66346697 smart plant enterprise install checklist
TRANSCRIPT
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
1/54
Unless otherwise specified, the topics listed in theAddition al Resourcescolumn can be found in the Full Text Retrieval (FTR) Installation and Configuration Guide.
Set Up the FTR Index Server
Task Number User Role Tool Step Description Comments/ Problems / Workarounds Additional Resources Setup Notes
1.0 FTR Install Operating SystemInstalling and Configuri ng FTR
with SmartPlant Foundation
1.1
Windows
2000 Server
or AdvancedServer
Install Microsoft Windows 2000 Server or Advanced
Server Service Pack 4
If you are using Microsoft Windows 2003 Server Service Pack 1, go
to step 1.2.
1.2Windows
2003 Server
Install Microsoft Windows 2003 Server Service Pack
1.
2.0 FTR Install Prerequisite Software
2.1 Oracle Install Oracle Client 10g R2 (10.2.0.1)
2.2 MDAC Install MDAC 2.8.1MDAC is delivered on Disc 1 of the SmartPlant Enterprise 2007 DVD
set. Click Prerequisite Software.
2.3 MSXML Install MSXML 4.0 SP2MSXML is delivered on Disc 1 of the SmartPlant Enterprise 2007
DVD set. Click Prerequisite Software.
2.4Adobe
ReaderInstall Adobe Reader 7.0.
Adobe Reader is delivered on Disc 1 of the SmartPlant Enterprise
2007 DVD set. ClickAdob e Reader Instal lati on.
3.0 Oracle Install Oracle Client on the FTR Main Host
Before you can configure the FTR Main Host to fetch tasks for
indexing from the SmartPlant Foundation data database, you must
install Oracle Client on the FTR Main Host. See the Oracle
documentation for more information.
4.0Set up database access by creating an
Oracle DSN
The FTR Index Server uses ODBC connections to connect to the
SmartPlant Foundation data database. If the FTR Index Server is
installed on the SmartPlant Foundation server, you do not need to
define a separate DSN Name for the FTR Index server. If the FTR
Full Text Retrieval (FTR)I n s t a l la t i o n & Co n f i g u r a t i o n Ch e c k l i s t
Software Versions: 2007 (3.5)
1 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
2/54
Unless otherwise specified, the topics listed in theAddition al Resourcescolumn can be found in the Full Text Retrieval (FTR) Installation and Configuration Guide.
Full Text Retrieval (FTR)I n s t a l la t i o n & Co n f i g u r a t i o n Ch e c k l i s t
Software Versions: 2007 (3.5)
Set Up the FTR Index Server
Task Number User Role Tool Step Description Comments/ Problems / Workarounds Additional Resources Setup Notes
5.0 FTRInstal l FTR Run Time (RT) on the FTR Main
Host
FTR RT must be installed before SmartPlant Foundation
is installed.Installing and Configuri ng FTR
with SmartPlant Foundation
5.1 FTR/SPFUninstall both FTR RT and SmartPlant Foundation (if
already installed).
When you remove previous versions of FTR, you will be prompted to
restart your computer. You should restart your computer before
continuing.
5.2 Configure the SPF vaults on the FTR Main Host.
The SmartPlant Foundation Vaults are called FTR Hosts. Because
all files residing in these FTR hosts are indexed locally on their
respective computers, the FTR Main Host should know the names of
all SmartPlant Foundation Vault hosts.
5.3Insert Disc 1 of the SmartPlant Enterprise 2007 DVD
set.
5.4Click Information Management Softwarein the
SmartPlant Enterprise Installationwindow to
access the FTR Installation.
5.5 Choose a Typical installation.
5.6 Finish installation steps and restart your computer. Reinstall SmartPlant Foundation after you restart your computer.
5.7 SPF Install or reinstall SmartPlant Foundation.See the SmartPlant Foundation
Installation and Setup Guide.
6.0 SPF/FTRInstall the FTR Index Server on the FTR
Main Host
You must have the FTR RT software installed on the Main
Host before you can install the FTR Index Server
software. See step 5.0 above for instructions.
Installing and Configuri ng FTR
with SmartPlant Foundation
6.1
Insert Disc 1 of the SmartPlant Enterprise 2007 DVD
set.
6.2
ClickInformation Management Softwarein the
SmartPlant Enterprise Installationwindow to
access the SmartPlant Foundation Installation.
