8. civil-ijce - slope's design for quarry's remediation using ground materials...

12
www.iaset.us [email protected] SLOPE’S DESIGN FOR QUARRY’S REMEDIATION USING GROUND MATERIALS OF PIRAEUS SUBWAY EXCAVATION M. CHATZIANGELOU 1 , B. CHRISTARAS 2 , K. BOTSOU 3 & EM. MALLIAROUDAKIS 4 1,2 School of Geology, Lab of Engineering Geology & Hydrogeology, Aristotle University of Thessaloniki, Athens, Greece 3 Kirillou & Methodioust, Kalamaria, Thessaloniki, Athens, Greece 4 J & P-AVAX Group, Marousi, Athens, Greece ABSTRACT The present paper investigates and suggests the appropriate safety slope geometry and materials deposition using them for remediation of quarries. Chaidari-Piraeus subway excavations materials are used for practical application of the above investigation. Eight groups of geological formations are distinguished, in order to investigate the most suitable geometry of the slopes. Slope stability is estimated using the most different cases of slope geometry, taking into account the percent of geological formations appearance and the excavated formations course. The excavated materials used for Chamilothori’s quarry remediation, which is placed at Koridalos city, near the constructions, and it is used as an example of proposed geometry application. Taking into account slope stability of deposits, benches from 3,5m to 5m height, lower downstairs and higher upstairs, inclined from 30 o to 60 o , where the inclination of the slopes increase from downstairs to upstairs, so as geometry approaches the sliding circle, are proposed to be constructed. Also, enough space, somewhere at the upper stages and downstairs, is indispensable in order to accept the pieces which may fall because of erosion or weathering. Also, deposits materials with poor mechanical properties are proposed to be placed downstairs, where the slope is formed by small inclinations. Cohesive materials are proposed to be placed upstairs. Excavation products which consists of no cohesive materials, are ought to be placed at the center of quarry, so as they do not influence on slope stability. Furthermore, drainage layers with dip of 15 o , lengthen 15m are also proposed to be put on every bench. KEYWORDS: Piraeus Subway, Quarries Remediation, Slope Design, Slope Stability INTRODUCTION Chaidari-Piraeus subway is the under construction line of Athens subway extension driving to Piraeus city. The excavated geological formations consist of metamorphic rocks in Chaidari area, while in Piraeus city the geomaterials consist of sedimentary formations. Taking into account that TBM was used for that underground excavations , the above excavation products adopt soil characteristics. The present paper investigates the use of deposits for quarries remediation. For this reason, it suggests the appropriate safety slope geometry using Chamilothoris quarry as example. Properties of Geological Formations The geological formations during subway’s excavation are going to be meta -sandstone, claystone, marl, siltstone, schist, serpedinite, limestone, marley limestones, silt, loose soil, conglomerates, sand and sandstones. Along subway’s excavation, metamorphic formations are met at Chaidari area, placed, while sedimentary formations are found in Piraeus International Journal of Civil En gineerin g (IJC E) ISSN(P): 2278-9987; ISSN(E): 2278-9995 Vol. 3, Issue 3, May 2014, 91-102 © IASET

Upload: suma

Post on 11-May-2017

218 views

Category:

Documents


0 download

TRANSCRIPT

www.iaset.us edi [email protected]

SLOPE’S DESIGN FOR QUARRY’S REMEDIATION USING GROUND MATERIALS OF

PIRAEUS SUBWAY EXCAVATION

M. CHATZIANGELOU1, B. CHRISTARAS

2, K. BOTSOU

3 & EM. MALLIAROUDAKIS

4

1,2School of Geology, Lab of Engineering Geology & Hydrogeology, Aristotle University of Thessaloniki, Athens, Greece

3Kirillou & Methodioust, Kalamaria, Thessaloniki, Athens, Greece

4J & P-AVAX Group, Marousi, Athens, Greece

ABSTRACT

The present paper investigates and suggests the appropriate safety slope geometry and materials deposition using

them for remediation of quarries. Chaidari-Piraeus subway excavations materials are used for practical appl ication of the

above investigation. Eight groups of geological formations are d istinguished, in order to investigate the most suitable

geometry of the slopes. Slope stability is estimated using the most different cases of slope geometry, taking into account

the percent of geological format ions appearance and the excavated fo rmations course. The excavated materials used for

