Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated in Table 1, a search and analysis of applicable records and resources of the project location did not identify any seepage areas, as defined by Ontario Regulation 359/09, in the project location or within the surrounding 120 metres. The results of the site investigation verified this determination. 9. SUMMARY OF AMENDMENTS TO THE RECORDS REVIEW Based on the results of the site investigations, five previously unidentified water bodies (crossings 48 through 52) were observed within 120 metres of the project location. Based on the results of the site investigation, it was determined that five streams mapped within the project location or 120 metre setback area, do not meet the definition of a water body under Ontario Regulation 359/09 (i.e., is not a permanent or intermittent stream). Previously unidentified water bodies and water bodies determined not to exist during field investigations are discussed in Table 7 and are shown on Figure 6a through 6d. Classification of water bodies are shown on Figure 7a through 7d. 10. CONCLUSIONS This report is intended to fulfill the requirements for the Water Assessment Report under Ontario Regulation 359/09. Based on the results of the site investigations, multiple water bodies have been identified within the project location or within 120 metres. Based on these findings, an Environmental Impact Study, as outlined under REA Sections 39 and 40, is required for this project; one has been prepared. Table 8 summarizes the results of the site investigation in the context of the proposed project.

Upload: others

Post on 22-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated

Dufferin Wind Power Project

Water Assessment Report August 2012

Page 45

Dufferin Wind Power Inc.

8.4 Seepage Areas

As indicated in Table 1, a search and analysis of applicable records and resources of the project

location did not identify any seepage areas, as defined by Ontario Regulation 359/09, in the

project location or within the surrounding 120 metres. The results of the site investigation

verified this determination.

9. SUMMARY OF AMENDMENTS TO THE RECORDS REVIEW

Based on the results of the site investigations, five previously unidentified water bodies

(crossings 48 through 52) were observed within 120 metres of the project location. Based on

the results of the site investigation, it was determined that five streams mapped within the

project location or 120 metre setback area, do not meet the definition of a water body

under Ontario Regulation 359/09 (i.e., is not a permanent or intermittent stream).

Previously unidentified water bodies and water bodies determined not to exist during field

investigations are discussed in Table 7 and are shown on Figure 6a through 6d. Classification of

water bodies are shown on Figure 7a through 7d.

10. CONCLUSIONS

This report is intended to fulfill the requirements for the Water Assessment Report under

Ontario Regulation 359/09. Based on the results of the site investigations, multiple water

bodies have been identified within the project location or within 120 metres. Based on these

findings, an Environmental Impact Study, as outlined under REA Sections 39 and 40, is required

for this project; one has been prepared. Table 8 summarizes the results of the site

investigation in the context of the proposed project.

Page 2: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated
Page 3: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated

!(

!(

!(

!(

!( !(

!(

!(

!(

!(

!( !(

!(!(

4THLINE

3RDLIN

E

COUNTYROAD21

SIDEROAD

240

COUN

TYROAD124

30THSIDEROAD

20THSIDEROAD

5THLINE

COUNTYROAD

9

SIDEROAD250

4THLINENORTHEAST

TOW

NLINEMU

LMU

RMELAN

CTHON

8THLINENORTHEAST

SOUTHLINEC

GREYROAD9

ROAD57A

6THLINENORTHEAST

8THLINE

TOWNLINEMELANCTHONOSPREY

ROAD67A

15THSIDEROAD

2NDLINENORTHEAST

TOWNLINEM

ULM

URM

ELANCHTON

10THLINE

6THLINENORTHEAST

5THLIN

E

SIDEROAD

250

30THSIDEROAD

TOWNLINEMELANCTHONOSPREY

Nottawasaga

UpperGrand

Saugeen

9

8

7

65

4

3

2

1112

1413

10

T9

T8

T7

T6

T5

T4

T3

T2

T1

T22

T49

T48

T47T45

T44

T43

T42

T41

T39

T38

T37

T36

T34

T33

T32T31

T30

T29

T28

T27

T26

T25

T24

T23

T21

T20

T19

T18

T17

T16

T15

T14

T13

T12

T11

T10

1

T46

T40

T35

DufferinWindPowerProject

Figure6aSiteInvestigationMap

CreatedBy:SLPCheckedBy:DR

DateCreated:112311DateModified:021512

FilePath:I:\GIS\115199-DufferinWind\2012\Mapping\WaterAssessmentReport\

Map3aWaterAssessmentReport-RecordsReview.mxdProducedbyDillonConsultingLimitedunderLicencewiththe

