Page 1: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

825391

PRELIMINARY ASSESSMENT AND RECOMMENDED WORK PROGRAM 1983

SCOTCH CREEK PROJECT

FOR

CORVETTE PETROLEUM CORPORATION

OCTOBER 15, 1983

Page 2: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

- i -

SUMMARY

Corv e t t e Petroleum C o r p o r a t i o n has acquired by o p t i o n 24

mineral c l a i m s , four p l a c e r s leases and has staked an a d d i ­

t i o n a l 40 u n i t s near Shuswap Lake. These claims and l e a s e s

cover an a u r i f e r o u s oxide f a c i e s i r o n formation that has been

a l t e r e d by s i l i c i f i c a t i o n and p y r i t i s a t i o n probably p r i m a r i l y

as a r e s u l t of f o l d i n g . Gold appears to concentrate i n areas

of high a l t e r a t i o n and samples taken returned 220 ppb Au, 560

ppb Au and 1840 ppb Au. A l l of which represent very anomalous

values f o r t h i s environment.

D i r e c t comparisons to known larg e tonnage economic gold

d e p o s i t s i n s i m i l a r Eastern Canadian environments can be made

on the b a s i s o f :

i ) geology

i i ) geochemistry

i i i ) s t r u c t u r a l c o n t r o l s

i v ) a s s o c i a t e d economic m i n e r a l i z a t i o n

This i s a new p o t e n t i a l d e p o s i t type f o r the C o r d i l l e r a and

r e p r e s e n t s very high e x p l o r a t i o n p o t e n t i a l . A Phase I, one

month program of d e t a i l e d mapping l i t h o and s o i l geochemistry

with VLF EM and Magnetics surveys has been recommended at an

estimated cost of $54,000. A Phase II program to c o n s i s t of

induced p o l a r i z a t i o n and follow-up trenching i s recommended at

$53,000. Favourable r e s u l t s from these two phases w i l l p r ovide

d r i l l t a r g e t s .

Page 3: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

TABLE OF CONTENTS

Page

SUMMARY i

1.0 INTRODUCTION 2

2.0 PROPERTY LOCATION, ACCESS, TITLE 3

3.0 HISTORY 6

4.0 GEOLOGY 8

4.1 Regional 8 4.2 Local 12

4.3 Mineral Occurrences 15

5.0 RECOMMENDED WORK PROGRAM 18

5.1 Plan 18 5.2 Budget 20

5.3 Schedule 22

6.0 CONCLUSIONS 24

7.0 RECOMMENDATIONS * 25

CERTIFICATE - T.G. Hawkins, P.Geol. 26

BIBLIOGRAPHY 27

APPENDIX I A n a l y s i s C e r t i f i c a t e , Table I I I

APPENDIX II Figure 4

Page 4: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

LIST OF ILLUSTRATIONS

Page

Drawing 1 General L o c a t i o n Map 1

Drawing 2 D e t a i l e d L o c a t i o n Map 5

Drawing 3 Regional Geology Map 9

Drawing 4 Property Geology and Plan In Pocket

Table I Ownership Summary 4

Table II 1983 P r o j e c t Schedule 23

Table I I I Rock Sampling Summary Appendix I

Page 5: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

100 2 0 0 3 0 0

To a c c o m p a n y R e p o r t by

T . E . G r e g o r y H a w k i ns , P. Geo l ,

d a t e d O c t o b e r 15 , 1 9 8 3 .

4O0 5 0 0 k m

•T* J

C O R V E T T E P E T R O L E U M C O R P O R A T I O N

G E N E R A L L O C A T I O N M A P

S C O T C H C R E E K P R O J E C T

K A M L O O P S M I N I N G DIVISION

Project No V I 31

Seal* '

Drawing No: I

By

D a t t : O c t . 1 9 8 3

M P H ) MPH Consulting Limited

Page 6: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

- 2 -

1.0 INTRODUCTION

The f o l l o w i n g r e p o r t i s prepared upon the request of Mr. B.

G i l l , Chairman, Corvette Petroleum and as per the w r i t t e n r e p l

dated September 19, 1983. This was agreed f o l l o w i n g a t r i p to

the Scotch Creek Property on September 10, 1983 with Mr. J .

Simpson, r e p r e s e n t a t i v e of Corvette Petroleum.

Page 7: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

- 3 -

2.0 PROPERTY LOCATION, ACCESS, TITLE

(F i g u r e s 1 and 2)

The Scotch Creek Property l i e s on the northern shore of Shuswap

Lake, between Scotch and H l i n a Creeks, Map 82L/14W, at 50°58'

l a t i t u d e , 119°25' l o n g i t u d e i n the Kamloops Mining D i v i s i o n of

B r i t i s h Columbia.

Access to the property i s v i a the Trans Canada Highway, 70

m i l e s east from Kamloops to the C e l i s t a turn o f f to the north

and along the north shore of Shuswap Lake to C e l i s t a . The a l l

weather H l i n a Creek d i r t road f o l l o w s the n o r t h e a s t e r n bank of

H l i n a Creek three miles to the northwest and onto the

p r o p e r t y . Several logging roads, some passable by four wheel

d r i v e v e h i c l e , t r a n s e c t the property and lead to the main

showing trenches some 1/2 miles to the southwest of the H l i n a

Creek road.

The p r o p e r t y i s comprised of 25 staked claims and four p l a c e r

l e a s e s as summarized below.

Table I Ownership Summary

Reg i s t e r e d Owner

Claim Name and Record Number Ex p i r y Date

Wayne Tyner Cher 1 to VIII Inc. 2577 to 2584 Inc.

A l l 8th May, 1985

Wayne Tyner Saba II 477

3rd October, 1986

Wayne Tyner Sow I to Sow VIII Inc. 2124 to 2131 Inc.

