, enter a name for the macro step, for example, LOCAL, choose User-Defined in Processing Area, choose 1 in Iterations, and choose Continue.
28. Right-click the step row you have just created and choose
Ad d Element (Result Level) Planning Table Element Add resul t row . In the APO Macro Builder dialog box choose Local Planner Forecast Adjustment in the Row field and Attribute Change in Change mode field. Choose Adopt.
29. Right-click the result row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_INPUT( 0 )”. Choose Continue.
30. Right-click the result row you have created in step 28 and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the
APO Macro Builder dialog box choose Local Planner Forecast Adjustment in the Row field and Attribute Change in Change mode field. Choose Adopt.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 47/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 47 of 130
31. Right-click the result row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_BG( 17 )”. Choose Continue.
32. Right-click the step row you have created in step 27 and choose Ad d Element (Step
level) Append macro step . In the APO Macro Builder dialog box, in the descriptive
text section, enter a name for the macro step, for example, Central, choose User-Defined in Processing Area, choose 1 in Iterations, and choose Continue.
33. Right-click the step row you have just created and choose
Ad d Element (Result Level) Planning Table Element Add resul t row . In the APO Macro Builder dialog box choose Central Planner Forecast Adjustment in the Row field and Attribute Change in Change mode field. Choose Adopt.
34. Right-click the result row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_INPUT( 1 )”. Choose Continue.
35. Right-click the result row you have created in step 33 and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Central Planner Forecast Adjustment in the Row
field and Attribute Change in Change mode field. Choose Adopt.
36. Right-click the result row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_BG( 48 )”. Choose Continue.
37. Right-click the step row you have created in step 35 and choose Ad d Element (Step
level) Append macro step . In the APO Macro Builder dialog box, in the descriptivetext section, enter a name for the macro step, for example, Output Pop-up, choose User-Defined in Processing Area, choose 1 in Iterations, and choose Continue.
38. Right-click the step you have just created and choose
Add Element (Resul t Level) Add act ion box . In the APO Macro Builder dialog box,input Description Output Pop-up. Choose Continue.
39. Right-click the action box row you have just created and chooseAdd Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ OUTPUT_POPUP( 'CYCLE' ;'STATUS' ; 'Central_Planner' )”. Choose Continue.
40. Right-click the step row you have created in step 37 and choose
Add Element (Step Level) Append Contro l Statement for steps .In the APO Macro Builder dialog box, choose “ ELSE” and choose Continue.
41. Right-click the control statement row you have just created and choose Add Element
(Step level) Ap pend macro step . In the APO Macro Builder dialog box, in thedescriptive text section, enter a name for the macro step, for example, LOCAL, chooseUser-Defined in Processing Area, choose 1 in Iterations, and choose Continue.
42. Right-click the step row you have just created and choose
Ad d Element (Result Level) Planning Table Element Add resul t row . In the APO Macro Builder dialog box choose Local Planner Forecast Adjustment in the Row field and Attribute Change in Change mode field. Choose Adopt.
43. Right-click the result row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_INPUT( 0 )”. Choose Continue.
44. Right-click the result row you have created in step 42 and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Local Planner Forecast Adjustment in the Row field and Attribute Change in Change mode field. Choose Adopt.
45. Right-click the result row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .
In the APO Macro Builder dialog box, choose “ ROW_BG( 17 )”. Choose Continue.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 48/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 48 of 130
46. Right-click the step row you have created in step 44 and choose Ad d Element (Step
level) Append macro step . In the APO Macro Builder dialog box, in the descriptivetext section, enter a name for the macro step, for example, Central, choose User-Defined in Processing Area, choose 1 in Iterations, and choose Continue.
47. Right-click the step row you have just created and choose
Ad d Element (Result Level) Planning Table Element Add resul t row . In the APO Macro Builder dialog box choose Central Planner Forecast Adjustment in the Row field and Attribute Change in Change mode field. Choose Adopt.
48. Right-click the result row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_INPUT( 0 )”. Choose Continue.
49. Right-click the result row you have created in step 47 and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Central Planner Forecast Adjustment in the Row field and Attribute Change in Change mode field. Choose Adopt.
50. Right-click the result row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .
In the APO Macro Builder dialog box, choose “ ROW_BG( 17 )”. Choose Continue.
51. Right-click the step row you have created in step 46 and choose Ad d Element (Step
level) Append macro step . In the APO Macro Builder dialog box, in the descriptivetext section, enter a name for the macro step, for example, Output Pop-up, choose User-Defined in Processing Area, choose 1 in Iterations, and choose Continue.
52. Right-click the step you have just created and choose
Add Element (Resul t Level) Add act ion box . In the APO Macro Builder dialog box,input Description Output Pop-up. Choose Continue.
53. Right-click the action box row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ OUTPUT_POPUP( 'CYCLE' ;'STATUS' ; 'No_Planning' )”. Choose Continue.
54. Right-click the step row you have created in step 51 and choose Ad d Element (Step
level) Append macro step . In the APO Macro Builder dialog box, in the descriptivetext section, enter a name for the macro step, for example, Process Message, chooseUser-Defined in Processing Area, choose 1 in Iterations, and choose Continue.
55. Right-click the step row you have just created and choose
Add Element (Resul t Level) Add process message .In the APO Macro Builder dialog box, in the descriptive text section, enter WARNING:Status neither Local nor Central, choose Information in Message Type field, and chooseContinue.
56. Right-click the step row you have created in step 54 and choose
Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “
ENDIF” and choose Continue.
57. Right-click the step with name Local, Choose Active/Inactive in the context menu. Repeatthe same operation for all the 3 steps with name Local .
58. Select the macro and choose Check to check it. Choose Generate to generate the macro.
59. Use drag and drop and move the macro to the Events section and to the Start folder inthe upper right screen area.
60. Choose Save.
Result
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 49/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 49 of 130
Title Level 1 Level 2 Level 3
Read Planning Status
TS_GET : ( 1 Iterations : M 07.2009; M 07.2009 )
TS_GET
LAYOUTVARIABLE_SET( 'LV_CYCLE' ; TS_GET('DEMAND_PLANNING' ; 'PLANNING_CYCLE' ; '*' ; '*' ; 1
; 1 ) )
IF
LOCAL
LAYOUTVAR_VALUE( 'LV_CYCLE' ) = 1
* LOCAL : ( 1 Iterations : M 07.2009; M 07.2009 )
Row: Local Planners Forecast Adjustment ( Attributes ) =
ROW_INPUT( 1 )
Row: Local Planners Forecast Adjustment ( Attributes ) =
ROW_BG( 48 )CENTRAL : ( 1 Iterations : M 07.2009; M 07.2009 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
ROW_INPUT( 0 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
ROW_BG( 17 )
Output Pop-up : ( 1 Iterations : M 07.2009; M 07.2009 )
Output Pop-up
OUTPUT_POPUP( 'CYCLE' ; 'STATUS' ; 'Local_Planner' )
ELSEIF
CENTRAL
LAYOUTVAR_VALUE( 'LV_CYCLE' ) = 2
* LOCAL : ( 1 Iterations : M 07.2009; M 07.2009 )
Row: Local Planners Forecast Adjustment ( Attributes ) =
ROW_INPUT( 0 )
Row: Local Planners Forecast Adjustment ( Attributes ) =
ROW_BG( 17 )
CENTRAL : ( 1 Iterations : M 07.2009; M 07.2009 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
ROW_INPUT( 1 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
ROW_BG( 48 )
Output Pop-up : ( 1 Iterations : M 07.2009; M 07.2009 )
Output Pop-up
OUTPUT_POPUP( 'CYCLE' ; 'STATUS' ; 'Central_Planner' )
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 50/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 50 of 130
Title Level 1 Level 2 Level 3
ELSE
* LOCAL : ( 1 Iterations : M 07.2009; M 07.2009 )
Row: Local Planners Forecast Adjustment ( Attributes ) =
ROW_INPUT( 0 )Row: Local Planners Forecast Adjustment ( Attributes ) =
ROW_BG( 17 )
CENTRAL : ( 1 Iterations : M 07.2009; M 07.2009 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
ROW_INPUT( 0 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
ROW_BG( 17 )
Output Pop-up : ( 1 Iterations : M 07.2009; M 07.2009 )
Output Pop-up
OUTPUT_POPUP( 'CYCLE' ; 'STATUS' ; 'No_Planning' )
Process Message : ( 1 Iterations : M 07.2009; M 07.2009 )Information [ WARNING Status neither Local nor Central ]
ENDIF
The rows with * in the first column should be inactivated.
3.3.6.2 Macro: Set Plannin g Cycle to "No Planning "
UseModify the value of the field in the table to 0. This means that, currently, the planning status isneither Local Planner, nor Central Planner.
Procedure1. Right-click the macro node below the planning table and choose Create New Macro
Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Set Planning Cycle to "No Planning". Choose button Choose to assign a suitable icon forthis macro (Please make sure the icon is different with the often used ones, and differentwith the icon assigned to other Macros). Choose Continue.
2. Right-click the macro and choose Add macro Element Step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, TS_SET: “ No Planning ” , choose User-Defined in Processing Area, choose 1 in Iterations, and choose Continue.
3. Right-click the step you have just created and choose
Add Element (Resul t Level) Add act ion box . In the APO Macro Builder dialog box,input Description TS_SET: “ No Planning ” . Choose Continue.
4. Right-click the action box row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ TS_SET( ‘DEMAND_PLANNING’ ;
‘PLANNING_CYCLE’ ;”. Choose Continue.
5. Right-click the operation/function row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ’*’ ; ‘*’ ; 1 ; 0 )”. Choose
Continue.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 51/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 51 of 130
6. Right-click the step you have created in step 2 and choose Ad d Element (Step Level)
Append macro step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Set Central Adj to no input, choose User-defined in Processing Area, choose 1 in Iterations, and choose Continue.
7. Right-click the step you have just created and chooseAd d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row field, and Attribute change in Change mode field. Choose Adopt.
8. Right-click the result row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_INPUT( 0 )”. Choose Continue.
9. Right-click the result row you have created in step 7and choose
Ad d Element (Result Level) Planning Table Element Append resul t row In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row field, and Attribute change in Change mode field. Choose Adopt.
10. Right-click the result row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_BG( 17 )”. Choose Continue.
11. Select the macro and choose Check to check it. Choose Generate to generate the macro.
12. Choose Save.
Result
Title Level 1 Level 2 Level 3
Set Planning Cycle to "No Planning"
TS_SET: “No Planning” : ( 1 Iterations : M 06.2009; M 06.2009 )
TS_SET: “No Planning”
TS_SET( 'DEMAND_PLANNING' ; 'PLANNING_CYCLE' ;
'*' ; '*' ; 1 ; 0 )
SET Central Attr. : ( 1 Iterations : M 06.2009; M 06.2009 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
ROW_INPUT( 0 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
ROW_BG( 17 )
3.3.6.3 Macro: Set Planning Cycle to " Loc al Planner"
UseModify the value of the field in the table to 1. This means that, currently, the planning status isLocal Planner.
Procedure1. Right-click the macro node below the planning table and choose Create New Macro
Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Set Planning Cycle to "Local Planner". Choose button Choose to assign a suitable iconfor this macro (Please make sure the icon is different with the often used ones, anddifferent with the icon assigned to other Macros). Choose Continue.
2. Right-click the macro and choose Add macro Element Step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, TS_SET: “ Local Planner ” , choose User-Defined in Processing Area, choose 1 in Iterations, and choose Continue.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 52/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 52 of 130
3. Right-click the step you have just created and choose
Add Element (Resul t Level) Add act ion box . In the APO Macro Builder dialog box,input Description TS_SET: “ Local Plannner ” . Choose Continue.
4. Right-click the action box row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .
In the APO Macro Builder dialog box, choose “ TS_SET( ‘DEMAND_PLANNING’ ;‘PLANNING_CYCLE’ ;”. Choose Continue.
5. Right-click the operation/function row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ’*’ ; ‘*’ ; 1 ; 1 )”. Choose
Continue.
6. Right-click the step you have created in step 2 and choose Ad d Element (Step Level)
Append macro step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Set Central Adj to no input, choose User-defined in Processing Area, choose 1 in Iterations, and choose Continue.
7. Right-click the step you have just created and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row field, and Attribute change in Change mode field. Choose Adopt.
8. Right-click the result row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_INPUT( 0 )”. Choose Continue.
9. Right-click the result row you have created in step 7and choose
Ad d Element (Result Level) Planning Table Element Append resul t row In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row field, and Attribute change in Change mode field. Choose Adopt.
10. Right-click the result row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_BG( 17 )”. Choose Continue.
11. Select the macro and choose Check to check it. Choose Generate to generate the macro.
12. Choose Save.
Result
Title Level 1 Level 2 Level 3
Set Planning Cycle to "Local Planner"
TS_SET: “Local Planner” : ( 1 Iterations : M 06.2009; M 06.2009 )
TS_SET: “Local Plannner”
TS_SET( 'DEMAND_PLANNING' ; 'PLANNING_CYCLE' ;'*' ; '*' ; 1 ; 1 )
SET Central Attr. : ( 1 Iterations : M 06.2009; M 06.2009 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
ROW_INPUT( 0 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
ROW_BG( 17 )
3.3.6.4 Macro: Set Planning Cyc le to " Central Planner"
UseModify the value of the field in the table to 2. This means that, currently, the planning status isCentral Planner.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 53/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 53 of 130
Procedure1. Right-click the macro node below the planning table and choose Create New Macro
Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Set Planning Cycle to "Central Planner". Choose button Choose to assign a suitable iconfor this macro (Please make sure the icon is different with the often used ones, and
different with the icon assigned to other Macros). Choose Continue.
2. Right-click the macro and choose Add macro Element Step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, TS_SET: “ Central Planner ” , choose User-Defined in Processing Area, choose 1 in Iterations, and choose Continue.
3. Right-click the step you have just created and choose
Add Element (Resul t Level) Add act ion box . In the APO Macro Builder dialog box,input Description TS_SET: “ Central Planner ” . Choose Continue.
4. Right-click the action box row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ TS_SET( ‘DEMAND_PLANNING’ ;‘PLANNING_CYCLE
’ ;”. Choose Continue.
5. Right-click the operation/function row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ’*’ ; ‘*’ ; 1 ; 2 )”. Choose
Continue.
6. Right-click the step you have created in step 2 and choose Ad d Element (Step Level)
Append macro step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Set Central Adj to input, choose User-defined in Processing Area, choose 1 in Iterations, and choose Continue.
7. Right-click the step you have just created and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the
APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row field, and Attribute change in Change mode field. Choose Adopt.
8. Right-click the result row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_INPUT( 1 )”. Choose Continue.
9. Right-click the result row you have created in step 7and choose
Ad d Element (Result Level) Planning Table Element Append resul t row In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row field, and Attribute change in Change mode field. Choose Adopt.
10. Right-click the result row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_BG( 48 )”. Choose Continue.
11. Select the macro and choose Check to check it. Choose Generate to generate the macro.
12. Choose Save.
Result
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 54/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 54 of 130
Title Level 1 Level 2 Level 3
Set Planning Cycle to "Central Planner"
TS_SET: “Central Planner” : ( 1 Iterations : M 06.2009; M 06.2009 )
New action box
TS_SET( 'DEMAND_PLANNING' ; 'PLANNING_CYCLE' ;'*' ; '*' ; 1 ; 2 )
SET Central Attr. : ( 1 Iterations : M 06.2009; M 06.2009 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
ROW_INPUT( 1 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
ROW_BG( 48 )
3.3.6.5 Macro: Copy fc st Local Adj. to Central Ad j.
UseCopy the key figure Local Planners Forecast Adjustment to Central Planner Forecast Adjustment , if Central Planner Forecast Adjustment is not fixed.
Procedure
1. Right-click the macro node below the planning table and choose Create New Macro Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Copy fcst Local Adj. to Central Adj. Choose Continue.
2. Right-click the macro and choose Add macro Element Step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Determine FCST Adj. Central, choose Future in Processing Area, and choose Continue.
3. Right-click the step row you have just created and choose
Add Element (Resul t Level) Add Contro l Statement .In the APO Macro Builder dialog box, choose “ IF” and choose Continue.
4. Right-click the control statement row you have just created and chooseAd d Element (Result Level) App end Condi t ion .In the APO Macro Builder dialog box, input description FCST Adj. Central is fixed andchoose Continue.
5. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .
In the APO Macro Builder dialog box, choose “ IS_FIXED(”.Choose Continue.
6. Right-click the operation/function row you have just created and chooseAd d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Central Planners Forecast Adjustmentin the Row field, and Row Attribute in Data field. Choose Continue.
7. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) = 0 AND IS_INITIAL(”. Choose
Continue.
8. Right-click the operation/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Local Planners Forecast Adjustment inthe Row field, and Row Attribute in Data field. Choose Continue.
9. Right-click the argument row you have just created and chooseAdd Element (Argument Element) Append Operator /Funct ion .
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 55/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 55 of 130
In the APO Macro Builder dialog box, choose “ ) = 0 AND IS_PARTLY_FIXED(”.
Choose Continue.
10. Right-click the operation/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Cental Planners Forecast Adjustment
in the Row field, and Row Attribute in Data field. Choose Continue.11. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) = 0”. Choose Continue.
12. Right-click the condition row you have created in step 4 and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Central Planner Forecast Adjustment field. Choose Adopt .
13. Right-click the result row you have just created and choose
Add Element (Argument Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Local Planners Forecast Adjustment inthe Row field. Choose Continue.
14. Right-click the result row you have created in step 12 and choose
Add Element (Resul t Level) Append Contro l Statement .
In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue.
15. Select the macro and choose Check to check it. Choose Generate to generate the macro.
16. Use drag and drop and move the macro to the Events section and to the Start folder inthe upper right screen area.
17. Choose Save.
Result
Title Level 1 Level 2 Level 3Copy fcst Local Adj. to Central Adj.
Determine FCST Adj. Central : ( 24 Iterations : M 07.2011; M 06.2013 )
IF
FCST Adj. Central is fixed
IS_FIXED(
Row: Central Planners Forecast Adjustment ( Frm M 07.2011 )
) = 0 and is_initial(
Row: Local Planners Forecast Adjustment ( Frm M 07.2011 )
) = 0 and is_partly_fixed(
Row: Central Planners Forecast Adjustment ( Frm M 07.2011 )) = 0
Row: Central Planners Forecast Adjustment ( Frm M 07.2011 ) =
Row: Local Planners Forecast Adjustment ( Frm M 07.2011 )
ENDIF
3.3.6.6 Macro: Calc. Demand Plan
UseCalculate the key figure Demand Plan by adding the following key figures together: ManualForecast, Central Planner Forecast Adjustment , and Additional Demand .
Procedure
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 56/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 56 of 130
The macro is exactly the same as the macro in the Planning Book YDP_PB_MASS_JOB,View YDP_DV_MACRO. You do not need to create the macro step by step again, but youneed to import it from the view YDP_DV_MACRO, just like copying.