6.3Choose a Custominstallation, and select FTR Index
Serverfrom the list of components.
The SmartPlant Foundation installation stops IIS services when you
click Next. The software restarts these services after SmartPlant
Foundation installation is complete. Be sure that these services have
started successfully before using the SmartPlant Fou
6.4 Finish installation steps.
2 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
3/54
Unless otherwise specified, the topics listed in theAddition al Resourcescolumn can be found in the Full Text Retrieval (FTR) Installation and Configuration Guide.
Full Text Retrieval (FTR)I n s t a l la t i o n & Co n f i g u r a t i o n Ch e c k l i s t
Software Versions: 2007 (3.5)
Install and Configure FTR Run Time (RT) on all SPF Vaults
Task Number User Role Tool Step Description Comments/ Problems / Workarounds Additional Resources Setup Notes
7.0 FTRInstall and conf igure FTR RT on all SPF
vaults
All files are indexed on their respective SmartPlant
Foundation vaults. The vaults are called FTR Hosts.
Because all files residing in these FTR hosts are indexed
locally on their respective computers, the FTR Main Host
should know the names of all SmartP
Installing and Configuri ng FTR
with SmartPlant Foundation
3 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
4/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
5/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
6/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
7/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
8/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
9/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
10/54
22.7 PDS Modify the envar.txt file in the project folder to point to the correct reference data foryour project
22.8 PDS In PARNU, create the prj_project schemaIn the Project Environmentdialog box, click Database > Create > Create Schema. Replace
project with your project name. See Task 21.9for details on using the Create Schema form.
22.9 PDS Specify the location of the HVAC project file
Click Start > All Prog rams > HVAC Modeling > PEHVAC Configure. In the HVAC_PROJ_PATH
field, enter the folder containing the HVAC project file, as defined in step. In the
HVAC_PROJ_NODEfield, enter the name of the file server.
22.10 PDS Specify the location of the HVAC control fileClick Start > All Prog rams > HVAC Modeling > PEHVAC Configure. In the PEHVAC Control File
field, specify the location of the peh.cmd file.
22.11 PDS Create the hrf_project schemaIn theProject Environment dialog box, click Database > Create > Create Schema. Replace
project with your project name. See Task 21.9 for details on using the Create Schema form.
22.12 PDS Load the PE-HVAC tables to the databaseIn the Project Environmentdialog box, clickAppl icat ions > PE_HVAC and select your project. On
the Reference Databases form, select Load,and enter envar.txtin the Filenamefield.
22.13 PDS Create a PE-HVAC design fileIn the Project Environmentdialog box, select PE-HVAC. In the Create Design Filedialog box,
specify the settings for your design file.
22.14 PDS Set the units for the design file
In the Project Environmentdialog box, select PE-HVAC > Enter Design File. Select a design file
and click OK.In the graphical environment, click Settings > Design File . Change the MU:SU:PUsettings to match the settings of the PDS project (1:12:2032 for English projects or 1:1000:80 for
metric projects).
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Additional Resources Setup Notes
23.0 PDS Configure PDS for an integrated environmentFor guidelines about integrating PDS, see theSmartPlant Enterprise Installation &
Setup of SmartPlant Foundation (SPF) checklist.
on gure ant esgn
System (PDS) for an
Integrated Environment
Working in an Integrated Environment
10 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
11/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
12/54
Unless otherwise specified, the topics listed in theAddition al Resourcescolumn can be found in the SmartPlant 3D Installation Guide .
Installation and Configuration Flowchart (SP3D Flowchart)
Set Up the SmartPlant 3D Database Server:
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Documentation Link TR / CR Setup Notes
Software Versions: 2007
(7.0)
SmartPlant EnterpriseI n s t a l la t i o n & S e t u p o f Sm a r t P la n t 3 D ( S P3 D )
2.7 SP3DAs a Local Administrator, log into Oracle and run the
SP3DRoles.sql, SP3DUser.sql, and
SP3DProjectAdministrator.sql scripts
2.8 SP3D Intall the Oracle MTS Recovery Service
2.9 SP3D Create the Oracle Streams Tablespace
2.10 SP3D Create the Oracle Streams Administrator
3.0 SP3DConfigure the SmartPlant 3D Database Server for
MSSQL Server 2005
If you are using Oracle 10gR2 as your database software
and have completed Task Number 2.0, skip this section
and go to Task Number 4.0.