28th September, 1984

Wayne Tyner Tar I to Tar VII Inc. 4th October, 1984 2149 to 2155 Inc.

Page 8: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

Registered Lessee

P l a c e r Lease Number Ex p i r y Date

Wayne Tyner 547 28th February, 1984

Wayne Tyner 720 30th May, 1986

Wayne Joseph Tyner 2330 31st December, 1983

Wayne J . Tyner 2789 5th March, 1984

Corvette Petroleum C o r p o r a t i o n l o c a t e d an a d d i t i o n a l 2 claims

c o n s i s t i n g of 40 u n i t s on October 3 to October 7, 1983. These

are to be recorded as Scotch 1 (Tag No. 62871) and Scotch 2

(Tag No. 62872).

In an agreement dated October 4, 1983, Corvette agreed to

o p t i o n from Mr. Tyner a l l p l a c e r and lode claims f o r cash and

stock c o n s i d e r a t i o n s .

Page 9: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

Copper

/ "\ Island

[ / ^ / ] P L A C E R L E A S E

M I N E R A L C L A I M

R e f e r e n c e = N T S 8 2 L 14

To o c c o m p a n y R e p o r t by

T . E . G r e g o r y H a w k i n s , P. Geol,

d a t e d Oc tober 15, 1983.

C O R V E T T E P E T R O L E U M C O R P O R A T I O N

D E T A I L E D LOCATION MAP

S C O T C H C R E E K P R O J E C T

K A M LOOPS M I N I N G D I V I S I O N

Prc-tKt No, V 13 1

S w l * ' | : 5 0 . 0 0 0

Drov>>g No: 2 D o t * O c t . 1983

M P H Consulting Limited

Page 10: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

- 6 -

3.0 HISTORY

The Scotch Creek area f i r s t gained prominence as a gold p l a c e r

camp. It was f i r s t mined in the 1860s. The most important

p e r i o d f o r p l a c e r mining was the 1885-1887 p e r i o d when 1519

oz. worth $26,500 was recovered. In the mid-1930s, work was

done to prove the existence of o l d channels above the present

creekbed and i n 1934 one group recovered 60 oz. from the

bedrock at an o l d channel 175 f e e t above the Creek. Scotch

Creek P l a c e r Mines L t d . tested the benches and creekbed with a

d r a g - l i n e and h y d r a u l i c k i n g equipment. Apparently, y i e l d s were

not good enough as p r o d u c t i o n and work records appear to

disappear from the r e p o r t s a f t e r 1936.

The gold was found as coarse, well-rounded, f l a t t e n e d p e l l e t s

and nuggets with an average f i n e n e s s of 842. Nuggets of over

$2 (.11 oz.) were r a r e . No a p p r e c i a b l e amount of gold was

found i n the main body of g r a v e l s , but was found s p o r o d i c a l l y

at or near bedrock. Most of the work was done immediately

below the f o r k (9 miles from Shuswap Lake) and above and below

the canyon 1-1/2 miles downstream. Workings could be found as

f a r upstream as 21 m i l e s . The source f o r the Au i s s a i d to be

the abundant quartz veins and s t r i n g e r s in the area.

There are numerous mineral occurrences in and around the Adams

P l a t e a u . The e a r l i e s t mentioned i s i n 1885, but most

Page 11: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

e x p l o r a t i o n appears to have s t a r t e d a f t e r 1928, when the

Mosquito King (now known as Garnet) was f i r s t r e p o r t e d . Almost

a l l of the occurrences are Pb Zn Ag ± Cu ± Au and are e i t h e r

concordant sedimentary or v o l c a n i c d e p o s i t s or v e i n d e p o s i t s .

The Iron Pot, Metal C r e s t , S i l v e r King and Shuswap p r o p e r t i e s

are a l l w i t h i n approximately one mile of the Corvette

P r o p e r t y . A l l have been considered vein-type d e p o s i t s Pb Zn ±

Ag Au Cu N i . Iron Pot and Metal Crest produced at some time

but are now considered exhausted. Iron Pot ( P e a r l Marie) and

S i l v e r King/Queen claims are s t i l l on the map. The Mosquito

King and King Tut were the most important claims but are some­

what f u r t h e r away. King Tut i s an Ag Pb Zn Au v e i n d e p o s i t ,

regarded as a p o t e n t i a l producer.

In more recent times p a r t i c u l a r l y the mid to l a t e 1970s, major

mining companies i n c l u d i n g Craigmont Mines L t d . , Esso Minerals

and Noranda have explored the Adams Plateau and the western

f l a n k of Scotch Creek f o r massive s u l p h i d e s . Numerous

i n t e r e s t i n g occurrences have been l o c a t e d but nothing of

economic importance has been developed.

A more d e t a i l e d d e s c r i p t i o n of mineral occurrences i s provided

i n the M i n e r a l Occurrences s e c t i o n f o l l o w i n g .

Page 12: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

4 . 0 GEOLOGY

4.1 Regional (Figure 3)

Regional g e o l o g i c a l work f o r the Shuswap area have included

Jones, A.G., 1959 (1" = 4 miles) Campbell, R.B., 1963 (1" = 4

miles) and most r e c e n t l y O k u l i t c h , 1974 (1:250,000).

Figure 3 i s comprised of work by Jones (1959) and Campbell

(1963). As a r e s u l t some c o r r e l a t i o n of rock types i s

r e q u i r e d . The f o l l o w i n g u n i t s are d e s c r i b e d as c o r r e l a t i v e and

are b e l i e v e d to c o n t a i n the great m a j o r i t y of the l i t h o l o g i e s

u n d erlying the area.

