7 - Manufacturing Resource Planning
Dr. Ron Tibben-Lembke
pp. 222-234, 236-7, 240
![Page 2: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/2.jpg)
How do we account for LT?
System for organizing WIP releases Consider LT for each item Look at BOM to see what parts needed Release so they will arrive just as needed
Example Figure 7.2 Order quantity is 50 units LT is one week I’ve added “Net requirements” and “scheduled
releases” rows to Figure for clarity
![Page 3: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/3.jpg)
Fig 7.2
1 2 3 4 5
Gross Requirements 10 40 10
Scheduled receipts (begin) 50
Projected Available Balance (ending) 4
54
44
44
4
Net Requirements 6
Planned Order Receipts
Planned Order Releases
6 units short
![Page 4: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/4.jpg)
Fig 7.2
1 2 3 4 5
Gross Requirements 10 40 10
Scheduled receipts (begin) 50
Projected Available Balance (ending) 4
54
44
44
4
Net Requirements 6
Planned Order Receipts 50
Planned Order Releases 50
Order 50 units week earlier
![Page 5: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/5.jpg)
Fig 7.2
1 2 3 4 5
Gross Requirements 10 40 10
Scheduled receipts (begin) 50
Projected Available Balance (ending) 4
54
44
44
4
44
Net Requirements 6
Planned Order Receipts 50
Planned Order Releases 50
Ending inventory
![Page 6: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/6.jpg)
Terminology
Projected Available balance Not on-hand (that may be greater) Tells how many will be available (in ATP sense)
Planned order releases ≠ scheduled receipts Only when material has been committed to their
production Move to scheduled receipts as late as possible Preserves flexibility
![Page 7: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/7.jpg)
Figure 7.3 1605 Snow Shovel
1605 Snow Shovel
048Scoop-shaftconnector
13122 Top Handle Assy314 scoop assembly
118 Shaft (wood)
062 Nail (4)
14127 Rivet (4)
![Page 8: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/8.jpg)
314 scoop assembly
314 scoop assembly
14127 Rivet (6)019 Blade (steel)
2142 Scoop (aluminum)
![Page 9: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/9.jpg)
13122 Top Handle Assembly
1118Top handle
Coupling (steel)
11495 WeldedTop handle bracket
Assembly
13122 Top Handle Assembly
457 Top handle(wood)
129 Top HandleBracket (steel)
082 Nail (2)
![Page 10: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/10.jpg)
BOM Explosion
Process of translating net requirements into components part requirementsTake into account existing inventoriesConsider also scheduled receipts
![Page 11: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/11.jpg)
BOM Explosion Example
Need to make 100 shovelsWe are responsible for handle
assemblies.
![Page 12: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/12.jpg)
13122 Top Handle Assembly
1118Top handle
Coupling (steel)
11495 WeldedTop handle bracket
Assembly
13122 Top Handle Assembly
457 Top handle(wood)
129 Top HandleBracket (steel)
082 Nail (2)
![Page 13: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/13.jpg)
Net Requirements
Sch Gross NetPart Description Inv Rec Req ReqTop handle assy 25 -- 100 75
Top handle 22 25Nail (2 required) 4 50Bracket Assy 27 --
Top bracket 15 --Top coupling 39 15
![Page 14: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/14.jpg)
Figure 7.5
Sch Gross NetPart Description Inv Rec Req ReqTop handle assy 25 -- 100 75
Top handle 22 25 75 28Nail (2 required) 4 50 150 96Bracket Assy 27 -- 75 48
Top bracket 15 --Top coupling 39 15
![Page 15: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/15.jpg)
13122 Top Handle Assembly
1118Top handle
Coupling (steel)
11495 WeldedTop handle bracket
Assembly
13122 Top Handle Assembly
457 Top handle(wood)
129 Top HandleBracket (steel)
082 Nail (2)
![Page 16: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/16.jpg)
Figure 7.5
Sch Gross NetPart Description Inv Rec Req ReqTop handle assy 25 -- 100 75
Top handle 22 25 75 28Nail (2 required) 4 50 150 96Bracket Assy 27 -- 75 48
Top bracket 15 -- 48 33Top coupling 39 15 48 --
![Page 17: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/17.jpg)
Timing of Production
This tells us how many of each we needDoesn’t tell when to startStart as soon as possible?Dependent events (oh no, not that!)
