75 kama - digvijaycement.com
TRANSCRIPT
75 KAMACEMENT US
SINCE 1944 By Email
CHO/MOEF/HYC/A/302/2381 Date-28.05.2021
The Director (S), Ministry of Environment & Forests and ClimateChange Regional Office, Westem Region,Government of India
Kendriya Paryavaran Bhavan, Link Road No.3. E-5 Ravi Shankar Nagar, Bhopal 462 016 (MP)
Subject Submission of 6 Monthly Compliance Report of the conditions as laid Environmental Clearance letter No J-11015/47/2005-1A.
(M), dated 07/10/2005, in respect of Chorbedi (Composite) Limestone Mines, pertaining to Shree Digvijay Cement Co Ltd for the Period of
down in the
October 20 to March 21
Respected Sir,
As required, we are submitting herewith Pointwise compliance status to various stipulations, as laid- down in Environmental Clearance letter No. J-11015/47/2005-1A. II (M), dated 07/10/2005
with supporting documents, is enclosed with the following AnnexureEnvironment Statement in Form V for the year 2020-21
Ambient Air Quality Reports
Annexure A
Annexure B
Noise Level Annexure C
d. Environment Yearty Expenses Statement Annexure D
We hope that you will find the above submission in order
Thanking you,
Yours faithfully For SHREE DIGVIJAY CEMENT Co. LTD.
Shyam Narayan Singh Manager (Mines)
Enclosure: As Above
Copy To: The Environmental Engineer, Gujarat Pllution Control Board, Paryavaran Bhavan, Sector 10A,
Gandhinagar -382010
91 288 234 4272-75 Registered Office & Works
Post- Digvijaygram 361140, Jamnagar
Gujarat, India. CIN L269406) 1944PLCo00749
SHREE DiGVIJAY 91 288 234 4092
CEMENT Co. LTD. e9 [email protected] www.digvijaycement.com
SHREE DIGVIJAY CEMENT CO. LTD. CHORBEDI (COMPOSITE) LIMESTONE MINE
SIX MONTHLY COMPLIANCE STATUS October 20 to March 21
S.
NO. CONDITIONS COMPLIANCE STATUS
A. Specific Conditions
(i) The production capacity from this mine shall not exceed 0.9 MTPA with a capping of production of limestone to a capacity of 2.2 MTPA from all 5 Mines, namely Gop, Pachhtar, Mokhana, Chorbedi and Bhogat Limestone mines put together subject to the individual mines obtaining environmental clearance.
Production during Oct-20 to March-21 is 68235.716 MT from Chorbedi (Composite) Limestone Mine. 04 Mines viz. Gop, Chorbedi, Pachhtar and Mokhana Mines have obtained EC individually as detailed below: Gop Mines – J-11015/47/2005-IA.II (M) dated 7th
October 2005. Chorbedi Mines – J-11015/47/2005-IA.II (M) dated 7th
October 2005. Pachhtar Mines - J-11015/49/2005-IA. II (M) dated 7th
October 2005. Mokhana Mines - J-11015/48/2005-IA.II (M) dated
7th October 2005. Production of all 05 Limestone Mines during Oct-20 to March-21 and its capacities are as under-
Name of Mine EC Capacity in Million Tons
Production in Million Tons
Gop 0.25 0.162 Pachhtar 1.00 0.458 Chorbedi 0.90 0.068 Mokhana 0.70 0.00 Bhogat EC not granted 0.00
Total 2.85 (limited to 2.20)
0.688
Mokhana Mines: Whole lease area of Mokhana Mines was under Forest Land for which Possession taken over by Forest Department on 07.08.2004. The operations were stopped since 05.08.2004. Bhogat Mines: The area covered under CRZ and EC for this mine is rejected vide MoEF letter 09.10.2006. There is no production from Bhogat Mines Since 21.10.2004.
(ii) No mining shall be undertaken in forest land for which forestry clearance has not been obtained.
No Forestry Clearance given for 220.84 Hectares Forest land and possession handed over to Forest Department since 24.09.2004. No Mining is undertaken within the Forest Area since then.
(iii) Catch drains and siltation ponds of appropriate size and check dams should be constructed to arrest silt and sediment flows from the mining operations. The drains should be regularly desilted and maintained properly. Garland drain (size, gradient & length) shall be constructed for both mine pit and for the waste dump. Sump capacity should be designed keeping 50% safety margin over and above the peak sudden rainfall and maximum discharge in the
Construction of Garland Drains: For Waste Dump: Not applicable as there is no waste. For Mines: The mining is being done in slope and bottom of the hilly area following limestone deposits. Water flowing downwards from catchment is trapped into Mine Pits through water channels (Drains). The details are given in Annexure 1, vide our letter no Cho/MoEF/HYC/A/302/1985, Email dated 20.03.2020. Pits and Drains are marked in Surface Plan and submitted vide our letter no Cho/MoEF/HYC/A/302/1985, Email dated 20.03.2020 to your kind office as Annexure 2.
S. NO.
CONDITIONS COMPLIANCE STATUS
area adjoining the mine site. Sump capacity should also provide adequate retention period to allow proper setting of silt material. Sedimentation pits should be constructed at the corners of the garland drains.
Size of the Sump (Pit) is capable to receive and store 803900.00 Ltrs of water with average rainfall 63 Cm which is well above 50% safety margin to take care of sudden Peak rainfall. Sumps are large enough to provide adequate retention period for proper settling of silt material.
(iv) Drills should be wet operated or with
dust extractors. Drill machines are not in operation.
(v) Controlled blasting should be practiced and only between 12 Noon and 2 PM. The mitigative measures for control of ground vibrations to arrest the fly rocks and boulders should be implemented.
Drilling & Blasting has been eliminated by the use of Ripper –Dozer and Excavator combination, an Eco-Friendly mining.
(vi) Plantation shall be done over the lease
area covering 20.95 ha, which includes a green belt of adequate width around the ML area, along roads by planting suitable native species in consultation with the local DFO/Agricultural Department. The density of trees should be around 1000 plants per hectare.
Plantation as per EC condition is under progress & required area will be afforestated during life of mine. At present plantation area is 6.15 hectares at the end of March 2020. 0.80 Hectares area covered under plantation in the year 2019-20. We have done year wise plantation in mines area as per mining plan. A table with year wise plantation details is given below:
The species are selected as per recommendations of the Social Forestry division of the Forest Department at Taluka Lalpur, District Jamnagar. Saplings are also purchased from their Nursery. We have planted 4141 Nos of plants against the target of 1500 Nos of Plants for development of greenbelt over the next 10 years as per Annexure 3 of our letter no Cho/MoEF/HYC/A/302/1985, Email dated 20.03.2020.
Year Nos. of
Nos of Saplings planted
Up to 2018-19
5880
2019-20 1100 2020-21 4141
Total 11121
S. NO.
CONDITIONS COMPLIANCE STATUS
(vii) A water reservoir of 6 ha shall be created
from the deeper section of worked out pit. The higher benches of the void shall be terraced and plantation done to stabilize the slopes. Peripheral fencing shall be done alongwith excavated area.
A water reservoir of 6 ha. (Size – 400m X 150m) is created from the deeper section of worked out pit which helps in recharging ground water in the area. Terracing of Benches is being done. Planation at bench and fencing shall be created around the reservoir on maturity of mining operations; during final closure of the mining in 2033.
(viii) Ground water shall not be encountered
during mining operations. Prior approval of the MOEF and CGWA shall be taken for mining below ground water.
Ground Water is not encountered during mining operations. The Limestone thickness in the area is 4-10 mtrs from GL, whereas the Water table lies about 12-20 mtrs BGL so there is no possibility of working below Ground Water.
(ix) Rain water harvesting measures shall be taken up in consultation with the Regional Office, CGWB to recharge and augment groundwater in the area.
A study from reputed consultant and ex Director of CGWB is carried out for systematic Rain Water Harvesting in Chorbedi Mines. The report with proposals is submitted to Regional Office, CGWB, Ahmedabad along with application for Ground Water abstraction. As per proposal old mine pits are created which serves as recharge ponds. Additionally Circular pits in plantation area are also being made. Artificial Recharge structure at proposed Mines Office shall also be taken up once approval from CGWB, Ahmedabad is granted.
S. NO.
CONDITIONS COMPLIANCE STATUS
(x) A final Mine Closure Plan alongwith
detail of Corpus Fund should be submitted to the Ministry of Environment and Forests 5 years in advance of final mine closure for approval.
The validity of Mining Lease is up to 06.11.2033. Balance life of Mine is envisaged as 15 Years @ present rate of production. So Final Closure is anticipated by 2033; accordingly, Final Mine Closure plan will be submitted by 2028 i.e. before 5 years of anticipated closure.
(xi) Consent to operate shall be obtained from the SPCB before expanding mining operations.
CTO and subsequent Renewal of Consolidated Consents & Authorization has been obtained from GPCB, Gandhinagar, vide Order No. PC/CCAJMN-49/ID30233/589013 dated 28.04.2021 Consent order No.AWH-112516 dated 16.04.2021 valid up to 21.03.2026.
B. General conditions
(i) No change in mining technology and scope of working should be made
There is no change in mining technology and scope of working.
S. NO.
CONDITIONS COMPLIANCE STATUS
without prior approval of the Ministry of Environment and Forests.
(ii) No change in the calendar plan including excavation, quantum of limestone and waste should be made.
No change is made in the calendar plans including excavations, quantum of Limestone and waste.
