8. Processes 1
Agenda for Processes
1. Organization 2. Processes 3. Methods 4. Environment 5. Tools
![Page 2: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/2.jpg)
8. Processes 2
1. Organization
Types Three possibilities Integrated product teams (IPTs) Integrated process teams Organization guidelines
1. Organization
![Page 3: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/3.jpg)
8. Processes 3
Types
Large number of organization types are possible More than one type may be present on a project
at one time
1. Organization
![Page 4: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/4.jpg)
8. Processes 4
Types of Groupings
Project -- The grouping of people to accomplish the project
Company --The grouping of people by companies Administrative -- The grouping of people within a
company for personal development
1. Organization
![Page 5: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/5.jpg)
8. Processes 5
Types of Project Organization
Functional -- The grouping of people is along functional lines
Product -- The grouping of people is by product and process
Combination -- The grouping of people is a combination of functional and product
1. Organization
![Page 6: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/6.jpg)
8. Processes 6
Example 1 -- Functional Project Organization
Management
BusinessI&TSystem Engineering
Development
1. Organization
![Page 7: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/7.jpg)
8. Processes 7
Example 2 -- Product Project Organization
Level 1Product Team
Level 2Product Team 1
Level 2Product Team 2
Level 2Product Team 3
Level 3Product Team 2
Level 3Product Team 3
1. Organization
![Page 8: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/8.jpg)
8. Processes 8
Example 3 -- Combination Organization
Management
BusinessProcessesLevel 1
Product Team
Level 2Product Team 1
Level 2Product Team 2
Level 2Product Team 3
Level 2Product Team 2
Level 2Product Team 3
1. Organization
![Page 9: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/9.jpg)
8. Processes 9
IPTs
Have the capability to do a turn-key job in producing a product
Have work teams and resources Work teams are dedicated teams devoted to
the product Resources are people who may provide
services to several IPTs Organization is usually functional
1. Organization
![Page 10: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/10.jpg)
8. Processes 10
IPT Organization
ProductManagement
BusinessSystem Engineering
Mechanical Engineering
Electrical Engineering
Conf MgtReliability ManufacturingQuality
Computer Engineering
Work Teams
Resources
1. Organization
![Page 11: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/11.jpg)
8. Processes 11
Integrated Process Teams
Ensures that the same processes are used across multiple integrated product teams
1. Organization
![Page 12: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/12.jpg)
8. Processes 12
Process Teams and IPTs
Level 2Product Team 1
Level 2Product Team 2
Level 2Product Team 3
System Engineering
Mechanical Engineering
System Engineering
Mechanical Engineering
1. Organization
![Page 13: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/13.jpg)
8. Processes 13
Process Team Domain
May span the whole project including all IPTs and their work teams
Alternately, may be more than one set of process teams
1. Organization
![Page 14: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/14.jpg)
8. Processes 14
Process Teams Types
Company -- All IPTs at one company have different processes than the IPTs at another company
Location-- All IPTs at one location have different process teams than at another location
Project -- Each IPT defines its own processes, and there is no independent set of process teams
1. Organization
![Page 15: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/15.jpg)
8. Processes 15
Process Team Type Illustration
One process team for all
Company 1
Company 2
Location 1Location 2
Process team per company
Process team per location
1. Organization
![Page 16: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/16.jpg)
8. Processes 16
Advantages of Single Teams
Presents a uniform picture Allows functions such as CM to span whole project Simplifies communications among product teams
1. Organization
![Page 17: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/17.jpg)
8. Processes 17
Advantages of Multiple Teams
Allows teams to use tools such as computers that they have been trained on
Allows teams to use techniques learned on previous projects
Promotes improvement of quality by seeing the same process applied over multiple projects
1. Organization
![Page 18: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/18.jpg)
8. Processes 18
Process Teams Reporting Options
Management
Level 1 Product
Team
Process Teams
Management
Level 1 Product
Team
Process Teams
VsIndependent
Process TeamProcess Team Integrated
with Product
1. Organization
![Page 19: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/19.jpg)
8. Processes 19
Organization Guidelines
Organize teams in the same way as the spec tree Assign RAA for any one product to a single IPT OK for an IPT to have RAA for multiple products Don’t give multiple IPTs RAA for a single product Reduce coupling between IPTs
1. Organization
![Page 20: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/20.jpg)
8. Processes 20
Organization Limitations
Organization may be chosen for economic, personnel, or other reasons.