1. Choose Menu Edit and then choose Import Macro(s)
2. Choose Macro Book YDP_PB_MASS_JOB View (YDP_DV_MACRO), and choose MacroCalc. Demand Plan. And choose Continue.
3. If a warning message appears, choose Continue or Enter.
4. Select the macro and choose Check to check it. Choose Generate to generate the macro.
5. Use drag and drop and move the macro to the Events section and to the Default folder inthe upper right screen area.
6. Choose Save.
Result
Title Level 1 Level 2 Level 3
Calc. Demand Plan
New step : ( 24 Iterations : M 06.2011; M 05.2013 )
Row: Demand Plan ( Frm M 06.2011 ) =
Row: Manual Forecast ( Frm M 06.2011 )
+
Row: Central Planners Forecast Adjustment ( Frm M 06.2011 )
+
Row: Additional Demand ( Frm M 06.2011 )
3.3.6.7 Macro: Au tomatic Fix "Central Planner Ad j."
UseFix the key figure cell Central Planners Forecast Adjustment, if it does not equal to LocalPlanners Forecast Adjustment. This macro is used for making sure the changed value ofCentral Planners Forecast Adjustment will not be overwritten by macro Copy fcst Local Adj. toCentral Adj.
Procedure1. Right-click the macro node below the planning table and choose Create New Macro
Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro, Automatic Fix "Central Planner Adj.". Choose Continue.
2. Right-click the macro and choose Add macro Element Step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Automatic Fix "Central Planner Adj.", choose Future inProcessing Area, and choose Continue.
3. Right-click the step row you have just created and choose
Add Element (Resul t Level) Add Contro l Statement .
In the APO Macro Builder dialog box, choose “ IF” and choose Continue.
4. Right-click the control statement row you have just created and chooseAd d Element (Result Level) App end Condi t ion .In the APO Macro Builder dialog box, input Description Central adj. <> Local adj., and
choose Continue.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 57/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 57 of 130
5. Right-click the condition row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Add argument row . Inthe APO Macro Builder dialog box, choose Central Planners Forecast Adjustment in theRow field. Choose Continue.
6. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ <> ”.Choose Continue.
7. Right-click the operator/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Local Planner Forecast Adjustment inthe Row field. Choose Continue.
8. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ AND IS_FIXED(”.Choose Continue.
9. Right-click the operator/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Central Planner Forecast Adjustment
in the Row field, and Row Attribute in Data field. Choose Continue.
10. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ AND IS_INITIAL(”.Choose Continue.
11. Right-click the operator/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Central Planner Forecast Adjustmentin the Row field, and Row Attribute in Data field. Choose Continue.
12. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ )= 0”.Choose Continue.
13. Right-click the condition row you have created in step 4 and chooseAd d Element (Result Level) Planning Table Element Add resul t row . In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row field, and Value Change with Following Fixing in Change mode field. Choose Adopt .
14. Right-click the result row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Add argument row . Inthe APO Macro Builder dialog box, choose Central Planners Forecast Adjustment in theRow field. Choose Continue.
15. Right-click the result row you have created in step 13 and choose
Add Element (Resul t Level) Append Contro l Statement .
In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue.
16. Select the macro and choose Check to check it. Choose Generate to generate the macro.
17. Use drag and drop and move the macro to the Events section and to the Exit folder in theupper right screen area.
18. Choose Save.
Result
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 58/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 58 of 130
Title Level 1 Level 2 Level 3
Automatic Fix "Central Planner Adj.
Automatic Fix "Central Planner Adj. : ( 24 Iterations : M 07.2011; M 06.2013 )
IF
Central adj. <> Local adj Row: Central Planners Forecast Adjustment ( Frm M 07.2011 )
<>
Row: Local Planners Forecast Adjustment ( Frm M 07.2011 )
and is_fixed(
Row: Central Planners Forecast Adjustment ( Frm M 07.2011 )
) = 0 and is_initial(
Row: Central Planners Forecast Adjustment ( Frm M 07.2011 )
) = 0
Row: Central Planners Forecast Adjustment ( Frm M 07.2011 ) =
Row: Central Planners Forecast Adjustment ( Frm M 07.2011 )
ENDIF
3.3.6.8 Macro: Autom at ic Fix "Manual Fcst"
UseFix the key figure cell Manual Forecast if it does not equal to Statistical Forecast. This macrois used for making sure the changed value of Manual Forecast will not be overwritten.
Procedure
1. Right-click the macro node below the planning table and choose Create New Macro Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro, Automatic Fix "Manual Fcst". Choose Continue.
2. Right-click the macro and choose Add macro Element Step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Automatic Fix "Manual Fcst", choose Future in Processing Area,and choose Continue.
3. Right-click the step row you have just created and choose
Add Element (Resul t Level) Add Contro l Statement .In the APO Macro Builder dialog box, choose “ IF” and choose Continue.
4. Right-click the control statement row you have just created and chooseAd d Element (Result Level) App end Condi t ion .In the APO Macro Builder dialog box, input Description Manual Fcst <> Stat. Fcst , andchoose Continue.
5. Right-click the condition row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Add argument row . Inthe APO Macro Builder dialog box, choose Manual Forecast in the Row field. ChooseContinue.
6. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .
In the APO Macro Builder dialog box, choose “ <> ”.Choose Continue.
7. Right-click the operator/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Statistical Forecast in the Row field. Choose Continue.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 59/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 59 of 130
8. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ AND IS_FIXED(”.Choose Continue.
9. Right-click the operator/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Manual Forecast in the Row field, andRow Attribute in Data field. Choose Continue.
10. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) = 0”.Choose Continue.
11. Right-click the condition row you have created in step 4 and choose
Ad d Element (Result Level) Planning Table Element Add resul t row . In the APO Macro Builder dialog box choose Manual Forecast in the Row field, and ValueChange with Following Fixing in Change mode field. Choose Adopt .
12. Right-click the result row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Add argument row . Inthe APO Macro Builder dialog box, choose Manual Forecast in the Row field. Choose
Continue.
13. Right-click the result row you have created in step 11 and choose
Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue.
14. Select the macro and choose Check to check it. Choose Generate to generate the macro.
15. Use drag and drop and move the macro to the Events section and to the Exit folder in theupper right screen area.
16. Choose Save.
Result
Title Level 1 Level 2 Level 3Automatic Fix "Manual Fcst
Automatic Fix "Central Planner Adj. : ( 24 Iterations : M 07.2011; M 06.2013 )
IF
Central adj. <> Local adj
Row: Manual Forecast ( Frm M 07.2011 )
<>
Row: Statistical Forecast ( Frm M 07.2011 )
and is_fixed(
Row: Manual Forecast ( Frm M 07.2011 )
) = 0
Row: Manual Forecast ( Frm M 07.2011 ) =
Row: Manual Forecast ( Frm M 07.2011 )
ENDIF
3.3.6.9 Macro: Central adj/man . fcs t > 30% BG COL = RED
UseThis macro gives warning if the key figure Central Planners Forecast Adjustment is greaterthan 30% of Manual Forecast by changing the background color of the cell to RED. At thesame time, an alert is also generated.
Procedure
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 60/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 60 of 130
1. Right-click the macro node below the planning table and choose Create New Macro Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Central adj/man. fcst > 30% BG COL = RED. Choose Continue.
2. Right-click the macro and choose Add macro Element Step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Calc central adj / man. fcst, choose Future in Processing Area,and choose Continue.
3. Right-click the step row you have just created and choose
Add Element (Resul t Level) Add auxi l iary row . In the APO Macro Builder dialog box input Calc central adj / man. fcst in the Description field. Choose Continue.
4. Right-click the auxiliary row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .
In the APO Macro Builder dialog box, choose “ ABS(”.Choose Continue.
5. Right-click the operator/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Central Planners Forecast Adjustmentin the Row field. Choose Continue.
6. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .
In the APO Macro Builder dialog box, choose “ /”.Choose Continue.
7. Right-click the operator/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Manual Forecast in the Row field. Choose Continue.
8. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) * 100”. Choose Continue.
9. Right-click the step row you have created in step 2 and choose Add Element (Steplevel) Append m acro step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Change color if perc > 30%, choose Future in Processing Area,and choose Continue.
10. Right-click the step row you have just created and choose
Add Element (Resul t Level) Add Contro l Statement .In the APO Macro Builder dialog box, choose “ IF” and choose Continue.
11. Right-click the control statement row you have just created and chooseAd d Element (Result Level) App end Condi t ion .In the APO Macro Builder dialog box, input Description Percentage > 30%, and chooseContinue.
12. Right-click the condition row you have just created and choose
Add Element (Argument Level) Auxi l iary Table Element Add auxi l iary row . Inthe APO Macro Builder dialog box, choose Calc central adj / man. fcst in the Row field. Choose Continue.
13. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ > 30”. Choose Continue.
14. Right-click the condition row you have created in step 11 and choose
Ad d Element (Result Level) Ap pend alert/status . In the APO Macro Builder dialogbox choose Update in context in Action field, and input Central adj / man. fcst = & % inthe Alert Txt field. Choose Continue.
15. Right-click the alert row you have just created and chooseAdd Element (Argument Level) Add auxi l iary row . In the APO Macro Builder dialogbox, choose Historical Calc central adj / man. fcst in the Row field. Choose Continue.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 61/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 61 of 130
16. Right-click the alert row you have created in step 14 and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row field, and Attribute Change in Change mode field. Choose Adopt .
17. Right-click the result row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_BG( 26 )”. Choose Continue.
18. Right-click the result row you have created in step 14 and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row field, and Attribute Change in Change mode field. Choose Adopt .
19. Right-click the result row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_RICON( 2 )”. Choose Continue.
20. Right-click the result row you have created in step 18 and choose
Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ELSE” and choose Continue.
21. Right-click the control statement row you have just created and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row field, and Attribute Change in Change mode field. Choose Adopt .
22. Right-click the result row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_BG( 0 )”. Choose Continue.
23. Right-click the result row you have created in step 21 and choose
Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue.
24. Select the macro and choose Check to check it. Choose Generate to generate the macro.
25. Use drag and drop and move the macro to the Events section and to the Default folder inthe upper right screen area.
26. Choose Save.
Result
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 62/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 62 of 130
Title Level 1 Level 2 Level 3
Central adj/man. fcst > 30% BG COL = RED
Calc central adj / man. fcst : ( 48 Iterations : M 06.2009; M 05.2013 )
Row: Calc central adj / man. fcst ( Frm M 06.2009 ) =
ABS(Row: Central Planners Forecast Adjustment ( Frm M 06.2009 )
/
Row: Manual Forecast ( Frm M 06.2009 )
) * 100
Change color if perc > 30% : ( 48 Iterations : M 06.2009; M 05.2013 )
IF
Percentage > 30%
Row: Calc central adj / man. fcst ( Frm M 06.2009 )
> 30
Update in context : Standard status alert [ New alert : & ] with
Row: Calc central adj / man. fcst ( Frm M 06.2009 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
CELL_BG( 26 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
CEll_RICON( 2 )
ELSE
Row: Central Planners Forecast Adjustment ( Attributes ) =
CELL_BG( 0 )
ENDIF
The Final Events list (on the top left of Macro Workbench) for the data viewYDP_DV_FC_REV should be like this:
Event Macro
Default Central adj/man. fcst > 30% BG COL = RED
Calc. Demand Plan
Level Change
Start Read Planning Status
Copy fcst Local Adj. to Central Adj.
Exit Automatic Fix "Central Planner Adj.
Automatic Fix "Manual Fcst
3.3.7 Set up Macros for Planning Book YDP_PB_LOCAL_PLAN and Data View YDP_DV_LOC_ADJ
1. Access the activity, use one of the following navigation options:
SAP SCM menu Advanced Planning and Optimization Demand Planning Environment Current settings Macro Workbench
Transaction code /SAPAPO/ADVM
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 63/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 63 of 130
2. Choose the row of the planning book: YDP_PB_LOCAL_PLAN and data view YPD_DV_LOC_ADJ.
3.3.7.1 Macro: Calc. Demand Plan
UseCalculate the key figure Demand Plan by adding the following key figures together: ManualForecast, Central Planner Forecast Adjustment , and Additional Demand .
Procedure1. Right-click the macro node below the planning table and choose Create New Macro
Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Calc. Demand Plan. Choose Continue.
2. Right-click the macro and choose Add macro Element Step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, First Step, choose Future in Processing Area, and chooseContinue.
3. Right-click the step row you have just created and choose
Add Element (Resul t Level) Add Contro l Statement .In the APO Macro Builder dialog box, choose “ IF” and choose Continue.
4. Right-click the control statement row you have just created and chooseAd d Element (Result Level) App end Condi t ion .In the APO Macro Builder dialog box, input Description Is Central Planner Fcst initial , andchoose Continue.
5. Right-click the condition row you have just created and choose
Add Element (Argument Element) Add operator /funct ion . In the APO Macro
Builder dialog box, choose “ IS_INITIAL(”.Choose Continue.6. Right-click the operator/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Add argument row . Inthe APO Macro Builder dialog box, choose Central Planners Forecast Adjustment in theRow field, and Row Attribute in Data field. Choose Continue.
7. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append operator /funct ion . In the APO MacroBuilder dialog box, choose “ ) = 1”.Choose Continue.
8. Right-click the condition you have created in step 4 and choose
Ad d Element (Result Level) Planning Table Element Add resul t row . In the APO Macro Builder dialog box choose Demand Plan in the Row field. Choose Adopt.
9. Right-click the result row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Add argument row . Inthe APO Macro Builder dialog box, choose Manual Forecast in the Row field. ChooseContinue.
10. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ +”.Choose Continue.
11. Right-click the Operator/Function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Local Planners Forecast Adjustment inthe Row field. Choose Continue.
12. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .
In the APO Macro Builder dialog box, choose “ +”. Choose Continue.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 64/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 64 of 130
13. Right-click the Operator/Function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Additional demand in the Row field.
14. Right-click the result row you have created in step 8 and choose
Add Element (Resul t Level) Add Contro l Statement .
In the APO Macro Builder dialog box, choose “ ELSE” and choose Continue. 15. Right-click the condition you have just created and choose
Ad d Element (Result Level) Planning Table Element Add resul t row . In the APO Macro Builder dialog box choose Demand Plan in the Row field. Choose Adopt.
16. Right-click the result row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Add argument row . Inthe APO Macro Builder dialog box, choose Manual Forecast in the Row field. ChooseContinue.
17. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ +”.Choose Continue.
18. Right-click the Operator/Function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Central Planners Forecast Adjustmentin the Row field. Choose Continue.
19. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .
In the APO Macro Builder dialog box, choose “ +”. Choose Continue.
20. Right-click the Operator/Function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Additional demand in the Row field.
21. Right-click the result row you have created in step 15 and choose
Add Element (Resul t Level) Add Contro l Statement .
In the APO Macro Builder dialog box, choose“ ENDIF” and choose Continue.
22. Select the macro and choose Check to check it. Choose Generate to generate the macro.
23. Choose Save.
Result
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 65/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 65 of 130
Title Level 1 Level 2 Level 3
Calc. Demand Plan
New step : ( 24 Iterations : M 07.2011; M 06.2013 )
IF
Is Central planner Fcst initial IS_INITIAL(
Row: Central Planners Forecast Adjustment ( Frm M 07.2011 )
) = 1
Row: Demand Plan ( Frm M 07.2011 ) =
Row: Manual Forecast ( Frm M 07.2011 )
+
Row: Local Planners Forecast Adjustment ( Frm M 07.2011 )
+
Row: Additional Demand ( Frm M 07.2011 )
ELSE
Row: Demand Plan ( Frm M 07.2011 ) =
Row: Manual Forecast ( Frm M 07.2011 )
+
Row: Central Planners Forecast Adjustment ( Frm M 07.2011 )
+
Row: Additional Demand ( Frm M 07.2011 )
ENDIF
3.3.7.2 Macro: Read Plannin g Status UseWe use a field in the table to control the planning status. There are 3 macros that are createdto modify the value of the field to indicate the current planning status: No Planning, LocalPlanner, and Central Planner.
This macro is used to read the value in the table, and modify the attribute of some key figurerows according to the planning status.
ProcedureThe macro is exactly the same as the macro in the Planning BookYDP_PB_CENTRAL_PLAN, View YDP_DV_FC_REV. You do not need to create the macro
step by step again, but you need to import it from the view YDP_DV_FC_REV, just likecopying.
1. Choose Menu Edit and then choose Import Macro(s)
2. Choose Macro Book YDP_PB_MASS_JOB View (YDP_DV_FC_REV), and chooseMacro Read Planning Status. And choose Continue.
3. When a warning message appears, choose Continue or choose Enter.
4. Right-click the step with name LOCAL, Choose Active/Inactive in the context menu.Repeat the same operation for all the 3 steps with name LOCAL. Make sure these stepsare active.
5. Right-click the step with name CENTRAL, Choose Active/Inactive in the context menu.Repeat the same operation for all the 3 steps with name CENTRAL. Make sure thesesteps are inactive.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 66/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 66 of 130
6. Select the macro and choose Check to check it. Choose Generate to generate the macro.
7. Use drag and drop and move the macro to the Events section and to the Start folder inthe upper right screen area.
8. Choose Save.
Result
Title Level 1 Level 2 Level 3
Read Planning Status
TS_GET : ( 1 Iterations : M 07.2009; M 07.2009 )
TS_GET
LAYOUTVARIABLE_SET( 'LV_CYCLE' ; TS_GET(
'DEMAND_PLANNING' ; 'PLANNING_CYCLE' ; '*' ; '*' ; 1
; 1 ) )
IF
LOCAL
LAYOUTVAR_VALUE( 'LV_CYCLE' ) = 1
LOCAL : ( 1 Iterations : M 07.2009; M 07.2009 )
Row: Local Planners Forecast Adjustment ( Attributes ) =
ROW_INPUT( 1 )
Row: Local Planners Forecast Adjustment ( Attributes ) =
ROW_BG( 48 )
* CENTRAL : ( 1 Iterations : M 07.2009; M 07.2009 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
ROW_INPUT( 0 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
ROW_BG( 17 )
Output Pop-up : ( 1 Iterations : M 07.2009; M 07.2009 )
Output Pop-up
OUTPUT_POPUP( 'CYCLE' ; 'STATUS' ; 'Local_Planner' )
ELSEIF
CENTRAL
LAYOUTVAR_VALUE( 'LV_CYCLE' ) = 2
LOCAL : ( 1 Iterations : M 07.2009; M 07.2009 )
Row: Local Planners Forecast Adjustment ( Attributes ) =
ROW_INPUT( 0 )
Row: Local Planners Forecast Adjustment ( Attributes ) =
ROW_BG( 17 )* CENTRAL : ( 1 Iterations : M 07.2009; M 07.2009 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
ROW_INPUT( 1 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
ROW_BG( 48 )
Output Pop-up : ( 1 Iterations : M 07.2009; M 07.2009 )
Output Pop-up
OUTPUT_POPUP( 'CYCLE' ; 'STATUS' ; 'Central_Planner' )
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 67/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 67 of 130
Title Level 1 Level 2 Level 3
ELSE
LOCAL : ( 1 Iterations : M 07.2009; M 07.2009 )
Row: Local Planners Forecast Adjustment ( Attributes ) =
ROW_INPUT( 0 )Row: Local Planners Forecast Adjustment ( Attributes ) =
ROW_BG( 17 )
* CENTRAL : ( 1 Iterations : M 07.2009; M 07.2009 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
ROW_INPUT( 0 )
Row: Central Planners Forecast Adjustment ( Attributes ) =
ROW_BG( 17 )
Output Pop-up : ( 1 Iterations : M 07.2009; M 07.2009 )
Output Pop-up
OUTPUT_POPUP( 'CYCLE' ; 'STATUS' ; 'No_Planning' )
Process Message : ( 1 Iterations : M 07.2009; M 07.2009 )Information [ WARNING Status neither Local nor Central ]
ENDIF
The rows with * in the first column should be inactivated.