Year Mineral Proposed Production
as per approved Mining
Plan in MT
Actual Production
in MT
Rema
rks
2020-21
Limestone 400000 68235.716
(iii) Data on ambient air quality (RPM and SPM) should be regularly submitted once a year to the Ministry including its Regional Office (WZ) at Bhopal and the Gujarat State Pollution Control Board /Central Pollution Control Board once in six months.)
Noted. Monitoring of Ambient Air Quality and Noise is being done on monthly basis by the Royal Environment Auditing & Consultancy Service, Rajkot. A copy of test report for the period of October 20 to March-21 is being attached for your kind reference as Annexure B, wherein parameters of PM10 are also within prescribed limit.
(iv) Fugitive dust emissions from all the sources should be controlled regularly. Water spraying arrangement on haul roads, wagon loading, dump trucks (loading & unloading) should be provided and properly maintained.
Fugitive dust emissions from all the sources are controlled regularly. Water spraying arrangement on haul roads and mining areas is being practiced.
(v) Adequate measures should be taken for control of noise levels in the work environment.
Regularly monitoring the noise level being done by a NABL accredited Lab. Data of Noise level is given below Copy enclosed as Annexure C.
(vi) Industrial waste water, if any, should be properly collected, treated so as to conform to the standards prescribed under GSR 422 (E) dated 19th May, 1993 and 31st December, 1993 or as amended from time to time.
Maintenance of vehicles is being done in Tata Corgo, situated in Rajkot – Jamnagar Highway, Hapa, Jamnagar, Gujarat. All maintenance & treatment facilities like ETP are available as per the norms. A photograph is attached for your kind reference. Hence this condition may be treated as complied.
S. NO.
CONDITIONS COMPLIANCE STATUS
(vii) Occupational health surveillance programme of the workers should be undertaken periodically to observe any contractions due to exposure to dust and take corrective measures, if needed.
Occupational health surveillance program of the workers is being taken periodically to observe any contractions due to exposure to dust. Initial (IME) and Periodical Medical Examination (PME) of all the work persons is done at statutory intervals. Initial / Periodical Medical Examination is being carried out for following parameters as per Form O under rule 29 B of Mines Rules 1955 for all employees General Development: Height, Weight, Eye, Ears, Respiratory System, Circulatory System, Nervous System, Locomotor System, Hydrocele Any other abnormality. Urine, Skiagram of Chest, Cardiological Assessment, Neurological Assessment, ILO-Chest Radiograph, Spirometery, Audiometry, Pathological Test (Blood Sugar – Fasting & Post Prandial) So far not a single case is detected for dust borne disease.
(viii) The funds earmarked For environmental protection measures should be kept in separate account and should not be diverted for other purpose. Year wise expenditure should be reported to this Ministry’s Regional Office located at Bhopal (WZ).
The funds earmarked for environmental protection measures is kept in separate account and not diverted for other purpose. Expenditure for environmental protection measures is given below: Last 8 years Recurring yearly data is as under:
S.No. Year Recurring Yearly Expenditure
1 2013-14 303784 2 2014-15 340882 3 2015-16 356060 4 2016-17 311700 5 2017-18 437775 6 2018-19 472097 7 2019-20 417950 8 2020-21 620250
Expenditure for environmental protection measures for the period is enclosed as Annexure D.
(ix) The Regional Office (WZ) of this Ministry located at Bhopal shall monitor compliance of the stipulated conditions. The project authorities should extend full cooperation to the office (s) of the Regional Office by furnishing the requisite data / information/ monitoring reports.
We are submitting six monthly compliance report along with annexures to the MoEF Regional Office Bhopal and GPCB. Full co-operation is being extended to theauthorities/officials by providingdata/information/monitoring report etc.
(x) A copy of clearance letter will be marked to concerned Panchayat / local NGO, if any, from whom and suggestion / representation has been received while processing the proposal.
Copy of clearance letter was handed over to all concerned Panchayat.
S. NO.
CONDITIONS COMPLIANCE STATUS
(xi) State Pollution Control Board should
display a copy of the clearance letter at the Regional Office, District Industry Centre and Collector’s Office/Tehsildar’s Office for 30 days and provide copies of the same to anyone requesting for the same.
SPCB displayed the copy of EC as per procedure.
(xii) The project authorities should advertise in at least two local newspapers widely circulated around the project, one of which shall be in vernacular language of the locality concerned, within 7 days of the issue of clearance letter informing that the project has been accorded environmental clearance and a copy of the clearance letter is available with the State Pollution Control Board and may also be seen at web site of the Ministry of Environment and Forests at htt://envfor.nic.in.
We have advertised in two local newspapers dated 10.12.2005 in respect of Environmental Clearance having been accorded to our Limestone Mines, by the MOEF New Delhi. The publication has appeared in the – (1) Times of India – Ahmedabad Edition (2) Phoolchhab – Rajkot edition.
FORM Y Environment Audit Report for the financial year ending the 31" March 2021
PART-A Name &Address of the Owner/ Occupier of the Industr Operation or process
Shree Digvijay Cement Co. Ltd. Chorbedi (Composite) Limestone Mine
Survey No.1 Village-ChorbediTaluka- Lalpur, Distt. -Jamnagar
(Gujarat) Industry Category Primary: Secondary: (SIC Code)
(STC Code) Mining Industry
Production Capacity 0.9 million TPA .
4 Year of Establishment 07.11.1983
Date of the last Environmental 11.05.2020
Statement submitted
PART B
Water&Raw Material Consumption i) * Water consumption M" / day
Process 0 Cooling
Domestic (Drinking) Dust Suppression 1.10 KL Plantation
0.28 KL
:0.38 KL
(*)P. S Yearly consumption spread equally over 365 days of a year
Process water consumption per unit of product
During current
Financial Year 2020-21
Name of products
During previous Financial Year
2019-20
Not Applicable Not Applicable LIMESTONE
(ii) Raw material consumption
Consumption of raw material
per unit of output During the previous During the current
financial year 2019-20 financial year 2020-21
Name of raw materials | Name of
Products S.
No.
0 Limestone Explosives Ammonium nitrate Detonating Fuse Safety Fuse Detonator Cord Relays_ HSD Lubricant oil
11 Grease
111670 L 21135 L
75 L 2040 L 10 519 Kg 123 Kg
Annexure A
PART-C
Pollution discharged to Envinonment/unit of output (Parameter as speciticd in the consent issued)
Concentration of pollutants in
discharges (Mg/Nm')
Percentage of Qty. of pollutants discharged (Kg/Day)
Pollutants variation from
prescribed standard
with reasons
(a) Water NIL Air Enclosed Annexure-1
Note The prescribed limit of concentration as per the Consent issued-
Sr. No. Pollutant Time Concentration in
Ambient Air Weightage Average
Annual 50 1 Sulphur dioxide (SO2) in Microgram/M3 24 hours 80
2 Nitrogen Dioxide(NOx) in Microgram/M13 Annual 40
80 24 hours Annual 60 Particulate Matter (Size less than 10
Microgram/M* or PM 10 Microgram/M3 Particulate Matter (Size less than 2.5
Microgram/M° or PM 2.5 Microgram/M3
3 100 24 hours
Annual 40 4 24 hours 60
PART-D Hazardous Wastes
(As specified under Hazardous Wastes/Management& Handling Rules, 1989)
Hazardous Wastes Total Quantity (Kg.)
During the previous
Financial Year
During the current
Financial Year (a) From Process 120 Liters 10 Liters
(Used Oil from
Machines) (b) From pollution
control facilities
PART E
(Solid Wastes) Total Quantity
During the current
Financial Year Not applicable, as there is no generation of solid waste
During the Previous
Financial Year From process (a)
b) from the process. From pollution control
Facility i) Quantity recycled or re-
utilized within the unit (c)
ii) Sold
ii) Disposed
PART-F Please specify the characterization (in terms of concentration and quantum) of Hazardousas well as solid waste and indicate disposal practice adopted for both these categories of
waste.
The used oil when taken out of machine at oil change time, it is collected in an empty barrel. This oil is reused for external lubrication of rinning moving parts of loading machine
Not applicable; as described above in Part E.
PART-GG Impact of the pollution abatement measures taken on conservation of natural resources
and on the cost of production.
Due to additional higher investment cost of pollution control monitoring and abatement
measures there is slight additional burden on cost of production. Thus, the cost of production
increases to certain extent. However, as it is absolutely necessary to have a pollution control to
conserve ecology & environment, we have planted trees in the mines.
PART-H Additional measures investment proposal for environmental protection including abatement of
pollution, prevention of pollution.
Following control measures were contemplated for reducing dust in mines.
Mining is being done by Eco-friendly Dozer-Ripper. Dust suppressed on haul road by water sprinkling.
1. 2
Fumes and smoke emissions from HEMM controlled by regular maintenance and timely
overhaul of engines.
Tarpaulin covering on the transporting vehicle before leaving the mine site.
AAQ monitoring is done on regular basis. Contract awarded to Royal Environment
Auditing and consultancy Service, Rajkot and reports are submitted to GPCB,
Gandhinagar, MOEF, New Delhi and Regional Office of MOEF, Bhopal.
3.
PART- Any other particulars for improving the quality of the environment
Following are various measures taken by us: -
. Plantation has been done in mines.
2. Sense of creating & maintaining clean environment among the employees are
being created by celebrating Mines Environment and Mineral Conservation Week
every year and Environment Day and other such functions time to time on
Environment, keeping slogan boards on environment etc.
