95metcalf south
TRANSCRIPT
-
8/16/2019 95Metcalf South
1/18
CONCEPTUAL CIVIL PLANS
CONCEPTUAL LANDSCAPE PLANS
CONCEPTUAL BUILDING ELEVATIONSAND MATERIAL INFORMATION
FOR THE NEWLY PROPOSED SITESBETWEEN 95th STREETS & 97TH STREETSAND METCALF & GLENWOOD
2-8
9-16
17-18
TABLE OF CONTENTS
PRELIMINARY DEVELOPMENT PLANS
DLR G oupr
95METCALF southEXHIBITA
LEGAL DESCRIPTION
MetcalfProperty:
Parcel1
Allof the Northhalf (N ½)of the Northwest quarter (NW ¼)ofthe Northwest Quarter (NW ¼), of Secon5, Township13, Range 25, JohnsonCounty, Kansas, except North55 feet thereofin 95th Street right-of-way, and except the West 100 feet thereof inU.S. 69 Highway right-of-way, exceptthat poronplaedas Lot 1, METCALFSOUTHSHOPPING CENTER, asubdivision inthe City ofOver-landPark, Johnson County, Kansas; and
Parcel2
Allof the Southhalf (S½) ofthe Northwest Quarter (NW ¼)ofthe Northwest Quarter (NW ¼)of Secon5, Township13, Range 25, JohnsonCounty, Kansas, except the South 162.11 feet thereof,andexcept the West 100 feet thereof (now U.S.69 Highway right-of-way), subject toeasements,restricons, andreservaonsof record, ifany, andsubject tothe rightsofthe public inand tohigh-waysand roadways, ifany.
Parcel3
Lot 1, METCALFSOUTH SHOPPING CENTER, asubdivisionin the City ofOverlandPark, JohnsonCounty, Kansas.
EXHIBITB
LEGAL DESCRIPTION
Sears Property
Parcel1
Allof the South162.11 feedofthe NW ¼ofthe NW ¼of Secon5, Township13, Range 25, John-sonCounty, Kansas, except the West 100 feet thereof, now inU.S. 69 Highway right-of-way, contain-ing 4.555 acres, more ofless;
Parcel2
Allof the North¼of the Southwest ¼of the Northwest ¼ofSecon 5, Township13, Range 25,JohnsonCounty, Kansas, except the West 100 feet thereof, takenfor right-of-way for U.S.Highway69, containing 9.386 acres, more or less;
Parcel3
A part ofthe NW ¼of Secon5, Township13, Range 25, JohnsonCounty, Kansas, more parcular-ly describedasfollows: Beginning at the Southwest corner ofthe NW ¼of saidSecon5; thenceNorth, along the West line ofthe NW ¼of saidSecon 5, adistance of 777.10 feet, thence East,adistance of 100 feet, toapoint on the East right-of-way line ofU.S.69 Highway, asnow located;saidpoint being the point of beginning, ofsubject tact; thence North, along the East right-of-wayline ofsaidU.S. 69 Highway, adistance of221.29 feet, toa point onthe Southline ofthe NW ¼of thisSW ¼of the NW ¼of saidSecon 5; thence S89° 35’ 59”E, along the Southline ofthe NW¼of the SW ¼of the NW ¼of saidSecon 5, adistance of1223.97 feet, tothe Southeast cornerthereof, thence South, along the East line ofthe W ½of the NW ¼ofsaid Secon5, a distance of5feet; thence S0° 24’ 12”W a distance of119.90 feet; thence N 89° 35’ 48”W, adistance of26.69feet, toa point ofcurvature; thence Westerly andSouthwesterly along acurve tothe le having aradiusof 2643.10 feet, adistance of303.03 feet, toa point oftangency; thence S83° 50’ 04”W, adistance of527.61 feet, toa point ofcurvature; thence Southwesterly andWesterly, along acurvetothe right have aradiusof 2974.90 feet, adistance of320.13 feet, toa point oftangency, thenceWest, adistance of49.87 feet, to the point ofbeginning of subject tract, containing 4.879 acres,more or less.