Organization may not be optimum for execution Regardless of the organization, the product engineers
have RAA to make the product work
1. Organization
![Page 21: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/21.jpg)
8. Processes 21
Size of IPTs
5-20 people Ensure stakeholders satisfaction
1. Organization
![Page 22: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/22.jpg)
8. Processes 22
Communications among IPTs
IPTs need to agree upon information communicated between products
Description, schedule, and RAA for items to be sent between IPTs
Communication between engineers on common issues
1. Organization
![Page 23: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/23.jpg)
8. Processes 23
2. Processes
Definition Purpose of a process Types of processes Guidelines
2. Processes
![Page 24: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/24.jpg)
8. Processes 24
Definition
Process - a particular method of doing something
2. Processes
![Page 25: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/25.jpg)
8. Processes 25
Purpose of Process
Bring the customer onto the project team Include customer in the process Give confidence that we know what we’re doing
Cause harmony among stakeholders Improve the use of tools & training Promote reusability from project to project Improve the way we do things
2. Processes
![Page 26: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/26.jpg)
8. Processes 26
Types of Processes
Development -- developing an item Agreement -- agreeing on an item Change -- changing an item Phase -- completing a phase Conduct -- conducting an activity
2. Processes
![Page 27: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/27.jpg)
8. Processes 27
Development
Define stakeholders
Agree Capture Kick-offDevelop
Examples
Development of a process
Development of requirements
Development of a design
Development of an interface
Development of a change
stakeholdersitem
agreementdocument
start
2. Processes
![Page 28: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/28.jpg)
8. Processes 28
Agreement
Agree among team 1
stakeholders
Agree among team 2
stakeholders
Agree between points of contacts
local agreements
Examples
Document reviews
Development of interfaces
Agreement among teams involves stakeholders working out details but then directing results through the point of contact for the team
team 1 consensus
team 2 consensus
agreement
2. Processes
![Page 29: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/29.jpg)
8. Processes 29
Change
1. Open 2. Assign
3. Hold 4. Reject
5. Define stakeholders
7. Agree 8. Capture 9. Communicate 10. Close
6. Solve
Examples
Configuration
Action items and issues
Problems
identification assignment stakeholders solution
agreement documentation messages closure
hold rejection
2. Processes
![Page 30: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/30.jpg)
8. Processes 30
Control
Observe current state
Observe desired
state
Generate correction
Predict future
desired state
stimulus
Examples
Cost and schedule
Risk
current
desired
correctionfuture
desired
Example stimuli: periodic, degree of change, scheduled events
2. Processes
![Page 31: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/31.jpg)
8. Processes 31
Phase
Phase processes are outlined in discussion with the specific phase
Design Acquire products Build Test Sell-off
2. Processes
![Page 32: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/32.jpg)
8. Processes 32
Conduct
Checklists Correspond more closely to methods than to
process Example -- meetings
Purpose Type (e.g. information, brain storming,
consensus building) Agenda Time keeper and agenda enforcement Documentation and propagation of decisions
2. Processes
![Page 33: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/33.jpg)
8. Processes 33
Guidelines
Problem Barriers to process acceptance Methods for overcoming barriers Methods for embedding process Expense
2. Processes
![Page 34: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/34.jpg)
8. Processes 34
Problem
Ignore
Active use
Process
On the shelf
2. Processes
![Page 35: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/35.jpg)
8. Processes 35
Barriers to Process Acceptance
Management doesn’t support a process People don’t know that a process has been started Process doesn’t match what people do Process steps cost more than the value they bring Process doesn’t have measurable steps There’s no incentive to execute the process
2. Processes
![Page 36: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/36.jpg)
8. Processes 36
Methods for Overcoming Barriers
Obtain and publish management acceptance Include stakeholders in development of process Make each step clear, measurable, and useful Assign RAA for each step Hold kick-off meeting to start using the process Embed process in daily activities
2. Processes
![Page 37: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/37.jpg)
8. Processes 37
Methods for Embedding Process
Incorporate process into the use of a tool Enforce process by committees Incorporate process steps into schedule
2. Processes
![Page 38: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/38.jpg)
8. Processes 38
Problems
Process may become expensive Cost is easier to assess than benefit Benefit may be less than cost
Examples Are there too many process steps Are the processes used or useful Are minutes to meetings worth the effort put
into them
2. Processes
![Page 39: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/39.jpg)
8. Processes 39
3. Methods
Definitions Examples Heuristics
3. Methods
![Page 40: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/40.jpg)
8. Processes 40
Definitions
Methods are techniques for doing a process step
3. Methods
![Page 41: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/41.jpg)
8. Processes 41
Examples
Requirements management TPMs Risk management Reviews
3. Methods
![Page 42: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/42.jpg)
8. Processes 42
Heuristics
Definitions Examples
3. Methods
![Page 43: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/43.jpg)
8. Processes 43
Heuristic Definition
Rules of thumb
3. Methods
![Page 44: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/44.jpg)
8. Processes 44
Rule of Thumb Definition
A rule based on practical experience without reference to scientific principals
May have widespread validity, but may not always be true
3. Methods
![Page 45: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/45.jpg)
8. Processes 45
Example 1 -- People
Good people are number one priority Better to have good people and bad process than
good process and bad people
3. Methods
![Page 46: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/46.jpg)
8. Processes 46
Example 2 -- Planning
Plan the work and work the plan Develop requirements as if they were going to be
implemented by another company Don’t confuse requirements and design