Chamilothori’s quarry remediation, which is placed at Koridalos city, near the constructions, and it is used as an example

of proposed geometry applicat ion. Taking into account slope stability of deposits, benches from 3,5m to 5m height,

lower downstairs and higher upstairs, inclined from 30o to 60

o, where the inclination of the slopes increase from downstairs

to upstairs, so as geometry approaches the sliding circle, are proposed to be constructed. Also, enough space, somewhere at

the upper stages and downstairs, is indispensable in order to accept the p ieces which may fall because of erosion or

weathering. Also, deposits materials with poor mechanical propert ies are proposed to be placed downstairs, where the

slope is formed by small inclinations. Cohesive materials are proposed to be placed upstairs. Excavation products which

consists of no cohesive materials, are ought to be placed at the center of quarry, so as they do not influence on slope

stability. Furthermore, drainage layers with dip of 15o, lengthen 15m are also proposed to be put on every bench.

KEYWORDS: Piraeus Subway, Quarries Remediation, Slope Design, Slope Stability

INTRODUCTION

“Chaidari-Piraeus” subway is the under construction line of Athens subway extension driving to Piraeus city.

The excavated geological formations consist of metamorphic rocks in Chaidari area, while in Piraeus city the geomaterials

consist of sedimentary fo rmations . Taking into account that TBM was used for that underground excavations, the above

excavation products adopt soil characteristics. The present paper investigates the use of deposits for quarries remediation.

For this reason, it suggests the appropriate safety slope geometry using Chamilothoris quarry as example.

Properties of Geological Formations

The geological formations during subway’s excavation are going to be meta-sandstone, claystone, marl, siltstone,

schist, serpedinite, limestone, marley limestones, silt, loose soil, conglomerates, sand and sandstones. Along subway’s

excavation, metamorphic formations are met at Chaidari area, p laced, while sedimentary format ions are found in Piraeus

International Journal of Civil

Engineering (IJCE) ISSN(P): 2278-9987; ISSN(E): 2278-9995 Vol. 3, Issue 3, May 2014, 91-102 © IASET

92 M. Chatziangelou, B. Christaras, K. Botsou & EM. Malliaroudakis

Impact Factor (JCC): 2.6676 Index Copernicus Value (ICV): 3.0

city. The contact between metamorphic and sedimentary format ions is metin Maniatika area. The geomechanical propert ies

(Craig, 2005) and the percent of the geological format ions appearance are showed on table 1.

Table 1: Geomechanical Properties and Percent of Geological Formations’

Appearance along Piraeus Subway Excavation

Geological Formation Type Percent of Total

Appearance % c (kPa) φ (

ο)

Dry Density

(kN/m3)

Meta-madstone – Clayey schist AS-PH 14,5 003-50 17-30 19-26

Meta-madstone AS-SL 3 00-74 20-30 16-26

Meta-madstone – Meta-sandstone AS-STL 16 004-48 20-30 17-24

Claystone ΝG-MS 2 0012-35 20-30 13-24

Marl - madstone NG-ML 5,5 35-82 25-30 16-23

Meta-sandstone - Schistolite AS-ST 12,5 00-26 25-40 18-27

Meta-madstone – Clayey

schist – Meta-sandstone AS-PHS 0,5 19-25 17-30 19-24

Serpendinite OPH 6 20-46 25-45 13-21

Limestone K 8,5 0-5 >35

Marl, Marley limestone NM-MK 9 6-107 25-35 16-22

Silt and siltstone PT-SM 7 5-214 20-30 15-18

Loose soils SW 1 15-20 15

Conglomerates PT-CN 1 20-30 23

Sand PT-SD 2 18-177 20-30 15-19

Marl, siltstone, claystone NM-MS 7,5 6-107 25-30 14-22

Sand stone, Claystone NM-ST 4 20-30 18-23

Taking into account that TBM is used for the subway’s excavation, the excavated rock mass is destroyed and

soiled. So, the deposits of geological format ions of Pireaus subway excavation behave as soil which means that the

potential failures of the formed slopes arecircular slid ing. Thus, in order to analyze the stability of the slopes

(Bishop & Morgenstern, 1960), of the remediated products, the balance of a critical circular slid ing surface, which is cut in

to a numerous sliding slides with the same width, is examined using Bishop Method (Bishop, 1955).

