  • 10.September 2002 Digital Optical Control System 1

    80Mbit/s Digital Optical Links for Control, Timing and Trigger of the CMS Tracker

    Part I. System OverviewPart II. Prototype Testing

    Anne Marie SandvikCERN

  • 10.September 2002 Digital Optical Control System 2

    Tracker Optical Links

    A-Opto Hybridprocessingbuffering

    TTCRx

    ADC

    Rx ModuleFED

    TTCRx

    FEC

    PLL Delay

    MUX2:1

    PLL

    APVamplifierspipelines128:1 MUX

    Detector Hybrid

    DCU

    processingbuffering

    12

    96

    3

    8/12

    64/96

    Back-End

    CCUCCU

    CCU CCU

    Control4

    TTC

    DAQ

    Digital Control2300 links @40MHz

    D-Opto Hybrid

    12

    Front-End

    Analogue Readout40000 links @ 40MS/s

    TRx Module

  • 10.September 2002 Digital Optical Control System 3

    Tracker Requirements

    Fibres to or from same optohybrid2Skew (ns)

    rms0.5Jitter (ns)

    10-910-12Bit-error-rate

    802Speed (Mbit/s)

    To share analogue readout link components1310 nmWavelength (nm)

    NotesMaxTypMinItem

    •Tracker environment – T ~ -10°C

    – B = 4T

    – 150kGy & 3x1014 π/cm2 radiation dose

    – 10 years min. lifetime

  • 10.September 2002 Digital Optical Control System 4

    System implementation

    96121 12

    Final p-i-n diodes and back-end Transceiver still to be procured

  • 10.September 2002 Digital Optical Control System 5

    Part Two

    Prototype testing

  • 10.September 2002 Digital Optical Control System 6

    Prototype Testing• DOH (3/5 Parts) • TRx (5/10 Parts)

    Commercial 4 way2.5 Gbit/s Transceiverfrom NGK Optobahn

    ASIC made at CERNDimensions:

    Footprint: 35x25mmHeight : 5mm

    XMinimum Data Rate

    XReset

    XXSaturation

    XXSensitivity

    XXOptical Power

    NGK TransceiverDigital optohybridMeasurements

  • 10.September 2002 Digital Optical Control System 7

    Measurement setup DOH

    Optical attenuators

    BERT

    Reference Optohybrid

    Optohybrid under test

    I2C

    Ck DaDa Ck

    I2C

    A

    A

  • 10.September 2002 Digital Optical Control System 8

    TRx test setup

    Reference OptohybridI2C

    BERT

    TRx

    Ck DaDa Ck

    A

  • 10.September 2002 Digital Optical Control System 9

    Tx Characteristics

    -12

    -10

    -8

    -6

    Sign

    al A

    mpl

    itude

    [dBm

    ]

    -10 -9 -8 -7 -6 -5 -4 -3 -2Average launched power [dBm]

    DOH Typical eye-pattern from TRx

    Average launched power: -6.7dBm

    -12

    -10

    -8

    -6

    Sign

    al A

    mpl

    itude

    [dBm

    ]

    -10 -9 -8 -7 -6 -5 -4 -3 -2Average launched power [dBm]

    TRx

    Signal Amplitude: -8.5dBm

  • 10.September 2002 Digital Optical Control System 10

    10-11 10

    -8 10

    -5 10

    -2

    BER

    -35 -30 -25 -20 -15 -10 -5Average Launched Power [dBm]

    Rx Sensitivity & Saturation

    Example of bit-error-rate versus average launched power

    Typ.Operating

    Range

    Sens

    itivi

    ty

    Satu

    ratio

    n

  • 10.September 2002 Digital Optical Control System 11

    Rx characteristics•DOH

    •RX40 Specs •Sensitivity ~ -20 dBm•Saturation ~ -3dBm

    •TRx spec :•Sensitivity ~ -18 dBm•Saturation ~ -5 dBm

    -28

    -24

    -20

    Sens

    itivi

    ty [d

    Bm]

    -6 -4 -2 0 2Saturation Level [dBm]

    DOH

    -28

    -24

    -20

    Sens

    itivi

    ty [d

    Bm]

    -6 -4 -2 0 2Saturation Level [dBm]

    TRx

  • 10.September 2002 Digital Optical Control System 12

    Full link

    • Optical power margins measured in each channel – optical attenuation increased to point where errors occur or link fails

    - From DOH to TRx - From TRx to DOH- Clock: ~17.5dB - Clock: ~9.5dB- Data: ~17.5dB - Data: ~ 10dB

    • Two Links tested with attenuation for 15 hours without any errors BER < 3* 10-13

    • Full link made with DOH, TRX, 100m cable + 3 ‘patch-panels’

    BERTNGK-

    OptobahnTRx

    CERNDOH

    D

    D

    CK

    CK

    out

    in Tx

    RxTx

    Rx

    A

    Electricalconnections

    100m opticalfibre ribbon

    MPO-12

    FC/PC

  • 10.September 2002 Digital Optical Control System 13

    Summary• 80Mbit/s digital links developed at CERN for CMS Tracker control

    – will also be used by ECAL, Preshower and Pixels

    • Philosophy has been to (re)use analogue link components

    • Extensive testing of the prototype DOH and NGK-TRx – Devices work well and compatible with intended link system– Testing procedures in place for production

    • Full prototype link with DOH, TRX and realistic cabling tested– operates with a large safety margin – BER < 10-12

    • The remaining specs and interfaces to be frozen end of 2002, procurement of devices to start in 2003

  • 10.September 2002 Digital Optical Control System 14

    • More information on the Digital Optical Links:

    http://cern.ch/cms-opto