CO Signature of a person carrying out
an industry, operation or process Date: 22.05.2021
Name: SHYAM NAKAYAN SINGH Designation: Manager (Mines)
Address: Shree Digvijay Cement Co. Ltd.
P.O. Digvijaygram 361140
(Via) Jamnagar, Gujarat
RROyal Environment Auditing & Consultancy Service
nviron, nme. Care lort
303-304, Shivalik-7, B/s.Bal Adalat, Gondal Road, RAJKOT-360 002 Ph. +91 2812360695 E-mail : [email protected] admin @royalconsultancy.com Onmen are to
Ref. No. 69o/03/2020-21 Date: 31/03/2021
REPORT OF AMBIENT AIR QUALITY MONITORING: Core Zone CHORBEDI MINES: MARCH 2021 (1st time)
Name of company: Shree Digvijay Cement Company Limited
Digvijaygram -361 140.
District: Jamnagar.
Core Zone = 1. Near Weigh Bridge Average Result
of 24 Hrs. Sr. No. Particulars Unit 2nd 1 8:00 Hrs. 8:00 Hrs. 8:00 Hrs.
01. Date of sampling 10/03/2021 10/03/2021 11/03/2021 11/03/2021
Duration of Sampling Hrs. 8.00 8.00 8.00 24.00 OZ.
03 Dominant Wind Direction (From) NE NE NE NE
04 Average Wind Speed Km./Hrs. 2 to 14 2 14 2 to 4 2 to 14
05. Average flow rate during sampling m3/minutes 1.10 1.20 1.20 1.17
LPM 2.0 2.0 2.0 2.0 06 Average flow rate for Gas sampling
07. pg/m 60 60 50 60 Pemissible Limits of PM 2.5
08 vg/m 30 29 2 28.7 Measured Concentration of PM 2.5
100 100 100 100 09. Permissible Limits of PM 10 Hg/m
52 51 53 52.0 10 Measured Concentration of PM 10 Hg/m
30 80 B0 30 11. Permissibe Limits of sO g/m
Measured Concentration of SO, Pg/m 10.5 15.3 13.2 13.0 12.
80 80 80 80 13. Permissible Limits of NO Hg/m
Measured Concentration of NO2 vg/m 20.4 18.5 24.5 21.1
14 Instrument used: 1) Ecotech RDS, Model No. AAS -217BL, Gaseouse Sampling Kit- AAS 109&PM 2.5 Sampler AAS 127
Calibrate Done on: 17/06/2020
Jqolis
Dfadel
Royal Environment Auditing & Consultancy Service R:Rot
Analyst
Annexure B
Ryal Environment Auditing & Consultancy Service
ironm Care lor
303-304, Shivalik-7, B/s. Bal Adalat, Gondal Road, RAJKOT- 360 002 Ph. +91 281 2360695 E mail: [email protected] admin @royalconsultancy com
M will «a
Ref. No. :691/03/2020-21 Date: 31/03/2021
REPORT OF AMBIENT AIR QUALITY MONITORING : Core Zone CHORBEDI MINES: MARCH 2021 (1st time)
Name of company Shree Digvijay Cement Company Limited
Digvijaygram -361 140. District: Jamnagar.
Core Zone 2. Near Loading Place Average Resut
of 24 Hrs. Sr. No. Particulars Unit
2nd 3
8:00 Hrs. 8:00 Hrs. 8:00 Hrs. 01 Date of sampling 10/03/2021 10/03/2021 11/03/2021 11/03/2021
02. Duration of Sampling Hrs. 8.00 8.00 8.00 24.00
NE NE NE NE 03. Dominant Wind Direction (From)
04. Average Wind Speed Km.JHrs 2 to 14 2 to 14 2 to 14 2 to 14
Average flow rate during sampling m3/minutes 1.10 1.20 1.10 1.13 05.
06. Average flow rate for Gas sampling LPM 2.0 2.0 2.0 2.0
07. Pemissible Limits of PM 2.5 pg/m 30 60 50
37 39 38.7 08. Measured Concentration of PM 2.5 Hgim
100 100 100 100 09. Permissible Limts of PM 10 Pg/m
Measured Concentration of PM 10 g/m 53 58 57 56.0 10.
80 30 80 11. Permissible Limits of sO Pg/m
12. Measured Concentration of SO, Hg/m 11.5 14.3 13.2 13.0
Pemissible Limits of NO 30 30 13. gim 30 30
Measured Concentration of NO Hg/m 22.2 18.5 24.7 21.8 14.
Instrument used:1) Ecotech RDs, Model No. AAS -217BL, Gaseouse Sampling Kit- AAS 109& PM 25 Sampler AAS 127
Calibrate Done on: 17/06/2020
DPad
Royal Environment Auditing & Consultancy Service
Jeglish
Analyst
ROyal me.
Environment Auditing & Consultancy Service 303 304, Shivalik 7, Bs Bal Adalat. Gondal Road RAJKOT 360 002 Ph 491 281 2360695 Email royalerironment@live comadmin @royalconsultarcy com
are tof
Oate 31/03/2021 Ref No. 79o03/2020-21
REPORT OF AMBIENT AIR QUALITY MONITORING: Core Zone CHORBEDI MINES: MARCH 2021 (2nd time)
Name of company Shree Digvijay Cement Company Limited
Digvijaygram - 361 140.
District: Jamnagar.
Core Zone 1. Near Weigh Bridge Average Result
Sr. No. Particulars Unit rd of 24 Hrs.
8:00 Hrs. 8:00 Hrs. 8:00 Hrs. 23/03/2021 23/03/2021 24/03/2021 24/03/2021
01. Date of sampling
02 Duration of Sampling Hrs. 8.00 8.00 8.00 24.00
03. Dominant Wind Direction (From) NE NE NE NE
04 Average Wind Speed Km./Hrs. 3 to 18 3 to 18 3 to 18 3 to 18
05 Average flow rate during sampling m3/minutes 1.10 1.20 1.20 1.17
06. Average fow rate for Gas sampling LPM 2.0 2.0 2.0 2.0
07. Permissible Limlts of PM 2.5 vg/m 50 60 60
08 Measured Concentration of PM 2.5 Pg/m 36 39 38 37.7
09. Permissible Limits of PM 10 Hgm 100 100 100 100
Measured Concentration of PM 10 Hg/m 55 57 54 55.3 10.
Pemissible Limits of SO, g/m B0 30 30 30 11.
12 Measured Concentration of SO, Hg/m 15.3 16.8 13.5 15.2
13. Pemmissible Limlts of NO, Pg/m 30 30 30 80
14. Measured Concentration of NO, vg/m 24.3 25.1 25.3 24.9
Instrument used : 1) Ecotech RDS, Model No. AAS -217BL, Gaseouse Sampling Kit- AAS 109&PM 2.5 Sampler AAS 127
Calibrate Done on 17/06/2020
pfasaf.
Royal EnvironmenAuditing& Consultancy Service
Juq el iS
Analyst
ROyal onmen Care
Environment Auditing & Consultancy SerVice
re to
willeat
303-304, Shivalik-7, B/s. Bal Adalat, Gondal Road, RAJKOT 360 002
Ph:+91 281 2360695 E mail royalenvironment@ ive. com adnin @royalconsultancy.com
Date: 31/03/2021
Ref. No. 791/03/2020-21
REPORT OF AMBIENT AIR QUALITY MONITORING: Core Zone
CHORBEDI MINES : MARCH 2021 (2nd time)
Name of company: Shree Digvijay Cement Company Limited
Digvijaygram -361 140 District: Jamnagar.
Core Zone = 2. Near Loading Place
2n 8:00 Hrs.
Average Result of 24 Hrs. Sr. No. Particulars Unit 3rd
8:00 Hrs. 8:00 Hrs. 23/03/2021 23/03/2021 24/03/2021 24/03/2021
01. Date of sampling
Hrs. 8.00 8.00 8.00 24.00 02. Duration of Sampling
NE NE NE NE 03. Dominant Wind Direction (From)
Km./Hrs 3 to 18 3 to 18 3 to 18 3 to 18 04. Average Wind Speed
m3/minutes 1.20 1.10 1.10 1.13 05 Average flow rate during sampling
Average flow rate for Gas sampling LPM 2.0 2.0 2.0 2.0 06.
Permissible Limits of PM 2.5 wg/m 60 60 50 07.
ug/m 36 38 35 36.3 08. Measured Concentration of PM 2.5
100 100 100 100 09. Permissible Limits of PM 10 Pg/m
vg/m 60 58 56 58.0 0. Measured Concentration of PM 10
Pemlssible Limits of SO Pg/m 80 80 80 80 11.
Measured Concentration of SO Hg/m 16.5 12.6 18.5 15.9 12.
Pemissible Limits of NO, pgim 80 80 80 80 13.
14. Measured Concentration of NOg pglm 23.5 20.5 24.1 22.7
Instrument used: 1) Ecotech RDS, Model No. AAS-217BL, Gaseouse Sampling Kit- AAS 109 & PM 2.5 Sampler AAS 127
Calibrate Done on: 17/06/2020
Ptod. Royal Environmént Auditng & Consultancy Service
Seey Analyst
Royal nme
Environment Auditing & Consultancy Service 303-304, Shivalik-7, B/s. Bal Adalat, Gondal Road. RAJKOT 360 002 Ph:+91 281 2360695 Email royalenvironnent@live com adrin @royalconsultancy.com
for
ent ll eare
Ref. No. 590/02/2020-21 Date: 27/02/2021
REPORT OF AMBIENT AIR QUALITY MONITORING: Core Zone CHORBEDI MINES: FEBRUATY 2021 (1st time)
Name of company: Shree Digvijay Cement Company Limited Digvijaygram-361 140.