OntarioMinistryofNaturalResources©Queen’sPrinterforOntario,2011

0 0.5 1 1.5 km

1:40,000

/

MajorRoadsLocalRoads

Legend

ProjectComponents

Woodlands

ProvinciallySignificantWetlands

120mProjectLocationSetback

Waterbody

UnevaluatedWetlands

DelineatedWetlands

Watercourse

Non-ProvinciallySignificantWetlands

WatercourseCrossing

TeritaryWatershed

Noisy River

Pine River

!( WatercourseCrossingsFoundNottoExist13

!(1

DirectionalDrilling

TurbineLocationsA

UndergroundCollectorSystemFeederLines

PowerLineOption1-69KVLine

UndergroundCollectorAlternateFeederLines

AccessRoads

230kVPrivateEasementStudyArea

PowerLineOption2-230KVLine

BuildableArea(ConstructionImpactArea)

ConstructionLaydownArea

CranePath

SubstationLocation"

OperationsandMaintenanceBuilding

Page 4: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated
Page 5: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

15THSIDEROAD

2NDLINENORTHEAST

4THLINE

HIGHWAY10

3RDLIN

E

COUNTYROAD

17

5THLIN

E

COU

NTYROAD124

2NDLINESOUTHWEST

SIDEROAD

280

2NDLINENORTHEAST

15THSIDEROAD

5THSIDEROAD

4THLINESOUTHWEST

SIDEROAD

270

COUNTYROAD

21

MAINSTREET

4THLINENORTHEAST

RIVERROAD

HIGHWAY89

SIDEROAD

250

SIDEROAD

300

SIDEROAD

260

7THLINESOUTHWEST

SIDEROAD5

MILLLANE

OLDFIELDCOURTFIELDWAYCOURT

5THLIN

E

HIGH

WAY89

SIDEROAD

270

48

28

27

26

25

24

23

22

21

20

UpperGrand Nottawasaga

49

48

28

27

26

25

24

23

22

21

20

DufferinWindPowerProject

Figure6bSiteInvestigationMap

CreatedBy:SLPCheckedBy:DR

DateCreated:112311DateModified:080112

FilePath:I:\GIS\115199-DufferinWind\2012\Mapping\WaterAssessmentRepot\

Map3bWaterAssessmentReport-RecordsReview.mxdProducedbyDillonConsultingLimitedunderLicencewiththe

OntarioMinistryofNaturalResources©Queen’sPrinterforOntario,2011

0 0.5 1 1.5 km

1:40,000

/

MajorRoadsLocalRoads

Legend

ProjectComponents

Woodlands

ProvinciallySignificantWetlands

120mProjectLocationSetback

Waterbody

UnevaluatedWetlands

DelineatedWetlands

Watercourse

Non-ProvinciallySignificantWetlands

WatercourseCrossing

TeritaryWatershed

!( NewWatercourseCrossingsObservedDuringSiteInvestigations

48

!(1

PowerLineOption2-230kVLinePowerLineOption1-69kVLine

230kVPrivateEasementStudyArea

DirectionalDrillingDirectionalDrilling/OverheadLinesUndergroundInstallation

Page 6: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated
Page 7: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated

