Qafco V Steering a Major Fertilizer Project to Completion
Gianluca AliottaCommercial Development Manager
Gas MonetizationSaipem S.p.A.
e-mail: [email protected]
Qafco V – Steering a Major Fertilizer Complex to Completion 2
Table of Contents
Introduction
Scope of Work
Technology Scheme & Design Approach
Contractual Scheme & Execution Approach
Qafco V – Steering a Major Fertilizer Complex to Completion 3
Saipem – Leadership in the Fertiliser Sector Trend on Highest Capacity Ammonia/Urea Complexes
Design 3250 T/DRecord 3719 T/D
Profertil, Argentina
Single Train
EPCIn operation since 2000
Single Train
Engro, PakistanQafco 5 & 6, QatarMatix, India
Design 3850 T/D Revamp Target 4200 T/D
Profertil, Argentina
EPC & EPCSFirst Start-up 2010
Fertinitro, VenezuelaOmifco, Oman
Two Trains
Design Fertinitro 2x2200 T/DDesign Omifco 2x2530 T/D
EPCIn operation since 2001In operation since 2005
Snamprogetti™ 5000+ T/D
Snamprogetti™5000+ T/D
Same performancewith one train
as two world’s largesttwo trains complexwith many savings
Design ready, based on well proven process lay-out scheme as well as proven and referenced design for all major critical machines and equipments
Introduction
Qafco V – Steering a Major Fertilizer Complex to Completion 4
Ammonia & Urea World Scale Project Location: Mesaieed, Qatar
Existing Qafco’s PlantsQafco5 + Qafco 6 plants area
Introduction
Qafco V – Steering a Major Fertilizer Complex to Completion 5
Project Scope of Work
Process UnitsAmmonia 2 x 2300 (MTPD)
Urea Synthesis 1 x 3850 (MTPD)
Urea Granulation 1 x 3850 (MTPD)
UF85 1 x 85 (MTPD)
U&OsPower & Steam Generation 200 (MVA) / 840 (T/H)
SW / CW 125,000 (M3/H) / 64,000 (M3/H)
Potable water 36 (M3/H)
BFW 840 (M3/H)
Desalination Water 225 (M3/H)
Plant Instrument air 10,390 (NM3/H)
Qafco V – Steering a Major Fertilizer Complex to Completion 6
Project Scope of Work
U&OsSolid Urea Storage 1 x 100,000 (MT)
Solid Urea Handling Facilities 1 x 1000 (MTPH)
Liquid Ammonia Storage & Pumping Facilities 2 x 50,000 (MT)
Ammonia Loading System 1 x 1000 (MTPH)
Extension of the existing berth of Jetty no 1 5,000 to 70,000 (DWT)
Qafco V – Steering a Major Fertilizer Complex to Completion
2 Ammonia Plants
1 Urea Plant
Cogen2 Plant
Sea Water Cooling Unit Urea bulk Hall
Project Scope of Work
7
QAFCO-V Site
Qafco V – Steering a Major Fertilizer Complex to Completion
Ammonia Storage
Cogen 1
Jetty Expansion
Project Scope of Work
8
QAFCO Existing Facilities Site
Qafco V – Steering a Major Fertilizer Complex to Completion 9
Project Scope of Work
Description U/m Quantity
Buildings Nr. 12
Earth Movement m3 2.250.000
R.C. Concrete m3 120.000
Concrete Paving m2 163.000
Piping Tons 23.200
Steel Structures Tons 33.000
Equipment/Packages Tons 54.000
Electrical Cables km 2.850
Instrument Cables km 3.660
Insulation m2 262.000
Painting m2 713.000
MAIN QUANTITIES
Qafco V – Steering a Major Fertilizer Complex to Completion 10
AMMONIA: HALDOR TOPSOE A/S
UREA: SNAMPROGETTITM
GRANULATION: UFT
UF85: PERSTOP
Technology Scheme & Design Approach
10
Qafco V – Steering a Major Fertilizer Complex to Completion 11
Technology Scheme & Design Approach
Haldor Topsoe A/S Ammonia Process
Qafco V – Steering a Major Fertilizer Complex to Completion 12
CARBONDIOXIDE
VACUUMSYSTEM
WWT
TO LP SECTION
FEED
PC AS BFW
AMMONIA UREASOLUTION
HIGH PRESSURE SECTION LOW PRESSURE SECTIONMEDIUM PRESSURE SECTION VACUUM SECTION
WASTE WATER TREATMENT SECTION
Technology Scheme & Design Approach
SnamprogettiTM Urea Process
Qafco V – Steering a Major Fertilizer Complex to Completion 13
UFT Granulation Process
Technology Scheme & Design Approach
Qafco V – Steering a Major Fertilizer Complex to Completion 14
Contractual SoW EPCC
Contractual Mode LSTK
Awarded to Saipem / HDEC(as Consortium)
Consortium’s Leader Saipem
Contractual Scheme & Execution Approach
Qafco V – Steering a Major Fertilizer Complex to Completion 15
Contractual Scheme & Execution Approach
Activity by
License & Basic Engineering Design
SaipemDetailed Engineering
Procurement
Construction HDEC
Commissioning & Start-up Saipem