The lowest prices of frict ion angle and cohesion, in addit ion to average of the prices of dry density are used, so as

the conclusions may approach reality.

Slopes Stability Investigation – General Data

In order to investigate the suitable geometry of slopes stability, eight groups of geological formations are

distinguished. The minimum geomechanical properties of d ry density, cohesion and angle of frict ion are appeared on

table 2.

Slope stability is estimated using different slope geometry, taking into account the percent of geological

formations appearance and the excavated formations course (Abramson et al, 2002). So, slopes with heights of 24m, 28m,

29m, 32m and 33m are investigated. The inclination of the slopes are supposed to be the same of all benches, between

30o and 60

o (Berilgen, 2006), o r to be different for every bench between 15

o and 90

o.

Slope’s Design for Quarry’s Remediation Using Ground Materials of Piraeus Subway Excavation 93

www.iaset.us edi [email protected]

Table 2: Minimum Geomechanical Properties of Geological Groups

Geological

Group

γ

(KN/m3)

c

(KN/m2) φ(ο)

1 22 3 17

2 20 0 20

3 20 4 20

4 18 12 20

5 19 35 25

6 22 0 25

7 17 20 25

8 21 19 17

The heights of the benches are supposed to be the same of all benches 2m, 3m or 4m, o r they are different for

every bench from 1,5m to 5m. The width of the benchesis taking into account from 1m to 6m. Also the benchesplatesare

examined as horizontal or inclined.

Height of Slope = 24m, Angle of Benches = 45o: The slope is investigated having benches with height of 2 and 3m, and

width of 2m. A ll the possible geological formations (Das, 2005) are used, and furthermore, the slope stabilityis

investigated for cohesive geological formations only. For every case the slope is unsafe, as safety factor is calculated

between 0, 4 and 0,8.

Height of Slope = 24m, Angle of Benches = 15o – 90

o: The slope is considered to be constructed with benches of height

from 2m until 4m (Siddique et al, 2005). All the possible geological formations are used for the design, but the slope is

investigated only for cohesive geological formations. The stability of the slopeis investigated as an example geological

group 1, consisted of one geological formation. The safety factors which were calculated, according to Duncan &

Wright (2005), are found to be between 0 and 0, 9.

There are two exceptions of safe slopes geometry; 1) Slope, which consists of cohesive materials, is stable on

unsaturated conditions, when the height of benches decreases from upstairs to downstairs, as the geometry approaches the

sliding circle, and the dips of benches are not bigger than 60o. The safety factor is calculated 1, 15 (Table 3-Case A).

2) Slope, which consists of material 1, with angle of the slopes of benches between 30o and 45

o, is stable when the upper

bench is formed by two d ips; downstairs of 45o and upstairs of 35

o (SF = 1,5). The stability is increasing when a middle

bench is also formed by two same slope angles (SF = 1,6) (Tab le 3-Case B).

Height of Slope Lower than 24m, Angle of Benches = 35o – 65

o: Two slope cases are investigated; i) in the first case, the

most cohesive materials are used from geological groups 5 and 7, ii) in the second case all the possible geological

formations are used.

In the first case, the slope is 13m high and is formed by three benches. The middle bench is higher than the others

and the lowest bench is inclined about 45o, while the other benches are inclined about 60

o. Also, the width of the level spot

of the lower bench is 6m, where the width of the level spot of the other bench is 4m. In saturated conditions, the safety

factor is calcu lated 1,5 and in unsaturated conditions the safety factor is calculated 1,7(Duncan and Wright, 1980).

(Table 3-Case C). Comparing this situation with the situation of an unstable slope- this is formed by cohesive and no

cohesive materials, with benches of 2m width and inclined 45o- which is described on previous paragraph, we conclude

that the use of different angles, higher upstairs and lower downstairs and the creation of a wider level spot, increase the

safety.