E a r l y authors grouped the Eagle Bay (Unit 7,4) Sicamous (Unit

6,3) Mara (Unit 5) Tsalkim (Unit 4) as the Mount Ida Group and

dated the package as l a t e Pre-Cambrian. These formations

d i r e c t l y o v e r l i e the Monashee Group of E a r l y Pre-Cambrian age

and are o v e r l a i n by T e r t i a r y to Recent B a s a l t s and g l a c i a l -

l a c u s t r i n e d e p o s i t s . J u r a s s i c / C r e t a c e o u s i n t r u s i v e s intrude

t h i s metavolcanic/metasedimentary basement.

Jones (1959) d e s c r i b e s the Tsalkom formation, estimated at a

t h i c k n e s s of 4,000 to 1,500 f e e t , as being p r i m a r i l y composed

of a l t e r e d greenstone with subordinate s e r i c i t i c and c h l o r i t i c

sedimentary r o c k s . This greenstone t y p i c a l l y contains c h l o r i t e

e p i d o t e , c a l c i t e , z o i s i t e , hornblende, a l b i t e , magnetite and

Page 13: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

GSC M A P 4 8

( 1 9 6 3 )

GSC M E M O I R

2 9 6

L E G E N D

( M E M O I R 2 9 6 )

Q U A T E R N A R Y

L E G E N D

( G S C MAP 4 8 , 1 9 6 3 )

P L E I S T O C E N E / R E C E N T

21 G l o c i o l d e p o s i t s . f I

T E R T I A R Y

y.o B o s a l t i c r n y o l i t e f l o w s c o n g l o m e r a t e , s h a l e , s a n d s t o n e .

G l a c i a l d e p o s i t s , a l l u v i u m .

JURR A S I C / C R E T A C E O U S

7 a B i o t i t e g r o n o d i o r i t e , g r a n i t e .

J U R R A S S I C / C R E T A C E O U S

G r a n i t e , g r o n o d i o r i t e . I S

SHUSWAP T E R R A N E E A G L E BAY F O R M A T I O N

C h l o r i t e ond s e r i c i t e sch is t , s l a t e , l i m e s t o n e , q u a r t z i t e ; minor c o n g l o m e r a t e .

7 a P r e d o m i n a n t l y l imes tone .

S I C A M O U S F O R M A T I O N

P E R M I A N OR E A R L I E R E A G L E BAY F O R M A T I O N

G r e e n s t o n e , g r e e n s c h i s t , c h l o r i t e s c h i s t , p h j l l i t e , l i m e s t o n e , q u a r t z -s e r i c i t e s c h i s t , q u o r t z i t e , vo l can i c a g g l o m e r a t e .

4 a , dork g reen and b r o w n p h y l l i t e { c o m m o n l y l i m y ) , l i m e s t o n e , s e r i c i t i c q u a r t z i t e i m i n o r g r e e n s t o n e , q u a r t z - f e l d s p a r - c h l o r i t e gneiss, and m e t a - c o n g l o m e r a t e ; 4 b , t r a c h y l i c t u f f and b r e c c i a

Grey ond b u f f w e a t h e r i n g , w h i t e , g r e y , ond b u f f m a r b l e and l i m e s t o n e ' , m inor g r e e n s t o n e and p h y l l i t e .

F loggy l i m e s t o n e , s e r i c i t e s c h i s t , g r a p h i t e s c h i s t .

M A R A F O R M A T I O N

A r g i l l i t e , s l a t e , s e r i c i t e , ond c h l o r i t e s c h i s t , l i m e s t o n e .

T S A L K O M F O R M A T I O N

Green o n d e s i t e and a g g l o m e r a t e ' c h l o r i t e sch is t - s l a t e .

To a c c o m p a n y R e p o r t by

T. E. Gregory H a w k i n s , P. Geo!,

d a t e d O c t o b e r 1 5 , 1 9 8 3 .

C O R V E T T E P E T R O L E U M C O R P O R A T I O N

R E G I O N A L GEOLOGY MAP

S C O T C H C R E E K P R O J E C T

K A M L O O P S M I N I N G D I V I S I O N

P i c j K t No, V 151 B r S .H .

Scoter 1 " z 4 m i l o Drown- R D M.

D r c i n o N * 3 Dolo- O c t . I 9 S S

MPH Consulting Limited

Page 14: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

t i t a n i t e . Minor quartz c a l c i t e v e i n l e t s a l s o occur. Minor

sedimentary u n i t s are s e r i c i t e s c h i s t , s e r i c i t i c a r g i l l i t e ,

c h l o r i t i c a r g i l l i t e and black s c h i s t . These are i n t e r m i t t e n t

and grade to tuffaceous and greywacke sediments.

T i g h t i s o c l i n a l f o l d i n g accentuates bedding. Regional

metamorphism i s g e n e r a l l y g r e e n s c h i s t f a c i e s with amphibotite

f a c i e s o c c u r r i n g conspicuously c l o s e to g r a n i t i c c o n t a c t s .

The same author d e s c r i b e s the conformably o v e r l y i n g Mara

Formation as a 2,000 to 4,500 f e e t t h i c k n e s s of p h y l l i t e and

mica s c h i s t with subordinate v o l c a n i c members s i m i l a r to the

un d e r l y i n g Tsalkom formation. As such i t i s considered as an

a r g i l l a c e o u s t r a n s i t i o n from Tsalkom to the comformable

Sicamous Formation.

The Sicamous Formation i s b e l i e v e d to be 7,000 f e e t of fl a g g y

impure blue to .black limestone interbedded with minor

ca l c a r e o u s s e r e c i t i c s c h i s t . Pure g r a p h i t e i s common. A high

degree of deformation has produced f o l i a t i o n in the s c h i s t s .