!(

!(

!(

!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

4THLINE

2NDLIN

E

BLINDLIN

E

25THSIDEROAD

HIGH

WAY10

20THSIDEROAD

COUN

TYROAD11

COUN

TY ROAD12

HURONTARIOSTREET

1STLINEEHS

TOWNLINE M

ONOAM

ARANTH

15THSIDEROAD

COUNTYROAD8

30THSIDEROAD

2NDL

INE

EHS

6THLIN

E

HIGHWAY89

MAPLEWOODDRIVE

20THSIDEROAD

30THSIDEROAD

1STLINE EHS

1STLINE EHS

2NDLIN

EEHS

Nottawasaga

UpperGrand

50

40

39

38

37

36

35

34

33

3231

30

29

28

27DufferinWindPowerProject

Figure6cSiteInvestigationMap

CreatedBy:SLPCheckedBy:DR

DateCreated:112311DateModified:080112

FilePath:I:\GIS\115199-DufferinWind\2012\Mapping\WaterAssessmentRepot\

Map3cWaterAssessmentReport-RecordsReview.mxdProducedbyDillonConsultingLimitedunderLicencewiththe

OntarioMinistryofNaturalResources©Queen’sPrinterforOntario,2011

0 0.5 1 1.5 km

1:40,000

/

MajorRoadsLocalRoads

Legend

ProjectComponents

Woodlands

ProvinciallySignificantWetlands

120mProjectLocationSetback

Waterbody

UnevaluatedWetlands

DelineatedWetlands

Watercourse

Non-ProvinciallySignificantWetlands

WatercourseCrossing!(1

TeritaryWatershed

!( WatercourseCrossingsFoundNottoExist15

!( NewWatercourseCrossingsObservedDuringSiteInvestigations

50

PowerLineOption2-230KVLinePowerLineOption1-69KVLine

DirectionalDrilling

PointofInterconnect-69kVPowerLine(Lot14,Concession1-TownofMono)

DirectionalDrilling/OverheadLinesUndergroundInstallation

Page 8: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated
Page 9: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

4THLIN

E

2NDLIN

E HIGH

WAY10

COUN

TYROAD12

COUN

TY ROAD11

COUNTYROAD10

15THSIDEROAD

6THLINE

TOW

NLINE MO

NO AM

ARAN

TH

COUNTYROAD109

HURO

NTARIOSTREET

10THSIDEROAD

1STLINE EHS

5THSIDEROAD

CENTENNIALR

OAD

COUNTYROAD7

DAWSONROAD

WILLOUGHBYROAD

COUNTYROAD23

COUNTYROAD

3

1STLINEEHS

COUN

TYROAD11

1STLINEEHS

Nottawasaga

UpperGrand

Credit-16Mile

52

51

47

46

45

44

43

42

41

40

Mill Creek

Monora CreekMonora Creek

DufferinWindPowerProject

Figure6dSiteInvestigationMap

CreatedBy:SLPCheckedBy:DR

DateCreated:112311DateModified:080112

FilePath:I:\GIS\115199-DufferinWind\2012\Mapping\WaterAssessmentRepot\

Map3dWaterAssessmentReport-RecordsReview.mxdProducedbyDillonConsultingLimitedunderLicencewiththe

OntarioMinistryofNaturalResources©Queen’sPrinterforOntario,2011

0 0.5 1 1.5 km

1:40,000

/

MajorRoadsLocalRoads

Legend

ProjectComponents

Woodlands

ProvinciallySignificantWetlands

120mProjectLocationSetback

Waterbody

UnevaluatedWetlands

DelineatedWetlands

Watercourse

Non-ProvinciallySignificantWetlands

WatercourseCrossing

TeritaryWatershed

!( WatercourseCrossingsFoundNottoExist46NewWatercourseCrossingsObservedDuringSiteInvestigations!(50

!(1

PowerLineOption2-230KVLine

DirectionalDrillingDirectionalDrilling/OverheadLines

Page 10: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated
Page 11: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A"