3. Methods
![Page 47: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/47.jpg)
8. Processes 47
Example 3 -- Hierarchy
Don’t confuse requirements and levels of Hierarchy RAA for a product should rest with only one IPT
3. Methods
![Page 48: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/48.jpg)
8. Processes 48
Example 4 -- Order of Tasks
Parallel is good; serial is bad
3. Methods
![Page 49: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/49.jpg)
8. Processes 49
Example 5 -- Partitioning
Maximize cohesion and minimize coupling
3. Methods
![Page 50: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/50.jpg)
8. Processes 50
Example 6 -- Control
Push control to the lowest level
3. Methods
![Page 51: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/51.jpg)
8. Processes 51
Example 7 -- Optimization
Work first; optimize last Simplify
3. Methods
![Page 52: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/52.jpg)
8. Processes 52
4. Environment
Environment was discussed earlier in connection with management
4. Environment
![Page 53: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/53.jpg)
8. Processes 53
5. Tools
Definition Intranet Requirements Design Build and test
5. Tools
![Page 54: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/54.jpg)
8. Processes 54
Intranet
Familiarity Flexibility Input Navigation Output Quality
5. Tools
![Page 55: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/55.jpg)
8. Processes 55
Familiarity
Familiar to engineers because the Intranet Many hardware and software solutions available A powerful & cost savings communications tool
5. Tools
![Page 56: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/56.jpg)
8. Processes 56
Flexibility
Can be used on simple & complex networks Allows many tools including
CM Quality checking Mail Scheduling Data management
Allows grouping data the way program is organized
5. Tools
![Page 57: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/57.jpg)
8. Processes 57
Intranet Inputs
Allows entering data in the format of the tool that generated the data
Avoids converting from tool format to data base format More spontaneously adaptation than data base
5. Tools
![Page 58: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/58.jpg)
8. Processes 58
Data Base Inputs
People use reports from data bases rather having to learn the data base
Data base difficult to learn and slow in creating large reports
5. Tools
![Page 59: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/59.jpg)
8. Processes 59
Navigation
Intuitive big picture needing minimum training Graphics and formatting Access from PCs, Sun workstations, and Macintoshes Same look from different platforms URLs point to information Hierarchical organization of page
5. Tools
![Page 60: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/60.jpg)
8. Processes 60
Output
Document generation with HTML & hyperlinks Design documents as collection of files Independent authors Office tools support of HTML generation
5. Tools
![Page 61: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/61.jpg)
8. Processes 61
Quality
RAA Organization Consistent themes Current links Garbage collection Search engines
5. Tools
![Page 62: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/62.jpg)
8. Processes 62
RAA
Each page should have an RAA owner Quality checking is important regardless of the
tool used to maintain the library Poor quality irritates the users Poor quality leads to distrust of the information Quality checking should be frequent
5. Tools
![Page 63: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/63.jpg)
8. Processes 63
Organization
Team Product Function Hybrid
5. Tools
![Page 64: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/64.jpg)
8. Processes 64
Team
Separate home page for each team Each team places product and administrative
information on home page Works well if teams organized in same way as
products are organized A stable approach because teams assume
ownership
5. Tools
![Page 65: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/65.jpg)
8. Processes 65
Product
Separate home page for each product Owner assigned for each product Especially useful if teams aren’t organized in
same way products are organized Easier to navigate for descriptions of product Takes more work to maintain than team
organization
5. Tools
![Page 66: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/66.jpg)
8. Processes 66
Function
Useful for information that doesn’t align on product or team boundaries
Examples are common processes and procedures, reference documents, and phone numbers
5. Tools
![Page 67: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/67.jpg)
8. Processes 67
Hybrid
A combination of all three methods plus others Intranet allows this flexibility
5. Tools
![Page 68: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/68.jpg)
8. Processes 68
Consistent themes
Helpful to a have a librarian with RAA for themes Navigation improved by seeing similar
organization across teams and products Look and feel improved by consistent use of
color, fonts, symbology, and graphics A difficult concept to enforce
5. Tools
![Page 69: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/69.jpg)
8. Processes 69
Current links (1 of 2)
URLs point to files Links can be broken by several means
File can be deleted Name of file can change Case of file name can change as a result of tool used
to update the file
5. Tools
![Page 70: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/70.jpg)
8. Processes 70
Current links (2 of 2)
Desirable to give any file being pointed to a fixed name and then not change it.
Desirable that only one person have RAA for a file
Tools exist to automatically report broken links
5. Tools
![Page 71: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/71.jpg)
8. Processes 71
Garbage collection
Keeping data current is often forgotten task Review based on the age of each file
5. Tools
![Page 72: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/72.jpg)
8. Processes 72
Page Organization
Primary means of navigation
5. Tools
![Page 73: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/73.jpg)
8. Processes 73
Search engines
Powerful but require a lot of memory
5. Tools
![Page 74: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/74.jpg)
8. Processes 74
Requirements
See INCOSE tools discussed with requirements activity
5. Tools
![Page 75: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/75.jpg)
8. Processes 75
Design
Can use many of the INCOSE tools Depends heavily on special analysis and drawing
tools
5. Tools
![Page 76: 8. Processes1 Agenda for Processes q1. Organization q2. Processes q3. Methods q4. Environment q5. Tools](https://reader036.vdocuments.us/reader036/viewer/2022062802/56649ed15503460f94bdf91c/html5/thumbnails/76.jpg)
8. Processes 76
Build and Test
Depends heavily on special tools Tracking Scheduling Analysis