3.1 SP3DInstall and configure MSSQL Server 2005 SP1on the
database server
If you are using SmartPlant 3D in a stand-along environment, installSQL Server 2005 Standard edition. If you are using SmartPlant 3D
in a Global Workshare Envornment, install SQL Server 2005
Enterprise edition. Microsoft SQL Server 2005 requires XML 6.
3.2 SP3D Verify automatic startup of MSSQL Server 2005services.
3.3 SP3DRegister the database server in the Enterprise Manager
console
3.4 SP3D Assign system administrator privileges+R[22]C
4.0 SP3DInstall Prerequisite Software on SmartPlant 3D
Database Server
4.1 SP3D MDAC 2.8 SP1 (2.8.1)
Installed during Windows 2003 setup. For Windows 2000 Server
installations, available on the SmartPlant Enterprise DVD under
Prerequisite Software.
4.2 SP3D MSXML 4.0 SP2Delivered on the SmartPlant Enterprise DVD under Prerequisite
Software.
4.3 SP3D MSXML 4.0 Hotfix KB832414Delivered on the SmartPlant Enterprise DVD under Prerequisite
Software.
4.4 SP3D Internet Explorer 6.0 Service Pack 1Delivered on the SmartPlant Enterprise DVD under Prerequisite
Software.
4.5 SP3D Adobe 7.0 Reader Delivered on SmartPlant Enterprise DVD.
4.6 SP3D Microsoft NET Framework 2.0 Delivered on the Installation CD under Prerequisite Software.
12 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
13/54
Unless otherwise specified, the topics listed in theAddition al Resourcescolumn can be found in the SmartPlant 3D Installation Guide .
Installation and Configuration Flowchart (SP3D Flowchart)
Set Up the SmartPlant 3D Database Server:
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Documentation Link TR / CR Setup Notes
Software Versions: 2007
(7.0)
SmartPlant EnterpriseI n s t a l la t i o n & S e t u p o f Sm a r t P la n t 3 D ( S P3 D )
5.0 SP3DInstall Oracle Client Software on the SmartPlant
3D Workstation
5.1 SP3DInstall the Oracle Client software on the SmartPlant 3D
workstation
If you are using MSSQL Server 2005as your database software,
skip this section and go to Task Number 6.0. Do not use Oracle
"light client" as it does not include some of the DLLs required by
SmartPlant 3D.
5.2 SP3D Configure the Oracle Client
5.3 SP3D Verify startup of the Oracle Client Services
6.0 SP3DInstall MSSQL Server 2005 Client Software on the
SmartPlant 3D Workstation
If you are using Oracle 10gR2 as your database software,
skip this section and have completedTask Number 5.0, go
to Task Number 7.0.
6.1 SP3D Install Microsoft SQL Server 2005 Client Tools
Microsoft SQL Server 2005 requires XML 6.0 and will automatically
install it as part of the SQL Server 2005 Prerequisite installation.
However, the SmartPlant 3D Drawings and Reports task requires
XML 4.0 Service Pack 2. Make sure you have both versions o
7.0 SP3DInstall Prerequisite Software on the SmartPlant 3D
Workstation
7.1 SP3D MDAC 2.8 SP1 (2.8.1)
Installed during Windows 2003 setup. For Windows 2000 Server
installations, available on the SmartPlant Enterprise DVD underPrerequisite Software.
7.2 SP3D MSXML 4.0 SP2Delivered on the SmartPlant Enterprise DVD under Prerequisite
Software.
7.3 SP3D MSXML 4.0 Hotfix KB832414Delivered on the SmartPlant Enterprise DVD under Prerequisite
Software.
7.4 SP3D Internet Explorer 6.0 Service Pack 1Delivered on the SmartPlant Enterprise DVD under Prerequisite
Software.
7.5 SP3D Microsoft NET Framework 2.0 Delivered on the Installation CD under Prerequisite Software.
7.6 SP3D Excel 2003 Excel is required for reports generation.
7.7 SP3D Adobe 7.0 Reader Delivered on SmartPlant Enterprise DVD.
Set Up the SmartPlant 3D Workstation Computer:
13 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
14/54
Unless otherwise specified, the topics listed in theAddition al Resourcescolumn can be found in the SmartPlant 3D Installation Guide .