District: Jamnagar.
Core Zone = 1. Near Weigh Bridge Average Result
of 24 Hrs. Sr. No. Particulars Unit 2 rd
8:00 Hrs. 8:00 Hrs. 8:00 Hrs 01. Date of sampling 12/02/2021 12/02/2021 13/02/2021 13/02/2021
02. Duration of Sampling Hrs. 8.00 8.00 8.00 24.
03. Dominant Wind Direction (From) NW NW NW W
04. Average Wind Speed Km./Hrs 1 to 14 1 14 1 14 1 to 14
05. Average flow rate during sampling m3/minutes 1.20 1.10 1.10 1.13
06 Average flow rate for Gas sampling LPM 2.0 2.0 2.0 2.0
07 Permisslble Limits of PM 2.5 g/m 60 60 60 60
08. Measured Concentration of PM 2.5 Hg/m 33 32 30 31.7
09. Permissible Limits of PM 10 g/m 100 100 100 100
10. Measured Concentration of PM 10 Hg/m 5 54 56 55.0
Pemissible Limits of SO, g/m 80 80 80 80 1
Measured Concentration of SO, Hg/m 12.6 17.4 15.1 15.0 12.
13 Permissible Limits of NO, vg/m 80 80 80 80
Measured Concentration of NO ug/m 24.3 20.1 14. 26.4 23.6
Instrument used: 1) Ecotech RDS, Model No. AAS 2178L, Gaseouse Sampling Kit- AAS 109& PM 2.5 Sampler AAS 127
Calibrate Done on : 17/06/2020
adea
Royal Environmét Auditng & Consultancy Service Jagclish
Analyst
ROya ronme. Environment Auditing & Consultancy Service 303-304 Shivalik-7, B's. Bal Adalat, Gondal Road, RAJKOT 360002Ph. +91 281 2360695 » E-mail royalenvironment @ live.com admin @royalconsltancy com
Ware ot
Ref. No 591/02/2020-21 Date: 27/02/2021
REPORT OF AMBIENT AIR QUALITY MONITORING: Core Zone CHORBEDI MINES: FEBRUARY 2021 (1st time)
Name of company: Shree Digvijay Cement Company Limited
Digvijaygram -361 140 District: Jamnagar.
Core Zone = 2. Near Loading Place Average Result
of 24 Hrs. Sr. No. Particulars Unit 2nd 1
8:00 Hrs. 3rd
8:00 Hrs. 8:00 Hrs 01. Date of sampling 12/02/2021 12/02/2021 13/02/2021 13/02/2021
02 Duration of Sampling Hrs. 8.00 8.00 8.00 24.00
03 Dominant Wind Direction (From) NW NW NW NW
04 Average Wind Speed Km./Hrs. 1 to 14 1 to 14 1 to 14 1 to 14
05 Average fow rate during sampling m3/minutess 1.20 1.10 1.20 1.17
06 Average flow rate for Gas sampling LPM 2.0 2.0 2.0 2.0
07 Pemissible Limits of PM 2.5 Pg/m 60 60 60 60
08. Measured Concentration of PM 2.5 pg/m 43 40 42 1.7
09. Permissibe Limits of PM 10 pg/m 100 100 100 100
10 Measured Concentration of PM 10 Hg/m 56 60 59.0
11. Pemissible LImits of So, wg/m 80 80 80 80
Measured Concentration of SO vg/m 13.6 16.2 15.0 12. 15.1
13. Permissible Limits of NO, g/m 80 80 80 80
14 Measured Concentration of NO vg/m 25.1 21.3 27.4 4.6
Instrument used: 1) Ecotech RDS, Model No. AAS-217BL, Gaseouse Sampling Kit AAS 109 & PM 2.5 Sampler AAS 127
Calibrate Done on : 17/06/2020
Pf ad Royal Environmeht Auditing& Consultancy Service
Jagdish
Analyst
ROyal ion nme.
Environment Auditing & Consultancy Service 303304, Shivalik-7, B/s. Bal Adlat, Gondal Road RAJKOT 360 002Ph +91 281 2360695 E mail royalervironment @ live com admin @royakconsutancy.com
are fof
Ret No. 690/02/2020-21 Date: 25/02/2021
REPORT OF AMBIENT AIR QUALITY MONITORING: Core Zone CHORBEDI MINES: FEBRUARY 2021 (2nd time)
Name of company Shree Digvijay Cement Company Limited
Digvijaygram- 361 140.
District: Jamnagar
Core Zone = 1. Near Weigh Bridge Average Result
of 24 Hrs. Sr. No. Particulars Unit 3rd 8:00 Hrs.
st 2nd
8:00 Hrs. 8:00 Hrs 01 Date of sampling 22/02/2021 22/02/2021 23/02/2021 23/02/2021
02. Duration of Sampling Hrs. 8.00 8.00 8.00 24.00
03. Dominant Wind Direction (From) NW NW NW NW
04 Average Wind Speed Km./t 2 to 16 2 to 16 2 to 16 2 to 16
05 Average flow rate during sampling m3/minutes 1.20 1.10 1.10 1.13
06 Average flow rate for Gas sampling LPM 2.0 2.0 2.0 2.0
07 Pemissible Limits of PM 2.5 Hg/m 60 60 60
Hg/m 35.7 08 Measured Concentration of PM 2.5 34 37
09 Permissible Limits of PM 10 100 100 100 100 Hg/m
10. Measured Concentration of PM 10 Hg/m 53 55 52 53.3
11 Permissibe Limits of Sso, vg/m 80 80 80 30
2 Measured Concentration of SO Pgm 12.5 17.6 14.4 14.8
Permissible Limits of NO 80 13. Hg/m B0 30 30
Measured Concentration of NO ug/m 21.4 22.5 23.5 22.5 4
Instrument used 1) Ecotech RDS, Model No. AAS-217BL, Gaseouse Sampling Kit- AAS 109 & PM 2.5 Sampler AAS 127
Callbrate Done on 17/06/2020
padof9
Royal Environment Auditing& Consultancy Service
Tagcli's
Analyst
ROya ttone
Environment Auditing& Consultancy Service 303 304 Shivalik 7, B/s Bal Adalat. Gondal Road, RAJKOT 360 002 Ph. 91 281 2360695 E mal royalenrvironment@ live com admin @royalconsultancy com
Ref No 691/02/2020-21 Dale 25/02/2021
REPORT OF AMBIENT AIR QUALITY MONITORING Core Zone CHORBEDI MINES: FEBRUARY 2021 (2nd time)
Name of company Shree Digvijay Cement Company Limited
Digvijaygram - 361 140
District: Jamnagar.
Core Zone = 2. Near Loading Place Average Result
of 24 Hrs. Sr. No. Particularss Unit 1st 2nd 3rd
8:00 Hrs. 8:00 Hrs. 8:00 Hrs. 22/02/2021 22/02/2021 23/02/2021 23/02/2021
01 Date of sampling
Hrs. 8.00 8.00 8.00 24.00 02 Duration of Sampling
NW NW NW NW
03 Dominant Wind Direction (From)
2 to 1 16 2 to 16 2 to 16 Average Wind Speed Km./Hrs 2 to 16
4
1.10 1.20 1.20 1.17 m3/minutes
05 Average fow rate during sampling
2.0 2.0 2.0 2.0 LPM
06 Average fiow rate for Gas sampling
60 50 60 30
07 Permissible Limits of PM 2.5 vgm 36 33 34.3
08 Measured Concentration of PM 2.5 vg/m
100 100 100 100
09 Permissible Limits of PM 10 g/m
56 54 56.0 8 Measured Concentration of PM 10 Hg/m 10.
80 30 80 30 vg/m 11 Pemissible Limits of So
15.2 16.8 15.5 14.6
12. Measured Concentration of SO Pg/m
30 80 80 30
Permissible Limits of NO, Hg/m 13.
21.6 26.4 24.4 25.3 vg/m 14
Measured Concentration of NO
Instrument used 1) Ecotech RDS, Model No. AAS 217BL, Gaseouse Sampling Kit- AAS 109 & PM 2.5 Sampler AAS 127
Calibrate Done on 17/06/2020
Tagdis
Analyst
Royal EnvironmentAuditing & Consultancy Service
ROyal Environment Auditing & Consultancy Service
ironme Care lr
hmentw 303-304, Shivalik-7, B/s. Bal Adalat, Gondal Road, RAJKOT 360 002. are tor y
Ph:+91 281 2360695 Email:[email protected] admin royalconsultancy com
Date: 31/01/2021 Ref. No. 492/01/2020-21
REPORT OF AMBIENT AIR QUALITY MONITORING Buffer Zone CHORBEDI MINES: JANUARY 2021 (1st time)
Name of company: Shree Digvijay Cement Company Limited
Digvijaygram - 361 140.
District: Jamnagar.