3.3.7.3 Macro: Local adj/man. fcst >30% BG COL= RED
UseThis macro gives warning if the key figure Local Planners Adjustment is greater than 30% of Manual Forecast by changing the background color of the cell to RED.
Procedure
1. Right-click the macro node below the planning table and choose Create New Macro Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Local adj/man. fcst >30% BG COL= RED. Choose Continue.
2. Right-click the macro and choose Add macro Element Step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Calc Local Adj percentage, choose Future in Processing Area,
and choose Continue.3. Right-click the step row you have just created and choose
Add Element (Resul t Level) Add auxi l iary row . In the APO Macro Builder dialog box input Aux. row for Local Adj. Percentage in the Description field. Choose Continue.
4. Right-click the auxiliary row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ABS( (”. Choose Continue.
5. Right-click the operator/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Local Planners Forecast Adjustment inthe Row field. Choose Continue.
6. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ /”.Choose Continue.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 68/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 68 of 130
7. Right-click the operator/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Manual Forecast in the Row field. Choose Continue.
8. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) * 100 )”. Choose Continue.
9. Right-click the step row you have created in step 2 and choose Add Element (Step
level) Append m acro step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Change color if perc > 30%, choose Future in Processing Area,and choose Continue.
10. Right-click the step row you have just created and choose
Add Element (Resul t Level) Add Contro l Statement .
In the APO Macro Builder dialog box, choose “ IF” and choose Continue.
11. Right-click the control statement row you have just created and chooseAd d Element (Result Level) App end Condi t ion .In the APO Macro Builder dialog box, input Description Percentage > 30%, and chooseContinue.
12. Right-click the condition row you have just created and choose
Add Element (Argument Level) Auxi l iary Table Element Add auxi l iary row . Inthe APO Macro Builder dialog box, choose Aux. row for Local Adj. Percentage in the Row field. Choose Continue.
13. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ > 30”. Choose Continue.
14. Right-click the condition row you have created in step 12 and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Local Planners Forecast Adjustment in the Row field, and Attribute Change in Change mode field. Choose Adopt .
15. Right-click the result row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_BG( 26 )”. Choose Continue.
16. Right-click the result row you have created in step 14 and choose
Add Element (Resul t Level) Append Contro l Statement .
In the APO Macro Builder dialog box, choose “ ELSE” and choose Continue.
17. Right-click the control statement row you have just created and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Local Planners Forecast Adjustment in the Row field, and Attribute Change in Change mode field. Choose Adopt .
18. Right-click the result row you have just created and chooseAdd Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_BG( 0 )”. Choose Continue.
19. Right-click the result row you have created in step 17 and choose
Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue.
20. Select the macro and choose Check to check it. Choose Generate to generate the macro.
21. Use drag and drop and move the macro to the Events section and to the Default folder inthe upper right screen area.
22. Choose Save.
Result
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 69/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 69 of 130
Title Level 1 Level 2 Level 3
Local adj/man. fcst >30% BG COL= RED
Calc Local Adj percentage : ( 24 Iterations : M 06.2011; M 05.2013 )
Row: Aux. row for Local Adj. Percentage ( Frm M 06.2011 ) =
ABS( (Row: Local Planners Forecast Adjustment ( Frm M 06.2011 )
/
Row: Manual Forecast ( Frm M 06.2011 )
) * 100 )
Change color if percentage > 30% : ( 24 Iterations : M 06.2011; M 05.2013 )
IF
Percentage > 30%
Row: Aux. row for Local Adj. Percentage ( Frm M 06.2011 )
> 30
Row: Local Planners Forecast Adjustment ( Attributes ) =
CELL_BG( 26 )
ELSE
Row: Local Planners Forecast Adjustment ( Attributes ) =
CELL_BG( 0 )
ENDIF
3.3.7.4 Macro: PROM >30% frm DP BG = RED
UseThis macro gives warning, if the key figure Additional Demand is greater than 30% of DemandPlan by changing the background color of the cell to RED.
Procedure
1. Right-click the macro node below the planning table and choose Create New Macro Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,PROM >30% frm DP BG = RED. Choose Continue.
2. Right-click the macro and choose Add macro Element Step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Calc Additional Demand percentage, choose Future in
Processing Area, and choose Continue.3. Right-click the step row you have just created and choose
Add Element (Resul t Level) Add auxi l iary row . In the APO Macro Builder dialog box input Aux. row for Additional Demand Percentage in the Description field. ChooseContinue.
4. Right-click the auxiliary row you have just created and choose
Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ABS( (”.Choose Continue.
5. Right-click the operator/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Additional Demand in the Row field. Choose Continue.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 70/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 70 of 130
6. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ /”.Choose Continue.
7. Right-click the operator/function row you have just created and choose
Ad d Element (Argum ent Level) Planning Table Element Append argument
row . In the APO Macro Builder dialog box, choose Demand Plan in the Row field. Choose Continue.
8. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) * 100 )”. Choose Continue.
9. Right-click the step row you have created in step 2 and choose Add Element (Step
level) Append m acro step .
In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Change color if perc > 30%, choose Future in Processing Area,and choose Continue.
10. Right-click the step row you have just created and choose
Add Element (Resul t Level) Add Contro l Statement .In the APO Macro Builder dialog box, choose “ IF” and choose Continue.
11. Right-click the control statement row you have just created and chooseAd d Element (Result Level) App end Condi t ion .In the APO Macro Builder dialog box, input Description Percentage > 30%, and chooseContinue.
12. Right-click the condition row you have just created and choose
Add Element (Argument Level) Auxi l iary Table Element Add auxi l iary row . Inthe APO Macro Builder dialog box, choose Aux. row for Additional Demand Percentage inthe Row field. Choose Continue.
13. Right-click the argument row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .
In the APO Macro Builder dialog box, choose“ > 30
”.
Choose Continue.14. Right-click the condition row you have created in step 11 and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Additional Demand in the Row field, and AttributeChange in Change mode field. Choose Adopt .
15. Right-click the result row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .
In the APO Macro Builder dialog box, choose “ CELL_BG( 26 )”. Choose Continue.
16. Right-click the result row you have created in step 14 and choose
Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ELSE” and choose Continue.
17. Right-click the control statement row you have just created and choose
Ad d Element (Result Level) Planning Table Element Append resul t row . In the APO Macro Builder dialog box choose Additional Demand in the Row field, and AttributeChange in Change mode field. Choose Adopt .
18. Right-click the result row you have just created and choose
Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_BG( 0 )”. Choose Continue.
19. Right-click the result row you have created in step 17 and choose
Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue.
20. Select the macro and choose Check to check it. Choose Generate to generate the macro.
21. Use drag and drop and move the macro to the Events section and to the Default folder in
the upper right screen area.
22. Choose Save.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 71/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 71 of 130
Result
Title Level 1 Level 2 Level 3
PROM >30% frm DP BG = RED
Calc Additional Demand percentage : ( 24 Iterations : M 06.2011; M 05.2013 )
Row: Aux. row for Addtional Demand Percentage ( Frm M 06.2011 ) =
ABS( (
Row: Additional demand ( Frm M 06.2011 )
/
Row: Demand Plan ( Frm M 06.2011 )
) * 100 )
Change color if percentage > 30% : ( 24 Iterations : M 06.2011; M 05.2013 )
IF
Percentage > 30%
Row: Aux. row for Addtional Demand Percentage ( Frm M 06.2011 )
> 30Row: Additional demand ( Attributes ) =
CELL_BG( 26 )
ELSE
Row: Additional demand ( Attributes ) =
CELL_BG( 0 )
ENDIF
The Final Events list (on the top left of Macro Workbench) for the data view
YDP_DV_LOC_ADJ should be like this:Event Macro
Default Macro: PROM >30% frm DP BG = RED
Local adj/man. fcst >30% BG COL= RED
Calc. Demand Plan
Level Change
Start Read Planning Status
Exit
3.4 Setting up the Process Chain
3.4.1 Process Chain – Data Preparation
3.4.1.1 Create Process Variant – Generate Characteristic ValueCombination
UseThe master data of Demand Planning determines the levels on which demand plans arecreated, changed, aggregated and disaggregated at your company. For example, your masterdata might consist of all of the products, product lines, regions, customers, those your
company intends to plan in Demand Planning, as well as all relevant combinations of these.From a technical point of view, you are specifying which characteristic values are plannable
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 72/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 72 of 130
for the characteristics in your planning area. This plannable characteristic values combinationis called characteristic value combination.
Procedure1. To Access the activity, use one of the following navigation options:
Transaction code /SAPAPO/MC62
SAP SCM Menu Advanced Planning and Optimization Master Data
Application-Specific Master Data Demand Planning
Maintain Characteristic Values
2. On the Maintain Planning-Relevant Characteristic Combination screen, enter your masterplanning object structure, for example, YDP_POS. then choose Create CharacteristicCombination.
3. In the Create Characteristic Combinations window, make the following entries:
Field name User action and values Comment
Create CharacteristicCombinations
Generate Immedtly X
Data Source
Load Data From: InfoProvider Choose from drop list
InfoProvider For example, InfoCube:ZY93_IC01
Sales history InfoCube
Version 001
Action Selection
Results Log X4. Choose Save.
5. On the Variant Attributes screen, make the following entry:
Field name User action and values Comment
Variant Name YDP_CVC Your variant name
Description GENERATE CVC‟S Your variant description
6. In the Object for selection screen section, choose the row which Field name is S_DAT .
7. For the selected row, use F4 input help at the column Selection variable. In the pop upVariant Attributes window, choose Type of Variable is D. Then choose Choose.
8. For the same row, use F4 input help at the column Name of variable (Input only using F4).On the prompt Variant Attributes window, choose (Beginning of mth-xx months, end ofmth+yy months). Then choose Choose.
9. In the Date Calculation Parameters window, enter 24 for a value for xxx , enter 0 for avalue for yyy . Then choose Choose. You can change this value based on yourrequirement.
If you want the system to roll over periodically without scheduling the same job repeatedly, you should use selection variables to enter relative dates. Thesystem then calculates the start and end dates each time the report isexecuted. For instance, you specify that the initialization period should befrom 12 months in the past to 12 months in the future.
10. Choose Save.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 73/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 73 of 130
11. Go back twice. The variant for characteristic value combination generation has beencreated, and can be used for background job run.
3.4.1.2 Create Process Variant – Initialize Planning Area
UseHere we create a process variant for initialize planning area. Then you can initialize theplanning area in a mass process job.
Procedure1. To Access the activity, use one of the following navigation options:
Transaction code /SAPAPO/TSINIT
SAP SCM Menu Advanced Planning and Optimization Demand
Planning Environment Current Settings Time
Series Administration Initialize Planning Area
2. On the Initialize Planning Area screen, make the following entry:
Field name User action and values Comment
Planning Area YDP_PA Your planning area
Planning Version 001
3. Choose Save.
4. In the Variant Attributes window, enter the following values:
Field name User action and values Comment
Variant Name YDP_PAREA_I Your variant name
Description Initialize Planning Area Your variant description
5. In the Object for selection screen area, select the row which Field name is Start/End Date.
6. For the selected row, use F4 input help for the column Selection variable. In the popupVariant Attributes window, select Type of Variable is D. Then choose Choose.
7. For the same row, use F4 input help at the column Name of variable (Input only using F4).In the popup Variant Attributes window, select (Beginning of mth-xx months, end ofmth+yy months). Then choose Choose.
8. In the Date Calculation Parameters window, enter 24 for a value for xxx , enter 24 for avalue for yyy . Then choose Choose. You can change this value based on yourrequirement.
9. Choose Save.
10. Go back. The variant for planning area initialize has been created, and can be used forbackground job run.
3.4.1.3 Create Process Variant – Load Data from InfoCube
Use After data is uploaded from an external file or ECC to BW InfoCube, data then needs to betransferred into the APO planning area (live cache). Here we create a process variant that isused to run this job as a step in process chain.
Procedure1. To access the activity, use one of the following navigation options:
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 74/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 74 of 130
Transaction code /SAPAPO/TSCUBE
SAP SCM Menu Advanced Planning and Optimization Demand
Planning Environment Data Administration Load Data from InfoCube
2. On the Load Planning Area Version screen, make the following entries:
Field name User action and values Comment
Source
InfoCube ZY93_IC01 Your data load infocube
Planning Version 001
Target
Planning Area YDP_PA Your planning area
Planning Version 001
Period
From For example, 01.04.2009 Define as necessary.
To For example, 31.03.2011 Define as necessary
Key Figure Assignment:InfoCube <-> Planning Area
Propose key figures X checked
Key Figure Assignment
ChooseCheck the proposed key figureassignment, change ifnecessary.
Results Log X Choose the checkbox3. Choose Save.
4. In the Variant Attributes window, enter the value as table:
Field name User action and values Comment
Variant Name YDP_LOAD Your variant name
Description Load Hist Data fromInfoCube
Your variant description
5. In the Object for selection screen area, select the row which Field name is From.
6. For the selected row, use F4 input help at the column Selection variable. In the popupVariant Attributes window, select Type of Variable is D. Then choose Enter .
7. For the same row, use F4 input help at the column Name of variable (Input only using F4).In the popup Variant Attributes window, select (Beginning of mth-xx months, end ofmth+yy months). Then choose Enter .
8. In the Date Calculation Parameters window, enter 24 for a value for xxx , enter 0 for avalue for yyy . Then choose Enter . You can change this value based on your requirement.
9. Choose Save.
10. Go back. The variant for load data from InfoCube has been created, and can be used forbackground job run.
3.4.1.4 Create Process Variant – Calculate Proportional Factor
Use
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 75/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 75 of 130
Proportional factors are one of the ways you can disaggregate data from an aggregate levelto a detailed one. Here you create a process variant to calculate proportional factor which canthen be used in the process chain as a process job.
Procedure
1. To Access the activity, use one of the following navigation options:
Transaction code /SAPAPO/MC8V
SAP SCM Menu Advanced Planning and Optimization Demand
Planning Environment Calculate ProportionalFactors
2. On the Calculate proportional factors screen, make the following entries:
Field name User action and values Comment
Planning area
Planning Area YDP_PA Your planning area
Basis for proportion calc.
Choose InfoCube X Choose the radio button
Name ZY93_IC01 Your sales historical InfoCube
3. Choose Execute.
4. On the /SAPAPO/RMDP_SHARE_MANAGER screen, choose the Basic Settings tabpage, make the following entries:
Field name User action and values Comment
Basis for proportion calc.
Planning version 001
Key figureZY93_BK91
Base key figure used tocalculate the proportion factor.
Period from 01.04.2009
To 31.03.2011
Calc. proportions for
Planning version 001
Transfer proportions to horizon
From 01.04.2011
To 31.03.2013
Proportion calc. type
Fixed Proportions X Check the radio button
5. Choose Save.
6. On the Variant Attributes screen, enter the value as table:
Field name User action and values Comment
Variant Name YDP_PROP Your variant name
Description Calculate Proportional Factor Your variant description
7. In the Object for selection screen area, select the row whose Field name is Period from.
8. For the selected row, use F4 input help at the column Selection variable. In the dialog boxVariant Attributes window, select D (Dynamic data calculation). Then choose Choose.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 76/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 76 of 130
9. For the same row, use F4 input help at the column Name of variable (Input only using F4).In the popup Variant Attributes window, select (Beginning of mth-xx months, end ofmth+yy months). Then choose Choose.
10. In the Date Calculation Parameters window, enter 24 for a value for xxx , enter 0 for avalue for yyy . Then choose Choose. You can change this value based on your
requirement.11. Repeat step 7- 9 for the row whose Field name is From.
12. In the Date Calculation Parameters window, enter 0 for a value for xxx , enter 24 for avalue for yyy . Then choose Choose. You can change this value based on yourrequirement.
13. Choose Save.
14. Go back twice. The variant for proportional factor calculation has been created, and can
be used for background job run.
3.4.1.5 Create Activities – Data Preparation
UseHere you create an activity which includes a macro to calculate the key figure sales quantitywithout additional demand , this key figure is then used as the base of statistical forecast run.
PrerequisitesThe macro listed below has been maintained.
Calculate historical sales without additional demand
Procedure1. To access the activity, use one of the following navigation options:
Transaction code /SAPAPO/MC8T
SAP SCM Menu Demand Planning Planning Demand Planning in
the Background Define Activities for Mass Processing
2. In the Activity screen, maintain the data according to the following table:
Field name User action and values Comment
Activity YDP_PRE Your activity name
Description Data preparation Your activity description
3. Then choose Create.
4. On the next Activity screen, maintain the data according to the following table:
Field name User action and values Comment
Planning Book YDP_PB_MASS_JOB
Data View YDP_DV_DATAPRE
5. Choose the Macro tab page at the bottom of the screen.
6. Select the macro „CALC. HIST.SALES WITHOUT ADD. DEMAND‟ from the drop list nextto the macro radio button.
7. Choose Adopt Current Action. The macro is displayed at the List of Actions area.
8. Choose Save.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 77/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 77 of 130
3.4.1.6 Create Planning Job – Data Preparation
Procedure1. To access the activity, use one of the following navigation options:
Transaction code /SAPAPO/MC8D
SAP SCM Menu Demand Planning Planning Demand Planning in
the Background Create Demand Planning in theBackground
2. Enter values according to the following table:
Field name User action and values Comment
Job number YDP_PRE
Job name DATA PREPARATION
3. Choose Execute.
4. On the Create Planning Job screen, make the following entries:
Field name User action and values Comment
Planning Book YDP_PB_MASS_JOB
Data View YDP_DV_DATAPRE
Version 001
5. Choose Execute,
6. On the Create Planning Job screen, maintain values according to the following table:
Field name User action and values Comment
Control Parameters forbackground planning
Activity YDP_PRE The activity you have created
Planning job information
Generate Log X Select the check box
Do Not Create Spool List X
Chars
One YDP_MP_ALL_PROD_LOC
7. Choose on aggregation level button, in the Choose chars screen, select all characteristics
except navigation attributes. Then choose Continue.8. Choose Save.
3.4.1.7 Create Process Chain – Data Preparation
UseNow, you can create the process chain to be used to prepare the planning area and the data.
Procedure1. To access the activity, use one of the following navigation options:
Transaction code RSPC SAP SCM Menu Demand Planning Environment Maintain Process
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 78/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 78 of 130
Chains
2. On the Process Chain Display Planning View screen, choose Create.
3. In the New Process Chain window, enter values as follows:
Field name User action and values Comment
Process chain YDP_LOAD_PRE
Long description YDP – Data Preparation
4. Choose Continue.
5. On the Insert Start Process screen, choose Create. In the prompt Start Process window,make the following entry:
Field name User action and values Comment
Process variants YDP_LOAD_PRE
Long description YDP Data Preparation
6. Choose Enter . Then choose Save
7. In the Create Object Directory Entry , choose Local Object, choose Continue.
8. In the process chain maintenance window, the starting process is now visible.
9. Choose the Process Type pushbutton.
10. Now add the 2nd
step of the process chain. Expand the node: SCM – Demand Planning.Choose the process type: Generate Characteristic Combination.
11. In the Insert Generate Characteristic Combination window, choose Create to create aprocess variant. Enter the Process Variants YDP_GENERATE_CVC and variantdescription. Then choose Enter .
