8. leonam guimaraes nuclear energy in brazil.ppt · power: 1.350 mw technology: siemens/kwu...

64
Leonam dos Santos Guimarães, October 15, 2012 CYTED-UNECE

Upload: others

Post on 31-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

Leonam dos Santos Guimarães, October 15, 2012

CYTED-UNECE

Page 2: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

2

It keeps being successful,

but there is still more to know

There is a Brazil that many people know

Football Carnival CoffeeAmazon forest

Page 3: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

3

another Brazil that you must know

Innovation, technology,competitivenessand productivity

Page 4: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

4

including the Brazilian Nuclear Industry

A synergic mix of:•large uranium reserves•fuel cycle technology•PWR technology•Non-proliferation

Mining& Milling Conversion Enrichment UO2 powder Pellets Fuel

ElementsPower

Generation

Page 5: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

Population 192 million 5th

Surface 8.5 million km2 5th

GDP US$ 1.98 trillion 8th

GDP/capta US$ 10,300/inh 77th

HDI 0.807 70th

Electric installed capacity 102.6 GW 9th

electricity production/year 500 TWh 10th

electricity consumption/capta 2,400 kWh/inh 90th

BRAZILGENERAL DATA

National Interconnected System

Page 6: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

BRAZILGENERAL DATA

7th GDP PPP6th GDP nominal

2011

Page 7: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

7

FORECASTS 2020Population and GDP per capita

Page 8: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

8

Fonte: Lighting the way, InterAcademy Council, 2007

BRAZIL: 90th place

BRAZIL: 69th place

HDI X ELECTRICITY CONSUMPTION

Page 9: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

9

HDI X ELECTRICITY CONSUMPTION

Gross Electric Generation

Consumption per capita

Page 10: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

10

FORECASTS 2020Energy and electricity consumption

Page 11: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

11

FORECASTS 2020Energy and electricity consumption

Page 12: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

12

ENERGY SUPPLY MATRIXWORLD x BRAZIL (%)

Page 13: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

13

CO2 emissions avoided in Brazil

HYDRO POWER: 1.677 million tons

BIO ETHANOL:165 million tons

NUCLEAR POWER: 63 million tons

38%

2000 – 2006

Page 14: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

14

ENERGY SUPPLY MATRIXWORLD x BRAZIL (%)

ENERGY SECTOR CARBON EMISSIONS (*)SOME COUNTRIES AND REGIONS (2008) - (tCO2/toe)

Page 15: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

15

ENERGY SUPPLY MATRIXFORECASTS 2020

Page 16: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

16

TOP 15 WORLD ELECTRIC GENERATORS BRAZIL IS ONE OF THE MAIN WORLD ELECTRICITY PRODUCERS

0 500 1.000 1.500 2.000 2.500 3.000 3.500 4.000

Billion kilowatts.hour

USA

China

Japan

Russia

Canada

Índia

Germany

France

United Kingdom

Brazil

South Korea

Italy

Spain

Australia

South Africa

Hydro Nuclear Renewables Thermal

source: International Energy Annual 2003

Brazil: 10a place

In a world electric generationdominated by fossil fuels

Brasil is an unique exemple of

RENEWABILITY

Page 17: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

17

TOP 15 WORLD HYDRO GENERATORS GREATEST CONTRIBUTION OF HYDRO POWER

0 500 1.000 1.500 2.000 2.500 3.000 3.500 4.000

Canada

Brasil

China

USA

Russia

Norway

Japan

Sweden

Índia

France

Venezuela

Paraguay

Áustria

Italy

Argentina

Hydro Nuclear Renewables Thermal

Brasil: 2a place60%

83%17%

7%

21%

99%8%

47%

11%

11%

67%

100%64%

15%

44%

Only Norway and Paraguay have arelative contribution of hydro power

greater than Brazil

Billion kilowatts.hour

source: International Energy Annual 2003

Page 18: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

18

ELECTRICITY SUPPLY MATRIXWORLD x BRAZIL (%)