!(

!(

!(

!(

!( !(

!(

!(

!(

!(

!( !(

!(!(

4THLINE

3RDLIN

E

COUNTYROAD21

SIDEROAD

240

COUN

TYROAD124

30THSIDEROAD

20THSIDEROAD

5THLINE

COUNTYROAD

9

SIDEROAD250

4THLINENORTHEAST

TOW

NLINEMU

LMU

RMELAN

CTHON

8THLINENORTHEAST

SOUTHLINEC

GREYROAD9

ROAD57A

6THLINENORTHEAST

8THLINE

TOWNLINEMELANCTHONOSPREY

ROAD67A

15THSIDEROAD

2NDLINENORTHEAST

TOWNLINEM

ULM

URM

ELANCHTON

10THLINE

6THLINENORTHEAST

5THLIN

E

SIDEROAD

250

30THSIDEROAD

TOWNLINEMELANCTHONOSPREY

Nottawasaga

UpperGrand

Saugeen

9

8

7

65

4

3

2

1112

1413

10

Stinso

n Drain

Westicott Drain

Orvis B

ranch

T9

T8

T7

T6

T5

T4

T3

T2

T1

T22

T49

T48

T47T45

T44

T43

T42

T41

T39

T38

T37

T36

T34

T33

T32T31

T30

T29

T28

T27

T26

T25

T24

T23

T21

T20

T18

T17

T16

T15

T14

T13

T12

T11

T10

1

T46

T40

T35 T19

DufferinWindPowerProject

Figure7aClassificationofWaterbodies

CreatedBy:SLPCheckedBy:DR

DateCreated:112311DateModified:020312

FilePath:I:\GIS\115199-DufferinWind\2012\Mapping\WaterAssessmentReport\

Map3aWaterAssessmentReport-RecordsReview.mxdProducedbyDillonConsultingLimitedunderLicencewiththe

OntarioMinistryofNaturalResources©Queen’sPrinterforOntario,2011

0 0.5 1 1.5 km

1:40,000

/

MajorRoadsLocalRoads

TurbineLocationsProjectComponents

Legend

ProjectComponents

Woodlands

ProvinciallySignificantWetlands

120mProjectLocationSetback

Waterbody

UnevaluatedWetlands

Non-ProvinciallySignificantWetlands

WatercourseCrossing

TeritaryWatershed

Noisy River

Pine River

DrainClassificationsA

CD

F

B

E

A

!(1

230KVPrivateEasementStudyArea

Page 12: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated
Page 13: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

4THLINE

HIGHWAY10

3RDL IN

E

COUNTYROAD

17

5THLIN

E

COUN

TYROAD124

2NDLINESOUTHWEST

SIDEROAD

280

2NDLINENORTHEAST

15THSIDEROAD

5THSIDEROAD

SIDEROAD

270

4THLINESOUTHWEST

COUNTYROAD

21

4THLINENORTHEAST

MAINSTREET

SIDEROAD

250

RIVERROAD

SIDEROAD

260

1STAVENUE

SIM

ONS

TREE

T

7THLINESOUTHWEST

MILLLANE

SIDEROAD5

SIDEROAD

300

HIGH

WAY89

BERRYSTREET

OLDFIELDCOURTFIELDWAYCOURT

SIDEROAD

270

5THLIN

E

SIDEROAD

250

49

48

27

26

25

24

23

22

21

20

Cague DrainCurphy Drain

Fraser Drain

McKibbon Drain

Cague Drain

McM

anam

an D

rain

Curphy Drain

Fraser Drain

McKibbon Drain

Arnold Drain

DufferinWindPowerProject

WaterAssessmentReport-Figure7bClassificationof

Waterbodies

CreatedBy:SLPCheckedBy:DR

DateCreated:112311DateModified:080112

FilePath:I:\GIS\115199-DufferinWind\2012\Mapping\WaterAssessmentReport\

Map3aWaterAssessmentReport-RecordsReview.mxdProducedbyDillonConsultingLimitedunderLicencewiththe