The o v e r l y i n g Eagle Bay Formation i s an important host to

numerous v e i n and concordant sulphide d e p o s i t s . Three

components were d e s c r i b e d by Jones. A limestone u n i t i s

sandwiched between a large upper thickness of metasedimentary/

metavolcanic c h l o r i t e s c h i s t and a lower t h i n n e r u n i t of the

Page 15: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

- 11 -

same composition. The c h l o r i t e content i s the d i s t i n g u i s h i n g

f a c t o r between the Eagle Bay and the Sicamous formation and may

represent the a d d i t i o n of t u f f to the chemical sediments.

T o t a l t h i c k n e s s i s estimated at +30,000 f e e t .

S i x t y percent of the rock u n i t s are d e r i v e d from a r g i l l i t e ,

greywacke, limestone and q u a r t z i t e and t h e i r metamorphosed

e q u i v a l e n t s . The sediments d i f f e r from the v o l c a n i c s by the

d i s t i n c t l y f i n e bedding. Impure calcareous rocks are s e r i c i t i c

with quartz as the p r i n c i p a l c o n s t i t e n t . C h l o r i t e , e p i d o t e ,

s e r i c i t e , magnetite, carbonate are common i n the green rocks

and s e r i c i t e , c h l o r i t e , carbonate, z o i s i t e and g r a p h i t e are

common i n the grey and black u n i t s .

Limestones are massive, non-bedded to t h i n bedded or fl a g g y ,

impure and s c h i s t o s e .

Rare quartz pebble conglomerate occurs w i t h i n the map area.

The v o l c a n i c s are predominantly dark green s c h i s t s d e r i v e d

from v o l c a n i c flows. They are s t r o n g l y cleaved and f o l i a t e d .

D i s t i n c t quartz and carbonate l a y e r s are developed along the

cleavage. The main c o n s t i t u e n t s are c h o r i t e , amphibolite and

epidote with p l a g i o c l a s e . Both s i d e r i t e and magnetite are

important a c c e s s o r i e s to a l l green s c h i s t s .

Page 16: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

- 12 -

The f i r s t of two J u r r a s i c / C r e t a c e o u s g r a n d i o r i t e i n t r u s i o n s

occurs j u s t west of Scotch Creek in the southern h a l f of the

map sheet and a second l a r g e r body i s cut by the lower l i m i t s

of Kwikoit Creek. Both are predominatly b i o t i t e g r a n o d i o r i t e

and g r a n i t i c s t o c k s .

T e r t i a r y v o l c a n i c a c t i v i t y has emplaced b a s a l t i c flows and flow

b r e c c i a s and agglomerate i n some of the e r o s i o n a l channels.

These in turn may be o v e r l a i n by g l a c i a l and l a c u s t r i n e

d e p o s i t s from which a minor amount of p l a c e r gold has been

produced i n Scotch Creek.

The basement rocks are h i g h l y contorted and a l t e r e d due to

i s o c l i n a l recumbent f o l d i n g and r e c r y s t a l l i z a t i o n . Shearing

has a l s o occurred along planes p a r a l l e l to the a x i a l planes of

the f o l d s . Thrust f a u l t i n g from the northwest i s a l s o p a r a l l e l

to the r e g i o n a l trend. Two stages of deformation are in e v i ­

dence the o l d e r r e s u l t i n g i n small s c a l e i s o c l i n a l recumbent

f o l d i n g and shearing with more broad upward and f a u l t i n g

o c c u r r i n g l a t e r and i n some cases e r a s i n g the o l d e r deforma-

t i o n a l f e a t u r e s . Scotch Creek i s formed along a major N-S

f a u l t system.

4.2 L o c a l (Figure 4)

The C o r v e t t e Petroleum C o r p o r a t i o n Scotch Creek Property i s

Page 17: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

u n d e r l a i n e x c l u s i v e l y by Eagle Bay Formation o v e r l a i n by

g l a c i a l and f l u v i a l e l a s t i c s . The most recent and most

d e t a i l e d work i s provided by O k u l i t c h (1974) who has dated the

Eagle Bay as e x c l u s i v e l y Cambrian to O r d i v i c i a n i n age.

Four major u n i t s have been d e s c r i b e d from youngest to o l d e s t as

fo l l o w s and are b a s i c a l l y in agreement with other works.

1. Greenstone, c h l o r i t i c p h y l l i t e , minor agglomerate,

s e r i c i t e , p h y l l i t e , q u a r t z i t e limestone, t u f f .

2. S e r i c i t i c s i l i c e o u s p h y l l i t e , s e r i c i t e q u a r t z i t e , quartz

b i o t i t e s c h i s t , quartz b i o t i t e garnet s c h i s t , minor t u f f

and minor l a y e r s of 1. above and limestone.

3. Black a r g i l l i t e , a r g i l l a c e o u s p h y l l i t e , s h a l e ; minor

1imestone.

4. T s h i n a k i n limestone member c o n s i s t i n g of massive white

c r y s t a l l i n e limestone with minor greenstone and

g r e e n s c h i s t .

The p r o p e r t y i s u n d e r l a i n by an east west trending sequence of

the above u n i t s with the o l d e r a r g i l l i t e member to the n o r t h .

F o l i a t i o n i s southwest ot northeast with dips from 30° to 65°

to the no r t h . L i n e a t i o n s of l a t e r stage f o l d axes plunge to

the northwest.

Page 18: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

- 14 -

A major f a u l t t r u n c a t e s t h i s trend at Scotch Creek and d i s ­

p l a c e s the Eagle Bay Formation approximately four miles to the

north on the west s i d e of the creek. T r i a s s i c v o l c a n i c flows

outcrop and form the f o o t w a l l of the Eagle Bay formation over

t h r u s t sheet. The e x i s t e n c e of the t h r u s t and the c l a s s i f i c a ­

t i o n of T r i a s s i c / C a m b r i a n u n i t s i s d i s p u t e d by some of the

e x p l o r a t i o n groups in the area.