94 M. Chatziangelou, B. Christaras, K. Botsou & EM. Malliaroudakis

Impact Factor (JCC): 2.6676 Index Copernicus Value (ICV): 3.0

The second slope is 20m high, being formed by five benches inclined between 35o and 45

o. The 2/3 of the height

of the upper bench inclines 45o and the 1/3 of the height of the upper part of the bench inclines 40

o. The slope is unstable as

the safety factor is calculated 0,5, in unsaturated conditions (Table 3-Case D).

Table 3: Slope Stability Investigations

Case A: Stable Slope with Cohesive

Materials, which Geometry Approaches

the Sliding Circle

Case B: Slopes Consist of Benches, which are Formed by Two Dips

Case C: Slope 13m High

Case D: Slope 20m High

Case E: S lope 32m High with Benches

Inclined 30o

Case F: Slopes Lower than 30m, which Their Geometry Approaches the Sliding Circle

Case G: Slopes 32m High is Formed with Different Cases of Geometry and Materials

Case H: Different Geometrical Formations of a Slope which Consists by Homogenous and Cohesive Material

Material 1

Material 3

Material 4

Material 5

Material 7

Material 1

4th terrace

6th terrace

40o

35o

45o

35o

Material 1

6th terrace

45o

35o

SF = 1,5 SF = 1,6

Material 5

Material 7

SF = 1,5 (saturated)

SF = 1,7 (unsaturated)

Material 1

Material 2

Material 3

Material 4Material 5

Material 6

Material 7

SF = 0,5

45o

40o

material 1

material 3

material 4material 5

material 7

SF = 0,9 (unsaturated conditions)

Material 3

SF = 0,5

Material 1

Material 3

Material 4

Material 5

Material 7

SF = 0,02 (saturated)

SF = 1,1 (unsaturated)

Material 3

Material 4

Material 5

Material 7

SF = 1 (saturated)

SF = 1,2 (unsaturated)

Slope 29m high Slope 28m high Slope 23m high

SF = 0,8 (unsaturated conditions)

Material 1

Material 3

Material 4

Material 5

Material 8Material 7

Material 1

Material 3

Material 4

Material 5

Material 7

SF = 0,8 (unsaturated conditions)

Material 1

Material 3

Material 4Material 5

Material 7

SF = 0,9 (unsaturated)

a b c

Material 7

SF = 1,3 (saturated)

SF = 1,4 (unsaturated)

Material 7

SF = 1,1 (saturated)

SF = 1,2 (unsaturated)

Slope’s Design for Quarry’s Remediation Using Ground Materials of Piraeus Subway Excavation 95

www.iaset.us edi [email protected]

Case I: a. Slope with Cohesive and no Cohesive Materials b. Slope with Cohesive Materials Only

Case J: a) The Slope is Formed by Benches of 2m width and b) The Slope is Formed with Level Spots

Case K: Slope with Dips of Benches Bigger at the Middle than Upstairs or

Downstairs

Case L: Small Unstable Sliding Circle on

Saturated Conditions of a Slope, which

Geometry Approaches the Sliding Circle and

it is Formed with Level Spots

Slopes Lower than 30m, Which their Geometry Approaches the Sliding Circle: Three slope cases are investigated;

a) slope 29m high, which consists of cohesive materials of geological groups 1,3,4,5, and 7 (Kumar & Samui, 2006).

The angles of the slopes are between 15o and 60

o, b) slope 28m high, which consists of material with low cohesion and

friction angle higher than 20o, like the material of geological g roup 3. The angle of the slope of the benches are between

30o and 75

o, c) slope 23m high, which consists of cohesive materials with friction angle more than 20

o, as the materials of

geological groups 3, 4, 5, and 7 are. The angles of the slopes, of the benches, are between 30o and 60

o (Table 3-Case F).