OntarioMinistryofNaturalResources©Queen’sPrinterforOntario,2011

0 0.5 1 1.5 km

1:40,000

/

MajorRoadsLocalRoads

Legend

ProjectComponents

Woodlands

ProvinciallySignificantWetlands

120mProjectLocationSetback

Waterbody

UnevaluatedWetlands

Non-ProvinciallySignificantWetlands

WatercourseCrossing

TeritaryWatershed

DrainClassifications

!(1

PowerLineOption2-230kVLinePowerLineOption1-69kVLine

230kVPrivateEasementStudyArea

DirectionalDrillingDirectionalDrilling/OverheadLines

A

CD

F

B

E

UndergroundInstallation

Page 14: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated
Page 15: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated

!(

!(

!(

!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

4THLINE

2NDLIN

E

BLINDLIN

E

25THSIDEROAD

HIGH

WAY10

20THSIDEROAD

COUN

TYROAD11

HURO

NTARIOSTREET

1STLINEEHS

TOWNLINE M

ONOAM

ARANTH

3RDLIN

EEHS

COUNTYROAD8

15THSIDEROAD

COU

NTY ROAD12

2NDLINEEHS30THSIDEROAD

HIGHWAY89

MAD

ILLDRIVE

20THSIDEROAD

2NDLIN

EEHS

1STLINE EHS

1STLINE EHS

2NDLINEEH

S

30THSIDEROAD

Nottawasaga

UpperGrand

50

39

38

37

36

35

34

33

3231

30

29

28

27 DufferinWindPowerProject

Figure7cClassificationofWaterbodies

CreatedBy:SLPCheckedBy:DR

DateCreated:112311DateModified:080112

FilePath:I:\GIS\115199-DufferinWind\2012\Mapping\WaterAssessmentReport\

Map3aWaterAssessmentReport-RecordsReview.mxdProducedbyDillonConsultingLimitedunderLicencewiththe

OntarioMinistryofNaturalResources©Queen’sPrinterforOntario,2011

0 0.5 1 1.5 km

1:40,000

/

MajorRoadsLocalRoads

Legend

ProjectComponents

Woodlands

ProvinciallySignificantWetlands

120mProjectLocationSetback

Waterbody

Lots/Concessions

UnevaluatedWetlands

Non-ProvinciallySignificantWetlands

WatercourseCrossing!(1

TeritaryWatershed

DrainClassifications

PowerLineOption2-230KVLinePowerLineOption1-69KVLine

DirectionalDrilling

PointofInterconnect-69kVPowerLine(Lot14,Concession1-TownofMono)

DirectionalDrilling/OverheadLines

A

CD

F

B

E

UndergroundInstallation

Page 16: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated
Page 17: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

4THLIN

E

2NDLIN

E HIGH

WAY10

COUN

TYROAD11

BLINDLIN

E

COUNTYROAD10

COUN

TYROAD12

15THSIDEROAD

TOW

NLINE MO

NOAM

ARAN

TH

COUN

TYROAD16

COUNTYROAD109

HIGHWAY9H

URONTARIO

STREET

TOWNLIN

E

10THSIDEROAD

BROADWAY

COUNTY

ROAD7

1STLINE EHS

2NDLIN

EEHS

KENNEDYROAD

5THSIDEROAD

CENTENNIALR

OAD

ZINASTREET

DAWSONROAD

1ST

WILLOUGHBYROAD

COUNTYROAD23

COUNTYROAD

3

ALDERSTREET

MILLSTREET

STARRVIEWCRESCENT

FRENCH

BUENAVISTA

SHANNONCOURT

BAYBERRYROAD

FEADSTREET

GOOSE

BERR

YST

REET

JOSHUAR

OAD

PERRYROAD

4THSTREET

1STLINEEHS

HURONTARIOSTREET

5THSIDEROAD

COUN

TYROAD11

2NDLIN

E

HURONTARIOSTREET

COUNTYROAD

109

1STLINEEHS

COUNTYROAD7

52

51

46

45

44

43

42

41

40

Mill Creek

Monora Creek

Mill Creek

47

DufferinWindPowerProject

Figure7dClassificationofWaterbodies

CreatedBy:SLPCheckedBy:DR

DateCreated:112311DateModified:080112

FilePath:I:\GIS\115199-DufferinWind\2012\Mapping\WaterAssessmentReport\

Map3aWaterAssessmentReport-RecordsReview.mxdProducedbyDillonConsultingLimitedunderLicencewiththe