The area has been prospected for lode gold m i n e r a l i z a t i o n

p a r t i c u l a r l y w i t h i n a h i g h l y b r e c c i a t e d quartz sulphide veined

u n i t w i t h i n the greenstone member mentioned above. T h i s

a u r i f e r o u s h o r i z o n i s h e r e i n i d e n t i f i e d as a s i l i c e o u s oxide

f a c i e s (hematite) i r o n formation.

A number of c a t e r p i l l a r trenches have been cut across the h i l l

s i d e w i t h i n t h i s u n i t and exposed widths of 5 f e e t to 30 f e e t

and v a r y i n g degrees of quartz p y r i t e v e i n i n g .

T h i s f r a c t u r e v e i n i n g appears to c o n t r o l the degree of p y r i t e

m i n e r a l i z a t i o n and hence gold v a l u e s . A l l three a l t e r e d

samples of the i r o n formation were anomolous in gold with

values of 220 ppb, 560 ppb and 1840 ppb r e f l e c t i n g rocks of

i n c r e a s i n g a l t e r a t i o n . A minor amount of r e l a t e d i r o n

carbonate v e i n s accompany the quartz v e i n i n g .

The importance of the i d e n t i f i c a t i o n of t h i s r e l a t i o n s h i p and

environment i s documented in numerous other l o c a l i t i e s p a r t i c u

Page 19: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

l a r l y Eastern Canada. The Musselwhite or Opapimiskan Lake gold

d e p o s i t of Dome Mines Limited f o r instance i s found i n oxide

f a c i e s i r o n formation that has undergone i s o c l i n a l recumbent

f o l d i n g with attendant quartz carbonate v e i n i n g with 2 percent

s u l p h i d e s (Andrews et a l , 1981). This d e p o s i t i s p r e s e n t l y

estimated to c o n t a i n 1,000,000 tons of 0.2 oz./ton g o l d .

As such t h i s environment and the very high p o t e n t i a l a s s o c i a t e d

with i t are new f o r the C o r d i l l e r a n .

A sample d e s c r i p t i o n and summary are provided i n Appendix I

f o l l o w i n g . Of a d d i t i o n a l importance i s the a s s o c i a t i o n of the

Eagle Bay Formation with numerous other massive s u l p h i d e and

v e i n type occurrences i n the area.

4.3 M i n e r a l Occurrences

Zinc Claims: have been explored by O r e l l Copper Mines Lt d . and

Craigmont Mines L t d . and t e s t e d by 17 diamond d r i l l holes

t o t a l l i n g 1529 m from 1977-78. A l l i n t e r s e c t e d bedded

a n d e s i t i c fragmentals and flows, s i l i c e o u s t u f f i t e s with some

r h y o l i t e e g n i m b r i t e s , t u f f s and fragmentals. The a n d e s i t e and

t u f f i t e c o n t a i n abundant s i l i c e o u s and/or cherty l a y e r s . Very

small amounts of py and po and t r a c e s of py and sp are found

disseminated i n most rock types. There are numerous zones of

massive po, py and magnetite with minor sp, cp i n conformable

c h l o r i t e and/or epidote r i c h l a y e r s .

Page 20: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

- 16 -

Best assays 3.38% Zn over 3 to 5 metres with others under 0.5%

Zn over 1.5 m or l e s s . P y r r h o t i t e , magnetite i r o n formation on

these claims i s a l s o reported to be "anomalous" i n g o l d .

Scotch Claims: have been explored by Craigmont Mines L t d . and

Esso Resources Canada L t d . from 1977 to 1979 and f i n a l l y t e s t e d

by 2 diamond d r i l l holes of 228 m. One hole tested an EM

anomaly and i n t e r s e c t e d g r a p h i t i c s c h i s t i n a sequence of meta-

sediments and m e t a v o l c a n i c s . The other cut a sheared r h y o l i t i c

flow with 1 metre of quartz c h l o r i t e massive s u l p h i d e s

comprised of p y r r h o t i t e and sparse disseminated c h a l c o p y r i t e i n

s c h i s t (no assays a v a i l a b l e ) . This d e p o s i t i s b e l i e v e d to be

hosted i n T r i a s s i c r o c k s .

Iron Pot ( A c i d y P e a r l , M a r i e ) : i s c l a s s i f i e d as an exhausted

producer of g o l d , l e a d , z i n c and n i c k e l in veins hosted w i t h i n

the Tshinka limestone member of the Eagle Bay formation.

Several quartz seams and veins appear to s t r i k e with the

bedding. The main s u l p h i d e mineral i s p y r r h o t i t e which i s

a s s o c i a t e d with a minor amount of l e a d , z i n c i n a zone about

"400 f e e t wide" (1930). " F a i r gold values" have a l s o been

o b t a i n e d . Two s h o r t a d i t s have been d r i v e n but exposed no

m i n e r a l i z a t i o n .

S i l v e r King ( S i l v e r Queen): i s an a r g e n t i f e r o u s galena and

s p h a l e r i t e v e i n hosted i n the Eagle Bay greenstone u n i t . No

other i n f o r m a t i o n i s known to e x i s t .

Page 21: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

- 17 -

Metal C r e s t : i s s i m i l a r i n type and host to the S i l v e r King

showing but has "produced" minor amounts of ore. An e r r a t i c

system of q u a r t z , l e a d , z i n c veins c r o s s c u t t i n g the s c h i s t

outcrop i n Scotch Creek. 100 f e e t of c r o s s c u t t i n g and d r i f t i n g

from one a d i t plus a 37 f o o t deep sh a f t are reported (1929).

Shuswap: i s reported as a copper, l e a d , z i n c ' v e i n hosted i n

Eagle Bay s e r i c i t i c p h y l l i t e , q u a r t z i t e s and s c h i s t s . I t i s

noted as a showing o n l y and no other d e t a i l e d i n f o r m a t i o n i s

known to e x i s t .

