Orange County Transportation Authority Published: October 2010 Connector Closure and Detour Alert Starts October 8, 2010 Connector Work Helps Fuel Project Completion Caltrans and OCTA will soon finish the SR-91 Eastbound Lane Addition Project. As the project nears completion, crews will realign the eastbound SR-91 (EB SR-91) to northbound SR-71 (NB SR-71) connector to improve driving operations in this area. To perform the work as safely and quickly as possible, the EB SR-91 to NB SR-71 connector will be closed for 15 full days. Safe and Simple Detour in Place During the closure, commuters will follow a safe and simple detour to transition from EB SR-91 to NB SR-71. By following these simple directions, you’ll be on the road to your destination: 91 Corona Green River Rd. Commuter Notification 15-Day Closure of Eastbound SR-91 to Northbound SR-71 Starts Midnight Friday, Oct. 8 and Reopens Saturday, Oct. 23 Closure Provides a Simple Detour for Commuters; a Safe Work Space for Crews Travel 1 1/2 miles east past SR-91/SR-71 interchange Exit Serfas Club Drive Turn left on Serfas Club Drive Turn left onto westbound SR-91 Travel west on SR-91 Transition to northbound SR-71 About the SR-91 Eastbound Lane Addition Project Construction of the SR-91 Eastbound Lane Addition Project is funded by the American Recovery and Reinvestment Act (ARRA) of 2009. When completed, the project will deliver: New 5.9-mile eastbound lane 12-foot lanes to improve driving conditions throughout the project area 12-foot shoulder area with new guardrails and concrete barriers 10 new retaining walls 5 widened bridges This project is the first in a series of freeway improvement projects designed to increase capacity, relieve congestion, and enhance operations for a better drive on SR-91 between Orange and Riverside counties. The SR-91 Eastbound Lane Addition Project will be completed by the end of 2010. Connector Closure Detour Closure Note: Closure dates may be subject to change due to weather or other unforeseen circumstances. For more information about this closure: Twitter: @91fwy Web Site: www.octa.net/sr-91.aspx Email: Angela Meluski, Community Liaison [email protected] Transportation Helpline: 800-724-0353

Upload: octa

Post on 09-Mar-2016

220 views

Category:

Documents


0 download

DESCRIPTION

91 Closure Notice

TRANSCRIPT

Page 1: 91 Closure Notice

����

��������������

���

��

SR-91 Improvement Project

SR-91 Improvement Project

SR-91 Improvement Project

Orange County Transportation Authority

SR-91 Improvement Project

SR-91 Improvement Project

SR-91 Improvement Project

Published: October 2010

Connector Closure and Detour AlertStarts October 8, 2010

Connector Work Helps Fuel Project CompletionCaltrans and OCTA will soon finish the SR-91 Eastbound Lane Addition Project. As the project nears completion, crews will realign the eastbound SR-91 (EB SR-91) to northbound SR-71 (NB SR-71) connector to improve driving operations in this area. To perform the work as safely and quickly as possible, the EB SR-91 to NB SR-71 connector will be closed for 15 full days.

Safe and Simple Detour in PlaceDuring the closure, commuters will follow a safe and simple detour to transition from EB SR-91 to NB SR-71. By following these simple directions, you’ll be on the road to your destination:

Lake

view

Ave

.

55

57 91

91

5

Corona

YorbaLinda

Anaheim Hills

Anaheim

Placentia

Fullerton

Buena Park

Green River Rd.

Yorb

a Li

nd

a R

d.

Bro

okh

urs

t A

ve.

Har

bo

r B

lvd

.

Imperial Hwy.

Commuter Notification

15-Day Closure of Eastbound SR-91 to Northbound SR-71 Starts Midnight Friday, Oct. 8 and Reopens Saturday, Oct. 23

Closure Provides a Simple Detour for Commuters; a Safe Work Space for Crews

• Travel 1 1/2 miles east past SR-91/SR-71 interchange

• Exit Serfas Club Drive

• Turn left on Serfas Club Drive

• Turn left onto westbound SR-91

• Travel west on SR-91

• Transition to northbound SR-71

About the SR-91 Eastbound Lane Addition ProjectConstruction of the SR-91 Eastbound Lane Addition Project is funded by the American Recovery and Reinvestment Act (ARRA) of 2009. When completed, the project will deliver:

• New 5.9-mile eastbound lane• 12-foot lanes to improve driving conditions throughout the project area• 12-foot shoulder area with new guardrails and concrete barriers• 10 new retaining walls • 5 widened bridges

This project is the first in a series of freeway improvement projects designed to increase capacity, relieve congestion, and enhance operations for a better drive on SR-91 between Orange and Riverside counties. The SR-91 Eastbound Lane Addition Project will be completed by the end of 2010.

Connector Closure

DetourClosure

Note: Closure dates may be subject to change due to weather or other unforeseen circumstances.

For more information about this closure:

Twitter: @91fwy

Web Site: www.octa.net/sr-91.aspx

Email: Angela Meluski, Community Liaison [email protected]

Transportation Helpline: 800-724-0353