OntarioMinistryofNaturalResources©Queen’sPrinterforOntario,2011

0 0.5 1 1.5 km

1:40,000

/

MajorRoadsLocalRoads

Legend

ProjectComponents

Woodlands

ProvinciallySignificantWetlands

120mProjectLocationSetback

Waterbody

UnevaluatedWetlands

Non-ProvinciallySignificantWetlands

WatercourseCrossing

TeritaryWatershed

DrainClassifications

!(1

PowerLineOption2-230KVLine

DirectionalDrillingDirectionalDrilling/OverheadLines

A

CD

F

B

E

Page 18: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated
Page 19: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated

Dufferin Wind Power Project

Water Assessment Report August 2012

Page 54

Dufferin Wind Power Inc.

Table 8: Summary of the Water Assessment Site Investigation

ID Water Body Does the Project Location

Overlap a Water Body? Is the Project Location within

120 metres of the Water Body? Distance to Nearest Project Components

Project Components within 120 metres of the Water Body EIS Required?

Lakes

None identified within the project location or adjacent lands within 120 metres

Lake Trout Lakes

None identified within the project location or adjacent lands within 120 metres

Permanent and/or Intermittent Streams

1 Upper Grand Yes Yes Within project location Horizontal Directional Drilling, Exit/Access Pits, Underground Collector Circuit

Yes

2 Nottawasaga -Noisy River No Yes 61 m Buildable Area, Underground Collector Circuit Yes

3 Nottawasaga -Noisy River Yes Yes Within project location Horizontal Directional Drilling, Exit/Access Pits, Underground Collector Circuit

Yes

4 Nottawasaga – Tributary of the Noisy River Yes Yes Within project location Horizontal Directional Drilling, Exit/Access Pits, Underground Collector Circuit

Yes

5 Nottawasaga -Noisy River Yes Yes Within project location Buildable Area, Horizontal Directional Drilling, Exit/Access Pits, Underground Collector Circuit

Yes

6 Nottawasaga -Noisy River No Yes 38 m Buildable Area, Access Road, Horizontal Directional Drilling, Exit/Access Pits, Underground Collector Circuit

Yes

7 Nottawasaga -Noisy River No Yes 84 m Buildable Area Yes

8 Nottawasaga – Tributary of the Noisy River Yes Yes Within project location Horizontal Directional Drilling, Exit/Access Pits, Underground Collector Circuit

Yes

9 Nottawasaga – Redickville Tributary (Online pond upstream)

Yes Yes Within project location Horizontal Directional Drilling, Exit/Access Pits, Underground Collector Circuit

Yes

10 Nottawasaga – Redickville Tributary Yes Yes Within project location Buildable Area, Access Road, Underground Collector Circuit, Underground Collector Alternate Path

Yes

11 Upper Grand River (wetland upstream)

Yes Yes Within project location Horizontal Directional Drilling, Exit/Access Pits, Underground Collector Circuit

Yes

12 Nottawasaga – Pine River Yes Yes Within project location Buildable Area, Access Road, Turbine 34 and 35, Crane Path, Underground Collector Circuit, Culvert Installation, Directional Drilling, Exit/Access Pits

Yes

13 No channel observed at this crossing. No No n/a n/a No

14 Nottawasaga – Pine River Yes Yes Within project location Buildable Area, Proposed Underground Collector Circuit Yes

230 kV Private Easement Study Area

Multiple Tributaries of the Upper Grand River Yes Yes Within project location 230 kV Line Yes