(We ignore statistical fluctuations)Front schedule Cutting approach (Fig. 7.6)
p. 231Back schedule Fig. 7.7 p.232
![Page 18: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/18.jpg)
Fig 7.8 – 13122 Top Handle Assy
13122 Top handle LT = 2
1
2
3
4
5
6
7
8
9
10
Gross Req 20 10 20 5 35 10
Sch receipts
Proj. Avail Bal (ending)
25
25
5
5
Net Req 5
Pl Order Rec 5
Pl Order Rel 5
p. 233
![Page 19: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/19.jpg)
Fig 7.8 – 13122 Top Handle Assy -2
13122 Top handle LT = 2
1
2
3
4
5
6
7
8
9
10
Gross Req 20 10 20 5 35 10
Sch receipts
Proj. Avail Bal (ending)
25
25
5
5
0
0
0
0
0
0
0
Net Req 5 20 5 35 10
Pl Order Rec 5 20 5 35 10
Pl Order Rel 5 20 5 35 10
![Page 20: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/20.jpg)
13122 Top Handle Assembly
1118Top handle
Coupling (steel)
11495 WeldedTop handle bracket
Assembly
13122 Top Handle Assembly
457 Top handle(wood)
129 Top HandleBracket (steel)
082 Nail (2)
X
![Page 21: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/21.jpg)
457 Top Handle
13122 Top handle LT = 2
1
2
3
4
5
6
7
8
9
10
Gross Req 20 10 20 5 35 10
Sch receipts
Proj. Avail Bal (ending)
25
25
5
5
0
0
0
0
0
0
0
Net Req 5 20 5 35 10
Pl Order Rec 5 20 5 35 10
Pl Order Rel 5 20 5 35 10
LT = 2
1
2
3
4
5
6
7
8
9
10
Gross Req 5 20 5 35 10
Sch receipts 25
Proj. Avail Bal (ending)
22
22
Net Req
Pl Order Rec
Pl Order Rel
One handle forEach assembly
![Page 22: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/22.jpg)
457 Top Handle
LT = 2
1
2
3
4
5
6
7
8
9
10
Gross Req 5 20 5 35 10
Sch receipts 25
Proj. Avail Bal (ending)
22
22
17
Net Req
Pl Order Rec
Pl Order Rel
![Page 23: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/23.jpg)
457 Top Handle
LT = 2
1
2
3
4
5
6
7
8
9
10
Gross Req 5 20 5 35 10
Sch receipts 25
Proj. Avail Bal (ending)
22
22
17
42
22
17
17
Net Req 18 10
Pl Order Rec 18 10
Pl Order Rel 18 10
![Page 24: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/24.jpg)
13122 Top Handle Assembly
1118Top handle
Coupling (steel)
11495 WeldedTop handle bracket
Assembly
13122 Top Handle Assembly
457 Top handle(wood)
129 Top HandleBracket (steel)
082 Nail (2)
X
![Page 25: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/25.jpg)
13122 Top Handle Assembly
1118Top handle
Coupling (steel)
11495 WeldedTop handle bracket
Assembly
13122 Top Handle Assembly
457 Top handle(wood)
129 Top HandleBracket (steel)
082 Nail (2)
X
X
![Page 26: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/26.jpg)
082 Nail (2 required)
LT = 1 Lot Size = 50
1
2
3
4
5
6
7
8
9
10
Gross Req 10 40 10 70 20
Sch receipts 50
Proj. Avail Bal (ending)
4
54
Net Req
Pl Order Rec
Pl Order Rel
13122 Top handle LT = 2
1
2
3
4
5
6
7
8
9
10
Gross Req 20 10 20 5 35 10
Sch receipts