12. On the Process Maintenance: Generate Characteristic Combination screen, choose theprogram variant YDP_CVC you created before with F4 input help and choose continue.
13. Choose Save. In the Create Object Directory Entry , choose Local Object , then go back tillthe new job is displayed on the right screen area.
14. Now add the 3rd
step to the process chain. Choose the process type: Initialize (CreateTime Series Objects) under the node: SCM – Demand Planning
15. In the Insert Initialize (Create Time Series Objects) window, choose Create to create aprocess variant. Enter the Process Variants YDP_INIT_PA and variant description. Thenchoose Enter .
16. In the Process Maintenance: Initialize (Create Time Series Objects) screen, choose theprogram variant YDP_PAREA_I you created before with F4 input help and choosecontinue.
17. Choose Save. In the Create Object Directory Entry , choose Local Object , then go back and continue. The selected job is now on the right screen area.
18. Now add the 4th
step to the process chain. Chooseprocess type: Load Data fromInfoCube under the node: SCM – Demand Planning.
19. In the prompt Insert Load Data from InfoCube window, choose Create to create a processvariant. Enter the Process Variants YDP_LOAD and variant description. Then chooseEnter .
20. In the Process Maintenance: Load Data from InfoCube screen, choose the programvariant YDP_LOAD you created before with F4 input help and choose continue.
21. Choose Save. In the Create Object Directory Entry , choose Local Object, then go back and continue. The selected job is now on the right screen area.
22. Now add the 5th
step to the process chain. Chooseprocess type: Calculate proportionalfactors under the node: SCM – Demand Planning.
23. In the popup Insert Calculate proportional factors window, choose Create to create a
process variant. Enter the Process Variants YDP_PROP and variant description. Thenchoose Enter .
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 79/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 79 of 130
24. In the Process Maintenance: Load Data from InfoCube screen, choose the processvariant YDP_PROP you created before with F4 input help and choose continue.
25. Choose Save. In the Create Object Directory Entry , choose Local Object, then go back and continue. The selected job is now on the right screen area.
26. Now add the 6th
step to the process chain. Chooseprocess type: DP Background
Processing under the node: SCM – Demand Planning.
27. In the prompt Insert DP Background Processing window, choose the planning jobYDP_PRE you created before with F4 input help and choose continue. The selected jobis now on the right screen area.
28. Now link these jobs by the same sequence they are created, by selecting the start job anddragging a line to the linked job, choose …successful in the Action for … dialog box.
29. Choose Activate to make the process chain active.
3.4.1.8 Schedule Process Chain – Data Preparation
UseNow you can schedule when the process chain should be run, periodically or manually trigger.Because this process chain is called as a local process chain, we schedule this process chainas immediate start.
Procedure1. Choose the Process Chain you have just created, and make sure you are in the change
mode.
2. Choose the Start Job.
3. On the Maintain Start Process screen, choose Change Selections.
4. On the Start Time screen, choose Immediate (Immediate start checkbox is selected).Choose Save.
5. On the Maintain Start Process screen, choose Save and Go back.
3.4.2 Process Chain – Data Load and Preparation from ECC
UseThis process chain is used to upload the master data and transaction data from SAP ECC.Then you make preparation at APO side for further demand planning in DP. It includes 3process chains, that is, load ECC transaction data, load ECC master data, and makepreparation in APO side.
PrerequisitesThe following process chains have been maintained:
Master Data Load from ECC, for detail, please reference Building Block Y93configuration guide.
Transaction Data Load from ECC, for detail, please reference Building Block Y93configuration guide.
Data Preparation
3.4.2.1 Create Process Chain – Data Load and Preparationfrom ECC
Procedure
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 80/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 80 of 130
1. To access the activity, use one of the following navigation options:
Transaction code RSPC
SAP SCM Menu Demand Planning Environment Maintain ProcessChains
2. On the Process Chain Display Planning View , choose Create, then make the followingentries:
Field name User action and values Comment
Process chain YDP_DATA_LOAD_PRE_ECC
Long description YDP – Data Load and Preparationfrom ECC
3. Choose Continue.
4. In the Insert Start Process window, choose Create. In the Start Process window, enter the
following values:
Field name User action and values CommentProcess variants YDP_DATA_LOAD_PRE_ECC
Long description Data Load and Preparation fromECC
5. Choose Enter , then choose Save
6. In the Create Object Directory Entry window, choose Local Object , Go back then chooseContinue.
7. In the Process Chain Maintenance Modified Version window, the starting process is nowvisible.
8. Choose Process Type.
9. Now add the 2
nd
step of the process chain. Expand the node:General Services. Choosethe process type: Local Process Chain.
10. In the prompt Insert Local Process Chain window, choose the process chainZBPR_Y93_ZDPA_PC01 using F4 input help and choose continue. The selected job isnow on the right screen area.
11. Repeat step 7- 8 to add the other two process chains: ZBPR_Y93_ZDPA_PC02, andYDP_LOAD_PRE.
12. Now link these jobs by the same sequence they are created, by selecting the start joband dragging a line to the linked job, choose …successful in the Action for … dialog box.
Make sure the process chain for master data load is executed before
process chain for transaction data load.13. Choose Activate to make the process chain active.
3.4.2.2 Schedule Process Chain – Data Load and Preparationfrom ECC
UseNormally you need to load data and do preparation at the beginning of each planning cycle,for example, at the beginning of each month. So you would schedule this process chain to runperiodically. You also would manually trigger this process chain when necessary.
Procedure1. Choose the Process Chain you just created, and make sure you are in the change mode.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 81/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 81 of 130
2. Choose Start Job.
3. On the Maintain Start Process screen, choose Change Selections.
4. On the Start Time screen, if you want to manually trigger this process chain, chooseImmediate (Immediate start checkbox is selected).
5. Or if you want to run periodically, you choose Date/Time, and specify the date, time andPeriod values.
Here, you choose to manually trigger by default. You could run periodically ifnecessary.
6. On the Start Time screen, choose Save.
7. On the Maintain Start Process screen, choose Save and Go back.
3.4.3 Process Chain – Data Load and Preparation from FlatFile
UseInstead from ECC, this process chain is used to upload data from flat file. After that you canmake preparation at APO side for further demand planning in DP. It includes 2 processchains, load data from flat file, and make preparation in APO side.
PrerequisitesThe following process chains have been maintained.
Data Load from Flat File
Data Preparation
3.4.3.1 Create Process Chain –
Data Load and Preparationfrom Flat File
Procedure1. To access the activity, use one of the following navigation options:
Transaction code RSPC
SAP SCM Menu Demand Planning Environment Maintain ProcessChains
2. In the Process Chain Display Planning View , choose Create and enter values as follows:
Field name User action and values CommentProcess chain YDP_DATA_LOAD_PRE_EX
Long description DPA – Data Load and Preparationfrom Excel
3. Choose Continue.
4. In the Insert Start Process window, choose Create. In the Start Process window, enter the
following values:
Field name User action and values Comment
Process variants YDP_DATA_LOAD_PRE_EX
Long description Data load and preparation from Excel
5. Choose Enter , then choose Save
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 82/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 82 of 130
6. In the Create Object Directory Entry , choose Local Object , Go back then chooseContinue.
7. In the Process Chain Maintenance Modified Version window, the starting process is nowvisible.
8. Choose Process Type.
9. Now add the 2nd step of the process chain. Expand the node:General Services. Chooseprocess type: Local Process Chain.
10. In the Insert Local Process Chain window, choose the process chainYDP_DATA_LOAD_FLAT using F4 input help and choose continue. The selected job isnow on the right screen area.
11. Repeat the steps 7 - 8 to add the other process chain YDP_LOAD_PRE.
12. Now link these jobs by the same sequence they are created by selecting the start job anddragging a line to the linked job.
13. Choose Activate to make the process chain active.
3.4.3.2 Schedule Process Chain –
Data Load and Preparationfrom Flat FileRefer to the steps described in chapter 3.4.2.2.
3.4.4 Process Chain – Forecast
PrerequisitesThe following macros have been maintained:
Initialize value: calc to corrected historical sales
Copy stat. fcst to man. fcst
3.4.4.1 Create Activities – Forecast
Procedure1. To access the activity, use one of the following navigation options:
Transaction Code /SAPAPO/MC8T
SAP SCM Menu Demand Planning Planning Demand Planning in
the Background Define Activities for Mass Processing
2. On the Activity screen, make the following entries:
Field name User action and values Comment Activity YDP_FC1 Your activity name
Description Macro: Calculate Corrected SalesHistory
Your activity description
3. Then choose Create.
4. On the next Activity screen, maintain the data according to the following table:
Field name User action and values Comment
Planning Book YDP_PB_MASS_JOB
Data View YDP_DV_FORECAST
5. Choose the Macro tab page at the bottom of the screen.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 83/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 83 of 130
6. Choose macro „INITIAL VAL: CALC TO CORR HIST SALES‟ from the drop list. Thenchoose Adopt Current Action button. The macro will be shown at the List of Actions area.
7. Choose Save.
8. Now create the 2nd
activity used for forecasting run. Second activity:
Field name User action and values Comment Activity YDP_FC
Description Forecasting
9. Then choose Create.
10. On the next Activity screen, make the following entries:
Field name User action and values Comment
Planning Book YDP_PB_MASS_JOB
Data View YDP_DV_FORECAST
11. Choose the Forecast tab page at the bottom of the screen, maintain the data according
the following table:
Field name User actionand values
Comment
Profile Selection
Master Prfl YDP_MFP F4 input help
Control Parameters
Generate alerts X
Delete old alerts before forecast X
12. Choose Select Messages, on the Selection of Storage-Sensitive Forecast Errors screen,select all error messages.
13. Choose Adopt Current Action. The forecast profile is shown at the List of Actions area.
14. Choose Save.
15. Now create the 3rd
activity which include a macro to copy the statistical forecast to manualforecast key figure, In the screen Activity , maintain the data according to the table below:
Field name User action and values Comment
Activity YDP_FC2 Your activity name
Description Macro: Copy stats fcst to manualfcst
Your activity description
16. Then choose Create.
17. On the next Activity screen, maintain the data according to the table below:
Field name User action and values Comment
Planning Book YDP_PB_MASS_JOB
Data View YDP_DV_FORECAST
18. Choose the Macro tab page at the bottom of the screen.
19. Choose Macro „ COPY STAT. FCST TO MAN. FCST ‟ from the drop list next to the Macroradio button. Choose Adopt Current Action button. The macro is shown in the List of
Actions area.
20. Choose Save.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 84/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 84 of 130
3.4.4.2 Create Planning Jobs – Forecast
Procedure1. To access the activity, use one of the following navigation options:
Transaction code /SAPAPO/MC8D
SAP SCM Menu Demand Planning Planning Demand Planning in
the Background Create Demand Planning in theBackground
2. Enter values according to the following table:
Field name User action and values Comment
Job number YDP_FC1
Job name Initialize Corrected Sales
3. Choose Execute.
4. On the next Create Planning Job screen, maintain values according the following table:
Field name User action and values Comment
Planning Book YDP_PB_MASS_JOB
Data View YDP_DV_FORECAST
Version 001
5. Choose Execute,
6. On the next Create Planning Job screen, maintain values according to the following table:
Field name User action and values Comment
Control Parameters forbackground planning
Activity YDP_FC1 The activity you have created
Planning job information
Generate Log X Select the check box
Do Not Create Spool List X
Chars
One YDP_MP_ALL_PROD_LOC
7. Choose Aggregation level , in the Choose chars dialog box, select all characteristics
except navigation attributes. Then choose Continue.8. Choose Save.
9. Now create the 2nd
job for the forecasting. Repeat step 2 – 4 with Job Name YDP_FCDescription Forecasting, then assign activity YDP_FC to this planning job.
10. Choose Aggregation level , in the Choose chars dialog box, select only product and location characteristics. Then choose Continue.
Here, the forecast is running at product and location level, which is thenautomatically disaggregated to the lowest level.
11. Choose Save.
12. Now, create the 3rd
job. Repeat the steps 2 – 6 with Job Name YDP_FC2 Description
Copy stats fcst to manual fcst, then assign the activity YDP_FC2 to this planning job
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 85/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 85 of 130
3.4.4.3 Create Process Chain – Forecast
Procedure1. To access the activity, use one of the following navigation options:
Transaction code RSPC
SAP SCM Menu Demand Planning Environment Maintain ProcessChains
2. In the Process Chain Display Planning View , choose Create and make the following
entries:
Field name User action and values Comment
Process chain YDP_FORECASTING
Long description YDP - Forecasting
3. Choose Continue.
4. In the Insert Start Process window, choose Create. In the prompt Start Process window,make the following entries:
Field name User action and values Comment
Process variants YDP_FORECASTING
Long description Forecasting
Choose Enter , then choose Save.
5. In the Create Object Directory Entry , choose Local Object , go back then choose Continue.
6. In the Process Chain Maintenance Modified Version window, the starting process is nowvisible.
7. Choose Process Type.
8. Now add the 2nd step of the process chain. Expand the node: SCM – Demand Planning .Choose process type: DP Background Processing.
9. In the Insert DP Background Processing window, choose the job YDP_FC1 you createdbefore using F4 input help and choose continue. The selected job is now on the rightscreen area.
10. Now add the 3rd
step of the process chain. Chooseprocess type: DP BackgroundProcessing under the node: SCM – Demand Planning .
11. In the Insert DP Background Processing window, choose the job YDP_FC you createdbefore and choose continue. The selected job is now on the right screen area.
12. Now add the 4th
step of the process chain. Chooseprocess type: DP BackgroundProcessing under the node: SCM – Demand Planning .
13. In the prompt Insert DP Background Processing window, Select the job YDP_FC2 youcreated before and choose continue. The selected job is now on the right screen area.
14. Now link these jobs by the same sequence they are created, by selecting the start joband dragging a line to the linked job, choose …successful in the Action for … dialog box.
15. Choose Activate to make the process chain active.
3.4.4.4 Schedule Process Chain – Forecast
UseNormally you need to run forecast for each planning cycle, for example, each month. Youwould manually trigger this process chain when necessary. You would also schedule this
process chain to run periodically
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 86/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 86 of 130
ProcedureRefer to the steps described in chapter 3.4.2.2.
3.4.5 Process Chain – Consolidate
UsePurpose of this process chain is to consolidate the local adjustments, additional demand keyfigure for the central planner to calculate the final demand plan.
PrerequisitesMacro listed below has been maintained.
Copy stat. fcst to man. fcst
Determine KF FORECAST ADJ.CENTRAL
Calc. Demand Plan
3.4.5.1 Create Activities – Consolidate
Procedure1. To Access the activity, use one of the following navigation options:
Transaction code /SAPAPO/MC8T
SAP SCM Menu Demand Planning Planning Demand Planning in
the Background Define Activities for Mass Processing
2. In the screen Activity, maintain the data according to the table below:
Field name User action and values Comment
Activity YDP_CONS Your activity name
Description Macro: Consolidate fcst data Your activity description
Then choose Create.
3. In the next screen Activity , maintain the data according to the table below:
Field name User action and values Comment
Planning Book YDP_PB_MASS_JOB
Data View YDP_DV_MACRO
4. Select the Macro tab page at the bottom of the screen. Three actions are to be defined
within this activity.5. Choose macro „ Copy stat fcst to man. fcst ‟ from the drop list next to the Macro radio
button. Choose Adopt Current Action button. The macro is shown at the List of Actionsarea.
6. Choose the down pushbutton to go to next action button to add the 2nd
action. Choosemacro „DETERMINE KF FORECAST ADJ. CENTRAL‟ from the drop list. Choose AdoptCurrent Action. The 2
nd macro is shown at the List of Actions area.
7. Choose the down pushbutton to go to next action button to add the 3rd
action. Choosemacro „ Calc. Demand Plan‟ from the drop list. Choose Adopt Current Action button. The3
rd macro is shown at the List of Actions area.
8. Choose Save.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 87/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 87 of 130
3.4.5.2 Create Planning job – Consolidate
Procedure1. To Access the activity, use one of the following navigation options:
Transaction code /SAPAPO/MC8D
SAP SCM Menu Demand Planning Planning Demand Planning in
the Background Create Demand Planning in theBackground
2. On the Create Planning Job screen, make the following entries :
Field name User action and values Comment
Job number YDP_CONS
Job name Macro: Consolidating
3. Choose Execute.
4. On the next Create Planning Job screen, maintain values according to the following table:
Field name User action and values Comment
Planning Book YDP_PB_MASS_JOB
Data View YDP_DV_MACRO
Version 001
5. Choose Execute,
6. On the next Create Planning Job screen, maintain values according to the following table:
Field name User action and values Comment
Control Parameters forbackground planning
Activity YDP_CONS The activity you have created
Planning job information
Generate Log X Select the check box
Do Not Create Spool List X
Chars
One YDP_MP_ALL_PROD_LOC
9. Choose Aggregation level , in the Choose chars screen, select all characteristics except
the navigation attributes. Then choose Continue.10. Choose Save. Then go back .
3.4.5.3 Create Process Chain – Consolidation
Procedure1. To access the activity, use one of the following navigation options:
Transaction code RSPC
SAP SCM Menu Demand Planning Environment Maintain ProcessChains
2. On the process chain maintenance planning screen, choose Create, then make thefollowing entries:
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 88/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 88 of 130
Field name User action and values Comment
Process chain YDP_CONSOLIDATING
Long description YDP - Consolidate
3. Choose Continue4. In the Insert Start Process window, choose Create. In the Start Process window, enter
values as follows:
Field name User action and values Comment
Process variants YDP_CONSOLIDATING
Long description Consolidating
5. Choose Enter , then choose Save.
6. In the Create Object Directory Entry , choose Local Object, Go back then choose Continue.In the Process Chain Maintenance Modified Version window, the starting process is nowvisible.
7. Choose Process Type.8. Expand the node: SCM – Demand Planning . Choose process type: DP Background
Processing
9. In the Insert DP Background Processing window, choose the job YDP_CONS you createdbefore and choose continue. The selected job is now on the right screen area.
10. Link the starting process to this job, by selecting the start job and dragging a line to theprevious selected job, choose …successful in the Action for … dialog box.
11. Choose Activate to make the process chain active.
3.4.5.4 Schedule Process Chain – Consolidation
UseNormally, you need to do this consolidation after forecasting and manual adjusting. You wouldmanually trigger this process chain when necessary. You would also schedule this processchain to run periodically.
ProcedureRefer to the steps described in chapter 3.4.2.2.
3.4.6 Process Chain – Release Demand Plan to SAP ECC
UseThis process chain supports the process to release the demand plan to SAP ECC, based ona transfer profile. You take this step if you want to release final demand plan to ECC. Ignore itif you want to release final demand plan to APO SNP for further planning.
3.4.6.1 Create Transfer Profile
UseBefore the activity can be created, you have to create a transfer profile, which is to be usedfor transferring your forecast results to SAP ECC Demand Management. In the transfer profile,you also define which key figure is to be transferred.
Procedure1. To access the activity, use one of the following navigation options:
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 89/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 89 of 130
2. In the Transfer Profile window, maintain value as follows:Field name User action and values Comment
Transfer Prfl. YDP_RLECC Your transfer profile name
3. Then choose Create.
4. In the Transfer Profile window, maintain the values as follows:
Field name User action and values Comment
APO
Planning Area YDP_PA Your planning area
Key Figure
ZY93_BK12
The key figure you want to
transfer back to ECC
Planning Version 001
APO Extras
Product Char.ZY93_BC01
Optional. If you do not makean entry, system uses thecharacteristic 9AMATNR.