In saturated conditions , the slope with height of 29m, which geometry approaches very well the sliding circle, is unstable,

as the safety factor is 0,02, andin unsaturated conditions,it is limited stable, as the safety factor is 1,1. In unsaturated

conditions, the slope with height of 28m, which geometry also approaches very well the sliding circle , is unstable, as the

safety factor is 0,484.On the other hand, the slope with height of 23mis stable. This is because the level spots of the

slopeshave different width, so as enough spaceis created somewhere at the upper stages, in order to accept the pieces of

upstairs which may fall. In unsaturated conditions, the safety factor is 1, 2 and in saturated conditions the safety factoris1.

Height of Slopes = 32m: Four Different Cases are Investigated

In the first case, the slope is formed by bencheswith inclination of30o, and width of 2m, consisting of cohesive

materials. In unsaturated conditions, the safety factor is 0,9(Table 3-Case E).

Material 1

Material 2

Material 3

Material 4

Material 5

SF = 0,9 (unsaturated)

Material 4

Material 5

SF = 1,7 (saturated)

SF = 1,8 (unsaturated)

a b

Material 1

Material 2

Material 3

Material 4

Material 5

Material 6

Material 7

SF = 0,2 (unsaturated)

Material 1

SF = 1,5 (unsaturated)

Material 3

Material 4

Material 5

Material 7

a b

Material 1

Material 3

Material 4Material 5

Material 7

SF = 0,7 (unsaturated)

Material 1

Material 2

Material 3

Material 4

Material 5

Material 6

Material 7

SF = 0,5 (unsaturated)

Material 1

SF = 0 (saturated)

Material 3

Material 4

Material 5

Material 7

96 M. Chatziangelou, B. Christaras, K. Botsou & EM. Malliaroudakis

Impact Factor (JCC): 2.6676 Index Copernicus Value (ICV): 3.0

In the second case, the slope is tested with seven bencheswhere the angles of the slopes are between 15oand 65

o,

and the width of the benches is 4m, except of the 5th

bench, with width of 2,5m. The slope consists of six cohesive

materials.In unsaturated conditions, the safety factor is calculated 0,8(Table 3-Case G-a)

In the third case, the slope is formed like in the previous case; seven benchesinclined from 15oto 65

o, with width

of 4m. But the 5th

bench’s width is 2,5m, and the width of the upper bench is 2m, which is narrower than the width

of the other benches.The slope consists of five cohesive materials.In unsaturated conditions, the safety factor is

calculated 0,8(Table 3-Case G-b).

In the fourth case, the slope is formed with benches, ofcut inclinationof 15oto 65

o. The width of the benches

differs one another. As the width of the penultimate bench is 6m, the middle benches (about 2,5m) are narrower

than the lower benches, and the upper benches are wider than the others.

In unsaturated conditions, the safety factor is calculated 0,9.

(Table 3-Case G-c).

Comparing the calculated safety factors of the slopes ,which are formed withbencheswith different slop inclination

the creation of enough space, about 6m wide, somewhere at the upper stages, in order to accept the pieces of upstairs which

may fall, increases the safety factor.

Height of Slopes = 33m: The slope is tested using only one material (serpentinite), with cohesion of 20 KN/m2 and

friction angle of 25o. When the benches inclined (Deschamps et al, 1999)45

o the safety factor is 1,4in unsaturated

conditions and 1,3 in saturated conditions. When the benchesinclined 60o, in unsaturated conditions the safety factor is

1,2 and in saturated conditions the safety factor is 1, 1. That means, the geometry of the same dips of benches is safe,

when the material is homogenous and cohesive. But this is an ideal case, as the serpentinite is only the 6% from the

excavated material of Piraeus tunnel (Table 3-Case H).

Considering the most suitable geometry and the suite of materials which will consist the slopes, we test a slope

with benches inclined 30o, a) with cohesive and no cohesive materials and b) with materials of the best properties of

cohesion and friction angle. The safety factor is calculated 0,9 for the case (a) and 1,8 for the Case (b)

(Table 3-Case BI-a and b)

For the first case, in unsaturated conditions, considering the deposits are cohesive, the safety factor is 0, 7.

Considering the deposits are cohesive and no cohesive, the safety factor is 0, 5.

