7 Reasons
Why GridInvestment Fail
-
8/17/2019 7 Reason Why Grid Investment Fail
2/12
⊡7 Reasons Why GridInvestment Fail
-
8/17/2019 7 Reason Why Grid Investment Fail
3/12
PitFall : Vendor/ Integrator businesscase analysis
Utility often rely on vendors or system integrator to provinvestment business system. Since these organization financial interest in moving project forward, a conflict-ofin inherent in this practice.
Recommendation : ngage third parties who has no finterest in the project to provide an unbiased financial evof the smart grid project
1
-
8/17/2019 7 Reason Why Grid Investment Fail
4/12
PitFall : Absence o ris! analysis
!hange in wholesase power cost structure, uncertaincostumer demand response participation, and many othecan result in considerable uncertainty over estimated resmart grid invesment.
Recommendation : Smart grid business case analysisinclude ris" analysis associated with uncertain parametassumption,applied in the analysis. Scenario analysis help impact of uncertainty while value-at-ris" analysis ptraditional financial ris" analysis.
"
-
8/17/2019 7 Reason Why Grid Investment Fail
5/12
PitFall : Failure to #uantiy uni#ueutility and costumer characteristic
#usiness case analysis often apply industry average parand estimaters that poorly represent actual utility characS$R! e%perience show that average cost& benefit parametpoor job of reflecting actual utility cost and benefit. #est
re'uires an objective evaluation of the business casavailable utility data.Recommendation : ma"e sure that the business case e%plicity 'uantifies these benefits for your utility rathrelying on estimates from other utilities.
$
-
8/17/2019 7 Reason Why Grid Investment Fail
6/12
PitFall : %ub&ective system integrator/'rime contractor selection(
%electing a system integrator/ 'rime contractoa''roving subcontractor based on name recogsales re'resentative) relationshi' or other sconsideration is dangerous(
Recommendation : don*t automatically assume +big name, 'rime contactor or subcontractodeliver all 'roduct and service -ithout com'li.he smart grid is relatively ne- a'lication area th+sha!e out, non 'erorming com'anies both larsmall( hec! many reerence(
0
-
8/17/2019 7 Reason Why Grid Investment Fail
7/12
PitFall : %ot-are 'erormance ailure(
Smart grid depend on software& () performance. (f your capability have not been successfully applied by several li"e your, proceed at you own ris". Software is notoriously to implement and modify for different application.
Recommendation : ma"e sure that you tal" with softwarvendor whose application are semilar to yours to ensurdelivery and acceptable capabilities.
-
8/17/2019 7 Reason Why Grid Investment Fail
8/12
Inade#uate 'ost2A3I im'lementationstrategies(
*any smart grid business plans rely heavily on post-+*( from costumer engagement& demand response, + anowever, program development and implementation planidentified and scheduled to limit implementation delays.
Recommendation : ma"e sure that post-+mi benefappropriately considered with program developmeimplementation plans clearly identified and scheduled implementation delays.
4
-
8/17/2019 7 Reason Why Grid Investment Fail
9/12
Insu5cient utility due diligence(
)his last category is a catchall that capture all those thiutilities should consider including elements from some ofitem above. )here are li"ely to be option that are not offefavored proposal that should be considered.
Recommendation : each utility should retain an independent evaluation firm for its due deligence or develohouse team of smart grid project participant from the application areas who have responsiblility for assessievaluating.
7
-
8/17/2019 7 Reason Why Grid Investment Fail
10/12
/US)(01?
-
8/17/2019 7 Reason Why Grid Investment Fail
11/12
“THANK YOU
-