Page 19: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

19

HYDROPOWER REQUIRES SYSTEM INTEGRATIONHAVING CONTINENTAL DIMENSIONS EQUIVALENT TO EUROPE

Rio de Janeiro

Recife

Manaus

Brasília

São PauloItaipu

Porto Alegre

Fortaleza

SalvadorBelo

Horizonte

AngraNPPs

4.000 km4.000 km

Page 20: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

20

ELECTRIC SYSTEM EVOLUTION IN THE 90´sNEED FOR THERMAL REGULATION

installed hydro capacityincreasing …

… but without aproportional increase in

the water stock

Installed Hydropower

Reservoir capacity

Stor

age

in G

W m

ean

MW

Page 21: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

21

ELECTRIC SYSTEM EVOLUTIONNEED FOR THERMAL REGULATION

root cause of 2001 supply crisis

0

20

40

60

80

100

120

140

jan/99 jan/00 jan/01 jan/02 jan/03

GW

mon

th

0%10%20%30%40%50%60%70%80%

% w

ater

sto

rage

Water stock River flow Generated

Water stock

River flow

Generated

CRISIS

Page 22: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

22

ELECTRIC SYSTEM EVOLUTION IN THE 90´sNEED FOR THERMAL REGULATION

RELATIONSHIPRESERVOIR CAPACITY /

TOTAL CHARGE – THERMAL GENERATION

Mainly due to charge reduction(and an increase thermal generation)

2001

SUPPLY

CRISE

Page 23: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

23

ELECTRIC SYSTEM EVOLUTION IN THE 90´s“DAM CULTURE” CHANGE

small reservoirsto avoid floodinglarge surfaces

Page 24: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

24

ELECTRIC SYSTEM EVOLUTION IN THE 90´s“DAM CULTURE” CHANGE

AHE Rio Madeira

Madeir

a Rive

r

AHE Santo Antônio

AHE Jirau

BOLIVIA AHE Belo Monte

Rio X

ingu

Project AHE BELO MONTE 11.000 MWProject AHE MADEIRA 6.500 MW

This tendency will beamplificated by new projects

in Amazon Bassin•Current average hydro capacity factor: 55%•Future average Amazon hydro capacity factor: 20-25%

Page 25: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

25

ELECTRIC SYSTEM EVOLUTION IN THE 90´sNEED FOR THERMAL REGULATION

more nuclear could help me! 0

500

1.000

1.500

2.000

2.500

3.000

3.500

2002 2003 2004 2005 2006 2007 2008

Nuclear Gás Carvão Óleo Biomassa

Page 26: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

26

ELECTRIC SYSTEM EVOLUTION IN THE 90´sNEED FOR THERMAL REGULATION

The main thermal fuels

avaliable in the country

1. Coal2. Biomass3. Natural Gas4. Crude Oil 5. Uranium

BRAZILIAN THERMAL OPTIONS

Page 27: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

27

ELECTRIC SYSTEM EVOLUTION IN THE 90´sNEED FOR THERMAL REGULATION

R$ 0,00

R$ 100,00

R$ 200,00

R$ 300,00

R$ 400,00

R$ 500,00

R$ 600,00

R$ 700,00

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Capacity Factor (%)

Cos

ts (R

$/M

Wh)

Gas Fuel OilDiesel Biomass

Coal Nuclear

• There will be a place for all thermal options– Minimum cost

according capacity factor range

• But costs are not the only decision factor: Price volatility Assurance of supply

must be considered too

Page 28: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

28

BRAZILIAN NUCLEAR INDUSTRY MONOPOLY ESTABLISHED BY CONSTITUTION

MINISTRY OFMINES AND ENERGY

ELETROBRÁS(holding)

ELETRONUCLEAR

CONVENTIONAL UTILITIESFurnas, Chesf, ...

MINISTRY OFSCIENCE & TECHNOLOGY

BRAZILIAN NUCLEAR ENERGYCOMMISIONCNEN

NUCLEAR FUEL INDUSTRY

INB

NUCLEAR HEAVY EQUIPMENT

NUCLEP

RESEARCH INSTITUTESIPEN, CDTN, IEN, IRD, CRCN

NUCLEAR SAFETYAUTHORITY

MINISTRY OFDEFENSE

RESEARCH INSTITUTESNAVY CTMSPAIR FORCE CTA/IEAvARMY CTEx/IEA

Page 29: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

ELETROBRAS10th. WORLD UTILITY

39,434 MW in operation37% of Brazil Installed Capacity59.000 km of transmission lines56% of Brazil total transmission

Hydro87%

Oil and Gas = 7%Coal = 1%

Nuclear = 5%

Own

Partnerships

Total

8,137

968

9,105

10,618

-

10,618

10,203

11

10,214

7,000

-

7,000

2,007

-

2,007

490

-

490

38,455

979

39,434

Total

Page 30: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

30

MISSIONWORKING ON 3 TIME FRAMES

1. TODAY : Operation & Maintenance

– Angra 1 :1985 (Westinghouse PWR 657 MW)

