7_james greatbanks presentation [compatibility mode]
TRANSCRIPT
![Page 1: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/1.jpg)
Infrastructure Projects
1
Crossrail Programme
James Greatbanks – Designated Project EngineerNR Crossrail Traction Power Supply Upgrade
Modelling &
Electrification
![Page 2: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/2.jpg)
2
Crossrail
• Network Rail delivering £2.3bn enhancements:
– 28 station upgrades
– Electrification and power supply upgrade
– Signalling and telecom renewals
– Grade separation and junction improvements
• New journey opportunities and 10% increase in rail capacity
• Up to 24 tph, each train 200m carrying up to 1500 passengers
• £14.9bn contributing £42bn in benefits
![Page 3: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/3.jpg)
3
Electrification and PSU
• 85 stkm Series 1 OLE
• 2 x 400kV supply points
• Autotransformer feeding: Stratford to Shenfield (30km) & Paddington to Maidenhead (40km)
• £200m KENSAL GREEN400kV Supply Point
PUDDING MILL LANE400kV Supply Point
Maidenhead MPATS
Slough ATSHayes SATS
West EalingATS
WestbourneParkATS
StepneyGreenSATS Plumstead ATS
Ilford SATS
Gidea Park SATS
Shenfield MPATS
![Page 4: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/4.jpg)
4
Electrification Modelling• Supply point loads
• Equipment loading
• Voltage profile
• Rail voltage
• Induced voltage
• Stray current
• Conducted interference
• Radiated emissions
• Train performance
• Earth potential rise
• Earth leakage
• Electrolytic corrosion
• Thermal loads
• Resonance
• Screening
• Staging / phasing
• Import and export
• Failure modes
![Page 5: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/5.jpg)
5
Project Lifecycle
GRIP – Governance for Railway Investment Projects
Staging Commissioning
Hazard Management
RatingsTimetable / Outputs
System Design
![Page 6: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/6.jpg)
6
System Design
TimetableRoute
Standards + Policy400kV Grid
System Design
Options:- E&B Design
- HV Equipment-OLE Sectioning
-Telecoms-Signalling
Outline DesignAIP
Detailed Design
System DesignRolling Stock
![Page 7: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/7.jpg)
7
System Design - Timetable
![Page 8: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/8.jpg)
8
System Design - Demand
Kensal Green Supply Point
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
00:0
0:00
01:0
0:00
02:0
0:00
03:0
0:00
04:0
0:00
05:0
0:00
06:0
0:00
07:0
0:00
08:0
0:00
09:0
0:00
10:0
0:00
11:0
0:00
12:0
0:00
13:0
0:00
14:0
0:00
15:0
0:00
16:0
0:00
17:0
0:00
18:0
0:00
19:0
0:00
20:0
0:00
21:0
0:00
22:0
0:00
23:0
0:00
Time of Day
Half H
our A
vera
ge Loa
d (M
VA)
30 MVA
67MVA65MVA
![Page 9: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/9.jpg)
9
System Design – Train Voltage
![Page 10: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/10.jpg)
10
System Design – Short Circuit
Kensal Green ATFS
![Page 11: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/11.jpg)
11
System Design – Rail Voltage
![Page 12: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/12.jpg)
12
System Design – Rail Voltage
![Page 13: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/13.jpg)
13
System Design – S&T Circuits
![Page 14: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/14.jpg)
14
AC/DC: South East Section
2km
Parallel AC and DC lines
New station
Engineering Connection
• Stray 50Hz
• Induced 50Hz
• Bridge bonding
• Stray DC / corrosion
![Page 15: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/15.jpg)
15
AC/DC: Conclusions
• Corrosion Rates [ATS earth mat, OLE foundations, bridge foundations]: 3000 – 10000 years
• Negligible 50Hz
• No requirement for screening conductor on NKL
• No requirement for VLDs
• No insulation in OLE masts
• Isolation transformer at Abbey Wood station
• One new rectifier
• Measurments
![Page 16: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/16.jpg)
16
Hazard Specific Modelling
• Inductive and conductive coupling to third parties
–London Underground
–DLR
–Heathrow baggage and air side services tunnels
• ATF cables
• Mark 3B OLE
• Reed track circuits
• Depot bonding
• Harmonic Resonance
![Page 17: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/17.jpg)
17
Third Parties
•Joint Crossrail Ltd / Network Rail study•Multi-frequency coupling•Tailored to ‘victim’ equipment
![Page 18: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/18.jpg)
18
Third Parties
![Page 19: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/19.jpg)
19
Third Parties
![Page 20: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/20.jpg)
20
ATF Cable
• Crossrail ATF is 12% cable
• Δ system design / outline design
• Earthing ATF cable at both ends
• ATF cable and S&T separation
0
1
2
3
4
5
6
0 5 10 15 20 25 30 35 40
Distance from Paddington (km)
ATF
/ S&
T Se
para
tion
(m)
![Page 21: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/21.jpg)
21
ATF Cable
![Page 22: 7_James Greatbanks Presentation [Compatibility Mode]](https://reader034.vdocuments.us/reader034/viewer/2022042619/58a184251a28ab176a8bc17e/html5/thumbnails/22.jpg)
22
Summary
• System Design as early as possible
• Change is inevitable, so build in allowances
• Change to scheme outputs = big impact
• Modelling required throughout the project lifecycle
• Engage sensitive third parties
• Use system boundaries rather than contract boundaries
• Limited number of suppliers
• Shortage of resource
• Modelling £ < Testing £££