9.00-foundation fieldbus saward mtl

Upload: cedbowen

Post on 06-Apr-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    1/22

    Cooper Industries: Confidential

    FOUNDATION Fieldbus -

    Practical Success Stories

    Phil Saward, Product Manager

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    2/22

    Introduction

    Topics

    What is Fieldbus?

    Comparison with existing 4-20mA installations

    Typical field network

    FOUNDATIONTM fieldbus in the Pharmaceutical

    industry When should Fieldbus be considered?

    Why use Foundation Fieldbus?

    Design, installation and commissioning

    Operation and maintenance Economic benefits

    Technical benefits

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    3/22

    Fieldbus system niches

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    4/22

    How is fieldbus different from 4-20mA?

    4-20mA

    Power

    Supply

    fieldbus

    PowerSupply

    In 4-20mA circuits, the power supply, fielddevice and input card are connected in series.

    In a Fieldbus system, the power supply, fielddevices and input card are connected in

    parallel.

    Input card

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    5/22

    Safe area

    Typical Fieldbus installation

    Redundant,

    isolated Fieldbus

    power conditioner

    Field wiring hub with

    spur short-circuit

    protection

    FOUNDATION Fieldbus Devices

    FIELDCONTROL ROOM

    Fieldbus control

    system (DCS)

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    6/22

    Fieldbus Today

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    7/22

    FOUNDATION fieldbusTM in Pharmaceuticals

    Installed base worldwide (published by Fieldbus

    Foundation, 2008): >10,000 systems

    >700,000 field instruments

    Diverse adoption: 9 of the top 10 oil & gas companies

    24 of the top 25 pharmaceutical manufacturers 23 of the top 25 chemical producers

    15 of the top 20 pulp & paper companies

    10 of the top 20 food & beverage companies

    ARC Advisory Group:powerful value proposition for fieldbus in the hybrid

    industries-namely, food & beverage and pharmaceutical,particularly when it comes to easing the process ofvalidation and regulatory compliance and the integrationof batch procedural operations with continuousprocesses. The function block structure of Foundationtechnology lends itself to these processes very well.

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    8/22

    Market Distribution

    GlobalGlobal

    LA

    12%

    NA

    43%AP

    13%

    MEA

    7%

    EUR

    25%

    Other

    8%

    Mining and

    Metals

    3%Education

    3%

    Pulp and

    Paper

    4%

    Food &

    Beverage

    9%

    Pharm-

    aceutical

    9%

    Power

    13%

    Oil & Gas29%

    Chemical

    22%

    IndustryIndustry

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    9/22

    Example FF applications in Europe

    Operator Location ControlSystem

    Novo Nordisk Bagsvaerd, Denmark Emerson

    AstraZeneca Gartuna, Sweden Emerson

    Novartis Basel, Switzerland Emerson

    Novartis Grimsby, UK Emerson

    Sanofi Aventis Aramon, France Emerson

    Biogal Rt. Debrecen, Hungary Yokogawa

    Glaxo SmithKline Cork, Eire Emerson

    Genzyme Belgium Emerson

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    10/22

    When should fieldbus be considered?

    Green Field FacilityFacility Upgrade

    New unit operation

    Process Automation Focus

    60% of sensors are analogue

    Existing cabling infrastructure is

    overloaded

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    11/22

    Why use FOUNDATION fieldbusTM?

    Integrated digital architecture

    Future proof

    Sensors can be field upgraded with new

    features

    Economic savings Different incentives at each stage of a facility

    life cycle:

    Capital/Construction

    Commissioning

    Operations, maintenance

    Reduced infrastructure

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    12/22

    Re-using Installed Cables

    Three existing4-20 mA Pairs

    J-Box

    TT

    Fieldbus devices

    Three existingpairs, one usedfor fieldbus

    J-Box

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    13/22

    ReplaceOperations & MaintenanceEngineering, Construction,

    & Commissioning/Start-up

    Economic Life Cycle

    CashFlow

    Analog

    fieldbus

    Time

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    14/22

    Engineering, Construction & Start-up

    Time

    startup

    CashFlow

    Reduce implementation

    risk and cost

    Engage in FEED stageSooner and faster

    start-up

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    15/22

    Termination count

    FT-100

    +

    -

    FCV-100

    +

    -

    TT-100

    +

    -

    Field

    PT-101

    +

    -

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    Junction Box

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    Marsh Cab.

    1

    2

    3

    4

    +-

    +-

    +-

    +-

    +-

    +-

    +-

    +-

    I.S.Barrier

    8

    24 20 5

    16 4

    8 2

    15

    +-

    +-

    +-

    +-

    +-

    +-

    I/OAssembly

    Conventional analog termination

    Fieldbus termination (also included

    in conventional termination count)Marshalling done in Junction Box with

    Fieldbus so Marsh Cab is optional

    Totals: 75 Analog

    34 Fieldbus

    4 pr 4 pr4 pr

    1 pr 1 pr 1 pr

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    16/22

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    17/22

    Operations & Maintenance

    CashFlow

    Higher sustained

    production with

    minimize costs

    Faster time-to

    profit

    Safer operation

    Fewer unscheduled

    outages

    Shorter scheduled outage

    Longer duration to

    scheduled outage

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    18/22

    Measurement accuracy

    IS Interface I/O card

    PV = 392.8mb12.83mA PV = 393.1mb12.87mA

    IS Interface H1 I/O card

    PV = 392.8mbPV = 392.8mbPV = 392.8mb

    Field JB +

    marshalling

    Field JB +

    marshalling

    12.86mA

    PV = 392.8mb PV = 392.8mb

    Leakage + noise Conversionerror

    Conversionerror

    4-20mA

    Fieldbus

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    19/22

    Diagnostics save wasted maintenance

    0%

    5%

    10%

    15%

    20%

    25%

    30%

    35%

    Routine

    check

    No

    Problem

    Calibration

    shift

    Zero Off Plugged

    lines

    Failed

    63% of instrument maintenance labour results in no action

    taken: waste of resources

    35%

    28%

    20%

    6% 6%

    4%

    Shell Global Solutions

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    20/22

    Fieldbus Project Costs

    Estimated Project Savings Materials and Field Devices

    Some increase

    Installation Labour

    Savings up to 50% Commissioning:

    Significant savings up to 60%

    Overall Capital Savings of 2530%

    However savings will only be realized if the projectis planned as a fieldbus project.

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    21/22

    Foundation System Architecture

    Sch

    eduled Determinism Highly Reliable PerformanceAutomatic Addressing

    Plug and Play

    Functional Communication Peer to Peer More Powerful

    Publisher/Subscriber Higher Performance

    Alarms and Events Time Stamped, Auditable Records

    Firmware Download Reduced Risk of Obsolescence

    Rigorous Testing Host & Device

  • 8/3/2019 9.00-Foundation Fieldbus Saward MTL

    22/22

    Questions