Proj. Avail Bal (ending)
25
25
5
5
0
0
0
0
0
0
0
Net Req 5 20 5 35 10
Pl Order Rec 5 20 5 35 10
Pl Order Rel 5 20 5 35 10
Two nails forEach assembly
![Page 27: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/27.jpg)
082 Nail (2 required)
LT = 1 Lot Size = 50
1
2
3
4
5
6
7
8
9
10
Gross Req 10 40 10 70 20
Sch receipts 50
Proj. Avail Bal (ending)
4
54
44
44
4
Net Req 6
Pl Order Rec 50
Pl Order Rel 50
![Page 28: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/28.jpg)
082 Nail (2 required)
LT = 1 Lot Size = 50
1
2
3
4
5
6
7
8
9
10
Gross Req 10 40 10 70 20
Sch receipts 50
Proj. Avail Bal (ending)
4
54
44
44
4
44
Net Req 6 26 20
Pl Order Rec 50
Pl Order Rel 50
![Page 29: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/29.jpg)
082 Nail (2 required)
LT = 1 Lot Size = 50
1
2
3
4
5
6
7
8
9
10
Gross Req 10 40 10 70 20
Sch receipts 50
Proj. Avail Bal (ending)
4
54
44
44
4
44
44
24
4
4
4
Net Req 6 26
Pl Order Rec 50 50
Pl Order Rel 50
![Page 30: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/30.jpg)
13122 Top Handle Assembly
1118Top handle
Coupling (steel)
11495 WeldedTop handle bracket
Assembly
13122 Top Handle Assembly
457 Top handle(wood)
129 Top HandleBracket (steel)
082 Nail (2)
X
XX
![Page 31: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/31.jpg)
11495 Bracket Assembly
13122 Top handle LT = 2
1
2
3
4
5
6
7
8
9
10
Gross Req 20 10 20 5 35 10
Sch receipts
Proj. Avail Bal (ending)
25
25
5
5
0
0
0
0
0
0
0
Net Req 5 20 5 35 10
Pl Order Rec 5 20 5 35 10
Pl Order Rel 5 20 5 35 10
LT = 2
1
2
3
4
5
6
7
8
9
10
Gross Req
Sch receipts
Proj. Avail Bal (ending)
27
Net Req
Pl Order Rec
Pl Order Rel
One bracket forEach assembly
![Page 32: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/32.jpg)
11495 Bracket Assembly
13122 Top handle LT = 2
1
2
3
4
5
6
7
8
9
10
Gross Req 20 10 20 5 35 10
Sch receipts
Proj. Avail Bal (ending)
25
25
5
5
0
0
0
0
0
0
0
Net Req 5 20 5 35 10
Pl Order Rec 5 20 5 35 10
Pl Order Rel 5 20 5 35 10
LT = 2
1
2
3
4
5
6
7
8
9
10
Gross Req 5
Sch receipts
Proj. Avail Bal (ending)
27
Net Req
Pl Order Rec
Pl Order Rel
One bracket forEach assembly
![Page 33: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/33.jpg)
11495 Bracket Assembly
13122 Top handle LT = 2
1
2
3
4
5
6
7
8
9
10
Gross Req 20 10 20 5 35 10
Sch receipts
Proj. Avail Bal (ending)
25
25
5
5
0
0
0
0
0
0
0
Net Req 5 20 5 35 10
Pl Order Rec 5 20 5 35 10
Pl Order Rel 5 20 5 35 10
LT = 2
1
2
3
4
5
6
7
8
9
10
Gross Req 5 20 5 35 10
Sch receipts
Proj. Avail Bal (ending)
27
Net Req
Pl Order Rec
Pl Order Rel
One bracket forEach assembly
![Page 34: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/34.jpg)
11495 Bracket Assembly
LT = 2
1
2
3
4
5
6
7
8
9
10
Gross Req 5 20 5 35 10
Sch receipts
Proj. Avail Bal (ending)