– Angra 2: 2001 (Siemens-KWU PWR 1350 MW)

2. TOMORROW: Engineering, Procurement,

Construction & Commissioning

– Angra 3: 2015 (AREVA NP PWR 1405 MW)

3. FUTURE: Research & Development

– 4 to 8 New NPP: 2015-2030

(national configuration PWR concept)

Page 31: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

ADMIRAL ÁLVARO ALBERTONUCLEAR POWER STATION

São Paulo220km

Belo Horizonte

350km

Rio de Janeiro130km

Angrados Reis

LOCATED NEAR FROM THE3 BRAZILIAN MAIN METROPOLITAN REGIONS

Page 32: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

ANGRA 2 PWRPower: 1.350 MWTechnology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR

Power: 657 MWTechnology: Westinghouse Operation start: Janeiro/1985

ADMIRAL ÁLVARO ALBERTONUCLEAR POWER STATION

Page 33: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

Othon Luiz Pinheiro da Silva

GENERATION TILL 2011: 182.450.141 MWhGENERATION RECORD 2011: 14,4 TWh** Itaipu record: 94 TWh

Availability 1997-2011Angra 1: 78,75%Angra 2: 88,03%

ANGRA 1 AND ANGRA 2 OPERATION

2011: IAEA PRIS – World 2nd Capacity factor

Page 34: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

Othon Luiz Pinheiro da Silva

participation in WANO and IAEAmissions abroad as specialists

on-the-job trainingin utilities

and consulting companies(USA and Europe)

participation ininternational conferences

and seminars

649

890

693

university degreetechniciansadministrative support

PERSONNEL PROFILE(2232 EMPLOYEES)

Page 35: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

DECENIAL ENERGY PLAN 2021No changes for Angra 3, but no new build

4.000 workers

ANGRA 3: 1.405 MW AREVA PWR

ANGRA 31.405 MW

2016

Page 36: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

36

TO BE CONNECTED

2016

NUCLEAR EXPANSION IN BRAZILANGRA 3

FIRST CONCRETE POURED2010

Page 37: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

37

NUCLEAR EXPANSION IN BRAZILANGRA 3 + 4-6 x 1.000 MW NUCLEAR STATIONS

ANGRA 3 WORKS ON SITE: General view

Page 38: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

DECENIAL ENERGY PLAN 2021No changes for Angra 3, but no new build

•The fact that the expansion of nuclear power generating facilities with have been restricted to Angra 3 is basically the time needed to deploy new plants.

•These periods are of the order of ten years counted from the definition of the site for the nuclear localization and the decision to commence effective measures for its implementation.

•It is noteworthy that are in development studies for selection of sites favoring the deployment of nuclear power plants in the Southeast / Midwest, South and Northeast.

•Thus, considering the time of maturation of a nuclear project, the probable date for the effective participation in the expansion of this power generation system beyond the horizon of this Plan.

•However, following the development of new projects and the deployment of new plants around the world, with prospects of technological advances that lead to the reduction of time and cost of deployment, must continue so that this source might be considered indicative plans in future.

Page 39: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

39H

YDR

O

NA

TUR

AL

GA

S

WIN

D A

ND

O

THER

R

ENEW

AB

LES

NU

CLE

AR

BIO

MA

SS A

ND

W

AST

E

CO

AL

FUEL

OIL

TOTA

L

2006 75,6 8,1 1,6 2,0 0,1 1,4 2,9 91,6Scenario 1 167,8 20,6 9,1 7,3 6,5 5,9 3,3 220,5Scenario 2 168,8 18,1 8,0 7,3 6,5 6,5 3,3 218,5Scenario 3 168,2 24,1 9,1 9,3 6,5 6,5 3,3 227,0Scenario 4 168,7 21,6 9,1 11,3 6,5 6,5 3,3 227,0Scenario 5 243,3 28,1 9,1 9,3 6,5 6,5 3,3 306,1

