º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ : ACCEPTANCE LETTER No.W.496/HIGA/27 dt. 12/01/2017 Ref: Tender Notice no. : CAO/CN/BNC/080/16 dated 24/08/2016 (HIGA/27) Tender Opened on : 29/09/2016 Negotiated offer dated. 08/12/2016. Dear Sir(s) 1. Your offer for the above work for Rs.8,92,92,098/‐ (RUPEES EIGHT CRORE NINETY TWO LAKH NINETY TWO THOUSAND AND NINETY EIGHT ONLY ) is accepted by the competent authority. The accepted schedule of items showing the rates and quantities is enclosed herewith. The completion period of the work is 12 (TWELVE) months from the date of issue of this letter. This Letter of Acceptance constitutes a binding contract between you and the Railway Administration. Please quote UCC in all further correspondence. 2. The Security Deposit (SD) for the contract is Rs.44,64,605/‐ (RUPEES FORTY FOUR LAKH SIXTY FOUR THOUSAND SIX HUNDRED AND FIVE ONLY ). The Earnest Money Deposit of Rs.6,20,400/- remitted vide FDR No.614041 dated 27/09/2016 issued by BANK OF BARODA, SHOLAPUR, by you along with the offer is adjusted towards a part of the SD. The balance SD of Rs.38,44,205/-will be recovered from the running bills of the contract @ 10% of bill amount from each bill. Please note that no interest will accrue on the Security Deposit. 3. A Performance Guarantee (PG) for Rs.44,64,605/‐ (RUPEES FORTY FOUR LAKH SIXTY FOUR THOUSAND SIX HUNDRED AND FIVE ONLY) is to be submitted by you within 30 (thirty) days from the date of issue of this letter in the forms mentioned in clause 4.0 (b) of Special Conditions of Contract. The PG shall be valid up to 60 days beyond the stipulated date of completion. 4. Please report to Dy. Chief Engineer/I/CN/UBL along with the detailed programme of work. Other conditions, details and milestones are mentioned overleaf. This letter consists of two enclosures as given below. Please acknowledge the receipt of this letter. ENCL: 1. PG Form, Yours faithfully 2. Schedule of items. (V. SRIDHAR) Dy. Chief Engineer/Works/Construction South Western Railway, Bangalore46 for and on behalf of President of India (Please Turn over) UCC 74238 Name of work: Gadag‐Hotgi Doubling Works ‐ Linking of track between Km 225/000‐ 257/000 Including Nimbal, Indiroad and Lachyan Yards. Value of work : Rs.8,92,92,098/‐ Completion period : 12 months To M/s GODAWARI INDUSTRIAL TRADERS MGM HOUSE, 1 ST FLOOR, OPP.NILA NAGAR, BUDHWAR PETH SOLAPUR - 413002 MAHARASHTRA nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä SOUTH WESTERN RAILWAY Office of the Chief Administrative Officer (Construction), 18, Millers’ Road, BANGALORE – 560 046

Upload: others

Post on 25-Jan-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

  • `

    º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ : ACCEPTANCE LETTER No.W.496/HIGA/27  dt. 12/01/2017

    Ref: Tender Notice no.    : CAO/CN/BNC/080/16  dated   24/08/2016   (HIGA/27)            Tender Opened on  : 29/09/2016        Negotiated offer dated. 08/12/2016. 

    Dear Sir(s)  1.   Your  offer   for  the   above  work   for  Rs.8,92,92,098/‐ (RUPEES  EIGHT CRORE NINETY TWO LAKH NINETY TWO 

    THOUSAND AND NINETY EIGHT ONLY )  is accepted by the competent authority. The accepted schedule of  items showing the rates and quantities is enclosed herewith.  The completion period of the work is 12 (TWELVE) months from the date of issue of this letter.  This Letter of Acceptance constitutes a binding contract between you and the Railway Administration.  Please quote UCC in all further correspondence. 

     2.  The  Security  Deposit (SD) for the contract is Rs.44,64,605/‐ (RUPEES FORTY FOUR LAKH SIXTY FOUR THOUSAND 

    SIX HUNDRED AND FIVE ONLY ). The Earnest Money Deposit of Rs.6,20,400/- remitted vide FDR No.614041 dated 27/09/2016 issued by BANK OF BARODA, SHOLAPUR, by you along with the offer is adjusted towards a part of the SD.  The balance SD of Rs.38,44,205/-will be recovered from the running bills of the contract @ 10% of bill amount from each bill. Please note that no interest will accrue on the Security Deposit. 

     3.      A  Performance  Guarantee  (PG)  for    Rs.44,64,605/‐  (RUPEES  FORTY  FOUR  LAKH  SIXTY  FOUR  THOUSAND  SIX 

    HUNDRED AND FIVE  ONLY) is to be submitted by you within 30 (thirty) days from the date of issue of this letter in the forms mentioned in clause 4.0 (b) of Special Conditions of Contract. The PG shall be valid up to 60 days beyond the stipulated date of completion. 

     4.      Please  report  to  Dy.  Chief  Engineer/I/CN/UBL    along with  the  detailed  programme  of  work.  Other  conditions, 

    details  and  milestones  are  mentioned  overleaf.  This  letter  consists  of  two  enclosures  as  given  below.  Please acknowledge the receipt of this letter. 

      ENCL:  1. PG Form,                     Yours faithfully                 2. Schedule of items.                     

                     (V. SRIDHAR) 

                                                                                                                            Dy. Chief Engineer/Works/Construction                                                              South Western Railway, Bangalore46                                                                                                    for and on behalf of  President of India  

    (Please Turn over) 

    UCC 74238  Name of work: Gadag‐Hotgi Doubling Works ‐Linking  of  track  between  Km  225/000‐257/000   Including  Nimbal,  Indiroad  and Lachyan Yards.  Value of work : Rs.8,92,92,098/‐ Completion period  : 12 months

    To M/s GODAWARI INDUSTRIAL TRADERS MGM HOUSE, 1ST FLOOR, OPP.NILA NAGAR, BUDHWAR PETH SOLAPUR - 413002 MAHARASHTRA

    nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä       SOUTH WESTERN RAILWAY

    Office of the  Chief Administrative Officer  

    (Construction), 18, Millers’ Road, 

    BANGALORE – 560 046 

  •  º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER No.W.496/HIGA/27 dt. 12/01/2017 

     Other conditions and details:  1.   Extension of time for submission of PG beyond 30 (thirty) days and up to 60 (sixty) days from the date of issue of this letter may 

    be accorded by the Contract Agreement signing Authority. However, a penal interest of 15% per annum shall be charged for the delay beyond 30 (thirty) days on a daily basis i.e., from 31st day of the date of issue of LOA. In case you fail to submit the requisite PG even after 60 days  from the date of  issue of LOA,  the contract shall be  terminated duly  forfeiting  the EMD and other dues, if any payable against the contract and you shall also be debarred from participating in re‐tender for the work. The PG will be released after satisfactory completion of the work as per the contract conditions. If the contract is rescinded, the SD shall  be  forfeited  and,  the  PG  shall  also  be  encashed.  Further,  you  will  be  debarred  from  participating  in  the  tender  for executing the balance work  

     2.      You  shall  execute  an  agreement  for  the work within  seven  days  from  the  date  of  receipt  of  notice  by  Railways  regarding 

    readiness of  the agreement.       The detailed programme of work to be submitted by you      in conformity with  the milestones given below or even earlier, shall be as stipulated in the special conditions. The programme shall indicate the time schedule of various  items of works  in the  form of Bar Chart/PERT Chart/CPM Chart.   The programme should also  include the details of organization (in terms of labour and supervisors), plant and machinery intended to be utilized from time to time for execution of the work within the stipulated date of completion.  In case of non‐submission of acceptable programme of work within 15 days of issue of this letter, you are liable for penal action including levying fine up to Rs. 50,000/‐. 

      MILE STONE CHART

       

                    

     ‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 

      Copy to: CAO/CN,  CE/CN/UBL,  Dy.FA&CAO/CN/UBL,  HQ‐Vigilance branch/UBL,   Ch.OS/Contracts,                   The Regional Labour Commissioner (Central) BUDA complex, Opp. Mothi Talkies,                     BELLARY‐583101  for information.              Copy to :  Dy.CE/I/CN/UBL,  XEN/CN/UBL – for  information and necessary action.                     NOTE: ScheduleP, Q and R  are SPECIAL RATES and shall not be taken as reference for                                   future tenders and in case of any increase  over  the agreement quantities,   the                                   rates shall be  negotiated to obtain reduction.                    (Encl: 1 copy of TC minutes & LOA with  copy of  schedule and conditions). 