Onyx: the Onyx Claim s i t u a t e d on Onyx Creek i s a Pb Zn o c c u r ­

rence with r e p o r t e d l y very high grade s i l v e r values ( 1934). It-

has been d e s c r i b e d as being a s s o c i a t e d with "quartz i n sedimen­

t a r y rocks" and i s hosted i n the Tshinka limestone. I t i s

q u e s t i o n a b l e whether t h i s i s a v e i n type or massive s u l p h i d e

type of showing.

Other very important d e p o s i t s w i t h i n the Eagle Bay f o r m a t i o n

i n c l u d e the p o t e n t i a l uranium producer at Rexspar and the ex

gold producer known as the Homestake. The l a t t e r i s a s s o c i a t e d

with a b a r i t e h o r i z o n assaying l e s s e r s i l v e r v a l u es and l e a d

z i n c copper. Both d e p o s i t s are "syngenetic" in n a t u r e .

Page 22: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

5.0 RECOMMENDED WORK PROGRAM

5.1 Plan

The Scotch Creek p r o p e r t i e s of Corvette Petroleum C o r p o r a t i o n

cover a g e o l o g i c a l environment that demonstrates a high

e x p l o r a t i o n p o t e n t i a l f o r massive s u l p h i d e and gold d e p o s i t s .

Massive s u l p h i d e t a r g e t s have been explored f o r i n the area and

i n the same host rocks with very encouraging r e s u l t s . The

ex i s t e n c e of a u r i f e r o u s " i r o n formation" i s known i n the Zinc

and BC p r o p e r t i e s but does not appear to have been i d e n t i f i e d

as such.

A d i r e c t c o r r e l a t i o n of the Scotch Creek l i t h o l o g i c , s t r u c t u r a l

and chemical environment can be made with known gold d e p o s i t

environments i n Eastern Canada. This then, d e f i n e s the tar g e t s

as s t r a t i f o r m and t e c t o n i c - s t r u c t u r a l l y c o n t r o l l e d bodies of

lower grade gold (0.05-0.2 oz/ton) d e p o s i t s of moderate tonnage

(1,000,000 to 5,000,000 t o n s ) .

Of prime i n i t i a l concern i s the determination of the l i m i t s and

c o n t r o l s on the m i n e r a l i z a t i o n known to e x i s t in the i r o n

f o r m a t i o n . As such the program i s designed to concentrate

g e o l o g i c a l , geochemical and geop h y s i c a l e f f o r t s on the known

t r e n d .

Very d e t a i l e d g e o l o g i c a l mapping of a v a i l a b l e outcrops on a

Page 23: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

- 19 -

surveyed g r i d i s r e q u i r e d . Whole rock analyses and t h i n

s e c t i o n s t u d i e s w i l l complement t h i s work.

S o i l sampling and 1ithogeochemical surveys are thought to

represent the most u s e f u l t o o l . Overburden on the h i l l s i d e s i s

b e l i e v e d to be r e s i d u a l s o i l f o r the most part not exceeding 15

f e e t i n t h i c k n e s s . 200 m x 20 m spacing and analyses for Cu Pb

and g o l d w i l l be completed. A l l rock samples w i l l a l s o be run

g eochemically and samples r e t u r n i n g high values w i l l then be

checked by assay.

Geophysical surveys aiong the same g r i d w i l l c o n s i s t of

Magnetics and VLF EM as mapping t o o l s o n l y . The most

reasonable system f o r d e l i n e a t i n g t h i s kind of m i n e r a l i z a t i o n

i s induced p o l a r i z a t i o n which w i l l a l s o be run as follow-up to

d e f i n e p o s s i b l e d r i l l t a r g e t s .

P r e l i m i n a r y d e t a i l e d follow-up can most probably be completed

by t r e n c h i n g i n much the same way that the e x i s t i n g trenching

has been c a r r i e d out. D r i l l t e s t i n g f o r depth w i l l u l t i m a t e l y

be r e q u i r e d i f r e s u l t s are p o s i t i v e .

The f o l l o w i n g cost estimates f o r Phase I and II i n c l u d e work

r e q u i r e d to b r i n g the p r o j e c t to a d r i l l i n g stage.

Page 24: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

- 20 -

5.2 Budget

Phase I

M o b i l i z a t i o n / D e m o b i l i z a t i o n $ 1,500

Pers o n n e l : G e o l o g i s t (mappinq, 1ithogeochemistry

sampling) 25 days @ $300 $ 7,500 Geophysical Operator (Magnetic and

EM) 25 days @ $250 6,250 Two A s s i s t a n t s ( f i e l d work, l i n e c u t t i n g

s o i l sampling) 25 days @ $150 x 2 7,500 21,250

F i e l d Expenses: Camp and M a t e r i a l s 25 days @ $40/day 1,000 S u p p l i e s 100 man days @ $25/man day 2,500 Equipment Rentals VLF Mag 1,400 Truck 4 x 4 p l u s f u e l 25 days @ $90/day 2,250 Analyses: Geochemical S o i l s

1,000 @ $7.35 7,350 (Au Cu Pb) Geochemical Rocks 100 § $11 .55 1,155 (5 elements plus gold s i l v e r ) Assays 50 @ $12 600 (Au Ag)

C o n s u l t i n g S u p e r v i s i o n 10 days @ $425

Report P r e p a r a t i o n 5 days @ $300 1 ,500 Costs 1,500

A d m i n i s t r a t i o n Fee 15% (19,255)

Contingency § 10%

Say

1 6 ,255

4 ,250

3 ,000

46 ,255 2 ,900

49 ,155 4 ,900

$54 ,000

Page 25: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

Phase II Induced P o l a r i z a t i o n , Trenching

M o b i l i z a t i o n / D e m o b i l i z a t i o n $ 1,500

10 days I.B. Surveying @ $1,500 15,000

Trench ing

Cat Rental 150 hours @ $100 15,000

S u p e r v i s i o n

G e o l o g i s t 14 days @ $300 4,200

F i e l d Costs

14 days @ $50 700

Truck Rental 15 days @ $90 1,350

Sample Analyses Assays 100 samples @ $12 (Au Ag) 1,200

C o n s u l t i n g 5 days @ $425 2,125

Report P r e p a r a t i o n 5 days @ $300 $ 1,500 Costs 1,500 3,000

44,175

A d m i n i s t r a t i o n @ 15% (34,750) 5,200

Contingency @ 10% 4,900

Say $53,000

Due to the nature of t h i s t a r g e t , allowance should be made f o r

extended g r i d work and property a c q u i s i t i o n i n the event that

the f a v o u r a b l e h o r i z o n extends beyond present p r o p e r t y l i m i t s .