NUCLEAR RENAISSANCE IN BRASILPROJECTIONS FROM NATIONAL ENERGY PLAN 2030

2006

Scena

rio 1

Scena

rio 2

Scena

rio 3

Scena

rio 4

Scena

rio 5

FUEL OILCOAL

BIOMASS AND WASTENUCLEAR

WIND AND OTHER RENEWABLESNATURAL GAS

HYDROTOTAL

0,0

50,0

100,0

150,0

200,0

250,0

300,0

350,0

A greater growth ratefor renewables

Page 40: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

40

NUCLEAR RENAISSANCE IN BRASILPROJECTIONS FROM NATIONAL ENERGY PLAN 2030

2007-2015 2016-2020 2021-2025 2026-2030 2016-2030

REFERENCE 1.405 MWAngra 3

1.000 MWNE 1

1.000 MWNE 2

2.000 MWSE 1+SE 2

4.000 MW

MEDIUM 1.405 MWAngra 3

1.000 MWNE 1

2.000 MWNE 1+NE 2

3.000 MWSE 1+SE 2+NE 3

6.000 MW

HIGH 1.405 MWAngra 3

2.000 MWNE 1+NE 2

3.000 MWSE 1+SE 2+NE 3

3.000 MWSE 3+SE 4+NE 4

8.000 MW

Page 41: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

41

ELECTRIC SYSTEM EVOLUTIONNUCLEAR CAPACITY INSTALLED - 2030

High ScenarioAdicional MW

Low ScenarioAdicional MW

BRASIL 9.360 5.360

RÚSSIA 33.760 26.760

ÍNDIA 32.160 16.260

CHINA 43.830 24.830Ther

mal

bas

edEl

ectr

ic s

yste

ms

Page 42: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

NATIONAL ENERGY PLAN 2030

NUCLEAR POTENCIAL ATLASOF BRASIL

2) Southeast2.000 MW

1) Northeast 2.000 MW

STARTING OPERATION:2022 - 2030

EPRI SITTING CRITERIAGEOPROCESSING APPLIANCES

Page 43: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

BRAZILIAN NUCLEAR POTENCIAL ATLAS

Page 44: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

44

NUCLEAR EXPANSION IN BRAZILREGIONAL SCREEN IN 4 NORTHEAST STATES

5 CANDIDATEAREAS

12 POTENTIALSITES SELECTED

FOR FURTHER STUDIES

3 PER STATE

NATIONAL ENERGY PLAN 2030

PRIORITY REGION

Page 45: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

45

NUCLEAR EXPANSION IN BRAZILNORTHEAST NUCLEAR POWER STATION

EXPLORATORY STUDY: SITE PE-1 (artistic view)

Page 46: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

46

NUCLEAR EXPANSION IN BRAZILNORTHEAST NUCLEAR POWER STATION

A ROUTE TODEVELOPMENTINSPIRED

ON TVAROADMAP

Page 47: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

FUKUSHIMA BRINGS 2 NEWS

A BAD ONE

FOR WORLD NUCLEAR INDUSTRY

OTHERNOT SO BAD

Page 48: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

FUKUSHIMA BRINGS 2 NEWS

• SEVERE ACCIDENTS HAPPEN• EVEN AFTER ALL POST‐TMI, POST‐

CHERNOBYL AND OPERATIONAL EXPERIENCE FEEDBACK COUNTER‐MEASURES

THE BAD NEWS

Page 49: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

FUKUSHIMA BRINGS 2 NEWSTHE NOT SO BAD NEWS

• THEY ARE NOT SO “CATHASTROFIC”• THE OBJECTIVELY MEASURED HARM FOR 

PUBLIC AND ENVIRONMENT CAUSED DOES NOT ADHERE TO THE HYPERBOLIC LANGUAGE OFTEN USED

Page 50: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

Stress Tests for Angra 1 and 2

According to specification issued by Iberoamerican Forum of Regulatory Bodies, Nuclear and Radiological (request from CNEN in January 2012)

Compliance with WENRA Specification for Stress Tests

Submitted to CNEN on April 2nd, 2012

Page 51: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

56 initiatives (studies and projects)

AroundUS$ 250 million to be applied from 2011 to 2015

High priority inside the organization

(submitted to Brazilian Nuclear Authority in December 2011)

Performance of Stress Tests

Fukushima Response Plan

Page 52: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

NATIONAL ENERGY PLAN 20301 ‐ 2 year delay minimum

1. Update 2035 (more nuclear?)– Was not be presented in 2011, as

planned – only this year (?)

2. Candidate areas National Atlas– Would be presented May 2011

– Will not be presented in 2011, as

planned – only in 2012 (?)

3. Site selection field works– Would be started end 2011

– Delayed (2013?)