     

    Sl.No. Activities Stretch TDC 1 Transportation of P.Way materials Km.225/000 – 236/000 1st Month 2 Transportation of P.Way materials Km.236/000 – 247/000 2nd Month 3 Transportation of P.Way materials Km.247/000 – 257/000 3rd Month 4 Linking of Track Km.225/000 – 236/000 4th Month 5 Linking of Track Km.236/000 – 247/000 5th Month 6 Linking of Track Km.247/000 – 257/000 6th Month 7 Assembly of Points & Crossings

    at NBL Nimbal yard 7th Month

    8 Assembly of Points & Crossings at Indiroad

    Indiroad yard 8th Month

    9 Assembly of Points & Crossings at Lachyan

    Lachyan yard 9th Month

    10 Manual packing and Engine Rolling

    Km.225/000 – 257/000 10th Month

    11 TT Machine packing Km.225/000 – 257/000 11th Month 12 Residual works Km.225/000 – 257/000 12th Month

  • South Western Railway (Construction)

    Annexure -I

    LOA No. W496/HIGA/27 Date : 12/01/2017 of UCC Code :74238

     Print Date : 12/01/2017

    Name of Work :

    Gadag‐Hotgi  Doubling Works  ‐Linking  of  track  between Km 225/000‐257/000    Including Nimbal,  Indiroad  and Lachyan Yards.  

    Name of the Contractor : G0164 ‐ GODAWARI INDUSTRIAL TRADERS

    ABSTRACT

    Sl. No.

    Departmental Value asper Tender

    Contractor % ScheduleTotal

    Schedule

    Description

    1

    P

    Items of works pertains to track linking works( During Non-Traffic Block

    4,69,55,473.00 +2% 4,78,94,582.46

    2

    Q

    Items of works pertains to track linking works( During Traffic Block

    88,08,486.00 +3% 90,72,740.58

    3

    R

    Items of works pertains to transportation

    3,07,85,500.00 +5% 3,23,24,775.00

    Total Value : 8,92,92,098.04

    Discount 0 % 0.00

    8,92,92,098.04

    Net Value :

    ( Rupees Eight Crore Ninety Two Lakh Ninety Two Thousand Ninety Eight ONLY)

     Signature of Contractor                                                             Schedule Page No: 1  of  

    101                                  Signature of Contract Signing Authority

  • SOUTH WESTERN RAILWAY   (CONSTRUCTION)

    Annexure - II

    Tender Ref No :- HIGA/27 Notice Date :- 24/08/2016 Dept : ENGINEERING

    Project : 15542 ‐ GADAG ‐ KUDAGI (RLY WORK) Agency: G0164 ‐ GODAWARI INDUSTRIAL TRADERS

    Name  of  the  Work  : Gadag‐Hotgi Doubling Works ‐Linking of track between Km 225/000‐257/000  Including Nimbal, Indiroad and Lachyan Yards.  

    Schedule of Items   LOA No. W496/HIGA/27 Date 12/01/2017 of UCC 74238 

    Schedule 'P'

    VETTED ITEMS

    Sl. No.

    Description of  Items

    CODE

    1

    PWNB‐001

    (i) Unloading 52 kg / 60 kg single rails / 2‐rail panels without rail traffic block during day / night from  Railway  wagons  of  any  type  in  stipulated  time  without  damaging  the  rails  and  as  perIRPWM  using  contractors  crane  and; (ii)  Stacking  the  rails  (in  case  of  single  rails  only). All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles,machinery,   fuel, consumables with all incidental charges and in all kinds of weather conditionsand  site    conditions    including  crossing  of  tracks wherever  required  duly  observing  all  safetyprecautions and including all ascent, descent, taxes, duties, cess, surcharges, fees etc. completelyas per the special conditions / specifications / regulations, as directed by the Engineer‐in‐Charge and  as  per  the  note(s)  below. Notes:  1. The  rate  includes  transporting,  leading and stacking of  the  rails  (in  case of  single  rails only)properly in a countable manner at the nominated location(s) up to a lead of 1 (one) km observing all safety precautions without disturbing the signals or the signalling arrangement, any fixturesetc.;  2.  The  rails  /  rail  panels  have  to  be  unloaded  in  such  a  way  as  to  not  infringe  the  movingdimensions.  The  rate  includes  any  minor  lateral  shifting  of  rail  panels  (after  they  have  been unloaded), if required, to clear infringement to moving dimensions. Such a shifting shall be doneimmediately  before  passage  of  trains  as  directed  by  the  Engineer‐in‐Charge; 3. Demurrage / Wharfage charges levied, if any, due to delay in unloading of rails shall be borneby  the  contractor; 4. Calculation of weight of Class II rails, if any, shall be made @ 5% lesser weight per m than thestandard  weight  per  m; 5. The rate includes engaging lookout men and banner flag men with hand flags and banner flags respectively in the day and signal lamps etc. in the night, wherever required (in case of doublingprojects,  yards  etc.),  for  the  safety  of  rail  traffic  passing  on  adjacent  line(s)  &  personnel; 6.  No  compensation  for  idling  of  manpower,  machinery  etc.  shall  be  paid  in  case  of  loss  ofutilization  due  to  non‐availability  of  wagons  /  traction  power  /  crew  of  Railway  underunavoidable  circumstances  after  all  the  resources  have  been  mobilised  by  the  contractor; 7. Sufficient number of skilled personnel, tools and machineryhave to be arranged even at shortnotice, even  for short duration and even  for  less quantity during day / night so as  to completeunloading within a reasonable period of time. 

    Quantity

    Rate

    Unit

    Amount

    600.00

    93.00

    1 metric tonne

    56,916.00

    ( Rupees  Ninety Three )

    Contractor's % : 2       Discount : 0

     Signature of Contractor                                                             Schedule Page No: 2  of  

    101                                  Signature of Contract Signing Authority

  • Schedule of Items   LOA No. W496/HIGA/27 Date 12/01/2017 of UCC 74238 

    Schedule 'P'

    VETTED ITEMS

    Sl. No.

    Description of  Items

    CODE

    2

    PWNB‐002

    Unloading 52 kg / 60 kg  long rail panels   3‐rail panels / 5‐rail panels / 10‐rail panels / 20‐rail panels without rail traffic block during day / night from Railway wagons of any type in stipulatedtime without  damaging  the  rails  and  as  per  IRPWM  using  contractors  crane with  contractor'sskilled  personnel,  tools  and  plant,  vehicles,    machinery,    fuel,  consumables  with  all  incidental charges  and  in  all  kinds  of weather  conditions  and  site  conditions  including  crossing of  trackswherever required duly observing all safety precautions and  including all  lead, ascent, descent,taxes, duties, cess, surcharges, fees etc. completely as per the special conditions / specifications /regulations,  as  directed  by  the  Engineer‐in‐Charge  and  as  per  the  note(s)  below. Notes: 1. The rail panels have to be unloaded in such a way as to not  infringe the moving dimensions.The  rate  includes  any  minor  lateral  shifting  of  rail  panels  (after  they  have  been  unloaded)required to clear infringement to moving dimensions. Such a shifting shall be done immediatelybefore  passage  of  trains  as  directed  by  the  Engineer‐in‐Charge; 2. Demurrage / Wharfage charges levied, if any, due to delay in unloading of rails shall be borneby  the  contractor; 3. Calculation of weight of Class II rails, if any, shall be made @ 5% lesser weight per m than thestandard  weight  per  m; 4. The rate includes engaging lookout men and banner flag men with hand flags and banner flagsrespectively in the day and signal lamps etc. in the night, wherever required (in case of doublingprojects,  yards  etc.),  for  the  safety  of  rail  traffic  passing  on  adjacent  line(s)  &personnel; 5.  No  compensation  for  idling  of  manpower,  machinery  etc.  shall  be  paid  in  case  of  loss  ofutilization  due  to  non‐availability  of  wagons  /  traction  power  /  crew  of  Railway  underunavoidable  circumstances  after  all  the  resources  have  been  mobilised  by  the  contractor; 6. Sufficient number of skilled personnel, tools and machineryhave to be arranged even at shortnotice, even  for short duration and even  for  less quantity during day / night so as  to completeunloading within a reasonable period of time. 

    Quantity

    Rate

    Unit

    Amount

    200.00

    159.00

    1 metric tonne

    32,436.00

    ( Rupees  One Hundred and Fifty Nine )

    Contractor's % : 2       Discount : 0

     

    3

    PWNB‐003

    (i)  Unloading  60  kg  /  52  kg  BG  PSC  sleepers  ‐ normal  /  SEJ  /  LC  /  Bridge  sleepers  from contractors road vehicles with contractors crane or by any other approved mechanical means onthe  formation  (as  per  the  requirement  of  Railway)  sufficiently  away  from  the  running  track without  obstructing  /  infringing  the  works  under  construction  and  /  or  proposed  to  beconstructed and without blocking the path of road vehicles moving in connection with the worksduring  day  /  night  and; (ii)  Stacking  the  sleepers  at  specified  location(s). All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles,machinery,   fuel, consumables with all incidental charges and in all kinds of weather conditionsand  site    conditions  including  crossing  of  tracks  wherever  required  duly  observing  all  safetyprecautions  and  including  all  lead,  ascent,  descent,  taxes,  duties,  cess,  surcharges,  fees  etc.completely  as    per  the  special  conditions  /  specifications  /  regulations,  as  directed  by  the Engineer‐in‐Charge  and  as  per  the  note(s)  below. Notes: 1.  The  sleepers  shall  be  neatly  and  properly  stacked  in  a  countable  manner; 2. The sleepers may have to be stacked at different locations as per the requirement and this 

     Signature of Contractor                                                             Schedule Page No: 3  of  

    101                                  Signature of Contract Signing Authority

  • Schedule of Items   LOA No. W496/HIGA/27 Date 12/01/2017 of UCC 74238 

    Schedule 'P'

    VETTED ITEMS

    Sl. No.