F o l l o w i n g the above two phase program however, and given

encouraging r e s u l t s there should be d r i l l i n g t a r g e t s .

Page 26: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

- 22 -

A t e n t a t i v e p r o v i s i o n f o r $150,000 i s t h e r e f o r e recommended

h e r e i n to cover the p r o j e c t e d cost of d r i l l i n g 3,000 feet at an

o v e r a l l cost of $50 per f o o t .

5.3 Schedule

The f o l l o w i n g t a b l e i s a summary of the p r o j e c t e d time

requirements f o r Phase I. Induced p o l a r i z a t i o n and t r e n c h i n g ,

i f warranted, have been estimated to take three weeks to

complete.

Page 27: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

M o b i l i z a t i o n

L i n e c u t t i n g

Geolog i c a l Mapping

S o i l Sampling

Geophysics EM Mag

C o n s u l t i n g / Supervis ion

D e m o b i l i z a t i o n

Analyses

Reporting

Table II 1983 P r o j e c t Schedule

Scotch P r o j e c t , Phase I

Page 28: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

6.0 CONCLUSIONS

The Scotch Creek property gold m i n e r a l i z a t i o n i s hosted

w i t h i n s i l i c e o u s oxide f a c i e s i r o n formation of Cambrian

age (Eagle Bay fo r m a t i o n ) .

The surrounding g e o l o g i c environment and the r e l a t e d rock

types are w e l l known f o r ho s t i n g both syng e n t i c massive

su l p h i d e d e p o s i t s and v e i n type d e p o s i t s . A minor amount

of p l a c e r p r o d u c t i o n has come from Scotch and H l i n a Creeks

d r a i n i n g the immediate t e r r a i n .

D i r e c t comparisons of t h i s type of gold bearing e n v i r o n ­

ment with other known gold d e p o s i t camps can be made on

the b a s i s o f :

a. geology

b. geochemistry of rock types

c. a l t e r a t i o n

d. a s s o c i a t e d eocnomic m i n e r a l i z a t i o n

The t a r g e t d e p o s i t i s t h e r e f o r e new to the C o n d i l l e r a n

environment and deserves e x p l o r a t i o n follow-up using

t a r g e t models, g u i d e l i n e s and techniques c o n s i s t e n t with

l a r g e r tonnage syngenetic gold d e p o s i t s .

Page 29: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

- 25 -

7.0 RECOMMENDATIONS

1. A high degree of s t r a t i g r a p h i c c o n t r o l through d e t a i l e d g e o l o g i c a l mapping i s h i g h l y recommended.

2. The above work must be c a r r i e d out i n con j u n c t i o n with 1ithogeochemical sampling and rock type i d e n t i f i c a t i o n .

3. I n i t i a l g e o p h y s i c a l surveying work i s requ i r e d to complement mapping i n areas of cover. A follow-up I.P. program w i l l a i d in i d e n t i f y i n g m i n e r a l i z e d t a r g e t s through c o n d u c t i v i t y and r e s i s t i v i t y measurements.

4. Geochemical s o i l sampling f o r gold i s recommended on the b a s i s of the extensive but l i g h t r e s i d u a l cover in the area and expected widespread anomalous gold i n rocks.

5. Trenching by c a t e r p i l l a r i s recommended on anomalies p r i o r to d r i l l i n g due to the success of the previous trenching i n exposing the i r o n formation f o r s u r f a c e sampling.

6. The above work i s estimated to cost $107,000 in two phases of $54,000 and $53,000, the f i r s t emphasizing g e o l o g i c a l and geochemical c o n t r o l s with the second t a r g e t i n g m i n e r a l i z a t i o n through geophysics and t r e n c h i n g .

7. The f i r s t phase i s estimated to take s i x weeks to complete both f i e l d work and r e p o r t i n g .

Page 30: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

CERTIFICATE

I, T.E. Gregory Hawkins, do hereby c e r t i f y :

1. That I am a C o n s u l t i n g G e o l o g i s t with business o f f i c e s at 301, 409 G r a n v i l l e S t r e e t , Vancouver, B r i t i s h Columbia V6C 1T2.

2. That I am a graduate in geology of The U n i v e r s i t y of A l b e r t a , Edmonton (B.Sc. 1973), and of M c G i l l U n i v e r s i t y , Montreal (M.Sc. 1979).

3. That I have p r a c t i s e d w i t h i n the g e o l o g i c a l p r o f e s s i o n f o r the past f o u r t e e n y e a r s .

4. That I am a Fellow of the G e o l o g i c a l A s s o c i a t i o n of Canada and a P r o f e s s i o n a l G e o l o g i s t r e g i s t e r e d i n the Province of A l b e r t a .

5. That the o p i n i o n s , c o n c l u s i o n s and recommendations contained h e r e i n are based on research f i e l d and research work c a r r i e d out i n September and October of 1983.