Buffer Zone = 1. Navapara Average Result of
24 Hrs. Sr. No. Particulars Unit 1 2nd 3rd 8:00 Hrs. 8:00 Hrs. 8:00 Hrs. 15/01/2021 15/01/2021 16/01/2021 16/01/2021
01 Date of sampling
Hrs. 8.00 8.00 8.00 24.00 02. Duration of Sampling
NE NE NE NE 03. Dominant Wind Direction (From)
Km./Hrs. 3 to 14 3 to 14 3 to 14 3 to 14 04 Average Wind Speed
m3/minutes 1. .10 1.20 1.20 1.17 05. Average flow rate during sampling
2.0 2.0 2.0 2.0 LPM
06. Average flow rate for Gas sampling
60 60 60 30
07 Permissible Limits of PM 2.5 Pg/m
37 34 38 36.3 Measured Concentration of PM 2.5 Hg/m3
08.
100 100 100 100 Permissible Limits of PM 10 Hg/m 09.
57 35 54 55.3 10. Measured Concentration of PM 10 ug/m
pg/m 80 80 80 80 11. Permissible Limits of so
18.4 17.3 17.5 17.7 Measured Concentration of SO ug/m 12.
30 80 80 80
13 Permissible Limits of NO, g/m
20.3 23.7 21.5 21.8 Measured Concentration of NO2 ug/m 14.
Instrument used 1) Ecotech RDS, Model No. AAS - 217BL, Gaseouse Sampling Kit- AAS 109 & PM 2.5 Sampler AAS 127
Calibrate Done on: 17/06/2020
DPadef,
Royal Envirónrpent Audithg&Consultancy Service Rajkot
tyst
ROya nvironm Care y
Environment Auditing & Consultancy Service 303-304, Shivalik-7, B/s.Bal Adalat, Gondal Road, RAJKOT 360 002 Ph: +91 281 2360695 E-mal: royalenvironment@ live.com [email protected]
Onment are tor
Ref. No. :592/01/2020-21 Date: 24/01/2021
REPORT OF AMBIENT AIR QUALITY MONITORING Buffer Zone CHORBEDI MINES: JANUARY 2021 (2nd time)
Name of company: Shree Digvijay Cement Company Limited
Digvijaygram -361 140.
District: Jamnagar.
Buffer Zone = 1. Navapara Average Result of
24 Hrs. Sr. No. Particulars Unit 2nd
8:00 Hrs. 3rd
8:00 Hrs. 8:00 Hrs. 01 Date of sampling 22/01/2021 22/01/2021 23/01/2021 23/01/2021
02. Duration of Sampling Hrs. 8.00 8.00 8.00 24.00
03. Dominant Wind Direction (From) NW NW NW NW
04 Average Wind Speed Km./Hrs. 2 to 18 2 to 18 2 to 18 2 to 18
05 Average flow rate during sampling m3/minutes 1.20 1.10 1.10 1.13
06. Average fiow rate for Gas sampling LPM 2.0 2.0 2.0 2.0
07 pg/m 60 60 60 60 Permissible Limits of PM 2.5
08 Measured Concentration of PM 2.5 Hg/m 35 32 36 34.3
09 Hg/m 100 100 100 100 Permissible Limits of PM 10
55 53 52 53.3 10 Measured Concentration of PM 10 Ho/m
Permissible Limits of SO Hg/m 30 30 80 80 11.
Measured Concentration of SO, ug/m 17.6 14.6 15.7 16.0 12.
Permissible Limits of NO wg/m B0 B0 80 80 13
21.5 23.9 20.8 22.1 14
Measured Concentration of NO2 ug/m
Instrument used 1) Ecotech RDS, Model No. AAS - 217BL, Gaseouse Sampling Kit- AAS 109& PM 2.5 Sampler AAS 127
Calibrate Done on: 17/06/2020.g & Co
Rajkot
a Royal Environment Auditingj Consultancy Service
Analýst
ROyal Environment Auditing & Consultancy Service
onmet 303-304, Shivalik-7, B/s Bal Adalat, Gondal Road, RAJKOT 360 002 '1ll a
Ph:+91 281 2360695 E-mail: royalenvironment @live com [email protected]
Ref No 392/12/2020-21 Date 31/12/2020
REPORT OF AMBIENT AIR QUALITY MONITORING Buffer Zone CHORBEDI MINES: DECEMBER 2020 (1st time)
Name of company: Shree Digvijay Cement Company Limited Digvijaygram - 361 140.
District: Jamnagar
Buffer Zone = 1. Navapara .Average Result of
24 Hrs.
Sr. No. Particulars Unit 2nd 3rd
8:00 Hrs. 8:00 Hrs. 8:00 Hrs. 01 Date of sampling 18/12/2020 18/12/2020 19/12/2020 19/12/2020
02 Duration of Sampling Hrs. 8.00 8.00 8.00 24.00
NW NW NW NW 03. Dominant Wind Direction (From)
04 Average Wind Speed Km./Hrs. 2 to 11 2 to 11 2 to 11 2 to 11
05 Average flow rate during sampling m3/minutes 1.20 1.10 .10 1.13
LPM 2.0 2.0 2.0 2.0 06 Average flow rate for Gas sampling
50 60 60 60 07 Pemissible Limits of PM 2.5 vg/m
ug/m 35 32 36 34.3 08. Measured Concentration of PM 2.5
100 100 100 100 09. Permissible Limits of PM 10 Pg/m
55 53 52 53.3 10. Measured Concentration of PM 10 Hg/m
Pemissible Limits of so, Pg/m 30 80 80 80 11
17.3 16.4 16.7 16.8 Measured Concentration of SO g/m 12.
80 80 80 80 Permissible Limits of NO, Pg/m 13.
Measured Concentration of NO ug/m 21.4 22.6 20.2 21.4 14
Instrumet used: 1) Ecotech RDS, Model No. AS-2178L, Gaseouse Sampling Kit AAS 109& PM 25 Sampler AAS 127
Calibrate Done on: 17/06/2020
Jcgdtsh
Analyst
Rajkot Royal Environmént Auditing& Consultancy Service
niron men Royal Care tor f,
Environment Auditing & Consultancy Service 303-304, Shivalik-7, Bs. Bal Adalat, Gondal Road. RAJKOT 360 002 Ph. 91 281 2360695 Email royalenvironmemt@lve com admin @ royalconsultancy.com
Care tof
Ref. No. 492/12/2020-21 Date: 31/12/2020
REPORT OF AMBIENT AIR QUALITY MONITORING Buffer Zone CHORBEDI MINES: DECEMBER 2020 (2nd time)
Name of company: Shree Digvijay Cement Company Limited
Digvijaygram -361 140.
District: Jamnagar.
Buffer Zone 1. Navapara Average Result of
24 Hrs. Sr. No. Particulars Unit 1st 2n 3rd
8:00 Hrs. 8:00 Hrs. 8:00 Hrs. 01 Date of sampling 24/12/2020 24/12/2020 25/12/2020 25/12/2020
02 Duration of Sampling Hrs. 8.00 8.00 8.00 24.00
03. Dominant Wind Direction (From) NE NE NE NE
04 Average Wind Speed Km./Hrs. 3 to 11 3 to 11 3 11 3 to 1
05. Average flow rate during sampling m3/minutes 1.10 1.20 1.20 1.17
06 Average flow rate for Gas sampling LPM 2.0 2.0 2.0 2.0
Permissible Limits of PM 2.5 vg/m 60 50 60 50 07.
Measured Concentration of PM 2.5 Hg/m 33 30 34 32.3 08.
09 Permissible Limits of PM 10 Hg/m 100 100 100 100
Measured Concentration of PM 10 Hg/m 53 51 50 51.3 10.
Permissible Limits of S0 vg/m 30 30 80 30 11.
Measured Concentration of SO Hg/m 16.5 13.7 14.6 14.9 12.
wg/m 80 80 13. Permissible Limits of NO, 80 30
Measured Concentration of NO2 yg/m 20.4 21.8 19.5 20.6 14.
Instrument used 1) Ecotech RDS, Model No. AAS -217BL, Gaseouse Sampling Kit- AAS 109 & PM 2.5 Sampler AAS 127
Calibrate Done on: 17/06/2020
Rajkot Joydish
Analyst Royal Environment Atyditing&Consultancy Service
irome
royal Environment Auditing & Cornsultancy Service
Oh.
303-304, Shivalk 7, B/s Bal Adalat, Gondal Road, RAJKOT 360 002 Ph. +91 281 2360695 E-mail royalenvironment@ ive com admin @royalcansultancy com
are for y
Date 30/11/2020 Ref. No. 292/11/2020-21
REPORT OF AMBIENT AIR QUALITY MONITORING: Buffer Zone CHORBEDI MINES NOVEMBER 2020 (1st time)
Name of company: Shree Digvijay Cement Company Limited Digvijaygram - 361 140.
District: Jamnagar
Buffer Zone 1. Navapara Average Result of
24 Hrs. Unit 2nd 3rd 1s
8:00 Hrs.
Sr. No. Particulars
8:00 Hrs. 8:00 Hrs. 11/11/2020 11/11/2020 12/11/2020 12/11/2020 01 Date of sampling
Hrs. 8.00 8.00 8.00 24.00 02 Duration of Sampling
SE SE SE SE 03 Dominant Wind Direction (From)
Km./ JHrs 3 to 11 3 to 11 3 to 11 3 to 11 04. Average Wind Speed
1.1 10 1.20 1.20 1.17 m3/minutes 05 Average flow rate during sampling
2.0 2.0 2.0 2.0 LPM 06 Average flow rate for Gas sampling
60 50 60 60 07 Permissible Limits of PM 2.5 vg/m
34 31 35 33.3 8. Measured Concentration of PM 2.5 Hg/m
100 100 100 100 09. Permissible Limits of PM 10 pg/m
54 52 51 52.3 Measured Concentration of PM 10 vg/m 10
80 80 30 30 Permissible Limits of Sso Hg/m 11.