    Description of  Items

    CODE

    may entail re‐handling them. The rate is inclusive of this. 

    Quantity

    Rate

    Unit

    Amount

    61000.00

    36.00

    1 NUMBER

    22,39,920.00

    ( Rupees  Thirty Six )

    Contractor's % : 2       Discount : 0

     

    4

    PWNB‐004

    (i) Trucking / Transportation of Rails of any section /size /  type from mid section / yard for aLead more than 1 km and up to 8 km during day / night under non‐traffic condition / without railtraffic  block  by  dip  lorries  /  rail  lorries  /  any  other  approved means  as  per  IRPWM  including loading at  the place of picking, hauling, unloading and placing  them without  infringing runningtraffic after trucking including protection of track with contractor's flagmen, wherever required,and;  (ii)  Stacking  the  rails. All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles,machinery,  fuel,  consumables,  loading, unloading with all  incidental  charges and  in all kinds ofweather  conditions  and  site    conditions    including  crossing  of  tracks  wherever  required  duly observing all safety precautions and including all ascent, descent, taxes, duties, cess, surcharges,fees etc. completely as per the special conditions / specifications / regulations, as directed by theEngineer‐in‐Charge  and  as  per  the  note(s)  below. Notes:  1.  The  rails  shall  be  neatly  and  properly  stacked  in  a  countable  manner; 2. The  rails may have  to be stacked at different  locations as per  the requirement and  this mayentail  re‐handling  them.  The  rate  is  inclusive  of  this;3. The rate includes engaging lookout men and banner flag men with hand flags and banner flagsrespectively in the day and signal lamps etc. in the night, wherever required (in case of doublingprojects, yards etc.), for the safety of rail traffic passing on adjacent line(s) & personnel. 

    Quantity

    Rate

    Unit

    Amount

    250.00

    200.00

    1 metric tonne

    51,000.00

    ( Rupees  Two Hundred )

    Contractor's % : 2       Discount : 0

     

    5

    PWNB‐005

    (i) Trucking / Transportation of BG Mono block PSC Track Sleepers for a Lead more than 1 kmand up  to  5  kmduring day  /  night  from mid  section under non  traffic  condition  / without  railtraffic block by rail  lorries / dip lorries  including loading at the place of picking, unloading andplacing them without infringing running traffic after trucking  including protection of track withcontractor's  flagmen,  wherever  required,  and, (ii)  Stacking  the  sleepers; All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles,machinery,    fuel, consumables,  loading, unloading with all  incidental charges and in all kinds ofweather  conditions  and  site    conditions    including  crossing  of  tracks  wherever  required  duly observing all safety precautions and including all ascent, descent, taxes, duties, cess, surcharges,fees etc. completely as per the special conditions / specifications / regulations, as directed by theEngineer‐in‐Charge  and  as  per  the  note(s)  below. Notes: 1.  The  sleepers  shall  be  neatly  and  properly  stacked  in  a  countable  manner; 

     Signature of Contractor                                                             Schedule Page No: 4  of  

    101                                  Signature of Contract Signing Authority

  • Schedule of Items   LOA No. W496/HIGA/27 Date 12/01/2017 of UCC 74238 

    Schedule 'P'

    VETTED ITEMS

    Sl. No.

    Description of  Items

    CODE

    2. The sleepers may have to be stacked at different locations as per the requirement and this mayentail  re‐handling  them.  The  rate  is  inclusive  of  this; 3. The rate includes engaging lookout men and banner flag men with hand flags and banner flagsrespectively in the day and signal lamps etc. in the night, wherever required (in case of doublingprojects, yards etc.), for the safety of rail traffic passing on adjacent line(s) & personnel. 

    Quantity

    Rate

    Unit

    Amount

    35000.00

    50.00

    1 eachsleeper

    17,85,000.00

    ( Rupees  Fifty )

    Contractor's % : 2       Discount : 0

     

    6

    PWNB‐006a

    (i) Providing barricading without rail traffic block with contractor's bamboo / casuarina posts ofminimum 100 mm dia. and minimum 2.5 m  length for vertical posts and minimum 50 mm dia.and minimum 2.0 m length for horizontal posts by fixing vertically at every 2.0 m  interval or as directed duly driving firmly inside the ground projecting at least 1.5 m above ground level and atleast  1.0  m  below  ground  level,  fixing  and  tying  horizontal  bamboo  /  casuarina    members  ofminimum 50 mm dia. spaced equally to the vertical members with contractors approved quality galvanised  iron binding wire or any other approved material, providing strips with contractorsred colour retro retro‐reflective tape on horizontal and vertical posts and across the horizontalmembers  in  alternate  bays    at  specified  interval  and; (ii)  Removal  of  entire  barricading  without  rail  traffic  block  duly  clearing  it  from  site  aftercompletion of  all  P Way works at  the  location after obtaining written permission of Dy.  CE‐in‐charge  in  writing. All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles,machinery,  fuel,  consumables,  loading, unloading with all  incidental  charges and  in all kinds ofweather  conditions  and  site  conditions  including  crossing  of  tracks  wherever  required  duly observing  all  safety  precautions  and  including  all  lead,  ascent,  descent,  taxes,  duties,  cess,surcharges,  fees etc.  completely as   per  the  special  conditions /  specifications /  regulations,  asdirected  by  the  Engineer‐in‐Charge  and  as  per  the  note(s)  below. Notes:  1.  The  two  stages  of  payment  (i.e.  a  &  b)  given  below  together  constitute  this  item; 2. Any missing component of  the barricading shall be  immediately recouped by the contractor; 3. Stage  ‐ 2 can be operated only after operating stage  ‐ 1. Stage  ‐ 2 alone cannot be operated; 4.  Both  the  stages  i.e.  fixing  and  removal  cannot  be  paid  in  the  same  bill; 5. A gap of at least 3 months is required for paying stage ‐2 i.e. removal after paying for stage  1 i.e.  fixing; 6. After taking joint inventory with the contractors authorised representative, only that length ofbarricading  found  fully  in  tact  before  removal,  shall  be  paid  for  stage    2; 7.  The barricading  after  its  removal  (after  obtaining written permission of Dy.  CE‐in‐charge  in writing)  shall  be  the  property  of  the  contractor. (a) Stage‐1: fixing of barricading 

    Quantity

    Rate

    Unit

    Amount

    5000.00

    75.00

    1 M

    3,82,500.00

    ( Rupees  Seventy Five )

    Contractor's % : 2       Discount : 0

     

     Signature of Contractor                                                             Schedule Page No: 5  of  

    101                                  Signature of Contract Signing Authority

  • Schedule of Items   LOA No. W496/HIGA/27 Date 12/01/2017 of UCC 74238 

    Schedule 'P'

    VETTED ITEMS

    Sl. No.

    Description of  Items

    CODE

    7

    PWNB‐006b

    (i) Providing barricading without rail traffic block with contractor's bamboo / casuarina posts ofminimum 100 mm dia. and minimum 2.5 m  length for vertical posts and minimum 50 mm dia.and minimum 2.0 m length for horizontal posts by fixing vertically at every 2.0 m  interval or as directed duly driving firmly inside the ground projecting at least 1.5 m above ground level and atleast  1.0  m  below  ground  level,  fixing  and  tying  horizontal  bamboo  /  casuarina    members  ofminimum 50 mm dia. spaced equally to the vertical members with contractors approved quality galvanised  iron binding wire or any other approved material, providing strips with contractorsred colour retro retro‐reflective tape on horizontal and vertical posts and across the horizontalmembers  in  alternate  bays    at  specified  interval  and; (ii)  Removal  of  entire  barricading  without  rail  traffic  block  duly  clearing  it  from  site  aftercompletion of  all  P Way works at  the  location after obtaining written permission of Dy.  CE‐in‐charge  in  writing. All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles,machinery,  fuel,  consumables,  loading, unloading with all  incidental  charges and  in all kinds ofweather  conditions  and  site  conditions  including  crossing  of  tracks  wherever  required  duly observing  all  safety  precautions  and  including  all  lead,  ascent,  descent,  taxes,  duties,  cess,surcharges,  fees etc.  completely as   per  the  special  conditions /  specifications /  regulations,  asdirected  by  the  Engineer‐in‐Charge  and  as  per  the  note(s)  below. Notes:  1.  The  two  stages  of  payment  (i.e.  a  &  b)  given  below  together  constitute  this  item; 2. Any missing component of  the barricading shall be  immediately recouped by the contractor; 3. Stage  ‐ 2 can be operated only after operating stage  ‐ 1. Stage  ‐ 2 alone cannot be operated; 4.  Both  the  stages  i.e.  fixing  and  removal  cannot  be  paid  in  the  same  bill; 5. A gap of at least 3 months is required for paying stage ‐2 i.e. removal after paying for stage  1 i.e.  fixing; 6. After taking joint inventory with the contractors authorised representative, only that length ofbarricading  found  fully  in  tact  before  removal,  shall  be  paid  for  stage    2; 7.  The barricading  after  its  removal  (after  obtaining written permission of Dy.  CE‐in‐charge  in writing)  shall  be  the  property  of  the  contractor. (b) Stage‐2: removal of barricading 