(Table 3 -Case K)

For the second case, where the geometry of slope approaches the sliding circle, the slope is formed with benchesi)

of 2m width each one(Table 3-Case J-a) and ii) with enough space somewhere at the upper stages and downstairs, in order

to accept the pieces of upstairs which may fall(Table 3-Case J-b). In unsaturated conditions, when the slope is formed with

bench of 2m width, the safety factor is 0,2. On the other hand, a design with cohesive materials, which is formed

bybenches with enough width spaceto accept the pieces that may fall, may increase the safety factor up to 1,5.Taking into

account that on saturated conditions a small unstable sliding circle (SF = 0) is formed downstairs, the drainage at this

location is indispensable (Table 3-Case L).

Slope’s Design for Quarry’s Remediation Using Ground Materials of Piraeus Subway Excavation 97

www.iaset.us edi [email protected]

Example of Application on Chamilothoris Quarry’s Remediation

The Chamilothoris quarry is placed at Koridallos area of Attica department.The location is near the construction

works of Piraeus subway, so the quarry may be suitable for excavation material deposition (Figure 1).

Figure 1: Location of Chamilothoris Quarry

Taking into account the above investigation of slope geometry and material deposition, the remediat ion of quarry

can be achieved by eight benches, which the height will be from 3,5m to 10m – increasing the slope angles from 30o,

downstairs to 60o, upstairs. Near the foot of the slope, the inclination of the second bench will be 16

o, so as the restrain

powers will be enhanced, and it can also be a safe “plate” that can accept the eroded mate rial or the pieces may fall from

superior benches.

The width of the benches is chosen to be 4m for the following two reasons; the first one is the acceptability of the

weathered material and the second one is the preservation of enough space for coming ways. In order the quarry’s

geometry approaches the sliding circle; the width of the fifth bench is chosen to be 2,5m. Finally, the width of the sixth

bench is better to be 6m, so it can increase the stability, being a plate which can accept the weathered material from the

above benches.

Figure 2: Deposition Design for Chamilothoris Quarry’s Remediation

Geological group 1

6,59

+164+164,5

+168+168,5

+172+172,5

+176+176,5

+180

+184

+189

+193

+160

37,7

4

44,3

6

46,7

4

49,74 55,74 58,24 62,24 64,841,7435,7431,7425,7421,7410,24

0,00

Distance

Geological group 3

Geological group 4

Geological group 5

Geological group 7

98 M. Chatziangelou, B. Christaras, K. Botsou & EM. Malliaroudakis

Impact Factor (JCC): 2.6676 Index Copernicus Value (ICV): 3.0

Figure 3: Chamilithori’s Quarry

As the deposition of materials concerns, the materials with poor mechanical p roperties is proposed to be placed

downstairs, where the dips of benches are small, and cohesive materials are proposed to be placed upstairs, where the

benches are sheer.So, materials of group 1, like meta-madstone or clayey schist, with cohesion more than 3kPa, friction

angle more than 17o and apparent weight of 22kN/m

3, can be deposited at the bottom of the quarry. Under the materials of

group 1, materials of group 3, like meta-madstone or meta-sandstone, with cohesion more than 4kPa, frict ion angle more

than 20o and apparent weight of 20kN/m

3 are proposed to be placed. On the middle of the slope, material o f group 4, like

clayey stone, with cohesion more than 12kPa, frict ion angle more than 20o and apparent weight of 18kN/m

3, can be placed.

Just above this format ion, it can be deposited cohesive materials of g roup 5, like marl or mudstone, with cohesion more

than 35kPa, friction angle more than 25o and apparent weight of 19kN/m

3. Finally, on the upper benches, materials, of

lower mechanical p roperties than the previous group, can be placed , which cohesion may be at least 20kPa, the friction

angle may be at least 25o and the apparent weigh may be about 17kN/m

3. These properties are described by material of

group seven, like serpendinite (Figure 2).

Figure 4: Critical Sliding Circle of Slope with Height of 33m on Unsaturated Conditions

SF = 1.112

R = 66.286m

Geological group 1

Geological group 3

Geological group 4

Geological group 5

Geological group 7

Slope’s Design for Quarry’s Remediation Using Ground Materials of Piraeus Subway Excavation 99

www.iaset.us edi [email protected]

Figure 5: Draining Beddings Arrangement for Slope with Height of 33m

Materials of group 8 will be excavated far away from Chamilothoris quarry, so they did not considered on our

predictions.