16.5 15.5 15.8 15.9 Measured Concentration of SO Hg/m 12.
80 80 80 30 Permissible Limits of NO0 ug/m 13
22.5 23.7 21.3 22.5 Measured Concentration of NO, Hg/m 14.
Instrument used: 1) Ecotech RDS, Model No. AAS-217BL, Gaseouse Sampling Kit: AAS 109 & PM.25 Sampler AAS 127
ing Calibrate Done on: 17/06/2020
FR.hot
ca.
Royal Environment Auditimg& Consultancy Service Analyst
tonmen. Environment Auditinq & Consultancy Service 303-304, Shivalik-7, B/s Bal Adalat. Gondal Road, RAJKOT- 360 002. Ph. +91 281 2360695 E-mail: royalenvironment@ ive.com admin @royalconsultancy.com ronent are tor
Date 30/11/2020 Ref. No 392/11/2020-21
REPORT OF AMBIENT AIR QUALITY MONITORING Buffer Zone CHORBEDI MINES: NOVEMBER 2020 (2nd time)
Name of company Shree Digvijay Cement Company Limited
Digvijaygram- 361 140.
District: Jamnagar.
Buffer Zone = 1. Navapara Average Result of
Sr. No. Particulars Unit t 3rd 24 Hrs.
8:00 Hrs. 8:00 Hrs. 8:00 Hrs. 25/11/2020 26/11/2020 26/11/2020 25/11/2020 01 Date of sampling
8.00 8.00 24.00 Hrs. 8.00 02. Duration of Sampling
SE SE SE SE 03 Dominant Wind Direction (From)
2 to 11 2 to 11 2 to 11 Km./Hrs. 2 to 11 04 Average Wind Speed
1.10 1.10 1.13 m3/minutes 1.20 05 Average flow rate during sampling
2.0 2.0 2.0 2.0 LPM 06 Average flow rate for Gas sampling
60 50 60 60 Permissible Limits of PM 2.5 Hg/m 07
32 29 32 31.0 Measured Concentration of PM 2.5 ug/m 08
100 100 100 100 Permissible Limits of PM 10 Hg/m 09 50 49 50.3 52 Measured Concentration of PM 10 Hg/m 10
80 80 80 80 g/m 11 Permissible Limits of so,
12.8 13.5 13.6 14.6 Measured Concentration of SO Hg/m 12
80 80 80 80 Permissible Limits of NO Hg/m 13
20.2 20.6 18.4 21.6 Hg/m 14 Measured Concentration of NO
instrument used 1) Ecotech RDS, Model No. AAS - 217BL, Gaseouse Sampling Kit- AAS 109 & PM 2.5 Sampler AAS 127
Calibrate Done on: 17/06/2020
Rakot ade
Royal Environment Auditing & Consultancy Service Analyst
/rpbo
Rya Environment Auditing & Consultancy Service
ironma Careln
ll
are to 303-304, Shivalik-7, B/s. Bal Adalat, Gondal Road, RAJKOT 360 002Ph:+91 281 2360695 E-mail : [email protected] [email protected]
Ref No. 192/10/2020-21 Date: 17/10/2020
REPORT OF AMBIENT AIR QUALITY MONITORING Buffer Zone CHORBEDI MINES : OCTOBER 2020 (1st time)
Name of company: Shree Digvijay Cement Company Limited Digvijaygram - 361 140.
District: Jamnagar.
Buffer Zone = 1. Navapara Average Result of
24 Hrs. Sr. No. Particulars Unit 2nd 3rd
8:00 Hrs. 8:00 Hrs. 8:00 Hrs. 01. Date of sampling 12/10/2020 12/10/2020 13/10/2020 13/10/20200
02. Duration of Sampling Hrs 8.00 8.00 8.00 24.00
03 Dominant Wind Direction (From) NE NE NE NE
04 Average Wind Speed Km./Hrs. 4 to 11 4 to 11 4 to 11 4 to 11
05. Average flow rate during sampling m3/minutes 1.20 1.10 1.10 1.10
05. Average flow rate for Gas samplin9 LPM 2.0 2.0 2.0 2.0
07 Permissible Limits of PM 2.5 Hg/m 50 50 60 60
08. Measured Concentration of PM 2.5 ug/m 32 29 33 31.3
09. Permissible Limits of PM 10 Hg/m 100 100 100 100
52 50 49 50.3 Measured Concentration of PM 10 ug/m 10
80 80 80 80 Permissible Limits of SO ug/m 11
15.5 13.4 14.3 14.4 12. Measured Concentration of SO Hg/m3
80 80 80 80 Permissible Limits of NO Hg/m 13.
Measured Concentration of NOg vg/m 21.6 22.8 20.4 21.6 14.
Instrument used 1) Ecotech RDS, Model No. AAS- 217BL, Gaseouse Sampling Kit- AAS 109& PM 2.5 Sampler AAS 127
Calibrate Done on: 17/06/2020
uditing& Con Jacqcdis
Analyst Rajkot pad,
ekod Royal Environmen 4uditing Consultantyervice
ROyal Environment Auditing & Consultancy Service 303-304. Shivalik-7, B/s Bal Adalat. Gondal Road. RAJKOT 360 002 Ph +91 281 2360695 E mail. royalenvironment @ ive com admin @ royalconsultanicy.com
Ref No 292/10/2020-21 Date 05/11/2020
REPORT OF AMBIENT AIR QUALITY MONITORING: Buffer Zone CHORBEDI MINES OCTOBER 2020 (2nd time)
Name of company Shree Digvijay Cement Company Limited Digvijaygram - 361 140.
District: Jamnagar.
Buffer Zone = 1. Navapara
Average Result of Sr. No. Particulars Unit 1st nd 3d 24 Hrs.
8:00 Hrs. 8:00 Hrs. 8:00 Hrs. 01 Date of sampling 29/10/2020 29/10/2020 30/10/2020 30/10/2020
02 Duration of Sampling Hrs 8.00 8.00 8.00 24.00
03 Dominant Wind Direction (From) NE NE NE NE
04 Average Wind Speed Km./Hrs. 3 to 11 3 to 1 3 to 11 3 to 11
05 Average flow rate during sampling m3/minutes 1.10 1.20 1.20 1.20
06 Average flow rate for Gas sampling LPM 2.0 2.0 2.0 2.0
Permissible Limits of PM 2.5 Hg/m 60 60 60 07 50
08 Measured Concentration of PM 2.5 Hg/m 30 27 31 29.3
09 Permissible Limits of PM 10 wg/m 100 100 100 100
10. Measured Concentration of PM 10 Hg/m 50 48 47 48.3
Permissible Limits of SO wg/m 80 80 80 11.
12 Measured Concentration of SO Hg/m 13.5 11.3 12.2 12.3
80 80 80 80 Permissible Limits of No, Hg/m 13
14. Measured Concentration of NO2 ug/m 20.5 21.7 19.3 20.5
Instrument used 1) Ecotech RDS, Model No. AAS-217BL, Gaseouse Sampling Kit- AAS 109 & PM 2.5 Sampler AAS 127
Calibrate Done on 17/06/2020
ent Aud
Rajkot
sditirig & Iaqdnt
Analyst Royal Environment uditing a Consultandy Service
Co
ROyal Environment Auditing & Consultancy Service
ronmen Care for
Ware sot t
ent will 303-304, Shivalik-7, B/s. Bal Adalat, Gondal Road, RAJKOT 360 002. Ph:+91 281 2360695 E-mail : royalenvironment@ live.com admin @royalconsultancy.com
onm
Ref. No. 698/03/2020-21 Date: 31/03/2021
WORK ZONE NOISE LEVEL MEASUREMENT
Name of company: Shree Digvijay Cement Company LimitedDigvijaygram - 361 140.
District: Jamnagar.
Sampling Date: 12/02/2021 Sr. No. Location of Sampling dB(A)
Pemissible Limits for 8:00 Hrs. 90 dBa
CHORBEDI MINES Inside Cabin 15 Mtr. Away 50 Mtr. Away
from m/c. from m/cC.
01. Dozer D8- N (CAT) 83.5 80.3 72.3
02 Hyndai - 140 Excavator 86.3 84.2 71.6
03. Tata-200 Excavator 83.4 81.5 70.2
Pachhtar and Pachhtardi Mines Inside Cabin 15 Mtr. Away 50 Mtr. Away
from m/c. from m/cC.
04. Dozer D -8R 85.6 81.5 72.4
05 Hyndai - 140 (LC 9) 84.3 81.2 71.2
06. Tata -200 Bracker 86.1 80.4 70.2
GOP MINES Inside Cabin 15 Mtr. Away 50 Mtr. Away
from m/C. from m/c.
07. Temporary Discontinued - Not Running during visit
Instruments used Sound level meter, Model :SL-4030 (Lutron Make)
Range: A-30 to 80 dB, B-50 to 100 dB,C-80 to 130 dB.