-
8/16/2019 95Metcalf South
2/18
Z:\acad\95TH AND ME TC ALF\9517 E.png
200' notificationlimits
200' notificationlimits
200' notificationlimits
200' notificationlimits
Southlimits of redevelopment
RevisedPreliminary Development Plan(PDP)property limits
RevisedPreliminary Development Plan(PDP)property limits
1 Existing Site Planscale: 1" = 100'-0" north
-
8/16/2019 95Metcalf South
3/18
V A N V
A N
1
2
3
4
5
6
7
8
10
11
12
13
14
9
1 Overall Site Planscale: 1" = 100'-0" north
-
8/16/2019 95Metcalf South
4/18
-
8/16/2019 95Metcalf South
5/18
V A N
V A N
1
2
3
4
5
6
7
8
10
11
12
13
14
9
-
8/16/2019 95Metcalf South
6/18
V A N
V A N
1
2
3
4
5
6
7
8
10
11
12
13
14
9
-
8/16/2019 95Metcalf South
7/18
V A N V
A N
1
2
3
4
12
13
14
-
8/16/2019 95Metcalf South
8/18
V A N V
A N
5
6
7
8
10
11
9
-
8/16/2019 95Metcalf South
9/18
-
8/16/2019 95Metcalf South
10/18
-
8/16/2019 95Metcalf South
11/18
-
8/16/2019 95Metcalf South
12/18
-
8/16/2019 95Metcalf South
13/18
-
8/16/2019 95Metcalf South
14/18
-
8/16/2019 95Metcalf South
15/18
-
8/16/2019 95Metcalf South
16/18
-
8/16/2019 95Metcalf South
17/18
2 26
3 7 3
2
13 12 3
11 1
3 2 12 6
2
3 2 3
2
1 1 2 3 37
1
1 MASONRY
2 STUCCO
3 GLAZING
4 TILE-ROOF
5 ARCHITECTURAL SCREEN
6 ARCHITECTURAL CANOPY
7 WOOD SIDING
CONCEPTUAL COLOR PALETTE
MATERIAL LEGEND
ARCHITECTURAL STYLE
The architectural style for The New Metcalf isinspired by the ornate detail and lush landscapingfound in the Mediterranean, the cleanliness andsophistication of contemporary design, and thetraditional form of classical architecture. This Neo-Classical Mediterranean style embodies the ideaof layering richness and meaning to create anauthentic and experiential environment.
OUT-PARCEL
JUNIORSCALE: 1/16” = 1’-0”
SCALE: 1/8” = 1’-0”
-
8/16/2019 95Metcalf South
18/18
South Elevation
East Elevation
North Elevation
West Elevation
T.O.S.
34’–0” T.O.S.
30’-8”
T.O.S.
30’–8”
T.O.S.
30’–8”
T.O.S.
10’–0”
T.O.S.
18’–0”
T.O.S.
33’–4”
T.O.S.
32’–8”
T.O.S.
32’–8”
T.O.S.
35’–4”
T.O.S.
36’–8”
T.O.F.
20’–6”
T.O.S.
36’–8”
T.O.S.
28’–0”
T.O.S.
19’–10”
T.O.S.
52’–0”
Painted EIFS
PaintedEIFS
PaintedEIFS
Screen Wall
Screen Wall
Cast StoneBase
Cast StoneBase
Cast StoneBase
Brick Veneerin RunningBond Pattern
Buff Color
Brick Veneerin RunningBond PatternBuff Color
Brick Veneer
in RunningBond PatternBuff Color
Brick Veneerin RunningBond Pattern
Buff Color
OrnamentalFencing
Ornamental
Fencing
LoadingDock
Beyond
Light Pole
TYP
Brick Veneerin HerringbonePattern
Buff Color
Brick Veneerin HerringbonePatternBuff Color
Brick Veneer
in HerringbonePatternBuff Color
Brick Veneerin HerringbonePattern
Buff Color
Brick Veneerin Soldier CoursePattern
Burgundy Color
Brick Veneerin Soldier CoursePatternBurgundy Color
Brick Veneerin Soldier CoursePattern
Burgundy Color
ClerestoryWindow
StandingSeamMetal Roof Painted to
match Lowe’sBlue
MetalCanopy
MetalCanopy
MetalCanopy
Planter withBench TYP
Brick Veneerin RunningBondPattern
Burgundy Color
Brick Veneerin RunningBondPatternBurgundy Color
Brick Veneerin RunningBondPattern
Burgundy Color
7’-6”HighIlluminatedCan Signage
5’-6”HighIlluminatedCan Signage
5’-6”HighIlluminatedCan Signage
OrnamentalFencing
Painted MetalCornice
Painted MetalCornice
Painted MetalCornice
PaintedMetalCoping
PaintedMetalCoping
PaintedMetalCoping
MetalLouvers
MetalLouvers
MetalLouvers
20”HighIlluminatedCan Signage
20”HighIlluminatedCan Signage
0 100’20’
0 100’20’
0 100’20’
0 100’20’
40’
40’
40’
40’