    Quantity

    Rate

    Unit

    Amount

    5000.00

    75.00

    1 M

    3,82,500.00

    ( Rupees  Seventy Five )

    Contractor's % : 2       Discount : 0

     

    8

    PWNB‐007a

    (i)  Providing  barricading without  rail  traffic  block with  contractor's wooden  bullies  /  posts  ofminimum 75 mm dia. and minimum 2.1 m length by fixing vertically at every 3.0 m  interval or asdirected duly excavating in all types of soils a pit of size 450 mm X 450 mm X 600 mm and filling the entire trench with M10 grade cement concrete with contractor's supply of cement (OPC 53grade),  20  mm  graded  granite  coarse  aggregate,  fine  aggregate  etc.  duly  embedding  the  postprojecting at  least 1.5 m above ground level and at  least 0.6 m below ground level, compacting the concrete with vibrator, fixing 5 rows of 12mm dia. contractors nylon rope of approved colorand  quality  spaced  equally  in  between  the  vertical  members,  painting  the  posts  from  top  tobottom  with  red  and  white  colour  bands  100  mm  wide  and  100  mm  apart  withcontractors approved quality enamel paints as directed, fixing contractors yellow colour retro‐reflective tape of  50  mm  width  of  approved  quality  on  the  posts  on  top  white  band. (ii)  Removal  of  entire  barricading  without  rail  traffic  block  duly  clearing  it  from  site  after completion of all P Way works at the location after obtaining written permission of Dy. CE‐in‐

     Signature of Contractor                                                             Schedule Page No: 6  of  

    101                                  Signature of Contract Signing Authority

  • Schedule of Items   LOA No. W496/HIGA/27 Date 12/01/2017 of UCC 74238 

    Schedule 'P'

    VETTED ITEMS

    Sl. No.

    Description of  Items

    CODE

    charge  in  writing. All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles, machinery,  fuel,  consumables,  loading, unloading with all  incidental  charges and  in all kinds ofweather  conditions  and  site  conditions  including  crossing  of  tracks  wherever  required  dulyobserving  all  safety  precautions  and  including  all  lead,  ascent,  descent,  taxes,  duties,  cess,surcharges,  fees etc.  completely as   per  the  special  conditions /  specifications /  regulations,  asdirected  by  the  Engineer‐in‐Charge  and  as  per  the  note(s)  below. Notes:  1.  The  two  stages  of  payment  (i.e.  a  &  b)  given  below  together  constitute  this  item; 2. Any missing component of  the barricading shall be  immediately recouped by the contractor; 3. Stage  ‐ 2 can be operated only after operating stage  ‐ 1. Stage  ‐ 2 alone cannot be operated; 4.  Both  the  stages  i.e.  fixing  and  removal  cannot  be  paid  in  the  same  bill; 5. A gap of at least 3 months is required for paying stage ‐2 i.e. removal after paying for stage  1 i.e.  fixing; 6. After taking joint inventory with the contractors authorised representative, only that length of barricading  found  fully  in  tact  before  removal,  shall  be  paid  for  stage    2; 7.  The barricading  after  its  removal  (after  obtaining written permission of Dy.  CE‐in‐charge  in writing)  shall  be  the  property  of  the  contractor. Stage‐1:  fixing  of  barricading  

    Quantity

    Rate

    Unit

    Amount

    1000.00

    99.00

    1 M

    1,00,980.00

    ( Rupees  Ninety Nine )

    Contractor's % : 2       Discount : 0

     

    9

    PWNB‐007b

    (i)  Providing  barricading without  rail  traffic  block with  contractor's wooden  bullies  /  posts  of minimum 75 mm dia. and minimum 2.1 m length by fixing vertically at every 3.0 m  interval or asdirected duly excavating in all types of soils a pit of size 450 mm X 450 mm X 600 mm and fillingthe entire trench with M10 grade cement concrete with contractor's supply of cement (OPC 53 grade),  20  mm  graded  granite  coarse  aggregate,  fine  aggregate  etc.  duly  embedding  the  postprojecting at  least 1.5 m above ground level and at  least 0.6 m below ground level, compactingthe concrete with vibrator, fixing 5 rows of 12mm dia. contractors nylon rope of approved colorand  quality  spaced  equally  in  between  the  vertical  members,  painting  the  posts  from  top  tobottom  with  red  and  white  colour  bands  100  mm  wide  and  100  mm  apart  withcontractorsapproved quality enamel paints as directed, fixing contractors yellow colour retro‐reflective tape of  50  mm  width  of  approved  quality  on  the  posts  on  top  white  band. (ii)  Removal  of  entire  barricading  without  rail  traffic  block  duly  clearing  it  from  site  aftercompletion of  all  P Way works at  the  location after obtaining written permission of Dy.  CE‐in‐charge  in  writing. All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles,machinery,  fuel,  consumables,  loading, unloading with all  incidental  charges and  in all kinds of weather  conditions  and  site  conditions  including  crossing  of  tracks  wherever  required  dulyobserving  all  safety  precautions  and  including  all  lead,  ascent,  descent,  taxes,  duties,  cess,surcharges,  fees etc.  completely as   per  the  special  conditions /  specifications /  regulations,  asdirected  by  the  Engineer‐in‐Charge  and  as  per  the  note(s)  below. Notes:  1.  The  two  stages  of  payment  (i.e.  a  &  b)  given  below  together  constitute  this  item;

     Signature of Contractor                                                             Schedule Page No: 7  of  

    101                                  Signature of Contract Signing Authority

  • Schedule of Items   LOA No. W496/HIGA/27 Date 12/01/2017 of UCC 74238 

    Schedule 'P'

    VETTED ITEMS

    Sl. No.

    Description of  Items

    CODE

     2. Any missing component of  the barricading shall be  immediately recouped by the contractor; 3. Stage  ‐ 2 can be operated only after operating stage  ‐ 1. Stage  ‐ 2 alone cannot be operated; 4.  Both  the  stages  i.e.  fixing  and  removal  cannot  be  paid  in  the  same  bill; 5. A gap of at least 3 months is required for paying stage ‐2 i.e. removal after paying for stage  1 i.e.  fixing; 6. After taking joint inventory with the contractors authorised representative, only that length ofbarricading  found  fully  in  tact  before  removal,  shall  be  paid  for  stage    2; 7.  The barricading  after  its  removal  (after  obtaining written permission of Dy.  CE‐in‐charge  in writing)  shall  be  the  property  of  the  contractor.  (b)Stage‐2: removal of barricading 

    Quantity

    Rate

    Unit

    Amount

    1000.00

    99.00

    1 M

    1,00,980.00

    ( Rupees  Ninety Nine )

    Contractor's % : 2       Discount : 0

     

    10

    PWNB‐008

    Pulling 20  rail  panels  (of 60 kg  / 52kg  rails)  on ground without  rail  traffic  block during day  /night duly lifting and keeping over the rollers and pulling with sufficient number of rail tongueswith  contractor's  skilled  personnel,  tools  and  plant,  vehicles,  machinery,  fuel,  consumables,loading,  unloading  with  all  incidental  charges  and  in  all  kinds  of  weather  conditions  and  siteconditions including crossing of  tracks wherever required duly observing all safety precautionsand including all lead, ascent, descent, taxes, duties, cess, surcharges, fees etc. completely as perthe special  conditions / specifications /  regulations and as directed by  the Engineer‐in‐Charge.    

    Quantity

    Rate

    Unit

    Amount

    4000.00

    2.00

    1 metric tonne per metre

    8,160.00

    ( Rupees  Two )

    Contractor's % : 2       Discount : 0

     

    11

    PWNB‐009

    (i)  Setting  out  centre  line  for  alignment  of  track  in  straight  without  rail  traffic  block  usingcontractor's  total  station  equipment  and;(ii)  Providing  centre  line  reference  marks  at  every  50  (fifty)  metres  interval  on  contractorswooden  pegs  with  contractors  enamel  paint  of  approved  quality  and  colour. All  of  the above  shall be executed with  contractors  skilled personnel,  tools  and plant,  vehicles,machinery,  fuel,  consumables,  loading, unloading with all  incidental  charges and  in all kinds ofweather  conditions  and  site    conditions    including  crossing  of  tracks  wherever  required  dulyobserving  all  safety  precautions  and  including  all  lead,  ascent,  descent,  taxes,  duties,  cess,surcharges, fees etc. completely as  per the special conditions / specifications / regulations and asdirected by the Engineer‐in‐Charge. 