Calibration is Done On: 12/09/2020
Teads
Royal Environment Auditing&Consultancy Service Analyst
Rajkot
Annexure C
ROyal Environment Auditing & Consultancy Service
ironme. Care for
303-304, Shivalik-7, B/s. Bal Adalat, Gondal Road, RAJIKOT 360 002 Ph:+91 281 2360695 E-mail royalenvironment @ live.com [email protected]
hent w are for
Ref. No. 697/03/2020-21 Date: 31/03/2021
REPORT OF AMBIENT NOISE LEVEL MEASUREMENT
Name of company: Shree Digvijay Cement Company Limited
Digvijaygram - 361 140.
District: Jamnagar.
Sampling Date: 12/03/2021
Sr. No. Location of Sampling Noise Level Avg. in dB (A)
Day Time
06:00 AM to 10:00 PM 10:00 PM to 06:00 AM Night Time
Time of sampling
01. GOP Mines Adm. Building 50.3 40.3
02. Chorbedi Mines Adm. Building 46.7 34.0
Pachhtar and Pachhtardi Mines 03 Adm. Building
49.3 33.7
CPCB Standards Limit in dB(A) Leq.
Area Code Category of Area / Zone Day Time Night Time
Industrial Area 75.0 70.0
3 Commercial Area 65.0 55.0
Residential Area 55.0 45.0
40.0 Silence Zone Linits As Per The Noise Pollution Regulation and Control Rules, 2000 Schedule See Rule 3(1)and 4(1)
D 50.0
Refernce Instruments used: Sound level meter, model : SL-4001. (Lutron Make) Calibration done on: 12/09/2020
Range (A-30 to 80 dB. (B) -50 to 100 dB, (C)-80 to 130 dB.
Jedis
Analyst Royal Environmert Auditing & Consultancy Service
ROya irme. Environment Auditing & Consultancy Service 303-304 Shivalik-7, B/s Bal Adalat, Gondal Road, RAJKOT 360 O02
Ph+91 281 2360695 E-mail royalenvironment @ live.com admin @ royalconsutancycom tare
Ref No 597/02/2020-21 Date: 27/02/2021
REPORT OF AMBIENT NOISE LEVEL MEASUREMENT
Name of company Shree Digvijay Cement Company Limited
Digvijaygram - 361 140.
District: Jamnagar.
Samping Date 12/02/2021
Location of Sampling Noise Level Avg. in dB (A) Sr. No.
Night Time 10:00 PM to 06:00 AM
Day Time Time of sampling 06:00 AM to 10:00 PM
01 GOP Mines Adm. Building 53.2 42.4
02 Chorbedi Mines Adm. Building 48.9 36.7
Pachhtar and Pachhtardi Mines
Adm. Building 03 51.2 35.8
CPCBStandards Limit in dB(A) Leq.
Area Code Category of Area / Zone Day Time Night Time
Industrial Area 75.0 70.0 A
65.0 55.0 Commercial Area
Residential Area 55.0 45.0
Silence Zone 50.0 40.0 D
Refernce Limits As Per The Noise Pollution Regulation and Control Rules, 2000 Schedule See Rule 3(1)and 4(1)
Calibration done on 12/09/2020 Instruments used Sound level meter, model SL-4001. (Lutron Make)
Range (A-30 to 80 dB, (B)-50 to 100 dB, (C) -80 to 130 dB
pfdo
Royal Environment Auditing & Consultancy Service
Jugdih
Analyst
ROya Environment Auditing & Consultancy Service
iTonme
303-304, Shivalik-7, B/s Bal Adalat. Gondal Road, RAJKOT- 360 002 Ph:+91 281 2360695 E-mal :royalenvironment@ live.com [email protected]
aretor
Ref No 598/02/2020-21 Date: 27/02/2021
WORK ZONE NOISE LEVEL MEASUREMENT
Name of company Shree Digvijay Cement Company Limited Digvijaygram- 361 140.
District: Jamnagar.
Sampling Date 12/02/2021Sr No. Location of Sampling dB(A)
Pemissible Limits for 8:00 Hrs. 90 dBa
15 Mtr. Away from m/c.
50 Mtr. Away CHORBEDI MINES Inside Cabin
from m/c.
01 Dozer D8-N (CAT) 84.6 81.4 73.2
02 Hyndai 140 Excavator 87.2 85.3 72.5
03. Tata- 200 Excavator 84.5 82.4 71.3
15 Mtr. Away
from m/c. 50 Mtr. Away
Pachhtar and Pachhtardi Mines Inside Cabin from m/c.
04 Dozer D-8R 86.5 82.6 73.5
05 Hyndai - 140 (LC - 9) 85.2 82.1 72.1
06 Tata-200 Bracker 87.2 81.5 71.3
50 Mtr. Away from m/c.
15 Mtr. Away GOP MINES Inside Cabin
from m/c.
07. Temporary Discontinued- Not Running during visit *
Instruments used Sound level meter, Model: SL-4030 (Lutron Make) Range: A-30 to 80 dB, B-50 to 100 dB,C-80 to 130 dB.
Calibration is Done On 12/09/2020
Tagclis Royal EnvironmentAuditing4Consultancy Service Analyst
Royal Environment Auditing & Consultancy Service
he,
303-304 Shivalk-7, Bs Bal Adalat, Gondal Road, RAJKOT 360 002. Ph.+91 281 2360695 E-mail : royalenvironment@ live.com admin @royalconsultancy.com
ae o
Ret No 498/01/2020-21 Date: 31/01/2021
WORK ZONE NOISE LEVEL MEASUREMENT
Name of company: Shree Digvijay Cement Company Limited
Digvijaygram - 361 140.
Distnict Jamnagar.
Sampling Date: 13/01/2021 Sr. No. Location of Sampling dB(A)
Permissibie Limits for 8:00 Hrs. 90 dBa
15 Mtr. Away 50 Mtr. Away from m/c. GOP MINES Inside Cabin
from m/c.
01 Dozer D8-N (CAT) 80.4 82.5 71.5
Hyndai 140 Excavator 83.5 81.3 74.5 02
03 Tata-200 Excavato 80.5 84.1 70.5
50 Mtr. Away 15 Mtr. Away from m/c. Pachhtar and Pachhtardi Mines Inside Cabin
from m/c.
04 Dozer D- 8R 82.5 84.1 72.3
81.4 34.7 74.2 05 Hyndai 140 (LC 9)
06 Tata- 200 Bracker 83.5 80.2 70.5
15 Mtr. Away 50 Mtr. Away CHORBEDI MINES Inside Cabin from mlc. from m/c.
07 Temporary Discontinued - Not Running during visit
instruments used Sound level meter, Model SL 4030 (Lutron Make)
Range A-30 to 80 dB, B-50 to 100 dB,C-80 to 130 dB.
Calibration done on: 12/09/2020
Jaqdsk
Analyst Royal Envirornment Auditing Consultancy Service
Rkot
ROyal Environment Auditing &, Consultancy Servic 303 304 5Shiwaik 7 Bo Bal Adalat gndal uarl 1h.MIT HD Ph 91 281 29ME mail rypalerinreortin xn arypdtn s paty
Ref No 497/01/2020-21 Date 31/01/2021
REPORT OF AMBIENT NOISE LEVEL MEASUREMENT
Name of company : Shree Digvijay Cement Company Limited
Digvijaygram - 361 140.
District: Jamnagar.
Sampling Date 13/01/2021
Sr. No. Location of Sampling Noise Level Avg. in dB (A)
Day Time 06:00 AM to 10:00 PM
Night Time 10:00 PM to 06 00 AM Time of sampling
01 GOP Mines Adm. Building 52.3 44.2
02 Chorbedi Mines Adm. Building 49.8 37.6
Pachhtar and Pachhtardi Mines 50.3 38.5 03 Adm. Building
CPCB Standards Limit in dB(A) Leq.
Area Code Category of Area Zone Day Time Night Time
75.0 70.0 industrial Area
Commercial Area 65.0 55.0 B
Residential Area 55.0 45.0
500 40.0 Silence Zone Linits As Per The Noise Polution Regulation and Control Rules, 2000 Schedule See Rule 3(1)and 4(1).
D
Refernce
Calibrabon done on 12/0/2020 Instruments used Sound level meter, model SL- 4001. (Lutron Make)
Range (A-30 to 80 dB, (B) - 50 to 100 dB. (C) -80 to 130 dB
R
oyal Enviota
Royal EnviroDment Auditing & Consultancy Service Analyst
ROya onmen; a
Environment Auditing & Consultangy Service 303-304, Shivlik-7, B/s. Bal Adalat, Gondal Road, RAJKOT 360 002
Ph: +91 2812360695 E-mail royalenvironment @live.com admin@ royalconsultancy.com (are tort
Date: 31/12/2020 Ref. No. 397/12/2020-21
REPORT OF AMBIENT NOISE LEVEL MEASUREMENT
Name of company: Shree Digvijay Cement Company Limited
Digvijaygram - 361 140.
District: Jamnagar.
Sampling Date 17/12/2020
Sr. No. Location of Sampling Noise Level Avg. in dB (A)
Day Time 06:00 AM to 10:00 PM
Night Time 10:00 PM to 06:00 AM Time of sampling
43.1 GOP Mines Adm. Building 01. 53.4
48.9 39.5 02 Chorbedi Mines Adm. Building
Pachhtar and Pachhtardi Mines
Adm. Building 51.2 41.5
03
CPCB Standards
Limit in dB(A) Leq.