Noncohesive materials, of group 2 and group 6, are not proposed to be placed onthe externalslopes, but they can

be placed at the center of the quarry, between the slopes, so as their low mechanical properties do not influence slope

stability.

In order to estimate the safety factor of the slopes of the quarry, 411 slid ing cases are investigated for every slope.

Taking into account the proposed geometry and deposition, the radius of critical circle on unsaturated conditions is

calculated 66,286m and the safety factor 1,112 (Figure 4). Actually, the safety factors of the most critical sliding circles are

up to 1,4, although there are some cases where the safety factor is higher than 1,4.

Figure 6: Small Failure of the Slope with Height of 33m on S aturated Conditions

In saturated conditions, circular failure isestimated at the upper part of the first bench. The radius of the critical

sliding circle is calculated 28,2m and the safety factor is 0,017 (Figure 6). The safety factors of the most critical sliding

circles are up to 1,2, although there are some cases where the safety factor is higher than 1,2. That means sliding may occur

where the load of the slope is increased because of the presence of the wate r. Drain ing beddings inclined

15o, lengthen 15m, on every bench can direct the water out of the slope (Figure 5).

The slope at north east side of the quarry (Figure 3) is lower than the other slopes (13m h igh). It can be formed

with three benches; the bench at the bottom of the slope may be 3,5m h igh, inclined 40o , the middle bench can be 5m high,

inclined 60o and the upper one can be 4m high, inclined 60

o.

Geological group 1

Geological group 3

Geological group 4

Geological group 5

Geological group 7

R = 28.2m

SF = 0.017

Geological group 1

Geological group 3

Geological group 4

Geological group 5

Geological group 7

100 M. Chatziangelou, B. Christaras, K. Botsou & EM. Malliaroudakis

Impact Factor (JCC): 2.6676 Index Copernicus Value (ICV): 3.0

Figure 7: Deposition Design for the North Eas t Side Slope of Chamilothoris Quarry’s Remediation

Figure 8: Critical Sliding Circle for the North East Side Slope with Height of 1

3m on Saturated and Unsaturated Conditions

The width of the bottom bench will be 6m and the width of the other two benches will be 4m.Materials of

group 5, like marl or madstone can be deposited on the bottom and materials of g roup 7, like serpendinite, can be deposited

under them (Figure 7). On unsaturated conditions, the radius of the critical sliding circle is calculated 18,824m and the

safety factor is calculated 1,738 (Figure 8).

The safety factors of the most critical sliding circles are up to 4, 5, although there are some cases where the safety

factor is higher than 4, 5. In saturated conditions, the radius of the critical circle is calculated 20,437 m and the safety

factor is calcu lated 1,517 (Figure 8). The safety factors of the most critical sliding circles are up to 4, although there are

some cases where the safety factor is higher than 4.

CONCLUSIONS

Taking into account that TBM is used for the subway’s excavation, the excavated rock mass is destroyed and

soiled. So, the deposits of geological formations of Pireaus subway excavation behave as soil. That means the failures of

the sliding of the slopes, which are formed by excavation materials, are circled. According to excavation format ions,

in order to investigate the suitable geometry of slopes stability, eight groups of geological formations, with different

mechanical characteristics, were d istinguished, according to excavation formations.

Slope stability was estimated using different slope geometry, taking into account the percent of geological

formations appearance and the excavated formations course.According to our investigation, the factors, which increase

+193

+189

+184

+180

0,00

3,26 9,26 11,76 15,76 18,26

Geological group 5

Geological group 7

Distance

Saturated conditionsR=20.437mSF = 1.517

Unsaturated conditionsR = 18.824m SF = 1.738

Geological group 5

Geological group 7

Slope’s Design for Quarry’s Remediation Using Ground Materials of Piraeus Subway Excavation 101

www.iaset.us edi [email protected]

slope stability, are; 1) Cohesive materials, 2) decrease of benches height from upstairs to downstairs, 3) geometry which

approaches the sliding circle, 4) benches inclined less than 60o, 5) formation of a midd le bench with two dips, 6) creation

of a wider level spot, so as enough space is created somewhere at the upper stages, in order to accept the pieces of upstairs .