Location Char.ZY93_BC03
Optional. If you do not makean entry, system uses thecharacteristic 9ALOCNO.
R/3
Requirement Type
Optional
You do not need to make anentry in this field if the productmaster records in R/3 containan MRP group and if each ofthese MRP groups has beenassigned a strategy group inR/3 Customizing. The systemdetermines the requirementstype from the main planningstrategy that is contained ineach strategy group.
Version
00
ID of the SAP ECC demand
program to which you wish totransfer.
Active X checked
5. Choose Save.
3.4.6.2 Create Activities – Release Demand Plan to SAP ECC
UseWith this step you define which action takes place, for example, a transfer to the SAP ECCsystem, when you create and schedule the respective job.
Procedure
Transaction code /SAPAPO/MC8U
SAP SCM Menu Demand Planning Environment Maintain TransferProfiles
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 90/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 90 of 130
1. Access the activity, use one of the following navigation options:
Transaction code /SAPAPO/MC8T
SAP SCM Menu Demand Planning Planning Demand Planning in
the Background Define Activities for Mass Processing
2. In the Activity screen, maintain the data according to the table below:
Field name User action and values Comment
Activity YDP_RLECC Your activity name
Description Release DP to ECC Your activity description
3. Then choose Create.
4. In the next Activity screen, maintain the data according to the table below:
Field name User action and values Comment
Planning Book YDP_PB_MASS_JOB
Data View YDP_DV_RELEASE
5. Select the R/3 Transfer Prfl. tab page in the lower screen area.
6. Enter the name of your transfer profile YDP_RLECC and choose Enter . The settings ofyour transfer profile are displayed. Choose Adopt Current Action, then action “R/3
Transfer ” with action counter 1 is automatically inserted in the activity.
7. Choose Save.
3.4.6.3 Create Planning job – Release Demand Plan to ECC
Procedure
1. To access the activity, use one of the following navigation options:Transaction code /SAPAPO/MC8D
SAP SCM Menu Demand Planning Planning Demand Planning in
the Background Create Demand Planning in theBackground
2. Enter values as follows:
Field name User action and values Comment
Job number YDP_RLECC
Job name Release DP to ECC
3. Choose Execute.4. On the next Create Planning Job screen, maintain values according to the following table:
Field name User action and values Comment
Planning Book YDP_PB_MASS_JOB
Data View YDP_DV_RELEASE
Version 001
5. Choose Execute.
6. On the next Create Planning Job screen, maintain values according to the following table:
Field name User action and values Comment
Control Parameters for
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 91/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 91 of 130
background planning
Activity YDP_RLECC The activity you have created
Planning job information
Generate Log X Select the check box
Do Not Create Spool List X
Chars
One YDP_MP_ALL_PROD_LOC
7. Choose Aggregation level , in the Choose chars screen, select only ZY93_BC01 (Product)and ZY93_BC03 (Location) characteristics. Then choose Continue.
8. Choose Save. Then choose Back .
3.4.6.4 Create Process Chain – Release DP to ECC
Procedure1. To Access the activity, use one of the following navigation options:
Transaction code RSPC
SAP SCM Menu Demand Planning Environment Maintain ProcessChains
2. In the process chain maintenance planning view, choose Create and enter values asfollows:
Field name User action and values Comment
Process chain YDP_RLECC
Long description DPA – Release DP to ECC
Choose Continue.
3. In the Insert Start Process window, choose Create. In the prompt Start Process window,enter values as follows:
Field name User action and values Comment
Process variants YDP_RLECC
Long description Release DP to ECC
Choose Enter , then choose Save
4. In the Create Object Directory Entry , choose Local Object , go back then choose
Continue. In the Process Chain Maintenance Modified Version window, the startingprocess is now visible.
5. Choose Process Types.
6. Expand the node: SCM – Demand Planning . Choose process type: DP BackgroundProcessing
7. In the Insert DP Background Processing window, choose the job YDP_RLECC youcreated before and choose Continue. The selected job is now on the right screen area.
8. Link the starting process to this job, by selecting the start job and dragging a line to theprevious selected job, choose …successful in the Action for … dialog box.
9. Choose Activate to make the process chain active.
3.4.6.5 Schedule Process Chain –
Release Demand Plan to
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 92/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 92 of 130
SAP ECC
UseNormally, you need to release demand plan result to SAP ECC at the end of each planningcycle. You would manually trigger this process chain when necessary. You would alsoschedule this process chain to run periodically.
ProcedureRefer to the steps described in chapter 3.4.2.2.
3.4.7 Process Chain – Release Demand Plan to APO-SNP
UseThis process chain supports the process to release the demand plan to APO-SNP, based ona release profile. You take this step if you want to release final demand plan to SNP for
further planning.Ignore this step if you want to release final demand plan to ECC.
3.4.7.1 Create Release Profile
UseBefore the activity can be created, you have to create a release profile.
Procedure1. To access the activity, use one of the following navigation options:
2. In the Release Profile window, maintain value as follows:
Field name User action and values Comment
Release Profile YDP_RLSNP Your release profile name
3. Then choose Create.
4. In the detail Release Profile window, maintain the values as follows:
Field name User action and values Comment
Basic Settings
Planning Area YDP_PA Your planning area
Key FigureZY93_BK12
The key figure you want torelease to SNP
Planning Version 001
Extras
Daily Bkts Prfl
9ADRPDEFAULT
Optional. Enter a planningbuckets profile containing daysif you wish the demand plan to
be released in daily bucketsCategory FA
Transaction code /SAPAPO/MC8S
SAP SCM Menu Demand Planning Environment Maintain ReleaseProfiles
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 93/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 93 of 130
Product Char.ZY93_BC01
Optional. If you do not makean entry, system uses thecharacteristic 9AMATNR.
Location Char.ZY93_BC03
Optional. If you do not makean entry, system uses thecharacteristic 9ALOCNO.
Strategy 20 Planning with final assembly
Create new orders X checked
5. Choose Save.
3.4.7.2 Create Activities – Release Demand Plan to APO-SNP
Procedure1. Now the activity can be created. To access the activity, use one of the following
navigation options:
Transaction code /SAPAPO/MC8T
SAP SCM Menu Demand Planning Planning Demand Planning in
the Background Define Activities for Mass Processing
2. On the Activity screen, maintain the data according to the table below:
Field name User action and values Comment
Activity YDP_RLSNP Your activity name
Description Release DP to SNP Your activity description
3. Then choose Create.
4. On the next Activity screen, maintain the data according to the table below:
Field name User action and values Comment
Planning Book YDP_PB_MASS_JOB
Data View YDP_DV_RELEASE
5. Choose the Release Prfl. tab page at the bottom of the screen. Maintain the value asfollows:
Field name User action and values Comment
Release Profile YDP_RLSNP Your release profile
6. Choose Enter .7. Choose Adopt Current Action, then action Release with action counter 1 is automatically
inserted in the activity.
8. Choose Save.
3.4.7.3 Create Planning job – Release Demand Plan to SNP
Procedure1. To access the activity, use one of the following navigation options:
Transaction code /SAPAPO/MC8D
SAP SCM Menu Demand Planning Planning Demand Planning inthe Background Create Demand Planning in the
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 94/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 94 of 130
Background
2. Enter values as follows:
Field name User action and values Comment
Job number YDP_RLSNP
Job name Release DP to SNP
3. Choose Execute.
4. On the next Create Planning Job screen, maintain values according to the following table:
Field name User action and values Comment
Planning Book YDP_PB_MASS_JOB
Data View YDP_DV_RELEASE
Version 001
5. Choose Execute.
6. On the next Create Planning Job screen, maintain the values according to the followingtable:
Field name User action and values Comment
Control Parameters forbackground planning
Activity YDP_RLSNP The activity you have created
Planning job information
Generate Log X Select the check box
Do Not Create Spool List X
Chars
One YDP_MP_ALL_PROD_LOC
7. Choose Aggregation level , on the Choose chars screen, select the characteristics forProduct and Location. Then choose Continue.
8. Choose Save.
3.4.7.4 Create Process Chain – Release DP to SNP
Procedure1. To access the activity, use one of the following navigation options:
Transaction code RSPC
SAP SCM Menu Demand Planning Environment Maintain ProcessChains
2. In the process chain maintenance planning view, cchoose Create and enter values as
follows:
Field name User action and values Comment
Process chain YDP_RLSNP
Long description DPA – Release DP to SNP
3. Choose Continue.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 95/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 95 of 130
4. In the Insert Start Process window, choose Create. In the Start Process window, entervalues as follows:
Field name User action and values Comment
Process variants YDP_RLSNP
Long description Release DP to SNP
5. Choose Enter , then choose Save.
6. In the Create Object Directory Entry , choose Local Object , go back then chooseContinue. In the Process Chain Maintenance Modified Version window, the startingprocess is now visible.
7. Choose Process Type.
8. Expand the node: SCM – Demand Planning . Choose process type: DP BackgroundProcessing
9. In the pop up Insert DP Background Processing window, choose the job YDP_RLSNPyou created before and choose continue. The selected job is now on the right screenarea.
10. Link the starting process to this job, by selecting the start job and dragging a line to theprevious selected job, choose …successful in the Action for … dialog box.
11. Choose Activate to make the process chain active. On the Create Object Directory Entryscreen, choose Local Object .
3.4.7.5 Schedule Process Chain – Release Demand Plan toAPO-SNP
UseNormally, you need to release demand plan result to SAP SNP at the end of each planning
cycle. You would manually trigger this process chain when necessary. You would alsoschedule this process chain to run periodically.
ProcedureRefer to the steps described in chapter 3.4.2.2.
3.4.8 Process Chain – Backup Historical Data Correction
UseThis process chain is used to back up the corrected history key figure into a backup InfoCube.
You can run this process chain based on your planning cycle, for example each month. Thenthis backup InfoCube can be used for reporting and analysis purposes.
3.4.8.1 Generate Backup InfoCube for Corrected history
UseFirst, you need to generate an InfoCube, which is used to backup the corrected history data.The InfoCube is generated based on the planning area. Only extract historical related keyfigures.
Procedure
1. To access the activity, use one of the following navigation options:
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 96/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 96 of 130
Transaction Code /SAPAPO/MSDP_ADMIN
SAP Menu Advanced Planning and Optimization DemandPlanning Environment Administration of DemandPlanning and Supply Network Planning
2. Choose Planning Area YDP_PA.3. Choose the menu path Extras Data Extraction Tools.
4. On the DP/SNP Data Extraction screen, choose Generate DataSource, on the Generateexport data source screen, enter DataSource name YDP_PA_DS02.
5. Choose Execute.
6. Choose Yes if the message Multiple DataSources for a planning object structure appears.
7. On the DataSource: Cusomer version Edit screen, hide the key figures except those fromthe following list:
InfoObject ID Short text
ZY93_BK01 Sales Quantity 1
ZY93_BK04 Historical Sales Correction
ZY93_BK05 Historical Sales Override
ZY93_BK06 Corrected Sales History
ZY93_BK91 Corrrected History without additional demand
UNIT Unit of measure
8. Choose Save.
9. On the DP/SNP Data Extraction screen, choose Data backup and dhoose GenerateInfoCube from the planning area, input the following values:
Field name User actions and values Comments
InfoCube ZY93_IC03
Description Backup YDP_PA - Corrected history
InfoArea ZBPR_Y93_DPA_IA01
10. Choose Execute.
11. Choose Yes on the Check window to include the proportional factor in the InfoCube.
12. Choose Continue in the Display logs window. Then Exit .
Result
The backup InfoCube for corrected historical sales data has been generated.
3.4.8.2 Change Backup InfoCube for Corrected history
UseHere, you create new dimensions for the InfoCube, then you put each characteristic to thecorresponding dimension.
Procedure1. To access the activity, use one of the following navigation options:
Transaction Code RSA1
SAP Menu Advanced Planning and Optimization Demand
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 97/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 97 of 130
Planning Environment Data WarehousingWorkbench
2. In the Data Warehousing Workbench: Modeling window, choose InfoProvider from theModeling section, expand InfoArea ZBPR_Y93_DPA_IA01 and choose InfoCubeZY93_IC03.
3. Change to change mode and select the folder Dimensions Folder at the right side of thescreen. Right-click dimension ZY93_IC031 and choose Properties. Change thedescription to Product and confirm.
4. Right-click dimension ZY93_IC03T and choose Properties. Change the description toTime and confirm.
5. Right-click the folder Dimensions and choose Create New Dimensions
Give a description for the dimension. The extra dimensions to be created are as follows:
Customer
Location
Region
Sales Org
Version
Created on
6. Choose Save.
7. Follow the table below to move the characteristics under dimension Product to the
corresponding dimensions by drag and drop:
Dimension InfoObject ID Description
Time 0CALMONTH Calendar year/month
0CALYEAR Calendar year
Product ZY93_BC01 Product
ZY93_BC02 Product Line
Customer ZY93_BC04 Customer
Location ZY93_BC03 Location
Region ZY93_BC05 Region
Sales Org ZY93_BC06 Sales Organization
Version 9AVERSION APO Planning Version
8. Right-click dimension Created on and choose InfoObject Direct Input . Input the followingvalues:
InfoObject ID Description0CREATEDON Date on which the record was created
9. Select the folder "Key Figures" and remove all key figures that are not part of thedatasource YDP_PA_DS02.
10. Choose Activate to activate the InfoCube.
6. Choose Local Object if the Create Object Directory Entry dialog box appears.
3.4.8.3 Create Transformation, DTP and InfoPackage
Procedure
1. To access the activity, use one of the following navigation options:
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 98/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 98 of 130
Transaction Code RSA1
SAP Menu Advanced Planning and Optimization DemandPlanning Environment Data WarehousingWorkbench
2. In the left part of the Administrator Workbench: Modeling screen, in the Modeling section,choose Source System.
3. Right-click your source system, for example, SH1CLNT185, choose ReplicateDataSources in the context menu. Select the as DataSource(RSDS) radio button if theData Source from Source System Unknown dialog box appears. A background job istriggered. Check in the job overview that this job has finished before proceeding to thenext step.
4. On the Administrator Workbench screen, you are still in the source system view. Right-click the source system SH1CLNT185 and choose Display DataSources Tree in thecontext menu.
5. Choose the DataSources 9AYDP_ PA_DS02 you have just created.
6. Choose Change Mode.
7. Choose Active DataSource. Choose Local Object if the Create Object Directory Entry screen appears.
8. In the left part of the Administrator Workbench: Modeling screen, in the Modeling section,choose InfoProvider .
9. Expand InfoArea ZBPR_Y93_DPA_IA01 and right-click InfoCube ZY93_IC03, ChooseCreate Transformation….in the context menu.
10. In the Create Transformation dialog box, enter the value as follows:
Field name User action and values Comment
Source of the Transformation
Object Type DataSource From the drop list
DataSource 9AYDP_PA_DS02
Source System for example SH1CLNT185
11. Choose Create Transformation.
12. On the Transformation Create screen, drag the line between two tables (if they are linkedautomatically, then just have a check and skip this step):
Source Field Target Field
CALMONTH 0CALMONTH
CALYEAR 0CALYEAR
/BIC/ZY93_BC01 ZY93_BC01/BIC/ZY93_BC02 ZY93_BC02
/BIC/ZY93_BC03 ZY93_BC03
/BIC/ZY93_BC04 ZY93_BC04
/BIC/ZY93_BC05 ZY93_BC05
/BIC/ZY93_BC06 ZY93_BC06
/BI0/9AVERSION 9AVERSION
/BIC/ZY93_BK01 ZY93_BK01
/BIC/ZY93_BK04 ZY93_BK04
/BIC/ZY93_BK05 ZY93_BK05
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 99/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 99 of 130
/BIC/ZY93_BK06 ZY93_BK06
/BIC/ZY93_BK91 ZY93_BK91
UNIT ZY93_BK01, ZY93_BK04, ZY93_BK05, ZY93_BK06
13. On the Transformation Create screen, in the right target table, choose the row0CREATEDON .
14. In the Rule Details window, choose Formula from the drop down list for the Rule Typefield and choose Change rule
15. In the prompt window, find SYST-DATUM Current Date from the field list and choose it.The Current Date is written at the formula area.
16. Choose Back.
17. Choose Transfer Values
18. Choose Activate to activate the transformation. Choose Yes if Log Display windowprompt. Choose Local Object if the Create Object Directory Entry screen appears.
19. Right-click Data Transfer Processes under InfoCube ZY93_IC03 again and chooseCreate Data Transfer Processes…in the context menu, enter the value below and confirm
the dialog:
Field name User actions and values
Data Transfer Proc. 9AYDP_PA_DS02 / SH1CLNT185 ZY93_IC03/Delta
DTP Type Standard(Can be Scheduled)
Object Type DataSource
DataSource 9AYDP_PA_DS02
Source System SH1CLNT185
20. Choose Continue.
21. Choose Activate Data Transfer Process. Choose Local Object if the Create ObjectDirectory Entry screen appears.
22. Expand the Data Transfer Processes 9AYDP_PA_DS02 / SH1CLNT185 ZY93_IC03/Delta, right-click DataSource 9AYDP_PA_DS02, choose CreateInfoPackage…. in the context menu.
23. In the Create InfoPackage window, enter InfoPackage descriptionZBPR_Y93_9AYDP_PA_DS02_IP01_F, and choose Save. Choose Local Object if theCreate Object Directory Entry screen appears.
24. At Schduler (Maintain InfoPackage) window, select Data Selection tab page, enter 001 forfrom value of /BI0/9AVERSION.
25. Choose Save and Exit .
3.4.8.4 Create Process Chain – Corrected History Back UP
Procedure1. To Access the activity, use one of the following navigation options:
Transaction code RSPC
SAP SCM Menu Demand Planning Environment Maintain ProcessChains
2. In the Process Chain Maintenance Planning View , choose Create and enter values asfollows:
Field name User action and values Comment
Process chain YDP_BU_CORR_HIST
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 100/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 100 of 130
Long description YDP – Backup Corrected HistorySales
3. Choose Continue
4. In the Insert Start Process window, choose Create.
Field name User action and values Comment
Process variants YDP_BU_CORR_HIST
Long description Backup Corrected History Sales
5. Choose Enter , then choose Save
6. In the Create Object Directory Entry , choose Local Object , go back then chooseContinue. In the Process Chain Maintenance Modified Version window, the startingprocess is now visible.
7. Choose Process Type.
8. Expand the node Load Process and Post-Processing . Choose Execute InfoPackage andselect the InfoCube for Corrected Historical Data Back-up in the Insert Execute
Infopackage window and choose Continue. 9. The data transfer process 9AYDP_PA_DS02 / SH1CLNT185 -> ZY93_IC03/Delta is
automatically inserted in the process chain view. The selected job is now on the rightscreen area.
10. Link the starting process to the Load Data job, by selecting the start job and dragging aline to the Load Data job, choose …successful in the Action for … dialog box. Then linkthe Load Data job to Data Transfer Process job, choose …successful in the Action for … dialog box.