Area Code Category of Area / Zone Day Time Night Time
75.0 70.0 A Industrial Area
B Commercial Area 65.0 55.0
Residential Area 55.0 45.0
50.0 40.0 Silence Zone Limits As Per The Noise Pollution Regulation and Control Rules, 2000 Schedule See Rule 3(1)and 4(1)
D
Refernce
Instruments used Sound level meter, model SL-4001. (Lutron Make) Range (A)-30 to 80 dB, (B) -50 to 100 dB, (C) - 80 to 130 dB
Calibration done on: 12/09/2020
Rakot
ud Royal Environment Auditing& Consultancy Service
Jagos
Analyst
Royal Environment Auditing & Consultancy Service
ronme tor
303-304, Shivali-7, B/s. Bal Adalat, Gondal Road, RAJKOT 360 002. Ph:+91 281 2360695 E mail : royalenvironment@ ive.com admin @royalconsutancy.com
hent Wtare fot
Ref No 398/12/2020-21 Date: 31/12/2020
WORK ZONE NOISE LEVEL MEASUREMENT
Name of company Shree Digvijay Cement Company Limited
Digvijaygram - 361 140.
District: Jamnagar.
Sampling Date 17/12/2020 Sr. No. Location of Sampling dB(A)
Permissible Limits for 8:00 Hrs. 90 dBa
GOP MINES Inside Cabin 15 Mtr. Away 50 Mtr. Away
from m/c. from m/c.
01 Dozer D8-N (CAT) 81.5 81.5 70.3
02 Hyndai- 140 Excavator 84.3 82.2 75.2
03 Tata- 200 Excavator 81.4 85.2 71.2
15 Mtr. Away 50 Mtr. Away Pachhtar and Pachhtardi Mines Inside Cabin from m/c. from m/c.
04 Dozer D-8R 83.4 85.2 70.2
05 Hyndai- 140 (LC -9) 82.5 85.8 75.3
06 Tata 200 Bracker 84.5 81.2 71.4
50 Mtr. Away 15 Mtr. Away
from m/c. CHORBEDI MINES Inside Cabin from m/c.
07 Temporary Discontinued- Not Running duning visit
Insitrumerts used Sound level meter, Model: SL 4030 (Lutron Make) Range:A-30 to 80 dB, B-50 to 100 dB.c-80 to 130 dB.
Calibration done on. 12/09/2020
d Royal Environmént Audititg& Consultancy Service
Jagck1sh
Analyst
Rakot
ROyal Environment Auditng & Consultancy Service 303-304, Shivalik-7, B/s Bal Adalat, Gondal Road, RAJKOT 360 002 Ph: +91 281 2360695 E-mail : royalenvironment @ live.com admin@ royalconsultancy.com Oment
Ware tor
Date: 30/11/2020 Ref. No. 297/11/2020-21
REPORT OF AMBIENT NOISE LEVEL MEASUREMENT
Name of company: Shree Digvijay Cement Company Limited
Digvijaygram - 361 140.
District: Jamnagar.
Sampling Date 11/11/2020
Sr. No. Location of Sampling Noise Level Avg. in dB (A)
Night Time 10:00 PM to 06:00 AM
Day Time Time of sampling 06:00 AM to 10:00 PM
01. GOP Mines Adm. Building 52.5 44.2
02 Chorbedi Mines Adm. Building 49.8 38.4
Pachhtar and Pachhtardi Mines
Adm. Building 03 52.3 40.6
CPCB Standards Limit in dB(A) Leq.
Area Code Category of Area Zone Day Time Night Time
Industrial Area 75.0 70.0
Commercial Area 65.0 55.0
Residential Area 55.0 45.0
50.0 40.0 Silence Zone Limits As Per The Noise Pollution Regulation and Control Rules, 2000 Schedule See Rule 3(1)and 4(1).
D Refernce
Instruments used: Sound level meter, model SL- 4001. (Lutron Make) Calibration done on: 12/09/2020
Range (A-30 to 80 dB, (B) - 50 to 100 dB, (C)-80 to 130 dB.
Rakot
Royal Environment Auditing & Consultancy Service Analyst
ROyal mhen
Environment Auditing & Consultancy Service 303 304, Shivalik 7, B's Bal Adalat, Gondal Road. RAJKOT 360 002 Ph +91 281 2360695 E-mail royalenvironment @ live com admin@ royalconsulancy.com
Ref No. 298/11/2020-21 Date. 30/11/2020
WORK ZONE NOISE LEVEL MEASUREMENT
Name of company Shree Digvijay Cement Company Limited Digvijaygram - 361 140
Distnct Jamnagar.
Sampling Date 11/11/2020 Sr. No. Location of Sampling dB(A)
Pemissible Limits for 8:00 Hrs. 90 dBa
15 Mtr. Away 50 Mtr. Away from mic.
GOP MINES Inside Cabin from m/c.
01 Dozer D8- N (CAT) 82.4 82.4 71.2
02 Hyndai- 140 Excavator 85.2 83.1 70.5
03 Tata 200 Excavator 82.5 80.4 72.3
50 Mtr. Away 15 Mtr. Away from m/c. Pachhtar and Pachhtardi Miness Inside Cabin
from m/c.
Dozer D-BR 84.5 80.4 71.3 04
83.4 80.3 70.2 05 Hyndai 140 (LC 9)
06 Tata -200 Bracker 85.4 82.5 72.5
50 Mtr. Away from m/c.
15 Mtr. Away CHORBEDI MINES Inside Cabin
from mic.
07 Temporary Discontinued Not Running during visit
Instruments used Sound level meter, Model: SL -4030 (Lutron Make)
Range A-30 to 80 dB, B-50 to 100 dB,C-80 to 130 dB
Calibration done on 12/09/2020
Jaxds
Analyst
ustu
Royal Envirohment Abdung&Consultancy Service
Rakot
ROya ronmen (a
Environment Auditing & Consultancy Service 303-304, Shivalik-7, B/s. Bal Adalat, Gondal Road, RAJKOT 360 002. Ph. +91 281 2360695 E-mail: royalenvironment @live.com [email protected]
Ref. No. 198/10/2020-21 Date: 17/10/2020
WORK ZONE NOISE LEVEL MEASUREMENT
Name of company: Shree Digvijay Cement Company Limited
Digvijaygram 361 140.
District: Jamnagar.
Sampling Date: 12/10/2020 Sr. No. Location of Sampling dB(A)
Permissible Limits for 8:00 Hrs. 90 dBa
15 Mtr. Away 50 Mtr. Away GOP MINES Inside Cabin
from m/c. from m/c.
01 Dozer D8- N (CAT) 83.5 80.3 72.3
02 Hyndai 140 Excavator 86.3 84.2 71.4
03 Tata - 200 Excavator 83.4 81.5 70.2
15 Mtr. Away from m/c.
50 Mtr. Away from m/cC. Pachhtar and Pachhtardi Mines Inside Cabin
04 Dozer D -8R 85.6 81.5 72.4
05 Hyndai 140 (LC 9) 84.3 81.2 71.2
06 Tata 200 Bracker 86.3 80.4 70.4
50 Mtr. Away 15 Mtr. Away from m/c. CHORBEDI MINESS Inside Cabin from m/c.
07 Temporary Discontinued - Not Running during visit
Instruments used: Sound level meter, Model: SL-4030 (Lutron Make)
Range :A- 30 to 80 dB, B-50 to 100 dB,C-80 to 130 dB.
Calibration done on 12/09/2020
Jagdus
Analyst Royal Envionrnent Auditng&Consultancy Service
R.ot
ROyal Environment Auditing & Consultancy Service 303-304. Shivalik 7, Bs Bal Adalat, Gondal Road RAJKOT 360 002 Ph 91 281 2360695 E mail royalenvironment a live. com admin @ royalconsuitancy.com
Ref No 197/10/2020-21 Date: 17/10/2020
REPORT OF AMBIENT NOISE LEVEL MEASUREMENT
Name of company : Shree Digvijay Cement Company Limited
Digvijaygram - 361 140.
District: Jamnagar.
Sampling Date 12/10/2020
Ssr. No. Location of Sampling Noise Level Avg. in dB (A)
Day Time Night Time 10:00 PM to 06:00 AM
Time of sampling 06:00 AM to 10:00 PM
01 GOP Mines Adm. Building 51.6 43.1
02 Chorbedi Mines Adm. Building 48.7 39.5
Pachhtar and Pachhtardi Mines 03 51.1 41.5
Adm Building
CPCB Standards Limit in dB(A) Leq.
Area Code Category of Area Zone Day Time Night Time
industrial Area 75.0 70.0
Commercial Area 65.0 55.0
Residential Area 55.0 45.0
40.0 Slence Zone Lemits As Per The Noise Polution Regulation and Control Rules, 2000 Schedule See Rule 3(1)and 4(1)
D 50.0
Refernce
instruments used Sound level meter, model St 4001 (Lutron Make)
Range (A-30 to 80 dB, (B) - 50 to 100 dB, (C) -80g30 dkg
Calibration done on 12/09/2020
Rajkot Jaqdil
Analyst Royal Environmeht Auditing& Consultancy Service
CHORBEDI (COMPOSITE) LIMESTONE MINES
YEARLY EXPENDITURE STATEMENT
FOR ENVIRONMENT MANAGEMENT
For the period of 2020-21
S. NO. WORK Expenditure in Rs
From April 20 to March 21
1 Ambient Air & Noise Monitoring
Water Sprinkling on haul roads
Purchasing of Sapling Purchasing of Soil
29370 2 107600
3 16800 4 3200
5 Plantation charge 331280
6 Recurring Expenses for Security 132000
and Maintenance of Plantation
Total 620250
Annexure D