    Quantity

    Rate

    Unit

    Amount

    25.00

    5,500.00

    1 TRACK KM

    1,40,250.00

    ( Rupees  Five Thousand Five Hundred )

    Contractor's % : 2       Discount : 0

     Signature of Contractor                                                             Schedule Page No: 8  of  

    101                                  Signature of Contract Signing Authority

  • Schedule of Items   LOA No. W496/HIGA/27 Date 12/01/2017 of UCC 74238 

    Schedule 'P'

    VETTED ITEMS

    Sl. No.

    Description of  Items

    CODE

     

    12

    PWNB‐010

    (i)  Setting  out  centre  line  for  alignment  of  track  in  curve  without  rail  traffic  block  usingcontractors  total  station  equipment  and; (ii)  Providing  centre  line  reference  marks  at  every  10  (ten)  metres  interval  on  contractorswooden  pegs  with  contractors  enamel  paint  of  approved  quality  and  colour. All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles,machinery,  fuel,  consumables,  loading, unloading with all  incidental  charges and  in all kinds ofweather  conditions  and  site    conditions    including  crossing  of  tracks  wherever  required  dulyobserving  all  safety  precautions  and  including  all  lead,  ascent,  descent,  taxes,  duties,  cess,surcharges, fees etc. completely as  per the special conditions / specifications / regulations and as directed by the Engineer‐in‐Charge. 

    Quantity

    Rate

    Unit

    Amount

    7.00

    6,000.00

    1 TRACK KM

    42,840.00

    ( Rupees  Six Thousand )

    Contractor's % : 2       Discount : 0

     

    13

    PWNB‐011a

    (i) Leading and dumping of Railways stone ballast without rail traffic block from stacks collectedon either side of formation in mid section / at yards at top of steep cuttings / side or bottom of high  banks  as  directed; (ii)  Spreading  the  ballast  on  the  formation  as  per  standard  section  and  required  cushion withextra  width  on  curves  and; (iii)  Boxing  of  ballast  to  standard  sectional  profile. All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles, machinery,  fuel,  consumables,  loading, unloading with all  incidental  charges and  in all kinds ofweather  conditions  and  site  conditions  including  crossing  of  tracks  wherever  required  dulyobserving all safety precautions and including all ascent, descent, taxes, duties, cess, surcharges,fees etc. completely as per the special conditions / specifications / regulations, as directed by theEngineer‐in‐Charge  and  as  per  the  note(s)  below. Notes: 1. This item consists of 3 stages of payment as mentioned in the sub‐items. The first 3 stages are for  a  lead of 150 m,  the next 3  stages are  for  a  lead between 150 m and 750 m and  the  last 3stages are for a lead between 750 m and 5000 m. Dumping shall be undertaken in these 3 stages as  instructed; 2.  While  operating  sub‐items  d,  e  and  f,  sub‐  items  a,  b  and  c  need  not  be  and  shall  not  be operated  as  sub‐items  d,  e  and  f  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c. Similarly while operating sub‐items g, h and i, sub‐ items a, b and c need not be and shall not be operated  as  sub‐items  g,  h  and  i  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c; 3. Stage  1 i.e. dumping of ballast shall be done in two phases  a) initial spreading and  b) furtherdumping  after  laying  the  sleepers  and  linking  the  track  as  directed; 4.  Stage  ‐2  i.e.  boxing  of  ballast  to  the  required BG  standard  ballast  profile  as  per  the  cushionspecified  as  per  IRPWM  includes  finishing  to  the  specified  BG  profile; 5.  Payment  shall  be  done  as  per  stack  measurement  without  deduction  for  any  voids;  6.  Stack  wise  prior  written  permission  of  Engineer‐in‐Charge  shall  be  taken  for  dumping  of ballast. No payment  shall be made  in case no such prior written permission  is obtained by  the contractor.  In addition, penal action shall be  taken for disturbing the ballast stacks without thepermission  of  the  competent  authority  of  Railway;

     Signature of Contractor                                                             Schedule Page No: 9  of  

    101                                  Signature of Contract Signing Authority

  • Schedule of Items   LOA No. W496/HIGA/27 Date 12/01/2017 of UCC 74238 

    Schedule 'P'

    VETTED ITEMS

    Sl. No.

    Description of  Items

    CODE

     7. The rate includes leading and lifting / lowering of ballast at the top of steep cuttings or at the bottom  of  high  banks  on  either  side  of  the  bank  /  cutting  to  the  formation. For  dumping  of  ballast  on  track  for  lead  up  to  150  m 

    Quantity

    Rate

    Unit

    Amount

    35000.00

    68.00

    1 cu.m

    24,27,600.00

    ( Rupees  Sixty Eight )

    Contractor's % : 2       Discount : 0

     

    14

    PWNB‐011b

    (i) Leading and dumping of Railways stone ballast without rail traffic block from stacks collectedon either side of formation in mid section / at yards at top of steep cuttings / side or bottom ofhigh  banks  as  directed; (ii)  Spreading  the  ballast  on  the  formation  as  per  standard  section  and  required  cushion withextra  width  on  curves  and; (iii)  Boxing  of  ballast  to  standard  sectional  profile. All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles, machinery,  fuel,  consumables,  loading, unloading with all  incidental  charges and  in all kinds ofweather  conditions  and  site  conditions  including  crossing  of  tracks  wherever  required  dulyobserving all safety precautions and including all ascent, descent, taxes, duties, cess, surcharges, fees etc. completely as per the special conditions / specifications / regulations, as directed by theEngineer‐in‐Charge  and  as  per  the  note(s)  below. Notes: 1. This item consists of 3 stages of payment as mentioned in the sub‐items. The first 3 stages are for  a  lead of 150 m,  the next 3  stages are  for  a  lead between 150 m and 750 m and  the  last 3stages are for a lead between 750 m and 5000 m. Dumping shall be undertaken in these 3 stagesas  instructed; 2.  While  operating  sub‐items  d,  e  and  f,  sub‐  items  a,  b  and  c  need  not  be  and  shall  not  be operated  as  sub‐items  d,  e  and  f  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c. Similarly while operating sub‐items g, h and i, sub‐ items a, b and c need not be and shall not be operated  as  sub‐items  g,  h  and  i  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c; 3. Stage  1 i.e. dumping of ballast shall be done in two phases  a) initial spreading and  b) furtherdumping  after  laying  the  sleepers  and  linking  the  track  as  directed; 4.  Stage  ‐2  i.e.  boxing  of  ballast  to  the  required BG  standard  ballast  profile  as  per  the  cushionspecified  as  per  IRPWM  includes  finishing  to  the  specified  BG  profile; 5.  Payment  shall  be  done  as  per  stack  measurement  without  deduction  for  any  voids;   6.  Stack  wise  prior  written  permission  of  Engineer‐in‐Charge  shall  be  taken  for  dumping  of ballast. No payment  shall be made  in case no such prior written permission  is obtained by  thecontractor.  In addition, penal action shall be  taken for disturbing the ballast stacks without the permission  of  the  competent  authority  of  Railway; 7. The rate includes leading and lifting / lowering of ballast at the top of steep cuttings or at thebottom  of  high  banks  on  either  side  of  the  bank  /  cutting  to  the  formation. (b)For  boxing  to  sectional  profile  for  a  lead  up  to  150  m 

    Quantity

    Rate

    Unit

    Amount

    35000.00

    34.00

    1 cu.m

    12,13,800.00

    ( Rupees  Thirty Four )

    Contractor's % : 2       Discount : 0

     Signature of Contractor                                                             Schedule Page No: 10  of  

    101                                  Signature of Contract Signing Authority

  • Schedule of Items   LOA No. W496/HIGA/27 Date 12/01/2017 of UCC 74238 

    Schedule 'P'

    VETTED ITEMS

    Sl. No.