20 Upper Grand River Tributary No Yes Within project location 230 kV Line Yes

21 Upper Grand River Tributary Yes Yes 80 m Horizontal Directional Drilling, Exit/Access Pits, 230 kV Line Yes

22 Upper Grand River Tributary No Yes Within project location 230 kV Line Yes

23 Nottawasaga – Curphy Drain (Boyne River)

Yes Yes Within project location 230 kV Line. Exit or Access Pits Yes

24 Nottawasaga – Curphy Drain (Boyne River)

Yes Yes Within project location 230 kV Line Yes

25 Nottawasaga – Cague Drain (Boyne River) Yes Yes Within project location Horizontal Directional Drilling or Overhead Line Yes

26 Nottawasaga – Cague Drain (Boyne River) Yes Yes Within project location 230 kV Line Yes

27 Nottawasaga – Boyne River Yes Yes Within project location Horizontal Directional Drilling or Overhead Line Yes

28 Nottawasaga – Boyne River Yes Yes Within project location 230 kV Line – Trenching Yes

29 Nottawasaga - Boyne River Yes Yes Within project location Horizontal Directional Drilling or Overhead Line Yes

30 Nottawasga - Boyne River Yes Yes Within project location 230 kV Line Yes

Page 20: 8.4 Seepage Areas - Dufferin Wind Power Inc.€¦ · Dufferin Wind Power Project Water Assessment Report August 2012 Page 45 Dufferin Wind Power Inc. 8.4 Seepage Areas As indicated

Dufferin Wind Power Project

Water Assessment Report August 2012

Page 55

Dufferin Wind Power Inc.

Table 8: Summary of the Water Assessment Site Investigation

ID Water Body Does the Project Location

Overlap a Water Body? Is the Project Location within

120 metres of the Water Body? Distance to Nearest Project Components

Project Components within 120 metres of the Water Body EIS Required?

31 North Branch of the Nottawasaga River Yes Yes Within project location Horizontal Directional Drilling or Overhead Line Yes

32 North Branch of the Nottawasaga River (located south of where it is mapped)

Yes Yes Within project location Horizontal Directional Drilling or Overhead Line Yes

33 North Branch of the Nottawasaga River Yes Yes Within project location 230 KV Line Yes

34 North Branch of the Nottawasaga River Yes Yes Within project location Horizontal Directional Drilling or Overhead Line Yes

35 North Branch of the Nottawasaga River Yes Yes Within project location 230 KV Line Yes

36 North Branch of the Nottawasaga River Yes Yes Within project location 230 KV Line Yes

37 No channel observed at this crossing. No No n/a n/a No

38 Upper Grand – Willow Brook Yes Yes Within project location 230 KV Line. Exit or Access Pits Yes

39 Upper Grand – Willow Brook Yes Yes Within project location Horizontal Directional Drilling, 230 KV Line Yes

40 Upper Grand – Willow Brook Yes Yes Within project location Horizontal Directional Drilling, 230 KV Line Yes

41 Upper Grand – Willow Brook Yes Yes Within project location Horizontal Directional Drilling, 230 KV Line Yes

42 Upper Grand – Willow Brook Yes Yes Within project location Horizontal Directional Drilling or Overhead Line Yes

43 Upper Grand – Willow Brook Yes Yes Within project location 230 KV Line Yes

44 South Branch of the Nottawasaga River Tributary (Marsh habitat)

Yes Yes Within project location Horizontal Directional Drilling or Overhead Line Yes

45 Upper Grand – Mud Creek Yes Yes Within project location Horizontal Directional Drilling or Overhead Line Yes

46 No channel observed at this crossing. No No n/a n/a No

47 No channel observed at this crossing. No No n/a n/a No

48 Upper Grand River Tributary Yes Yes Within project location 230 KV Line Yes

49 Upper Grand River Tributary Yes Yes Within project location 230 KV Line Yes

50 Upper Grand – Willow Brook Yes Yes Within project location Horizontal Directional Drilling, 230 KV Line Yes

51 Upper Grand – Willow Brook Yes Yes Within project location 230 KV Line Yes

52 Nottawasaga – South Branch of the Nottawasaga River

Yes Yes Within project location 230 KV Line Yes

Seepage Areas

None identified within the project location or adjacent lands within 120 metres