11. Choose Save.
12. Choose Activate to make the process chain active.
3.4.8.5 Schedule Process Chain –
Backup Historical DataCorrection
UseNormally, you need to backup historical data correction for report and analysis purpose. Youwould manually trigger this process chain when necessary.
ProcedureRefer to the steps described in chapter 3.4.2.2.
3.4.9 Process Chain – Backup Forecasting
UseThis process chain is used to save the forecast key figure into a backup InfoCube. You canrun this process chain based on your planning cycle, for example each month. Then thisbackup InfoCube can be used for reporting and analysis purpose.
3.4.9.1 Generate Backup InfoCube for Forecasting Result
Use
First, you need to generate an InfoCube which is used to backup the forecasting result. TheInfoCube is generated based on the planning area, only extract forecast related key figures.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 101/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 101 of 130
Procedure1. To access the activity, use one of the following navigation options:
Transaction Code /SAPAPO/MSDP_ADMIN
SAP Menu Advanced Planning and Optimization DemandPlanning Environment Administration of DemandPlanning and Supply Network Planning
2. Choose the planning area YDP_PA.
3. Choose the menu path Extras Data Extraction Tools.
4. On the DP/SNP Data Extraction screen, and choose Generate DataSource, on theGenerate export data source screen, enter DataSource name YDP_PA_DS01.
5. Choose Execute.
6. Choose Yes if the Multiple DataSource for a planning object structure screen appears.
7. On the DataSource: Customer version Edit screen, hide key figures except list below:
InfoObject ID Description
ZY93_BK07 Statistical Forecast
ZY93_BK08 Manual Forecast
ZY93_BK10 Local Planners Forecast Adjustment
ZY93_BK11 Central Planners Forecast Adjustment
ZY93_BK09 Additional demand
ZY93_BK12 Demand Plan
UNIT Unit of measure
8. Choose Save.
9. Choose Back .10. On the DP/SNP Data Extraction screen, choose Data backup and Choose Generate
InfoCube from planning area, input the following values:
Field name User actions and values Comments
InfoCube ZY93_IC02
Description Backup YDP_PA – Forecast result
InfoArea ZBPR_Y93_DPA_IA01
11. Choose Execute.
12. Choose Yes on the Check window to include the proportional factor in the Infocube.
13. Choose Continue on Display logs window. Then Exit .
ResultThe backup InfoCube for forecast result data has been generated.
3.4.9.2 Change Backup InfoCube for Forecast Result
UseHere you create new dimensions for the InfoCube, then put each characteristics tocorresponding dimension.
Procedure
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 102/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 102 of 130
1. To access the activity, use one of the following navigation options:
Transaction Code RSA1
SAP Menu Advanced Planning and Optimization DemandPlanning Environment Data Warehousing
Workbench2. In the Data Warehousing Workbench: Modeling window, choose InfoProvider from the
Modeling section, expand InfoArea ZBPR_Y93_DPA_IA01 and choose InfoCubeZY93_IC02.
3. Go to change mode and select the folder Dimensions Folder at the right side of thescreen. Right-click dimension ZY93_IC021 and choose Properties. Change thedescription to Product and confirm.
4. Right-click dimension ZY93_IC02T and choose Change Description. Change thedescription to Time and confirm.
5. Right-click the folder Dimension and choose Create New Dimensions
Give a description for the dimension. The extra dimensions to be created are as follows:
Customer Location
Region
Sales Org
Version
Created on
6. Choose Save.
7. Follow the table below to add the characteristics to the corresponding dimensions by dragand drop:
Dimension InfoObject ID Description
Time 0CALMONTH Calendar year/month
0CALYEAR Calendar year
Product ZY93_BC01 Product
ZY93_BC02 Product Line
Customer ZY93_BC04 Customer
Location ZY93_BC03 Location
Region ZY93_BC05 Region
Sales Org ZY93_BC06 Sales Organization
Version 9AVERSION APO Planning Version8. Right-click dimension Created on and choose InfoObject Direct Input . Insert the following
values, and choose enter.
InfoObject ID Description
0CREATEDON Date on which the record was created
9. Select the folder Key Figures and remove all key figures that are not part of thedatasource YDP_PA_DS01.
10. Choose Activate to activate the InfoCube.
11. Choose Local Object if the Create Object Directory Entry dialog box appears.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 103/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 103 of 130
3.4.9.3 Create Transformation, DTP and Infopackage
Procedure1. To access the activity, use one of the following navigation options:
Transaction Code RSA1
SAP Menu Information Systems Business Information Warehouse Modeling RSA1 - Data Warehousing Workbench:Modeling
2. In the left part of the Administrator Workbench: Modeling window, in the Modeling section,choose Source System.
3. Right-click your Source system, for example, SH1CLNT185, choose ReplicateDataSource in the context menu. Select the as DataSource(RSDS) radio button if theData Source from Source System Unknown dialog box appears. A background job is
triggered. Check in the job overview that this job has finished before proceeding to thenext step.
4. In the Administrator Workbench screen, you are still in the source system view. Right-click the source system SH1CLNT185 and choose Display DataSources Tree in thecontext menu.
5. Choose the DataSources 9AYDP_ PA_DS01 you have just created.
6. Choose Change Mode.
7. Choose Active DataSource. Choose Local Object if the Create Object Directory Entry screen appears.
8. In the left part of the Administrator Workbench: Modeling screen, in the Modeling section,choose InfoProvider .
9. Expand InfoArea ZBPR_Y93_DPA_IA01 and right-click InfoCube ZY93_IC02, chooseCreate Transformation….in the context menu.
10. In the Create Transformation dialog box, enter the value as below:
Field name User action and values Comment
Source of the Transformation
Object Type DataSource From the drop list
DataSource 9AYDP_PA_DS01
Source System e.g. SH1CLNT185
11. Choose Start Transformation.
12. On the Transformation Create screen, drag the line between two tables (if they are linkedautomatically, then just check and skip this step):
Source Field Target Field
CALMONTH 0CALMONTH
CALYEAR 0CALYEAR
/BIC/ZY93_BC01 ZY93_BC01
/BIC/ZY93_BC02 ZY93_BC02
/BIC/ZY93_BC03 ZY93_BC03
/BIC/ZY93_BC04 ZY93_BC04
/BIC/ZY93_BC05 ZY93_BC05
/BIC/ZY93_BC06 ZY93_BC06/BI0/9AVERSION 9AVERSION
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 104/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 104 of 130
/BIC/ZY93_BK01 ZY93_BK01
/BIC/ZY93_BK04 ZY93_BK04
/BIC/ZY93_BK05 ZY93_BK05
/BIC/ZY93_BK06 ZY93_BK06UNIT ZY93_BK01, ZY93_BK04, ZY93_BK05, ZY93_BK06
13. On the Transformation Create screen, in right target table, choosethe row 0CREATEDON .
14. On the Rule Details window, choose Formula from drop list for Rule Type field andchoose Change rule
15. In the prompt window, find SYST-DATUM Current Date from the field list and chooseit,Current Date is written at the formula area.
16. Choose Back.
17. Choose Transfer Values.
18. Choose Activate to activate the transformation. Choose Yes if the Log Display windowappears. Choose Local Object if Create Object Directory Entry screen appears.
19. Right-click Data Transfer Processes under InfoCube ZY93_IC02 again and chooseCreate Data Transfer Processes…in the context menu, enter the values below andconfirm the dialog:
Field name User actions and values
Data Transfer Proc. 9AYDP_PA_DS01 / SH1CLNT185 -> ZY93_IC02/Delta
DTP Type Standard(Can be Scheduled)
Object Type DataSource
DataSource 9AYDP_PA_DS01
Source System SH1CLNT185
20. Choose Continue.
21. Choose Activate Data Transfer Process. Choose Local Object if the Create ObjectDirectory Entry screen appears.
22. Expand the Data Transfer Processes 9AYDP_PA_DS01 / SH1CLNT185 ->ZY93_IC02/Delta, Right-click DataSource 9AYDP_PA_DS01, choose CreateInfoPackage…. in the context menu.
23. In the Create InfoPackage window, enter InfoPackage descriptionZBPR_Y93_9AYDP_PA_DS01_IP01_F, and choose Save. In the Schduler (MaintainInfoPackage) window, select the Data Selection tab page, enter 001 for from value of/BI0/9AVERSION.
24. Choose Save and Exit .
3.4.9.4 Create Process Chain - Forecast Backup
Procedure1. To access the activity, use one of the following navigation options:
Transaction code RSPC
SAP SCM Menu Demand Planning Environment Maintain ProcessChains
2. In the process chain maintenance planning view, choose Create and enter values asfollows:
Field name User action and values Comment
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 105/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 105 of 130
Process chain YDP_BU_FORECAST
Long description DPA – Backup Forecast
3. Choose Continue.
4. In the Insert Start Process window, choose Create.
Field name User action and values Comment
Process variants YDP_BU_FORECAST
Long description Back Up Forecast
5. Choose Enter , then choose Save .
6. In the Create Object Directory Entry , choose Local Object , go back then chooseContinue.
7. In the Process Chain Maintenance Modified Version window, the starting process is now
visible.
8. Choose Process Type.
9. Choose Delete Index under the node Data Target Administration. In the Insert DeleteIndex window, choose Create. Then enter Process Variant YDP_BACKUP_ZY93_IC02_IDX and Long descriptio ZY93_IC02 Index, then chooseContinue.
10. In the Process Maintenance: Delete Index window, choose InfoCube from the drop list.Then use F4 input help for Object Name, choose your InfoCube ZY93_IC02.
11. Choose Save. In the Create Object Directory Entry , choose Local Object, Go back thenchoose Continue.
12. Two jobs for Delete Index and Create Index are show.
13. Expand the node Load Process and Post-Processing. Choose Execute InfoPackage andselect Forecast InfoCube(ZBPR_Y93_9AYDP_PA_DS01_IP01_F) in the Insert ExecuteInfopackage window and choose Continue. If Display More Chain window pop up, choose
No.14. The Data Transfer Process 9AYDP_PA_DS01 / SH1CLNT185 -> ZY93_IC02/Delta is
automatically inserted in the process chain view. The selected job is now on the rightscreen area.
15. Link the starting process to the Load Data job, by selecting the start job and dragging aline to the Load Data job, choose …successful in the Action for … dialog box. Link theLoad Data job to Delete Indexes job, choose …successful in the Action for … dialog box.Link the Delete Indexes job to Data Transfer Process job, choose …successful in the Action for … dialog box. Finally link the Data Transfer Process job to Create Index job,choose …successful in the Action for … dialog box.
16. Choose Save.
17. Choose Activate to make the process chain active.
3.4.9.5 Schedule Process Chain – Forecast Back up
UseNormally, you need to back up forecast results at the end of each planning cycle for reportand analysis purposes. You would manually trigger this process chain when necessary.
ProcedureRefer to the steps described in chapter 3.4.2.2.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 106/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 106 of 130
3.4.10 Process Chain – Daily Backup Manual Changes
UseThis process chain is used for daily backup all manual changes which done in the planningprocess, for example, sales historical data correction, manual forecast, and etc.
Compared with the backups we describe in the next 2 chapters, this daily backup is mainlyused for data restore purpose, to avoid data loss.
3.4.10.1 Generate Daily Backup InfoCube for ManualChanges
UseFirst, you need to generate an InfoCube which is used to daily backup the manual changesthe planners has done in the planning process. The InfoCube is generated based on theplanning area, only extract those key figures which would be changed manually.
Procedure1. To access the activity, use one of the following navigation options:
Transaction Code /SAPAPO/MSDP_ADMIN
SAP Menu Advanced Planning and Optimization DemandPlanning Environment Administration of DemandPlanning and Supply Network Planning
2. Choose Planning Area YDP_PA.
3. Choose the menu path Extras Data Extraction Tools.
4. On the DP/SNP Data Extraction screen, choose Generate DataSource, on the Generate
export data source screen, enter DataSource name YDP_PA_DS04.5. Choose Execute.
6. Choose Yes if the Multiple DataSources for a planning object structure screen appears.
7. On the DataSource: Cusomer version Edit screen, hide the key figures except the
following ones:
InfoObject ID Short text
ZY93_BK04 Historical Sales Correction
ZY93_BK05 Historical Sales Override
ZY93_BK08 Manual Forecast
ZY93_BK09 Additional demand
ZY93_BK10 Local Fcst. Adj.
ZY93_BK11 Central Fcst. Adj
UNIT Unit of measure
8. Choose Save.
9. On the DP/SNP Data Extraction screen, choose Data backup and Choose GenerateInfoCube from planning area, input the following values:
Field name User actions and values Comments
InfoCube ZY93_IC04
Description Daily Backup YDP_PA – Manual Changes
InfoArea ZBPR_Y93_DPA_IA01
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 107/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 107 of 130
10. Choose Execute.
11. Choose Yes in the Check window to include the proportional factor in the Infocube.
12. Choose Continue in the Display logs window. Then Exit .
ResultThe daily backup InfoCube for manual changes has been generated.
3.4.10.2 Change Daily Backup InfoCube for Manual Changes
UseHere you create new dimensions for the InfoCube, then put each characteristics to thecorresponding dimension.
Procedure
1. To access the activity, use one of the following navigation options:
Transaction Code RSA1
SAP Menu Advanced Planning and Optimization DemandPlanning Environment Data WarehousingWorkbench
2. In the Data Warehousing Workbench: Modeling window, choose InfoProvider from theModeling section, expand InfoArea ZBPR_Y93_DPA_IA01 and chooseInfoCubeZY93_IC04.
3. Change to change mode and select the folder Dimensions Folder at the right side of thescreen. Right-click dimension ZY93_IC041 and choose Properties. Change thedescription to Product and confirm.
4. Right-click dimension ZY93_IC04T and choose Properties. Change the description toTime and confirm.
5. Right-click folder Dimensions and choose Create New Dimensions
Give a description for the dimension. The extra dimensions to be created are as follows:
Customer
Location
Region
Sales Org
Version
Created on
6. Choose Save.7. Follow the table below to move the characteristics under dimension Product to the
corresponding dimensions via drag and drop:
Dimension InfoObject ID Description
Time 0CALMONTH Calendar year/month
0CALYEAR Calendar year
Product ZY93_BC01 Product
ZY93_BC02 Product Line
Customer ZY93_BC04 Customer
Location ZY93_BC03 Location
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 108/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 108 of 130
Region ZY93_BC05 Region
Sales Org ZY93_BC06 Sales Organization
Version 9AVERSION APO Planning Version
7. Right-click dimension Created on and choose InfoObject Direct Input . Input the followingvalues:
InfoObject ID Description
0CREATEDON Date on which the record was created
8. Select the folder "Key Figures" and remove all key figures that are not part of thedatasource YDP_PA_DS04.
9. Choose Activate to activate the InfoCube.
10. Choose Local Object if the Create Object Directory Entry dialog box appears.
3.4.10.3 Create Transformation, DTP and InfoPackage
Procedure1. To access the activity, use one of the following navigation options:
Transaction Code RSA1
SAP Menu Advanced Planning and Optimization DemandPlanning Environment Data WarehousingWorkbench
2. In the left part of the Administrator Workbench: Modeling screen, in the Modeling section,choose Source System.
3. Right-click your Source system, for example, SH1CLNT185, choose Replicate
DataSources in the context menu. Select the as DataSource(RSDS) radio button if theData Source from Source System Unknown dialog box appears. A background job istriggered. Check in the job overview that this job has finished before proceeding to thenext step.
4. In the Administrator Workbench screen, you are still in the source system view. Right-click the source system SH1CLNT185 and choose Display DataSources Tree in thecontext menu.
5. Choose the DataSources 9AYDP_ PA_DS04 you just created before
6. Choose Change Mode.
7. Choose Active DataSource. Choose Local Object if Create Object Directory Entry screenappears.
8. In the left part of the Administrator Workbench: Modeling screen, in the Modeling section,
choose InfoProvider .
9. Expand InfoArea ZBPR_Y93_DPA_IA01 and Right-click InfoCube ZY93_IC04, ChooseCreate Transformation….in the context menu.
10. In the Create Transformation dialog box, enter the value as below:
Field name User action and values Comment
Source of the Transformation
Object Type DataSource From the drop list
DataSource 9AYDP_PA_DS04
Source System e.g. SH1CLNT185
Choose Create Transformation.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 109/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 109 of 130
11. On the Transformation Create screen, drag the line between two tables (if they are linkedautomatically, then just check and skip this step):
Source Field Target Field
CALMONTH 0CALMONTH
CALYEAR 0CALYEAR
/BIC/ZY93_BC01 ZY93_BC01
/BIC/ZY93_BC02 ZY93_BC02
/BIC/ZY93_BC03 ZY93_BC03
/BIC/ZY93_BC04 ZY93_BC04
/BIC/ZY93_BC05 ZY93_BC05
/BIC/ZY93_BC06 ZY93_BC06
/BI0/9AVERSION 9AVERSION
/BIC/ZY93_BK04 ZY93_BK04
/BIC/ZY93_BK05 ZY93_BK05
/BIC/ZY93_BK08 ZY93_BK08
/BIC/ZY93_BK09 ZY93_BK09
/BIC/ZY93_BK10 ZY93_BK10
/BIC/ZY93_BK11 ZY93_BK11
UNIT ZY93_BK01, ZY93_BK04, ZY93_BK05, ZY93_BK06
12. On the Transformation Create screen, in right target table, choose the row0CREATEDON .
13. On the Rule Details window, choose Formula from drop list for Rule Type field andchoose Change rule.
14. In the window, find SYST-DATUM Current Date from the field list and choose it. CurrentDate is written at the formula area.
15. Choose Back.
16. Choose Transfer Values.
17. Choose Activate to activate the transformation. Choose Yes if the Log Display windowappears. Choose Local Object if the Create Object Directory Entry screen appears.
18. Right-click Data Transfer Processes under InfoCube ZY93_IC04 again and chooseCreate Data Transfer Processes…in the context menu, enter the value below and confirmthe dialog:
Field name User actions and values
Data Transfer Proc. 9AYDP_PA_DS04 / SH1CLNT185 -> ZY93_IC04/Delta
DTP Type Standard(Can be Scheduled)
Object Type DataSource
DataSource 9AYDP_PA_DS04
Source System SH1CLNT185
19. Choose Continue.
20. Choose Activate Data Transfer Process. Choose Local Object if the Create ObjectDirectory Entry screen appears.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 110/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 110 of 130
21. Expand the Data Transfer Processes 9AYDP_PA_DS04 / SH1CLNT185 ->ZY93_IC04/Delta, Right-click DataSource 9AYDP_PA_DS04, choose CreateInfoPackage…. in the context menu.
22. In the Create InfoPackage window, enter InfoPackage descriptionZBPR_Y93_9AYDP_PA_DS04_IP01_F, and choose Save. Choose Local Object if
Create Object Directory Entry screen appears.23. At Schduler (Maintain InfoPackage) window, select Data Selection tab page, enter 001
for from value of /BI0/9AVERSION.
24. Choose Save and Exit .
3.4.10.4 Create Process Chain – Daily Back UP ManualChanges
Procedure1. To access the activity, use one of the following navigation options:
Transaction code RSPC
SAP SCM Menu Demand Planning Environment Maintain ProcessChains
2. In the Process Chain Maintenance Planning View , choose Create and enter values asfollows:
Field name User action and values Comment
Process chain YDP_BU_DAILY_CHANGE
Long description YDP – Daily Backup ManualChanges
3. Choose Continue4. In the Insert Start Process window, choose Create.
Field name User action and values Comment
Process variants YDP_BU_DAILY_CHANGE
Long description Daily Backup Manual Changes
5. Choose Enter , then choose Save.
6. In the Create Object Directory Entry , choose Local Object, go back then chooseContinue. In the Process Chain Maintenance Modified Version window, the startingprocess is now visible.