    Description of  Items

    CODE

     

    15

    PWNB‐011c

    (i) Leading and dumping of Railways stone ballast without rail traffic block from stacks collected on either side of formation in mid section / at yards at top of steep cuttings / side or bottom ofhigh  banks  as  directed; (ii)  Spreading  the  ballast  on  the  formation  as  per  standard  section  and  required  cushion withextra  width  on  curves  and; (iii)  Boxing  of  ballast  to  standard  sectional  profile. All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles,machinery,  fuel,  consumables,  loading, unloading with all  incidental  charges and  in all kinds of weather  conditions  and  site  conditions  including  crossing  of  tracks  wherever  required  dulyobserving all safety precautions and including all ascent, descent, taxes, duties, cess, surcharges,fees etc. completely as per the special conditions / specifications / regulations, as directed by theEngineer‐in‐Charge  and  as  per  the  note(s)  below. Notes: 1. This item consists of 3 stages of payment as mentioned in the sub‐items. The first 3 stages are for  a  lead of 150 m,  the next 3  stages are  for  a  lead between 150 m and 750 m and  the  last 3stages are for a lead between 750 m and 5000 m. Dumping shall be undertaken in these 3 stagesas  instructed; 2.  While  operating  sub‐items  d,  e  and  f,  sub‐  items  a,  b  and  c  need  not  be  and  shall  not  be operated  as  sub‐items  d,  e  and  f  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c. Similarly while operating sub‐items g, h and i, sub‐ items a, b and c need not be and shall not be operated  as  sub‐items  g,  h  and  i  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c; 3. Stage  1 i.e. dumping of ballast shall be done in two phases  a) initial spreading and  b) furtherdumping  after  laying  the  sleepers  and  linking  the  track  as  directed; 4.  Stage  ‐2  i.e.  boxing  of  ballast  to  the  required BG  standard  ballast  profile  as  per  the  cushion specified  as  per  IRPWM  includes  finishing  to  the  specified  BG  profile; 5.  Payment  shall  be  done  as  per  stack  measurement  without  deduction  for  any  voids;  6.  Stack  wise  prior  written  permission  of  Engineer‐in‐Charge  shall  be  taken  for  dumping  of ballast. No payment  shall be made  in case no such prior written permission  is obtained by  thecontractor.  In addition, penal action shall be  taken for disturbing the ballast stacks without thepermission  of  the  competent  authority  of  Railway; 7. The rate includes leading and lifting / lowering of ballast at the top of steep cuttings or at thebottom  of  high  banks  on  either  side  of  the  bank  /  cutting  to  the  formation. (c)For  fully  salvaging  all  the  ballast  at  stack  locations  /  that  fallen  in  drains  /  side  slopes  of formation etc. and dumping the same uniformly in track up to a lead of 150 m 

    Quantity

    Rate

    Unit

    Amount

    5000.00

    12.00

    1 cu.m

    61,200.00

    ( Rupees  Twelve )

    Contractor's % : 2       Discount : 0

     

    16

    PWNB‐011d

    (i) Leading and dumping of Railways stone ballast without rail traffic block from stacks collectedon either side of formation in mid section / at yards at top of steep cuttings / side or bottom ofhigh  banks  as  directed; (ii)  Spreading  the  ballast  on  the  formation  as  per  standard  section  and  required  cushion withextra  width  on  curves  and; (iii)  Boxing  of  ballast  to  standard  sectional  profile.

     Signature of Contractor                                                             Schedule Page No: 11  of  

    101                                  Signature of Contract Signing Authority

  • Schedule of Items   LOA No. W496/HIGA/27 Date 12/01/2017 of UCC 74238 

    Schedule 'P'

    VETTED ITEMS

    Sl. No.

    Description of  Items

    CODE

     All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles, machinery,  fuel,  consumables,  loading, unloading with all  incidental  charges and  in all kinds ofweather  conditions  and  site  conditions  including  crossing  of  tracks  wherever  required  dulyobserving all safety precautions and including all ascent, descent, taxes, duties, cess, surcharges,fees etc. completely as per the special conditions / specifications / regulations, as directed by theEngineer‐in‐Charge  and  as  per  the  note(s)  below. Notes: 1. This item consists of 3 stages of payment as mentioned in the sub‐items. The first 3 stages are for  a  lead of 150 m,  the next 3  stages are  for  a  lead between 150 m and 750 m and  the  last 3stages are for a lead between 750 m and 5000 m. Dumping shall be undertaken in these 3 stagesas  instructed; 2.  While  operating  sub‐items  d,  e  and  f,  sub‐  items  a,  b  and  c  need  not  be  and  shall  not  be operated  as  sub‐items  d,  e  and  f  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c. Similarly while operating sub‐items g, h and i, sub‐ items a, b and c need not be and shall not be operated  as  sub‐items  g,  h  and  i  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c; 3. Stage  1 i.e. dumping of ballast shall be done in two phases  a) initial spreading and  b) furtherdumping  after  laying  the  sleepers  and  linking  the  track  as  directed; 4.  Stage  ‐2  i.e.  boxing  of  ballast  to  the  required BG  standard  ballast  profile  as  per  the  cushionspecified  as  per  IRPWM  includes  finishing  to  the  specified  BG  profile; 5.  Payment  shall  be  done  as  per  stack  measurement  without  deduction  for  any  voids;   6.  Stack  wise  prior  written  permission  of  Engineer‐in‐Charge  shall  be  taken  for  dumping  of ballast. No payment  shall be made  in case no such prior written permission  is obtained by  thecontractor.  In addition, penal action shall be  taken for disturbing the ballast stacks without thepermission  of  the  competent  authority  of  Railway; 7. The rate includes leading and lifting / lowering of ballast at the top of steep cuttings or at thebottom  of  high  banks  on  either  side  of  the  bank  /  cutting  to  the  formation. (d) For dumping of ballast on track for lead more than 150 m and up to 750 m 

    Quantity

    Rate

    Unit

    Amount

    35000.00

    118.00

    1 cu.m

    42,12,600.00

    ( Rupees  One Hundred and Eighteen )

    Contractor's % : 2       Discount : 0

     

    17

    PWNB‐011e

    (i) Leading and dumping of Railways stone ballast without rail traffic block from stacks collectedon either side of formation in mid section / at yards at top of steep cuttings / side or bottom ofhigh  banks  as  directed; (ii)  Spreading  the  ballast  on  the  formation  as  per  standard  section  and  required  cushion withextra  width  on  curves  and; (iii)  Boxing  of  ballast  to  standard  sectional  profile. All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles, machinery,  fuel,  consumables,  loading, unloading with all  incidental  charges and  in all kinds ofweather  conditions  and  site  conditions  including  crossing  of  tracks  wherever  required  dulyobserving all safety precautions and including all ascent, descent, taxes, duties, cess, surcharges, fees etc. completely as per the special conditions / specifications / regulations, as directed by theEngineer‐in‐Charge  and  as  per  the  note(s)  below. Notes: 1. This item consists of 3 stages of payment as mentioned in the sub‐items. The first 3 stages are for a lead of 150 m, the next 3 stages are for a lead between 150 m and 750 m and the last 3 

     Signature of Contractor                                                             Schedule Page No: 12  of  

    101                                  Signature of Contract Signing Authority

  • Schedule of Items   LOA No. W496/HIGA/27 Date 12/01/2017 of UCC 74238 

    Schedule 'P'

    VETTED ITEMS

    Sl. No.

    Description of  Items

    CODE

    stages are for a lead between 750 m and 5000 m. Dumping shall be undertaken in these 3 stagesas  instructed; 2.  While  operating  sub‐items  d,  e  and  f,  sub‐  items  a,  b  and  c  need  not  be  and  shall  not  be operated  as  sub‐items  d,  e  and  f  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c. Similarly while operating sub‐items g, h and i, sub‐ items a, b and c need not be and shall not be operated  as  sub‐items  g,  h  and  i  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c; 3. Stage  1 i.e. dumping of ballast shall be done in two phases  a) initial spreading and  b) furtherdumping  after  laying  the  sleepers  and  linking  the  track  as  directed; 4.  Stage  ‐2  i.e.  boxing  of  ballast  to  the  required BG  standard  ballast  profile  as  per  the  cushionspecified  as  per  IRPWM  includes  finishing  to  the  specified  BG  profile; 5.  Payment  shall  be  done  as  per  stack  measurement  without  deduction  for  any  voids;   6.  Stack  wise  prior  written  permission  of  Engineer‐in‐Charge  shall  be  taken  for  dumping  of ballast. No payment  shall be made  in case no such prior written permission  is obtained by  thecontractor.  In addition, penal action shall be  taken for disturbing the ballast stacks without thepermission  of  the  competent  authority  of  Railway; 7. The rate includes leading and lifting / lowering of ballast at the top of steep cuttings or at thebottom  of  high  banks  on  either  side  of  the  bank  /  cutting  to  the  formation. (e)For  boxing to sectional profile for a lead  more than 150 m and up to 750 m 

    Quantity

    Rate

    Unit

    Amount

    35000.00

    34.00

    1 cu.m

    12,13,800.00

    ( Rupees  Thirty Four )

    Contractor's % : 2       Discount : 0

     

    18

    PWNB‐011f

    (i) Leading and dumping of Railways stone ballast without rail traffic block from stacks collectedon either side of formation in mid section / at yards at top of steep cuttings / side or bottom ofhigh  banks  as  directed; (ii)  Spreading  the  ballast  on  the  formation  as  per  standard  section  and  required  cushion withextra  width  on  curves  and; (iii)  Boxing  of  ballast  to  standard  sectional  profile. All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles,machinery,  fuel,  consumables,  loading, unloading with all  incidental  charges and  in all kinds ofweather  conditions  and  site  conditions  including  crossing  of  tracks  wherever  required  dulyobserving all safety precautions and including all ascent, descent, taxes, duties, cess, surcharges, fees etc. completely as per the special conditions / specifications / regulations, as directed by theEngineer‐in‐Charge  and  as  per  the  note(s)  below. Notes: 1. This item consists of 3 stages of payment as mentioned in the sub‐items. The first 3 stages are for  a  lead of 150 m,  the next 3  stages are  for  a  lead between 150 m and 750 m and  the  last 3stages are for a lead between 750 m and 5000 m. Dumping shall be undertaken in these 3 stagesas  instructed; 2.  While  operating  sub‐items  d,  e  and  f,  sub‐  items  a,  b  and  c  need  not  be  and  shall  not  be operated  as  sub‐items  d,  e  and  f  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c. Similarly while operating sub‐items g, h and i, sub‐ items a, b and c need not be and shall not beoperated  as  sub‐items  g,  h  and  i  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c; 3. Stage  1 i.e. dumping of ballast shall be done in two phases  a) initial spreading and  b) furtherdumping  after  laying  the  sleepers  and  linking  the  track  as  directed; 

     Signature of Contractor                                                             Schedule Page No: 13  of  

    101                                  Signature of Contract Signing Authority

  • Schedule of Items   LOA No. W496/HIGA/27 Date 12/01/2017 of UCC 74238 

    Schedule 'P'

    VETTED ITEMS

    Sl. No.