27
22
22
2
Net Req 3 35 10
Pl Order Rec 3 35 10
Pl Order Rel 3 35 10
![Page 35: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/35.jpg)
13122 Top Handle Assembly
1118Top handle
Coupling (steel)
11495 WeldedTop handle bracket
Assembly
13122 Top Handle Assembly
457 Top handle(wood)
129 Top HandleBracket (steel)
082 Nail (2)
X
XXX
![Page 36: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/36.jpg)
129 Top Bracket
LT = 1
1
2
3
4
5
6
7
8
9
10
Gross Req 3 35 10
Sch receipts
Proj. Avail Bal (ending)
15
Net Req
Pl Order Rec
Pl Order Rel
LT = 2
1
2
3
4
5
6
7
8
9
10
Gross Req 5 20 5 35 10
Sch receipts
Proj. Avail Bal (ending)
27
22
22
2
Net Req 3 35 10
Pl Order Rec 3 35 10
Pl Order Rel 3 35 10
![Page 37: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/37.jpg)
129 Top handle bracket
LT = 1
1
2
3
4
5
6
7
8
9
10
Gross Req 3 35 10
Sch receipts
Proj. Avail Bal (ending)
15
15
15
12
12
Net Req 23 10
Pl Order Rec 23 10
Pl Order Rel 23 10
![Page 38: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/38.jpg)
13122 Top Handle Assembly
1118Top handle
Coupling (steel)
11495 WeldedTop handle bracket
Assembly
13122 Top Handle Assembly
457 Top handle(wood)
129 Top HandleBracket (steel)
082 Nail (2)
X
XXX
X
![Page 39: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/39.jpg)
1118 Top handle coupling
LT = 3 Safety Stock = 20
1
2
3
4
5
6
7
8
9
10
Gross Req 3 35 10
Sch receipts
Proj. Avail Bal (ending)
39
Net Req
Pl Order Rec
Pl Order Rel
LT = 2
1
2
3
4
5
6
7
8
9
10
Gross Req 5 20 5 35 10
Sch receipts
Proj. Avail Bal (ending)
27
22
22
2
Net Req 3 35 10
Pl Order Rec 3 35 10
Pl Order Rel 3 35 10
![Page 40: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/40.jpg)
1118 Top handle coupling
LT = 3 Safety Stock = 20
1
2
3
4
5
6
7
8
9
10
Gross Req 3 35 10
Sch receipts 15
Proj. Avail Bal (ending)
39
39
54
51
51
16
Net Req 4
Pl Order Rec 4
Pl Order Rel 4
![Page 41: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/41.jpg)
1118 Top handle coupling
LT = 3 Safety Stock = 20
1
2
3
4
5
6
7
8
9
10
Gross Req 3 35 10
Sch receipts 15
Proj. Avail Bal (ending)
39
39
54
51
51
20
20
20
20
20
20
Net Req 4 10
Pl Order Rec 4 10
Pl Order Rel 4 10
![Page 42: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/42.jpg)
Other considerations
Safety stock if uncertainty in demand or supply quantity Don’t let available go down to 0
Safety LT if uncertainty in arrival time of supplyPlace order earlier than necessary
Order quantitiesEOQ, Lot-For-Lot, Periodic Order quantity,
more to come in ch. 14
![Page 43: 7 - Manufacturing Resource Planning Dr. Ron Tibben-Lembke pp. 222-234, 236-7, 240](https://reader036.vdocuments.us/reader036/viewer/2022070306/55182b26550346a7318b4e0a/html5/thumbnails/43.jpg)
Homework
DQ: 3, 7Problems: 3,5,6,7