7. Choose Process Type.
8. Expand the node Load Process and Post-Processing . Choose Execute InfoPackage andselect the InfoCube for Daily Back-up Manual Changes in the Insert Execute Infopackagewindow and choose Continue.
The data transfer process 9AYDP_PA_DS04 / SH1CLNT185 ZY93_IC04/Delta isautomatically inserted in the process chain view. The selected job is now on the rightscreen area.
9. Now add the 3rd
step of the process chain. Choose process type: Complete Deletion ofData Target Contents under the node: Data Target Administration.
10. In the Insert Complete Deletion of Data Target Contents window, choose Create.
11. In the Complete Deletion of Data Target Contents window, enter Process Variants YDP_DEL_CUBE, and Long Description YDP – Delete InfoCube. Choose Enter .
12. In the Process Maintenance: Complete Deletion of Data Target Contents window, in theObject Type field, choose InfoCube from the droplist. In the Object Name field, choose F4and choose ZY93_IC04, then choose Transfer Selections.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 111/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 111 of 130
13. In the Process Maintenance: Complete Deletion of Data Target Contents window, chooseSave.
14. In the prompted Create Object Directory Entry dialog box, choose Local Object , Go back then choose Continue. In the Process Chain Maintenance Modified Version window, the3
rd step is now visible.
15. Now add the 4th step of the process chain. Choose process type: Data Transfer Processunder the node: Load Process and Post-Processing.
16. In the Insert Data Transfer Process window, choose Data Transfer Proc.9AYDP_PA_DS04 / SH1CLNT185 -> ZY93_IC04/Delta with F4 input help. ChooseContinue.
17. Now add the 5th
step of the process chain. Choose process type: Deletion of Requestsfrom PSA under the node: Other BW Processes.
18. In the Insert Deletion of Request from PSA window, choose Create.
19. In the Deletion of Requests from PSA window, enter Process Variants YDP_DEL_PSA,and Long Description YDP – Delete PSA.
20. In the Process Maintenance: Deletion of Requests from PSA window, enter the data as
table below:
Field name User action and values Comment
DataSource 9AYDP_PA_DS04
Src. system SH1CLNT185
Older Than (No. of Days/Date) 31.12.9999
21. Choose Save.
22. In the prompted Create Object Directory Entry dialog box, choose Local Object , Go back then choose Continue. In the Process Chain Maintenance Modified Version window, the5
th step is now visible.
23. Now link these steps by the same sequence they are created, by selecting the start job
and dragging a line to the linked job, choose …successful in the Action for … dialog box.24. Choose Save.
25. Choose Activate to make the process chain active.
3.4.10.5 Schedule Process Chain – Daily Backup ManualChanges
UseNormally, it is better to back up all your manual planning works every day. We recommendthat you schedule this process chain as a daily job.
ProcedureRefer to the steps described in chapter 3.4.2.2.
3.4.11 Grouping Process Chain
UseWith this activity, the user can group the process chains logically, and then can easily find andmanage the process chains. Here we just give an example. You can group the processchains as your unique requirement.
Procedure1. To access the activity, use one of the following navigation options:
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 112/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 112 of 130
Transaction Code RSPC
SAP Menu Demand Planning Environment Maintain ProcessChains
2. Choose the Process Chain Data Preparation YDP_LOAD_PRE.
3. Choose Display/Change to make sure you are in the change mode.
4. Choose Display Components.
5. In the Assign Display Grouping dialog box, choose F4.
6. In the Selection dialog box, choose Create.
7. In the Creation of a Grouping dialog box, enter the following data:
Field name User action and values Comment
Application comp. YDP_DP
Long description Steps within the black box DP
8. Choose Enter .
9. In the Assign Display Grouping dialog box, choose Enter .
10. In the Process Chain Maintenance Modified Version screen, choose Save.
11. Choose Process Chains to refresh the change.
12. Choose the Process Chain YDP_FORECASTING, choose Display Components.
13. In the Assign Display Grouping dialog box, choose F4.
14. In the Selection dialog box, choose the Application Components YDP_DP you created instep 7.
15. Repeat step 12 to step 14 to assign the process chain YDP_DATA_LOAD_PRE_EX,YDP_DATA_LOAD_PRE_ECC, YDP_CONSOLIDATING, YDP_RLSNP, YDP_RLECC tothe Application Components YDP_DP.
16. Repeat step 2 to step 15 to assign the other Process Chains to the corresponding
Application Components. Follow the table below for maintenance:
Process Chain Application Components Long Description
YDP_BU_CORR_HIST
YDP_BACKUP
YDP - Backup and DataManagement
YDP_BU_BU_FORECAST
YDP_BU_DAILY_CHANGE
YDP_DATA_LOAD_FLATYDP_TRANS_LOAD
YDP - Data Load(Transaction Data)
ZDPA_ECC_TRANS_DATA
ZBRP_Y93_ZDPA_PC01YDP_MASTER_LOAD
YDP - Data Load(Master Data)
YDP_LOAD_PREYDP_SUB
YDP – Sub ProcessChain
3.5 Setting up Alert Profile (Optional)
3.5.1 Set Up Application-Specific Alert Profiles - APO ForecastAlert Profiles
Use
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 113/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 113 of 130
Maintain this alert profile if you want to monitor forecast alerts for Demand Planning. Theprofile allows you to maintain a user-specific selection of alerts corresponding to your area ofresponsibility.
Prerequisites
Optional: You have specified priorities for forecast alerts in Customizing. If you donot specify priorities, the system issues all forecast alerts as warning messages, asstandard.
In the Forecast Profile for Demand Planning, you have defined a diagnosis group.The diagnosis group contains the threshold values, which trigger an alert when theyare exceeded. For Univariate forecasts these are always maximum values.
Procedure1. To access the activity, use one of the following navigation options:
Transaction code /SAPAPO/AMON_SETTING
SAP SCM Menu Supply Chain Monitoring Current Settings Set
Alert Monitor
2. In the Alert Profile Maintenance window, choose Create Profile.
3. In the Create Alert Monitor Profile window, enter the value as follows:
Field name User action and values Comment
Category
Application Profile X selected
Identification
Profile ID YDP_FP01
Description Forecate alert profile AMO Application APO: Forecast Planning Choose from drop list
4. Choose Create.
5. In the Alert Profile Maintenance: Change <your alert profile name> window, choose theSelection tab page at the right side of the window, in the Select Alert Types section,expand the node Demand Planning – Forecast Alerts, maintain the value as the tablebelow:
Alert Types Selection Information Warning Error
MAD upper limit exceeded X
MAPE upper limit exceeded X
Here you should choose the alert types based on the parameters you selected inyour diagnosis group.
6. In the Object Selection section of the same screen, maintain the value as the table:
Field name User action and values Comment
Object Selection
Planning Book YDP_PB_MASS_JOB The planning book name
Select the planning book for which the system should determine alerts. You canenter a selection restriction. If you enter a selection range for a specificcharacteristic, only those alerts will be displayed that have that particular
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 114/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 114 of 130
characteristic. If you do not enter a selection, the system determines alerts for allselections in a planning book.
7. Choose Save. Expand the node APO: Forecast Planning at the left side of the window,then you can see the alert profile you just created.
3.5.2 Set Up Application-Specific Alert Profiles - APO Supply& Demand Planning Alert Profiles
UseMaintain this alert profile if you want to monitor macro-dependent alerts for Demand Planning.The profile allows you to maintain a user-specific selection of alerts corresponding to yourarea of responsibility.
Here we only focus on database alerts that have a better performance compared withdynamic alerts.
PrerequisitesYou should create a macro under a planning book and data view, in the macro, an alert willbe generated if some conditions is met, for example, if the adjustment by the central plannervaries from the manual forecast more than 30%.
Procedure1. To access the activity, use one of the following navigation options:
Transaction code /SAPAPO/AMON_SETTING
SAP SCM Menu Supply Chain Monitoring Current Settings Set Alert Monitor
2. In the Alert Profile Maintenance window, choose Create Profile.
3. In the Create Alert Monitor Profile window, enter the value as follows:
Field name User action and values Comment
Category
Application Profile X selected
Identification
Profile ID YDP_SDP01
Description Macro alert profile
AMO Application APO: Supply & Demand Planning Choose from drop list
4. Choose Create.5. In the Alert Profile Maintenance: Change <your alert profile name> window, choose the
Selection tab page at the right side of the window, in the Select Alert Types section,expand the node SDP – Database Macro Alerts, maintain the value as the table below:
Alert Types Selection Comment
Requirements Planning – Macro Status Alerts X
6. In the Object Selection section of the same screen, maintain the value as the table:
Field name User action and values Comment
Object Selection
Planning Book YDP_PB_CENTRAL_PLAN Your planning bookname
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 115/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 115 of 130
7. In the Database Alerts section of the same screen, maintain the value as follows:
Data View Selection Description Comment
YDP_DV_FC_REV YDP_MP_ALL_PROD_LOC Your selection
Here select the planning book and then data views for all the database or dynamicalerts for which you want the system to determine alerts.
If you want to choose all the database alerts for a planning book, enter a blankrow in the selection area for data views.
8. Choose Save. Expand the node APO: Supply & Demand Planning at the left side of thewindow, then you can see the alert profile you just created.
In this project, we make an example for the macro-dependent alert. Please refer toMacro: Central adj/man. fcst > 30% BG COL = RE(Planning book:
YDP_PB_CENTRAL_PLAN, Data View: YDP_DV_FC_REV). You would maintainthe macro-dependent alert based on your specific business requirement.
3.5.3 Set Up Overall Alert Profiles
UseMaintain this overall alert profile if you want to track alerts in APO Alert Monitor. The profileallows you to maintain a user-specific selection of alerts corresponding to your area ofresponsibility, and can be set up to track alerts by planning folder.
Procedure
1. Access the transaction using one of the following navigation options:Transaction code /SAPAPO/AMON_SETTING
SAP SCM menu Advanced Planning and Optimization Supply Chain
Monitoring Current Settings Set Alert Monitor
2. In the Alert Profile Maintenance window, choose Create Profile.
3. In the Create Alert Monitor Profile window, enter the value as follows:
Field name User action and values Comment
Category
Overall Profile X selected
Identification
Profile ID YDP_OAP
Description Overall alert profile
4. Choose Create.
5. In the Alert Profile Maintenance: Change <your overall alert profile name> window,choose the Setting tab page at the right side of the window, maintain the value follows:
Field Name User action and values Comment
Planning Version 001
Period
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 116/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 116 of 130
Relative Time Interval X Selected
Months 12
Application-Specific AlertProfiles
Alert Profile for APO: ForecastPlanning
YDP_FP01 Your forecast alert profile
Alert Profile for APO: Supply &Demand Planning
YDP_SDP01 Your supply & demandplanning alert profile
6. Choose Save. Expand the node Overall Alert Profiles at the left side of the window. Youcan see the alert profile you just created.
3.5.4 Assign Planners to Alert Profiles (Optional)
UseTo link specific users to specific alert profiles, if you want to display the alert at interactiveplanning screen, you have to maintain the relationships. The planners are not able to see anyalerts in Interactive Planning unless their SAP user ID is assigned to an alert profile.
Procedure1. To access the activity, use one of the following navigation options:
Transaction code /SAPAPO/SDPALPR
SAP SCM Menu Demand Planning Environment Current settings
Assign Planners to Alert Profile
2. In the Assign Planner to Alert Profile window, you can assign each planner for specific
alert profiles. Maintain value as table:
Field name User action andvalues
Comment
Plannr XXXX Planner user id
Planning Area YDP_PA
FCS profl. YDP_FC01 Forecast alert profile, ifrelevant
SDP Profl. YDP_SDP01 Supply & demand planningalert profile, if relevant
3. Choose Save.
3.6 Setting up Roles and Authorizations
PurposeThe SAP authorization concept protects transactions, programs, and services in SAP systemsfrom unauthorized access. On the basis of the authorization concept, the administratorassigns authorizations to the users that determine which actions a user can execute in theSAP system, after he or she has logged on to the system and completed the authenticationprocess.
To access business objects or execute SAP transactions, a user requires the correspondingauthorizations, since business objects or transactions are protected by authorization objects.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 117/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 117 of 130
The authorizations represent instances of generic authorization objects and are definedaccording to the tasks and responsibilities of the employee. The authorizations are groupedinto an authorization profile that is associated with a role. The user administrators then assignthe corresponding roles using the user master record, so that the user can use thecorresponding transactions for his or her tasks.
Use
This chapter describes the security roles and authorization set up required to support theDemand Planning scenario.
As described in the SCM Demand Planning BPD document, there are five SAP roles definedto support the process:
Local Demand Planner (AME Area). This role is assigned to a sales/demand plannerwho is responsible for America region.
Local Demand Planner (APJ Area). This role is assigned to a sales/demand plannerwho is responsible for Asia-Pacific, Japan region.
Local Demand Planner (EU Area). This role is assigned to a sales/demand plannerwho is responsible for Europe region.
Central Demand Planner. This role is assigned to a sales/ demand planner,responsible for the central demand plan. The central demand plan covers all theareas.
Demand Planning Administrator. This role covers the administrative functions tomonitor and maintain the demand planning system with regards to dataadministration, master data maintenance and batch processes.
The Core Interface (CIF) Administrator role will be required in the DP scenario if the demandplan is going to be released to ECC. This role is not covered in this document.
3.6.1 Role Overview
Modified versions of the SAP Standard delivered roles are used in this scenario in order torestrict to specific planning books and selection ID used in the demand planning scenario andto use the Business Intelligence (BI) authorization concept.
For more information on authorization objects relevant to Demand Planning, see theapplication help for Demand Planning:
http://help.sap.com/saphelp_scm70/helpdata/en/ed/f061c18ddd79448c49064f0e645725/frameset.htm
The table below lists the major access restriction for the different roles:Business Role SAP SCM
RoleCopy fromstandard role
Planning Area Accessible
Planning Book Accessible
Data View Accessible
BI Authorization
Local DemandPlanner( AME area)
YDP_IP_LOC_AME
SAP_SCM_FCS _PLN_STD
(DemandPlannerStandard)
YDP_PA YDP_PB_LOCAL_PLAN
YDP_DV_LOC_ADJ
YDP_LOC_AME
Local DemandPlanner ( APJarea)
YDP_IP_LOC_APJ
SAP_SCM_FCS _PLN_STD
YDP_PA YDP_PB_LOCAL_PLAN
YDP_DV_LOC_ADJ
YDP_LOC_APJ
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 118/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 118 of 130
3.6.2 BI Authorization in Demand PlanningBusiness Intelligence (BI) has its own authorization concept that differs in some details fromthe normal SAP authorization concept. You can use the BI authorization concept to restrictthe ability to access specific characteristics or characteristic values in Demand Planning.
Since organizations are set up differently for each implementation and assignments of localplanners are specific to the implementation, you may modify the authorization based on yourrealized organizational structure by following the steps mentioned below. This sectiondescribes how to create or modify the role based on the organization‟s requirement.
3.6.2.1 Authorization Relevant InfoObjects
UseWe only enable navigation attribute Area (attribute of characteristic Region) in the demandplanning object structure for BI authorizations control. The authorization relevant flag need tobe set up on the InfoObjects definition in the BI Administrator Workbench.
Procedure1. Access the activity using the following navigation options:
Transaction Code RSA1
SAP SCM Menu Information Systems Business Information Warehouse
Modeling Data Warehousing Workbench: Modeling
2. Choose InfoObjects in the left window.3. Expand the InfoArea Tree RDS Dem and Planning in the middle window.
Local DemandPlanner
( EU area)
YDP_IP_LOC_EU
SAP_SCM_FCS _PLN_STD
YDP_PA YDP_PB_LOCAL_PLAN
YDP_DV_LOC_ADJ
YDP_LOC_EU
CentralDemandPlanner
YDP_IP_CTR_ALL
SAP_SCM_FCS _PLN_EXP(DemandPlanner Expert).
YDP_PA YDP_PB_CENTRAL_PLAN
YDP_PB_MASS _JOB
* YDP_CTR_ALL
DemandPlanning Administrator
YDP_MP_ALL_ADMIN
( YDP_IP_CTR_ALL isalsoassigned)
SAP_SCM_FCS _PLN_ADM
* * * 0BI_ALL
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 119/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 119 of 130
4. Expand the InfoObject Catalog Char. Of RDS DP in the middle window.
5. Choose Characteristic Region in the middle window.
6. Choose the Attribute tab page in the right window.
7. If you are currently in display mode, choose Display <-> Change above to switch tochange mode.
8. Find the row of attribute ZY93_BC09 (Area), and tick the field AuthorizRelevant.
9. Choose Activate to acitvate the infoobject.
If you need to enable the BI authorization control on a Characteristic, but not aNavigation Attribute, you can follow the same instructions mentioned above, theonly difference are:
In step 7, choose the Business Explorer tab page.
In step 9, you do not need to find any row. Select the Authorization Relevantradio button.
If some objects are inactive due to this change, re-activate these objects.
In addition, other infoobjects are also required to be flagged as authorization relevant. In
standard delivered SAP, these objects are not flagged as authorization relevant, so you need
to change the following objects following the hits above.
0TCAACTVT - Activity in Analysis Authorizations
0TCAIPROV - Authorizations for InfoProvider
0TCAVALID - Validity of an Authorization
You can find these characteristics under InfoArea Unassigned Notes and InfoObject Catalog
Unassigned Characteristics. By using Search in the middle window, you can locate the 3
characteristics mentioned above more efficiently.
3.6.2.2 Maintain Analysis Authorization
Use
You create four authorizations here to control the access to different Areas. The authorization
is assigned to different roles later.
Procedure
1. Access the activity using the following navigation options:
Transaction Code RSECADMIN
SAP SCM Menu Advanced Planning and Optimization Demand Planning
Environment Manage Analysis Authorizations
2. Choose Maintenance on the Authorizations tab page.3. Input the 1
st authorization name YDP_LOC_AME in the field Authorization, and choose
the Create. 4. On the next screen, input name YD_ LOC_AME in the field Short Text: 5. Choose Insert Row.6. Input 0TCAACTVT in the column Charact./Dimensions, then choose Enter. 7. Repeat step 5 and step 6 to add Characteristic 0TCAIPROV and 0TCAVALID
8. Select the all the 3 rows you have just inserted, and choose Full Authorizations (for these3 characteristics, there is no restriction here).9. Choose Insert Row.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 120/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 120 of 130
10. Use Selection help (F4) in the field Charact./Dimensions to choose InfoObjectZY93_BC05__ZY93_BC09 (Area), then choose Enter.
11. Select the row ZY93_BC05_ZY93_BC09 (Area), and choose Details. 12. On the Value Authorizations tab page, choose Insert Row. 13. Input or use the selection help to choose EQ in the field Operator and AME in the field
Technical Character.(from), then choose Enter. 14. If there the Log Display window appears, choose Enter. 15. Choose Back twice to return to the initial screen.