    Description of  Items

    CODE

    4.  Stage  ‐2  i.e.  boxing  of  ballast  to  the  required BG  standard  ballast  profile  as  per  the  cushionspecified  as  per  IRPWM  includes  finishing  to  the  specified  BG  profile; 5.  Payment  shall  be  done  as  per  stack  measurement  without  deduction  for  any  voids;   6.  Stack  wise  prior  written  permission  of  Engineer‐in‐Charge  shall  be  taken  for  dumping  of ballast. No payment  shall be made  in case no such prior written permission  is obtained by  thecontractor.  In addition, penal action shall be  taken for disturbing the ballast stacks without thepermission  of  the  competent  authority  of  Railway; 7. The rate includes leading and lifting / lowering of ballast at the top of steep cuttings or at thebottom  of  high  banks  on  either  side  of  the  bank  /  cutting  to  the  formation. (f)  For  fully  salvaging  all  the  ballast  at  stack  locations  /  that  fallen  in  drains  /  side  slopes  offormation etc. and dumping the same uniformly in track up to a lead  more than 150 m and up to750 m 

    Quantity

    Rate

    Unit

    Amount

    5000.00

    12.00

    1 cu.m

    61,200.00

    ( Rupees  Twelve )

    Contractor's % : 2       Discount : 0

     

    19

    PWNB‐011g

    (i) Leading and dumping of Railways stone ballast without rail traffic block from stacks collectedon either side of formation in mid section / at yards at top of steep cuttings / side or bottom of high  banks  as  directed; (ii)  Spreading  the  ballast  on  the  formation  as  per  standard  section  and  required  cushion withextra  width  on  curves  and; (iii)  Boxing  of  ballast  to  standard  sectional  profile. All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles,machinery,  fuel,  consumables,  loading, unloading with all  incidental  charges and  in all kinds ofweather  conditions  and  site  conditions  including  crossing  of  tracks  wherever  required  duly observing all safety precautions and including all ascent, descent, taxes, duties, cess, surcharges,fees etc. completely as per the special conditions / specifications / regulations, as directed by theEngineer‐in‐Charge  and  as  per  the  note(s)  below. Notes: 1. This item consists of 3 stages of payment as mentioned in the sub‐items. The first 3 stages are for  a  lead of 150 m,  the next 3  stages are  for  a  lead between 150 m and 750 m and  the  last 3stages are for a lead between 750 m and 5000 m. Dumping shall be undertaken in these 3 stagesas  instructed; 2.  While  operating  sub‐items  d,  e  and  f,  sub‐  items  a,  b  and  c  need  not  be  and  shall  not  be operated  as  sub‐items  d,  e  and  f  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c. Similarly while operating sub‐items g, h and i, sub‐ items a, b and c need not be and shall not be operated  as  sub‐items  g,  h  and  i  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c; 3. Stage  1 i.e. dumping of ballast shall be done in two phases  a) initial spreading and  b) further dumping  after  laying  the  sleepers  and  linking  the  track  as  directed; 4.  Stage  ‐2  i.e.  boxing  of  ballast  to  the  required BG  standard  ballast  profile  as  per  the  cushionspecified  as  per  IRPWM  includes  finishing  to  the  specified  BG  profile; 5.  Payment  shall  be  done  as  per  stack  measurement  without  deduction  for  any  voids;  6.  Stack  wise  prior  written  permission  of  Engineer‐in‐Charge  shall  be  taken  for  dumping  of ballast. No payment  shall be made  in case no such prior written permission  is obtained by  the contractor.  In addition, penal action shall be  taken for disturbing the ballast stacks without thepermission  of  the  competent  authority  of  Railway;

     Signature of Contractor                                                             Schedule Page No: 14  of  

    101                                  Signature of Contract Signing Authority

  • Schedule of Items   LOA No. W496/HIGA/27 Date 12/01/2017 of UCC 74238 

    Schedule 'P'

    VETTED ITEMS

    Sl. No.

    Description of  Items

    CODE

     7. The rate includes leading and lifting / lowering of ballast at the top of steep cuttings or at thebottom  of  high  banks  on  either  side  of  the  bank  /  cutting  to  the  formation. (g)For dumping of ballast on track for lead more than 750 m and up to 5000 m 

    Quantity

    Rate

    Unit

    Amount

    53000.00

    126.00

    1 cu.m

    68,11,560.00

    ( Rupees  One Hundred and Twenty Six )

    Contractor's % : 2       Discount : 0

     

    20

    PWNB‐011h

    (i) Leading and dumping of Railways stone ballast without rail traffic block from stacks collectedon either side of formation in mid section / at yards at top of steep cuttings / side or bottom of high  banks  as  directed; (ii)  Spreading  the  ballast  on  the  formation  as  per  standard  section  and  required  cushion withextra  width  on  curves  and; (iii)  Boxing  of  ballast  to  standard  sectional  profile. All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles,machinery,  fuel,  consumables,  loading, unloading with all  incidental  charges and  in all kinds ofweather  conditions  and  site  conditions  including  crossing  of  tracks  wherever  required  duly observing all safety precautions and including all ascent, descent, taxes, duties, cess, surcharges,fees etc. completely as per the special conditions / specifications / regulations, as directed by theEngineer‐in‐Charge  and  as  per  the  note(s)  below. Notes: 1. This item consists of 3 stages of payment as mentioned in the sub‐items. The first 3 stages are for  a  lead of 150 m,  the next 3  stages are  for  a  lead between 150 m and 750 m and  the  last 3stages are for a lead between 750 m and 5000 m. Dumping shall be undertaken in these 3 stagesas  instructed; 2.  While  operating  sub‐items  d,  e  and  f,  sub‐  items  a,  b  and  c  need  not  be  and  shall  not  be operated  as  sub‐items  d,  e  and  f  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c. Similarly while operating sub‐items g, h and i, sub‐ items a, b and c need not be and shall not be operated  as  sub‐items  g,  h  and  i  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c; 3. Stage  1 i.e. dumping of ballast shall be done in two phases  a) initial spreading and  b) further dumping  after  laying  the  sleepers  and  linking  the  track  as  directed; 4.  Stage  ‐2  i.e.  boxing  of  ballast  to  the  required BG  standard  ballast  profile  as  per  the  cushionspecified  as  per  IRPWM  includes  finishing  to  the  specified  BG  profile; 5.  Payment  shall  be  done  as  per  stack  measurement  without  deduction  for  any  voids;  6.  Stack  wise  prior  written  permission  of  Engineer‐in‐Charge  shall  be  taken  for  dumping  of ballast. No payment  shall be made  in case no such prior written permission  is obtained by  the contractor.  In addition, penal action shall be  taken for disturbing the ballast stacks without thepermission  of  the  competent  authority  of  Railway; 7. The rate includes leading and lifting / lowering of ballast at the top of steep cuttings or at the bottom  of  high  banks  on  either  side  of  the  bank  /  cutting  to  the  formation. (h) For  boxing to sectional profile for a lead  more than 750 m and up to 5000 m 

    Quantity

    Rate

    Unit

    Amount

    53000.00

    34.00

    1 cu.m

    18,38,040.00

    ( Rupees  Thirty Four )

    Contractor's % : 2       Discount : 0

     

     Signature of Contractor                                                             Schedule Page No: 15  of  

    101                                  Signature of Contract Signing Authority

  • Schedule of Items   LOA No. W496/HIGA/27 Date 12/01/2017 of UCC 74238 

    Schedule 'P'

    VETTED ITEMS

    Sl. No.