Taking into account the above factors, that increase slope stability, the most suitable geometry of slope’s design for

quarry’s remediation using ground materials of Piraeus subway excavation, is succeeded by;

Benches from 3,5m to 5m height, lower downstairs and higher upstairs

Benches inclined from 30o to 60

o, where dips increase from downstairs to upstairs

Designing of enough space somewhere at the upper stages and downstairs, in order to accept the pieces which

may fall because of erosion of weathering.

Geometry approaches the sliding circle.

Deposition of materials with poor mechanical properties downstairs, where the slope is formed by small

inclinations.

Deposition of cohesive materials with best mechanical p roperties upstairs.

Use of cohesive material at the slopes and no cohesive materials at the middle of the quarry

The above investigation is applied on Chamilothoris quarry’s remediation. In unsaturated conditions, he radius of

slopes critical circle is calcu lated 66,286m and the safety factor 1,112. Actually, the safety factors of the most critical

sliding circles arebetween 1,1 and 1,4, although there are some cases , where the safety factor is higher than 1,4.

In saturated conditions, circular failure is estimated at the upper part of the first bench. The radius of the critical

sliding circle is calcu lated 28,2m and the safety factor is 0,017. The safety factors of the most crit ical sliding circles are up

to 1,2, although there are some cases where the safety factor is higher than 1,2. That means sliding may occur where the

load of the slope is increased because of the presence of the water. The sliding may be deterred by draining beddings

inclined 15o, lengthen 15 m, on every bench, which they can direct the water out of the slope.

REFERENCES

1. Abramson, K.W., Lee, T.S., Sharma, S., Boyce, G.M. (2002) Slope Stability and Stabilization methods.

John Wiley & Sons Inc. pp. 712.Nash, 1987

2. Berilgen, M. (2006). Investigation of stability of slopes under drawdown conditions, Computers and Geotechnics,

Elsevier 2006, www.Elsevier.com

3. Bishop, A.W. (1955) "The Use of the Slip Circle in the Stability Analysis of Slopes", Geotechnique,

Great Britain, vol. 5, No. 1, Mar., pp. 7-17

4. Bishop, A.W. and Morgenstern, N. (1960) Stability Coefficients for Earth Slopes. Geotechnique. Institution of

Civil Engineers, London, vol. 10, No. 4, December, pp. 129-150.

5. Craig, R.F. (2005). Craig’s soil mechanics. Spon Press, Taylor and Francis Group, London and New York

6. Das, B.M. (2005). Fundamental of geotechnical engineering, Nelson, USA, 2005

102 M. Chatziangelou, B. Christaras, K. Botsou & EM. Malliaroudakis

Impact Factor (JCC): 2.6676 Index Copernicus Value (ICV): 3.0

7. Deschamps, R., Hynes Chr., Bourdeau Ph. (1999). Embankment widening design guidelines and construction

procedures. Purdue University, West Lafayette, Indiana, 64p.

8. Duncan, J. M., Wright, S. G. (1980). The Accuracy of Equilibrium Methods of Slope Stability Analysis.

Engineering Geology, 16(1/2), pp 5-17.

9. Duncan, H.M.and Wright, S.G. (2005).Factor of Safety and Reliab ility. So il Strength and Slope Stability, John

Wiley and Sons, 2005, pp.19-211

10. Kumar, J. and Samui, P. (2006).Stability Determination for Layered Soil Slopes using the Upper Bound Limit

Analysis. Geotechnical and Geological Engineering Journal, Springer Publicat ions, vol. 24, 1803-1819.

11. Siddique, A., Safiullah, A.M.M. and Ansary M.A. (2005). An investigation into embankment failure along a

section of a major highway, Proceeding of the 16th

International Conference on Soil Mechanics and Geotechical

Engineering, Vol.1-5, 2005, pp.979-983.