6tjxukxyjx

Download 6tjxukxyjx

If you can't read please download the document

Upload: evansparrow

Post on 12-Sep-2015

4 views

Category:

Documents


1 download

DESCRIPTION

fhcghc

TRANSCRIPT

EngineerAlstom TransportFebruary 2014 Present (1 year 6 months)bangaloreI'm currently working on the "Fjernbane Infrastructure East" at Alstom Transport ,Bangalore. The project consists of the implementation of the total renewal of the Danish signalling infrastructure for the East part of the country.Involved in the Hardware design,interface design for the the field equipments to the IXL interlocking.Exposure to the Planning,developing & designing of cable terminal frame,I/O bit mapping,Installation drawings,Cable list,cubicle design .Asst.Signalling Design EngineerEtoE RailNovember 2011 December 2013 (2 years 2 months)BangaloreSSI INTERLOCKING (WESTRACE) for Chengalpattu station -producing vital and non-vital circuits based on Sectional Route Release.Signalling Design for Australia-Hardware design for FMG -GE TRANSPORTATION.(Coded track,SFD,DED,HBWD)Worked for SINGAPORE METRO.(CBTC-PMI MIGRATING SYSTEM involving the cut in design-Interface circuits for Platform screen doors,protection key switch,emergency stop plungers,emergency sop button.,)R&D Engineer-1G.G.TRONICS INDIA PVT.LtdSeptember 2010 September 2011 (1 year 1 month)Peenya,BangaloreR&D Testing & IntegarationOn Board Circuit DevelopmentProjectsSolomon LoopSeptember 2012Designing of Location Details and Power Calculations.The Location Design includes Point Circuits, DC Track Circuits, DED Circuits, Stream Flow Detector Circuits, Hot Bearing and Hot Wheel Detectors (HWBD) Circuits, Cable Distribution Plan, Cable Interconnection Diagram, Conduit Layout and also Bill of MaterialsTeam members:Deepa Joseph, Syed Akram, Mysoora ReddyChengalpattu SSIFebruary 2012 May 2012Chenagalpattu Station comes under Southern Railways(INDIAN RAILWAYS). This station has a 166 possible Routes.It comes under sectional route releaseExecution of Application logic with GCSS TOOL of WESTRACE SYSTEMS which involves both vital and non vital circuits.Involved partly in simulation of the logic Sucessfully completed Design with Factory Acceptance Test.Team members:Deepa Joseph, Syed Akram, Mysoora Reddy, G.Venkatesh Kannan - Team Leader, MOHAMMED MUJAHEDResignalling of Singapore MetroDecember 2013Interface design for track side elements such as Platform screen doors,protection key swith,platform stop plungers,blast door,emergency stop button,power distribution which involves the cut in desin for CBTC -PMI migrating system.It also involved in the preparation of cable plan,terminal frame. ,CoursesEtoE RailBASIC CONCEPTS OF R