    Description of  Items

    CODE

    21

    PWNB‐011i

    (i) Leading and dumping of Railways stone ballast without rail traffic block from stacks collectedon either side of formation in mid section / at yards at top of steep cuttings / side or bottom of high  banks  as  directed; (ii)  Spreading  the  ballast  on  the  formation  as  per  standard  section  and  required  cushion withextra  width  on  curves  and; (iii)  Boxing  of  ballast  to  standard  sectional  profile. All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles,machinery,  fuel,  consumables,  loading, unloading with all  incidental  charges and  in all kinds ofweather  conditions  and  site  conditions  including  crossing  of  tracks  wherever  required  duly observing all safety precautions and including all ascent, descent, taxes, duties, cess, surcharges,fees etc. completely as per the special conditions / specifications / regulations, as directed by theEngineer‐in‐Charge  and  as  per  the  note(s)  below. Notes: 1. This item consists of 3 stages of payment as mentioned in the sub‐items. The first 3 stages are for  a  lead of 150 m,  the next 3  stages are  for  a  lead between 150 m and 750 m and  the  last 3stages are for a lead between 750 m and 5000 m. Dumping shall be undertaken in these 3 stages as  instructed; 2.  While  operating  sub‐items  d,  e  and  f,  sub‐  items  a,  b  and  c  need  not  be  and  shall  not  be operated  as  sub‐items  d,  e  and  f  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c. Similarly while operating sub‐items g, h and i, sub‐ items a, b and c need not be and shall not be operated  as  sub‐items  g,  h  and  i  are  all‐inclusive  and  not  extra  over  sub‐  items  a,  b  and  c; 3. Stage  1 i.e. dumping of ballast shall be done in two phases  a) initial spreading and  b) further dumping  after  laying  the  sleepers  and  linking  the  track  as  directed; 4.  Stage  ‐2  i.e.  boxing  of  ballast  to  the  required BG  standard  ballast  profile  as  per  the  cushionspecified  as  per  IRPWM  includes  finishing  to  the  specified  BG  profile; 5.  Payment  shall  be  done  as  per  stack  measurement  without  deduction  for  any  voids;  6.  Stack  wise  prior  written  permission  of  Engineer‐in‐Charge  shall  be  taken  for  dumping  of ballast. No payment  shall be made  in case no such prior written permission  is obtained by  the contractor.  In addition, penal action shall be  taken for disturbing the ballast stacks without thepermission  of  the  competent  authority  of  Railway; 7. The rate includes leading and lifting / lowering of ballast at the top of steep cuttings or at the bottom  of  high  banks  on  either  side  of  the  bank  /  cutting  to  the  formation. (i)  For  fully  salvaging  all  the  ballast  at  stack  locations  /  that  fallen  in  drains  /  side  slopes  offormation etc. and dumping the same uniformly in track up to a lead  more than 750 m and up to 5000 m 

    Quantity

    Rate

    Unit

    Amount

    5000.00

    12.00

    1 cu.m

    61,200.00

    ( Rupees  Twelve )

    Contractor's % : 2       Discount : 0

     

    22

    PWNB‐012a

    (i) Leading up to a lead of 1 (one) km Railway’s stone ballast from ballast stacks on either side of formation  in mid  section  /  at  yards  at  top  of  steep  cuttings  /  side  or  bottom of  high banks  asdirected;  (ii) Loading into railway wagon(s) of any type during day / night using JCB or any other approvedmechanized  means  without  rail  traffic  block; (iii) Unloading during day / night without rail traffic block on the formation at station yard / 

     Signature of Contractor                                                             Schedule Page No: 16  of  

    101                                  Signature of Contract Signing Authority

  • Schedule of Items   LOA No. W496/HIGA/27 Date 12/01/2017 of UCC 74238 

    Schedule 'P'

    VETTED ITEMS

    Sl. No.

    Description of  Items

    CODE

    mid‐section  in  banks  /  cuttings  /  bridges  /  tunnels  etc.  on  mainline  /  loop  line; (iv)  Spreading  the ballast on  the  formation as per  standard  section  and  required  cushion withextra  width  on  curves  and; (v)  Boxing  of  ballast  to  standard  sectional  profile. All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles, machinery,  fuel,  consumables,  loading, unloading with all  incidental  charges and  in all kinds ofweather  conditions  and  site  conditions  including  crossing  of  tracks  wherever  required  dulyobserving all safety precautions and including all ascent, descent, taxes, duties, cess, surcharges, fees etc. completely as per the special conditions / specifications / regulations, as directed by theEngineer‐in‐Charge  and  as  per  the  note(s)  below. Notes: 1. This item consists of 2 stages of payment as mentioned in the sub‐items. Stage ‐ 1 is for leading and  loading  and  stage  –  2  is  for  unloading,  spreading  and  boxing  of  ballast; 2.  Payment  shall  be  done  as  per  stack  measurement  without  deduction  for  any  voids; 3. Stack wise prior written permission of Dy.CE‐in‐Charge shall be taken for dumping of ballast. No payment shall be made in case no such prior written permission is obtained by the contractor.In addition, penal action shall be taken for disturbing the ballast stacks without the permission ofthe  competent  authority  of  Railway; 4. The rate includes engaging lookout men and banner flag men with hand flags and banner flagsrespectively in the day and signal lamps etc. in the night, wherever required (in case of doublingprojects,  yards  etc.),  for  the  safety  of  rail  traffic  passing  on  adjacent  line(s)  &  personnel; 5.  No  compensation  for  idling  of  manpower,  machinery  etc.  shall  be  paid  in  case  of  loss  ofutilization  due  to  non‐availability  of  wagons  /  traction  power  /  crew  of  Railway  underunavoidable  circumstances  after  all  the  resources  have  been  mobilised  by  the  contractor; 6. The agency has to arrange machinery and sufficient personnel for loading and / or unloading ofballast  at  short  notice  and  even  for  short  duration  and  for  lesser  quantity; 7. The ballast shall be unloaded in such a way as to not infringe the moving dimensions. The rateincludes shifting of ballast away from running line (after the ballast has been unloaded) requiredto clear infringement to the moving dimensions. Such a shifting shall be done immediately before passage  of  trains  as  directed  by  the  Engineer‐in‐Charge; 8. The rate includes leading and lifting / lowering of ballast at the top of steep cuttings or at thebottom  of  high  banks  on  either  side  of  the  bank  /  cutting  to  the  formation. Leading  and  loading  of  ballast  into  wagons 

    Quantity

    Rate

    Unit

    Amount

    1000.00

    55.00

    1 cu.m

    56,100.00

    ( Rupees  Fifty Five )

    Contractor's % : 2       Discount : 0

     

    23

    PWNB‐012b

    (i) Leading up to a lead of 1 (one) km Railways stone ballast from ballast stacks on either side of formation  in mid  section  /  at  yards  at  top  of  steep  cuttings  /  side  or  bottom of  high banks  asdirected;  (ii) Loading into railway wagon(s) of any type during day / night using JCB or any other approvedmechanized  means  without  rail  traffic  block; (iii) Unloading during day / night without rail traffic block on the formation at station yard / 

     Signature of Contractor                                                             Schedule Page No: 17  of  

    101                                  Signature of Contract Signing Authority

  • Schedule of Items   LOA No. W496/HIGA/27 Date 12/01/2017 of UCC 74238 

    Schedule 'P'

    VETTED ITEMS

    Sl. No.

    Description of  Items

    CODE

    mid‐section  in  banks  /  cuttings  /  bridges  /  tunnels  etc.  on  mainline  /  loop  line; (iv)  Spreading  the ballast on  the  formation as per  standard  section  and  required  cushion with extra  width  on  curves  and; (v)  Boxing  of  ballast  to  standard  sectional  profile. All of  the above shall be executed with contractor's skilled personnel,  tools and plant, vehicles,machinery,  fuel,  consumables,  loading, unloading with all  incidental  charges and  in all kinds ofweather  conditions  and  site  conditions  including  crossing  of  tracks  wherever  required  dulyobserving all safety precautions and including all ascent, descent, taxes, duties, cess, surcharges, fees etc. completely as per the special conditions / specifications / regulations, as directed by theEngineer‐in‐Charge  and  as  per  the  note(s)  below. Notes: 1. This item consists of 2 stages of payment as mentioned in the sub‐items. Stage ‐ 1 is for leading and  loading  and  stage    2  is  for  unloading,  spreading  and  boxing  of  ballast; 2.  Payment  shall  be  done  as  per  stack  measurement  without  deduction  for  any  voids; 3. Stack wise prior written permission of Dy.CE‐in‐Charge shall be taken for dumping of ballast. No payment shall be made in case no such prior written permission is obtained by the contractor.In addition, penal action shall be taken for disturbing the ballast stacks without the permission ofthe  competent  authority  of  Railway; 4. The rate includes engaging lookout men and banner flag men with hand flags and banner flagsrespectively in the day and signal lamps etc. in the night, wherever required (in case of doublingprojects,  yards  etc.),  for  the  safety  of  rail  traffic  passing  on  adjacent  line(s)  &  personnel; 5.  No  compensation  for  idling  of  manpower,  machinery  etc.  shall  be  paid  in  case  of  loss  ofutilization  due  to  non‐availability  of  wagons  /  traction  power  /  crew  of  Railway  underunavoidable  circumstances  after  all  the  resources  have  been  mobilised  by  the  contracto