Use the copy function by choosing the pushbutton on the initial screen to create the other 3authorizations YDP_LOC_APJ, YDP_LOC_EU, and YDP_CTR_ALL.Each time you have copied the new authorization, select the row ZY93_BC05__ZY93_BC09(Area), and choose Details. On the new screen, change the field according to the table below:
Authorization name Intervals assigned for ZY93_BC05__ZY93_BC09 (Area)
YDP_LOC_APJ APJ
YDP_LOC_EU EU
YDP_CTR_ALL *
Save the new authorization each time you have finished the steps above.
3.6.3 Authorization Role and Profile Generation
UseDifferent roles are defined for Local Planner, Central Planner, and DP Administrator in thissection.
In the role maintenance transaction (t-code: PFCG), you can review the authorizationsassociated with this role:
Procedure1. Access the activity in SAP SCM system by navigating as follows:
Transaction code PFCG
SAP SCM Menu Tools Administration User Maintenance Role
Administration Roles
2. On the Role Maintenance screen, enter the following value:
Parameter ValueRole SAP_SCM_FCS_PLN_STD
3. Choose Copy Role.
4. In the dialog box that appears, make the following entries:
Parameter Value
from role SAP_SCM_FCS_PLN_STD
to role YDP_IP_LOC_AME
5. Choose Copy All .
6. Choose Change for the newly created role and make the following entry:Parameter Value
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 121/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 121 of 130
Description Demand Planning Local Planner – AME Area
7. Choose Save.
8. Choose the Authorizations tab page.
9. Choose Expert Mode for Profile Generation.
10. Choose Delete and Recreate Profile and Authorizations.
11. Choose ENTER.
If you cannot see the technical name of the authorization objects, choose themenu Utilities (M) -> Technical Name On.
12. Choose Manually to add new authorization objects.
13. In the Manual selection of authorizations box, enter the two authorization objectsS_TCODE and S_RS_AUTH in the Authorization Objects area, then choose Continue
(Enter).
14. In the authorization objects tree, expand the authorization you have just insert: Manually Cross-Application Authorization Objects (AAAB) Manually Transaction Code Check atTransaction start (S_TCODE ) Manually Transaction Code Check at Transaction start
(S_TCODE ) Transaction Code (TCD)
15. Choose the white bar of the authorization field Transaction Code (TCD).
16. In the Field values box, input SU53 in the „ From‟ field. In the second row, input /SAPAPO/MC62 in the „ From‟ field. Then choose button Transfer (Enter)
17. Now the yellow lights have been turned to green in front of these lines.
18. In the authorization objects tree, expand the authorization you have just insert: Business
Information Warehouse (RS) Manually BI Analysis Authorizations in Role(S_RS_AUTH) Manually BI Analysis Authorizations in Role (S_RS_AUTH) BI Analysis Authorizations: Name of an Authorization (BIAUTH).
19. Choose the white bar of the authorization field BI Analysis Authorizations: Name of an Authorization (BIAUTH).
20. In the Field values box, input YDP_LOC_AME in the „ From‟ field. Then choose Transfer(Enter).
21. Now the yellow lights have turned to green in front of these lines.
22. Expand the tree: Standard APO Authorization Objects (APO). There are nineauthorization objects with yellow light. And unter the tree Standard Basis – CentralFunctions (BC_Z), there are other authorization objects with yellow light . We need to
expand them one by one and fill them with content as follows. Each authorization objectcan be maintained as in step 18 to step 20.
In the following table, (+) means adding the following content, and (=) meanskeeping the default value proposed by system. * means choosnig Full Authorization.
AuthorizationObject Field Name Content
C_APO_DPPR ACTVT (+)*
APO_PROD (+)*
C_APO_FUN APO_FUNC (+)C_CHARC
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 122/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 122 of 130
APO_PAREA (+) YDP_PA
C_APO_IOBJ ACTVT (+)02,03
APO_IOBJNM
(+) ZY93_BK07, ZY93_BK08, ZY93_BK09,
ZY93_BK10, ZY93_BK11, ZY93_BK12
APO_PAREA (+) YDP_PA
C_APO_LOC ACTVT (+)02,03,16
APO_LOC (+)*
C_APO_PB ACTVT (+)02,03,16
APO_DVIEW (+)YDP_DV_LOC_ADJ
APO_PLBK2 (+)YDP_PB_LOCAL_PLAN
C_APO_PROD ACTVT (+)02,03,16
APO_LOC (+)*
APO_PROD (+)*
C_APO_PROM ACTVT (+)02,03
APO_PROMID (+)*
C_APO_SEL3 ACTVT (+)02,03,16
APO_PAREA (+)YDP_PA
APO_PLBK2 (+)YDP_PB_LOCAL_PLAN
APO_SELTXT (+)YDP_IP_LOC_AME
APO_VERS (+)001
C_APO_VERS ACTVT (+)02,03,16
APO_APKZ (+)AM,DP,MD,SNP
APO_KENN (+)*
APO_MOD (+)000APO_VERS (+)001
S_APPL_LOG ACTVT (+)03
ALG_OBJECT (+) APO_FCS
ALG_SUBOBJ (+)*
23. Choose Generate from the application toolbar.
24. In the Generate Profile dialog box, choose Generate.
25. In the window, keep the text proposed by system and choose Execute (Enter).
26. Choose Back twice.
27. Repeat these steps for the following values:
From Role To Role Role Description
SAP_SCM_FCS_PLN_STD YDP_IP_LOC_APJ Demand Planning Local Planner – APJ Area
SAP_SCM_FCS_PLN_STD YDP_IP_LOC_EU Demand Planning Local Planner – EU Area
SAP_SCM_FCS_PLN_EXP YDP_IP_CTR_ALL Demand Planning Central Planner – All Areas
SAP_SCM_FCS_PLN_ADM YDP_MP_ALL_ADMIN Demand Planning Administrator
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 123/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 123 of 130
For the roles YDP_IP_LOC_APJ and YDP_LOC_EU , they are quite similar withYDP_IP_LOC_AME, you can copy from YDP_IP_LOC_AME , and only modifythe fields in Bold in the two tables below by choosing Change Authorization dataon the Authorizations tab page.
Modify or add the authorization objects for the role YDP_IP_LOC_APJ according to
the table below:
AuthorizationObject Field Name Content
S_TCODE TCD SU53
S_RS_AUTH BIAUTH YDP_LOC_APJ
C_APO_DPPR ACTVT (+)*
APO_PROD (+)*
C_APO_FUN APO_FUNC (+)C_CHARC
APO_PAREA (+) YDP_PA
C_APO_IOBJ ACTVT (+)02,03
APO_IOBJNM
(+) ZY93_BK07, ZY93_BK08, ZY93_BK09,
ZY93_BK10, ZY93_BK11, ZY93_BK12
APO_PAREA (+) YDP_PA
C_APO_LOC ACTVT (+)02,03,16
APO_LOC (+)*
C_APO_PB ACTVT (+)02,03,16
APO_DVIEW (+)YDP_DV_LOC_ADJ
APO_PLBK2 (+)YDP_PB_LOCAL_PLAN
C_APO_PROD ACTVT (+)02,03,16
APO_LOC (+)*APO_PROD (+)*
C_APO_PROM ACTVT (+)02,03
APO_PROMID (+)*
C_APO_SEL3 ACTVT (+)02,03,16
APO_PAREA (+)YDP_PA
APO_PLBK2 (+)YDP_PB_LOCAL_PLAN
APO_SELTXT (+)YDP_IP_LOC_APJ
APO_VERS (+)001
C_APO_VERS ACTVT (+)02,03,16
APO_APKZ (+)AM,DP,MD,SNP
APO_KENN (+)*
APO_MOD (+)000
APO_VERS (+)001
S_APPL_LOG ACTVT (=)
ALG_OBJECT (+) APO_FCS
ALG_SUBOBJ (+)*
Modify or add the authorization objects for the role YDP_IP_LOC_EU according tothe table below:
Authorization Field Name Content
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 124/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 124 of 130
Object
S_TCODE TCD SU53
S_RS_AUTH BIAUTH ZPDA_LOC_EU
C_APO_DPPR ACTVT (+)*
APO_PROD (+)*
C_APO_FUN APO_FUNC (+)C_CHARC
APO_PAREA (+) YDP_PA
C_APO_IOBJ ACTVT (+)02,03
APO_IOBJNM
(+) ZY93_BK07, ZY93_BK08, ZY93_BK09,
ZY93_BK10, ZY93_BK11, ZY93_BK12
APO_PAREA (+) YDP_PA
C_APO_LOC ACTVT (+)02,03,16
APO_LOC (+)*
C_APO_PB ACTVT (+)02,03,16
APO_DVIEW (+)YDP_DV_LOC_ADJ
APO_PLBK2 (+)YDP_PB_LOCAL_PLAN
C_APO_PROD ACTVT (+)02,03,16
APO_LOC (+)*
APO_PROD (+)*
C_APO_PROM ACTVT (+)02,03
APO_PROMID (+)*
C_APO_SEL3 ACTVT (+)02,03,16
APO_PAREA (+)YDP_PA
APO_PLBK2 (+)YDP_PB_LOCAL_PLANAPO_SELTXT (+)YDP_IP_LOC_EU
APO_VERS (+)001
C_APO_VERS ACTVT (+)02,03,16
APO_APKZ (+)AM,DP,MD,SNP
APO_KENN (+)*
APO_MOD (+)000
APO_VERS (+)001
S_APPL_LOG ACTVT (=)
ALG_OBJECT (+) APO_FCS
ALG_SUBOBJ (+)*
Modify or add the authorization objects for the role YDP_IP_CTR_ALL according tothe table below:
AuthorizationObject Field Name Content
S_TCODE TCD SU53
S_RS_AUTH BIAUTH YDP_CTR_ALL
C_APO_ADV ACTVT (=)
APO_PLBK (+)*
APO_VIEW (+)*
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 125/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 125 of 130
C_APO_ADVN ACTVT (+)*
APO_MAKRON (+)*
C_APO_AMON ACTVT (=)
C_APO_ATP ACTVT (=)
APO_ATP_AR (=)
C_APO_DPPR ACTVT (+)*
APO_PROD (+)*
C_APO_FUN APO_FUNC (=)
APO_PAREA (+) YDP_PA
C_APO_IOBJ ACTVT (+)*
APO_IOBJNM (+) *
APO_PAREA (+) YDP_PA
C_APO_LOC ACTVT (+)*
APO_LOC (+)*
C_APO_MAC ACTVT (+)*
APO_MACRO (+)*
APO_PLBK (+)*
APO_VIEW (+)*
C_APO_MOD ACTVT (+)*
APO_KENN (+)*
APO_MOD (+)*
C_APO_PB ACTVT (+)02,03,16
APO_DVIEW (+)*
APO_PLBK2(+)YDP_PB_CENTRAL_PLAN,YDP_PB_MASS_JOB
C_APO_PROD ACTVT (+)*
APO_LOC (+)*
APO_PROD (+)*
C_APO_PROM ACTVT (+)02,03
APO_PROMID (+)*
C_APO_RES ACTVT (+)*
APO_LOC (+)*
APO_PLNR (+)*
APO_RES (+)*
C_APO_SEL3 ACTVT (+)02,03,16
APO_PAREA (+)YDP_PA
APO_PLBK2 (+)YDP_PB_LOCAL_PLAN
APO_SELTXT (+)YDP_IP_LOC_APJ
APO_VERS (+)001
C_APO_TSID ACTVT (+)*
APO_STSID (+)*
C_APO_VERS ACTVT (+)*
APO_APKZ (+)*APO_KENN (+)*
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 126/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 126 of 130
APO_MOD (+)*
APO_VERS (+)*
S_TRANSLAT ACTVT (=)
TLANGUAGE (+)*
TRANOBJ (+)*
S_APPL_LOG ACTVT (=)
ALG_OBJECT (+) APO_FCS
ALG_SUBOBJ (+)*
Modify or add the authorization objects for the role YDP_MP_ALL_ADMIN, and add *to all the empty authorization fields.
Result
You have generated all the authorization profiles needed for the scenario.
3.6.4 Creating SAP SCM Users and Assign Proper Roles
Use
You create four users here for different business role users. The access authorization is
controlled by assigning different roles to each user.
Procedure
1. Access the activity using the following navigation options:
Transaction Code SU01
SAP SCM Menu Tools Administration User Maintenance Users
2. Input User ID LOC_PLN_AME and choose Create.3. On the Address tab page, make the following entries:
Parameter Value
Last Name that is, Local Planner
First Name that is, AME
4. On the Logon Data tab page, make the following entries:Parameter Value
Initial Password that is, testing01
Repeat Password that is, testing01 (as same as cell above)
5. On the Roles tab page, make the following entries:
Parameter Value
Role YDP_IP_LOC_AME
Valid from that is, date of today
Valid to that is, 31.12.2099
6. Choose Save, then you have created the user and assigned it with the role of the localdemand planner - AME area.
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 127/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 127 of 130
7. Repeat the steps above to create the following users with a different role assignmentaccording to the table below:
User ID Role Assignment
LOC_PLN_APJ YDP_IP_LOC_APJ
LOC_PLN_EU YDP_IP_LOC_EU
CTR_PLN_ALL YDP_IP_CTR_ALL
DP_ADMIN YDP_MP_ALL_ADMIN
ResultYou have created the necessary users and assigned the respective role for them.
3.6.5 Assigning User to Planning Book
UseYou need to assign the default planning book to each DP user. When a planner opens thedemand planning desktop, he or she sees the planning book assigned to them. Note that youcan assign only one planning book to a user.
You can restrict the users‟ authorization so that they can only navigate to a specified planningbook or a specific data view.
Procedure1 To access the activity, use one of the following navigation options:
Transaction code /SAPAPO/SDPPLBK
SAP Menu Advanced Planning and Optimization
Demand Planning
Environment Current Settings Assign User to PlanningBook
2 Choose New Entries.
3 Change the following two lines, the first without the transaction code as shown in thetable:
Name Trans.Code
Plng book Data view Specificbook
SpecificView
CTR_PLN_ALL YDP_PB_CENTRAL_PLAN YDP_DV_FC_REV
If you set an indicator in the Specific book column, the user whose name you have
entered in the left column can only navigate to the specified planning book in interactivedemand planning (the user can access all the data views for this planning book).
If you set an indicator in the Specific View column, the user you have entered in the leftcolumn can use this planning book and the planning view only and cannot navigate toother planning books and views in the interactive demand planning.
4. To restrict a person‟s authorization (for example, for a local planner), so that they canonly use planning book YDP_PB_LOCAL_PLAN and data view YDP_DV_LOC_ADJ, youhave to maintain the table as follows:
Name Trans.Code
Plng book Data view Specificbook
SpecificView
LOC_PLN _APJ
YDP_PB_LOCAL_PLAN YDP_DV_LOC _ADJ
X X
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 128/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 128 of 130
5. Choose Save. If a system message appears, choose or create a customizing request andgo back.
6. Repeat the same procedure for all other users.
3.7 Setting up Chart Engine (Optional)
PrerequisitesMake sure the business function SCM_APO_DP_SNP_CTM is activated.
3.7.1 Maintaining User Setting
UseHere you can specify which of the technologies, SAP Business Graphics or Chart Engine, you
want to use by setting the relevant user parameter. Here you choose Chart Engine as default.
Procedure1. To access the activity, use one of the following navigation options:
Transaction code SU01
SAP SCM Menu Tools Administration User Maintenance Users
2. In the User Maintenance: Initial Screen window, enter user name, then choose Change.
3. Choose the Parameters tab page, and make the following changes:
Field Name User action and values Comment
Parameter ID /SAPAPO/SDP_CHART_V
Parameter value Do not maintain a value, oruse any other value thanCHART.
Parameter ID /SAPAPO/SDP_CHART_TB
Parameter value
X
To enable chart enginecustomizing tool bardisplayed in interactiveplanning screen.
4. Choose Save.
3.7.2 Maintaining Chart Setting
UseThe chart is user-specific, planning book-specific, and data view-specific. Here the userconfigures the chart as he or she wants, including in which planning book or data view toshow chart, display which key figures, in which chart type, and so on.
Procedure1. To access the activity, use one of the following navigation options:
Transaction code /SAPAPO/SDP94
SAP SCM Menu Advanced Planning and Optimization Demand
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 129/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
© SAP AG Page 129 of 130
Planning Planning Interactive Demand Planning
2. In the Interactive Planning window, choose Planning Book YDP_PB_CENTRAL_PLAN,and chooseData View YDP_DV_HS_ADJ.
This is just an example. So you can maintain the chart setting for other planningbooks and data views as desired.
3. In the Selection Profile section, chooseYDP_IP_CENTRAL_ALL.
4. In the Selected Objects section, choose Select all.
5. In the Header section in the work area, choose Load data.
6. In the Header section in the work area, choose Switch to table/graphic mode, thenchoose Switch to live/design mode
7. In the Planning Book: [Design] window, choose Switch Graphic Settings, a setting dialogbox appears.
8. Choose the Overview tab page, expand the node Series, and make the following settings
for each key figure:
Key Figures Setting User action and values
Corrected Sales History Visibility X
Chart type Lines
Historical Sales Correction Visibility X
Chart type Columns
Historical Sales Override Visibility Not checked
Historical Sales without additionaldemand
VisibilityNot checked
Sales Quantity 1 Visibility X
Chart type Lines
9. Choose Set Horizon, from the context menu. You can choose set or choose the start andend period of the chart. For example, you can choose 24 periods here.
10. Choose Set Value Scale, in the Set Minimum and Maximum dialog box, choose Automatic Minimum and Automatic Maximum. Then choose Continue.
11. Choose Save Graphic Settings.
12. Choose Define Layout . On the Layout Definition screen, choose Table, Graphic in theContainer One section. Choose Vertically in Arrangement of grid and graphic section.Then the table and the graphic are both displayed on the interactive planning screen.Choose Continue.
13. On the Planning Book: [Design] PLANNING BOOK FOR CENTRAL PLANNER /HISTORICAL screen, choose Save. In the Confirmation Prompt dialog box, choose AllFunctional Areas, then choose Save.
14. Choose Switch to live/design mode to go back to live mode.
15. Repeat the steps for other planning books/data views.
3.7.3 Central Maintaining and Copying Chart Customizing
Use
Since the chart customizing is user-specific, planning book-specific, and data view-specific,the user can delete the selected chart customizing by choosing specific planning book and
7/21/2019 96163055 SCM7 DP Config Guide
http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 130/130
SAP Best Practices SAP SCM Demand Planning Configuration (Y94): Configuration Guide
data view with this activity. The chart customizing can also be copied to other users by thisactivity.
Procedure1. To access the activity, use one of the following navigation options:
Transaction code /SAPAPO/SDP_CHART
SAP SCM Menu Advanced Planning and Optimization Demand
Planning Environment Current Settings Maintain Chart Customizing
2. In the Maintain Chart Customizing window, choose the Planning Book YDP_PB_CENTRAL_PLAN, Data View YDP_DV_HS_ADJ.
3. Choose Interactive Planning in the Application section.
4. If you want to delete the chart customizing, then choose Delete Chart Customizing inChoose an Activity section.
5. Choose Execute. The customizing for this planning book and data view is deleted.
6. If you want to copy chart customizing to other users, choose Copy Chart Customizing inthe Choose an Activity section.
7. Enter or choose the User in the Source User section.
8. Enter or choose the User in the Target Users section. The target user can be more thanone user.