6. That I own no d i r e c t , i n d i r e c t or contingent i n t e r e s t s i n the area, the subject property or shares or s e c u r i t i e s of Corvette Petroleum C o r p o r a t i o n or a s s o c i a t g d ^ o m p a n i e s ,

Dated at Vancouver, B r i t i s h Columbia, t h i s 15th^~da~; October, 1983.

nor do I expect to

y Hawkins^/p.Geol.

Page 31: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

BIBLIOGRAPHY

Andrews, A.J., Sharpe, D.R., Jones, D.A. 1982. No. 32 A

P r e l i m i n a r y Reconnaissance of the Wesgamow-North Caribou

Lake Metavolcanic-Metasedimentary B e l t , I n c l u d i n g the

Opapimiskan Lake (Musselwhite) Gold Occurrence. Ont.

Geol. Surv. 1981 Summary of A c t i v i t i e s .

B.C. Dept. Mines Annual Reports. 1888, p. 496; 1886, p. 212;

1887, p. 76; 1895, p. 696; 1896, p. 565; 1897, p. 613;

1898, p. 1101; 1933, p. 195; 1934, p. D29; 1936, p.

D49-52.

Black, J.M. 1974. Report on O r e l l Copper Mines L t d . f o r O r e l l

Copper Mines L t d . Dept. Mines Pet. Res. B.C. Assessment

Report 5132.

Campbell, R.B. 1963. Geology Adams Lake. Geol. Surv. of

Canada. Map 48, 1963.

Jones, A.G. 1959. Vernon Map-Area B r i t i s h Columbia. Geol.

Surv. of Canada Memoir 296.

O k u l i t c h , A.V. 1979. Thompson-Shuswap-Okanagan S t r a t i g r a p h y

and S t r u c t u r e Mineral Occurrences. Geol. Surv. of Canada

Open F i l e 637.

Page 32: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

- 28 -

O k u l i t c h , A.V. 1974. S t r a t i g r a p h y and S t r u c t u r e of the Mount

Ida Group, Vernon (82L) Seymour Area (82M), Bonaporte Lode

(92P) and K e t t l e River (82E) Map Areas B r i t i s h Columbia.

Geol. Surv. of Canada, Paper 74-1 Part A. P r o j e c t No.

720037.

Stewart, A. 1979. Diamond D r i l l i n g Report on the Scotch

Claim f o r Esso Resources Canada L t d . Dept. Mines. Pet.

Res. B.C. Assessment Report 7691.

V o l l o , N.B. 1977. Diamond D r i l l i n g Report on the 83M/3 B.C.

Group f o r Craigmont Mines L t d . Dept. Mines Pet. Res.

B.C. Assessment Report 6313.

V o l l o , N.B. 1978. Diamond D r i l l i n g Report on the B.C. 1-3 and

Zi n c 1-6 Claims f o r Craigmont Mines L t d . Dept. Mines

Pet. Res. B.C. Assessment Reports 6764 and 6891.

V o l l o , N.B. 1977. Diamond D r i l l i n g Report on the 82L/13

Scotch Claim f o r Craigmont Mines L t d . Dept. Mines Pet.

Res. B.C. Assessment Report 6419.

Page 33: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

APPENDIX I

A n a l y s i s C e r t i f i c a t e

Table I I I

Page 34: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

Table I I I Rock Sampling Summary

Number

64151

Location

F l o a t

D e s c r i p t i o n

quartz pebble conglomerate h i g h l y s i l i c i f i e d with abundant p y r i t e

Values Au ppb

<10

Ag ppm

0.2

64152 Trench #1 mixed grab sample of 220 0.4 numerous a l t e r e d p i eces of i r o n formation with quartz/carbonate s t r i n g e r s and p y r i t e across 30 fe e t

64153 Trench #3 grab sample of i n t r a f o r m a t i o n a l conglomerate/agglomerate with abundant p y r i t e w i t h i n i r o n formation

560 2.0

641 54 South Tench grab sample of completely unaltered i r o n formation i n 3 foot zone

<10 0.2

64155 Trench #2 very heavy p y r i t e i n veined i r o n formation

1840 1.6

Si

Page 35: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

I^oiibaclier <=J~al? orator GEOCHEMICAL A N A L Y S T S & ASSAYERS

cA / 2225 S . SPRINGER AVE. ,

B U R N A B Y . B. C . C A N A D A

TELEPHONE: 299-6910

CERTIFICATE OF ANALYSIS M P H CONSULTING LTD.

T O : 2002 - 1055 W. GEORGIA ST. VANCOUVER, B.C. V6E 3P3

C E R T I F I C A T E N O . f / 3

I N V O I C E N O .

D A T E A N A L Y S E D

P R O J E C T

N o . S a m p l e P H M o C u N o .

0 1 r). z /r? 0 1

0 2 0 2

03 / < / / » - j <9 o <T6o 0 3

04 / ^ / / s < / /a 04

0 5 0 5

06 0 6

0 7 0 7

0 8 0 8

0 9 0 9

10 10

11 11

12 12

13 13

14 14

15 1 5

16 16

1 7 17

18 18

19 19

2 0 2 0

2 1 2 1

2 2 2 2

2 3 2 3

2 4

2 5 2 5

2 6 2 6

2 7 2 7

2 8 2 8

2 9 2 9

3 0 30

3 1 3 1

32 3 2

33 33

3 2

33

3 4 • 3 4

3 5 3 5

3 6 3 6

3 7 3 7

38 _ 3 _ 8 _

1 9

/40

39

_ 3 _ 8 _

1 9

/40 4 0 -7 /

_ 3 _ 8 _

1 9

/40

VALUES IN PPM. UNLESS NOTED OTHERWISE. C e r t i f i e d b y

Page 36: 825391 · 2017. 3. 2. · 825391 preliminary assessmen ant d recommended work program 1983 scotch creek project for corvette petroleum corporation october 15, 1983

*

-i • /7SJ iff'

V.

/