September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report9.31.20169.31.20169.31.20169.31.2016
September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report 9.31.20169.31.20169.31.20169.31.20169.31.20169.31.20169.31.20169.31.20169.31.20169.31.20169.31.20169.31.2016
Monthly OverviewMonthly OverviewMonthly OverviewMonthly OverviewMonthly OverviewMonthly OverviewMonthly OverviewMonthly OverviewMonthly OverviewMonthly OverviewMonthly OverviewMonthly Overview
♦ Cont. interior wall framing & wall layout
♦ Cont. MEP install
♦ Started window installation
♦ Cont. installing brick masonry
♦ Cont. rough in and install of dormers
♦ Began install of roof insulation and ice & water shield
♦ Began flat roofing
♦ Finishing up weather barrier
♦ Cont. underground utility connection
Monthly Progress ReportMonthly Progress ReportMonthly Progress ReportMonthly Progress Report
OSU Spears School OSU Spears School OSU Spears School OSU Spears School
of Business Buildingof Business Buildingof Business Buildingof Business Building Oklahoma State UniversityOklahoma State UniversityOklahoma State UniversityOklahoma State University
ISSUE NO.18
PROGRESS REPORT: PROGRESS REPORT: PROGRESS REPORT: PROGRESS REPORT: This September, interior wall layout and framing has shot up on all
floors and is coming to completion on the fourth floor. Brick Masonry is continuing all
around different parts of the building, The Exterior northeast side is nearing completion
while we are also making head way on the interior south and south end cap. With roof decking
completed roof insulation, nailer board, and ice and water shield are being laid quickly
across the sloped roof. Dormer installation continues on exterior south side with windows
already in place in all interior south dormers. As the brick is washed off, windows are being
installed right behind them with 3rd and 2nd floor windows installed on the interior south
walls. MEP rough-in is underway and continuing floor by floor working downward.
As construction continues, Manhattan will issue monthly progress reports throughout the
construction process. Typically, these reports are generated and transmitted on the last
day of each month. These reports are meant to serve as a tool for OSU Long Range Facilities
Planning to document production and keep interested parties updated with progress whom
would not otherwise be involved on a daily basis.
Manhattan is proud to partner with OSU Long Range Facilities Planning, Spears School of
Business, and Elliot and Associates on this project.
September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report9.31.20169.31.20169.31.20169.31.2016
dormer Install & Roofingdormer Install & Roofingdormer Install & Roofingdormer Install & Roofing
Page 2Page 2Page 2Page 2
Pictured Above & Pictured Above & Pictured Above & Pictured Above &
below:below:below:below:
dormers are installed At
The South Interior Radius
Pictured Left: Pictured Left: Pictured Left: Pictured Left:
Flat roof Installation
September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report9.31.20169.31.20169.31.20169.31.2016
Brick MasonryBrick MasonryBrick MasonryBrick Masonry
Page 3Page 3Page 3Page 3
Pictured Above:Pictured Above:Pictured Above:Pictured Above:
South exterior brick masonry
Pictured Right:Pictured Right:Pictured Right:Pictured Right:
South end cap brick masonry
Pictured Below: Pictured Below: Pictured Below: Pictured Below:
Northeast exterior brick masonry
to the 2nd floor
September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report9.31.20169.31.20169.31.20169.31.2016
Window InstallationWindow InstallationWindow InstallationWindow Installation
Page 4Page 4Page 4Page 4
Pictured Above:Pictured Above:Pictured Above:Pictured Above:
South interior 3rd floor
windows installed
Pictured Right:Pictured Right:Pictured Right:Pictured Right:
South Dormer Windows
installation
Pictured Below:Pictured Below:Pictured Below:Pictured Below:
Third floor window prep
September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report9.31.20169.31.20169.31.20169.31.2016
Interior framingInterior framingInterior framingInterior framing
Page 5Page 5Page 5Page 5
Pictured Above:Pictured Above:Pictured Above:Pictured Above:
2nd floor north framing
Pictured Left: Pictured Left: Pictured Left: Pictured Left:
Basement skylight framing
Pictured Left: Pictured Left: Pictured Left: Pictured Left:
4th floor office framing
September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report9.31.20169.31.20169.31.20169.31.2016
MEP Install & Utility ConnectionMEP Install & Utility ConnectionMEP Install & Utility ConnectionMEP Install & Utility Connection
Page 6Page 6Page 6Page 6
Pictured Above:Pictured Above:Pictured Above:Pictured Above:
4th floor HVAC and
Plumbing vent pipe
Pictured Right and Pictured Right and Pictured Right and Pictured Right and
Below:Below:Below:Below:
Underground electric
Duct Bank Installation
September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report9.31.20169.31.20169.31.20169.31.2016
Aerial PhotoAerial PhotoAerial PhotoAerial Photo
August 2016August 2016August 2016August 2016
April 2015April 2015April 2015April 2015 May 2015May 2015May 2015May 2015 June 2015June 2015June 2015June 2015
July 2015July 2015July 2015July 2015 August 2015August 2015August 2015August 2015 September 2015September 2015September 2015September 2015
Page 7Page 7Page 7Page 7
October 2015October 2015October 2015October 2015 November 2015November 2015November 2015November 2015 December 2015December 2015December 2015December 2015
September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report9.31.20169.31.20169.31.20169.31.2016 Page 8Page 8Page 8Page 8
January 2016January 2016January 2016January 2016 February 2016February 2016February 2016February 2016 March 2016March 2016March 2016March 2016
April 2016April 2016April 2016April 2016 May 2016May 2016May 2016May 2016 June 2016June 2016June 2016June 2016
July 2016July 2016July 2016July 2016 August 2016August 2016August 2016August 2016 September 2016September 2016September 2016September 2016
October 2016October 2016October 2016October 2016 November 2016November 2016November 2016November 2016 December 2016December 2016December 2016December 2016
January 2017January 2017January 2017January 2017 February 2017February 2017February 2017February 2017 March 2017March 2017March 2017March 2017
aerial photoaerial photoaerial photoaerial photo
September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report9.31.20169.31.20169.31.20169.31.2016
“The only thing be�er than
recognizing a quality
product is building one.”
www.manhattanconstruction.com
Upcoming Activities For OctoberUpcoming Activities For OctoberUpcoming Activities For OctoberUpcoming Activities For October
• Cont. basement, 4th floor & 3rd floor MEP
• Cont. installation of windows
• Cont. laying roof shingles
• Complete electrical rooms
• Cont. brick masonry
• Cont. dormer Installation
• Begin installation of loggia Glass
• Cont. laying out/Framing of basement, 2nd, 3rd, and
4th floor walls
• Begin curtainwall installation
For a live feed of the Project, Visit: For a live feed of the Project, Visit: For a live feed of the Project, Visit: For a live feed of the Project, Visit:
http://spears.okstate.edu/building/live/http://spears.okstate.edu/building/live/http://spears.okstate.edu/building/live/http://spears.okstate.edu/building/live/
http://spears.okstate.edu/building/http://spears.okstate.edu/building/http://spears.okstate.edu/building/http://spears.okstate.edu/building/
L R F P Oklahoma State University,
Long Range Facilities Planning,