NUCLEARPOTENTIAL ATLAS40 CANDIDATE AREAS

2016-2020

2021-2025

2026-2030

2016-2030

1.000 MWNE 1

1.000 MWNE 2

2.000 MW

SE 1+SE 2

4.000 MW

2) Southeast2.000 MW

1) Northeast2.000 MW

Page 53: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

53

BRAZILIAN URANIUM RESOURCESONE OF THE MAIN RESERVES IN THE WORLD

Prospected area:only 30% of national territory

up to 100 meters deep6th. WORLD RESERVE

Page 54: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

54

BRAZILIAN URANIUM RESOURCESONE OF THE MAIN RESERVES IN THE WORLD

After prospected all thenational territory, probably

Brazil should be amongthe 2 MAJOR WORLD

RESERVES

Pré-cambrian soilsBrasil 3.400.000 km2

Austrália 3.800.000 km2

Page 55: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

55

LEI and USIDE - NAVY(OPERATION)

NUCLEAR FUEL INDUSTRY IN BRAZILURANIUM + TECHNOLOGICAL CAPABILITIES

ENRICHMENTRESENDE

(CONSTRUCTION)

ANGRA 1/2/3PWR

FUEL FABRICATION RESENDE

CONVERSION(PROJECT)

LAGOA REAL(OPERATION)

ELETRONUCLEAR

(OPERATION)

INB

INB

INB

INB

USEXA - NAVY(CONSTRUCTION)

LABMAT and LADICON NAVY

(OPERATION)

LABGENENAVY

(CONSTRUCTION)

URANIUM MINNINGAND MILLING

One of the few countries having both:1. large uranium reserves2. full technological capability for

local fuel production

Page 56: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

NUCLEAR FUEL INDUSTRY IN BRAZILLONG TERM VISION

Continental integration1. Mercosur2. South America3. Latin America

Assuring regional supply1. Uranium supplier2. Integral nuclear fuel

services supplier (open cycle)

FULL SCOPE SAFEGUARDS

Page 57: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

57

NON PROLIFERATION IN BRAZILUNIQUE SUCCESS EXPERIENCE

• Brazilian Constitution proscribe all non-pacific uses of nuclear energy– Member of NPT– Member of Tlatelolco Treaty

A remarkablerecord of more than

25 years without technical deviations or

suspicious events

• All nuclear installations fully safeguarded– Multilateral agreements (1990 + 1994)

(Brazil – Argentina – ABACC) + IAEA• ABACC – bilateral regional agency

– IAEA full escope (NPT - 1997)

Page 58: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

58

NON PROLIFERATION IN BRAZILUNIQUE SUCCESS EXPERIENCE

As Japan, Germany and Netherlands, has 2+1 enrichment plants fully safeguarded

Brazilian centrifuge program was never suspected being “proliferant” neither part of any international “black-marketing”

Has produced 20% batches for research reactor fuel under full scope safeguardsLEI

USIDE

RESENDEEnrichmentfacility

Page 59: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

ABADIA DE GOIÁS REPOSITORY

LOW AND MEDIUM LEVEL WASTE FINAL DISPOSAL

Page 60: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

60

External pool (2020) Long Term Interim Storage (2035)

SPENT FUEL LONG TERM STORAGE BRAZILIAN SOLUTION

Designed for 500 years

Page 61: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

61

ELECTRICITY SUPPLY MATRIXHYDROPOWER POTENTIAL RESSOURCES

technical, environmental and economically feasible to be developed till 2030

150/180 GW fromtotal of 260 GW

CONTINUOUS DECREASE IN HYDRO SHARE AFTER 2020

Page 62: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

SOPHIAS´S CHOICES•The expansion over the decade will be based on a mix of sources - nuclear, natural gas, (depending on the amount and cost of Pre-Salt gas) and coal (depending on the feasibility of CCS and clean coal)

•Renewable sources (biomass, solar, wind) will be an important complement•Expansion of energy efficiency programs because of rising marginal costs of expansion

Page 63: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

SOPHIAS´S CHOICES

Page 64: 8. Leonam Guimaraes Nuclear Energy in Brazil.ppt · Power: 1.350 MW Technology: Siemens/KWU Operation start: Janeiro/2001 ANGRA 1 PWR Power: 657 MW Technology: Westinghouse Operation

Leonam dos Santos Guimarães, October 15, 2012

CYTED-UNECE