Installation and Configuration Flowchart (SP3D Flowchart)
Set Up the SmartPlant 3D Database Server:
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Documentation Link TR / CR Setup Notes
Software Versions: 2007
(7.0)
SmartPlant EnterpriseI n s t a l la t i o n & S e t u p o f Sm a r t P la n t 3 D ( S P3 D )
8.0 SP3D Install SmartPlant 3D Client Software
8.1 SP3D Install SmartPlant 3D Reference Data Delivered on SmartPlant Enterprise DVD.
8.2 SP3D Install the SmartPlant 3D Client software Delivered on SmartPlant Enterprise DVD.
8.3 SP3D Configure Network Shares
8.4 SP3D Configure for Large Model Drawing Generation
8.5 SP3D Register Solid Edge Version 18 .DLL File
8.6 SP3D Configure for an Integrated Environment
9.0 SP3D Install and Configure the Name Generator Service
10.0 SP3D Install SmartPlant 3D PDS Project Translators Delivered on SmartPlant Enterprise DVD.
11.0 SP3D Integrate with SmartPlant P&ID
12.0 SP3D Install PDS Export Tools
Delivered on the Installation CD under Prerequisite
Software.
13.0 SP3D Install PDS Data AccessDelivered on the Installation CD under Prerequisite
Software.
14.0 SP3D Install Programming Resources
Not available on CD AutoPlay. Navigate to the
ProgrammingResourcesfolder under the SmartPlant 3D
folder on the Installation CD. Double-click the
ProgrammingResources.msi file.
14.1 SP3D Install the SmartPlant 3D Command Wizard Delivered as part of the Programming Resources setup.
14.2 SP3D Insta ll the Smar tP lant 3D Symbol/Part Def ini tion Wizard Del ivered as part o f the Programming Resources setup.
15.0 SP3DInstall Piping Specification Remote Access
Server.Delivered as part of SmartPlant 3D setup
14 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
15/54
Unless otherwise specified, the topics listed in theAddition al Resourcescolumn can be found in the SmartPlant 3D Installation Guide .Installation and Configuration Flowchart (SP3D Flowchart)
Set Up the SmartPlant 3D Database Server:
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Documentation Link TR / CR Setup Notes
Software Versions: 2007
(7.0)
SmartPlant EnterpriseI n s t a l la t i o n & S e t u p o f Sm a r t P la n t 3 D ( S P3 D )
15.1 SP3DConfigure the Piping Specification Remote Access Server
Service
15.2 SP3D Register the Site Database for P&ID Access
Create the SmartPlant 3D Databases:
16.0 SP3D Create the Site, Catalog, and Schema Databases
16.1 SP3DCreate the Site, Catalog, and Schema Databases for SQL
ServerIf you are using Oracle databases, go to Task 16.2.
16.2 SP3D Create the Site, Catalog, and Schema Databases for OracleIf you are using SQL Server databases and have completed Task16.1, go to Task 17.2.
17.0 SP3D Create the Model and Reports Databases
17.1 SP3D Create the Model and Reports Databases for SQL Server If you are using Oracle databases, got to Task 17.2
17.2 SP3D Create the Model and Reports Databases for OracleIf you are using SQL Server databases and have completed Task
17.1, go to Task 17.3
17.3 SP3DAssign Access Permissions to all of the SmartPlant 3D
databases
Configure the Interference Detection Server
17.0 SP3D Set Up Server-Based Interf erence Checking
17.1 SP3D Install Databases Interference Detection Service
17.2 SP3D Create IFC Permission Group Folder and Permission Group
Working in an Integrated Environment
15 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
16/54
Unless otherwise specified, the topics listed in theAddition al Resourcescolumn can be found in the SmartPlant 3D Installation Guide .
Installation and Configuration Flowchart (SP3D Flowchart)
Set Up the SmartPlant 3D Database Server:Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Documentation Link TR / CR Setup Notes
Software Versions: 2007
(7.0)
SmartPlant EnterpriseI n s t a l la t i o n & S e t u p o f Sm a r t P la n t 3 D ( S P3 D )
18.0 SP3D Configure the SmartPlant 3D Integration Plant
For guidelines about integrating SmartPlant 3D, see the
SmartPlant Enterprise Installation & Setup of
Foundation (SPF) checklist.
Configure SmartPlant 3D for
an Integrated Environment
16 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
17/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
18/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
19/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
20/54
Unless otherwise specified, the topics listed in the Additional Resources column can be found in theSmartPlant Electrical Installation Guide .
Set Up the SmartPlant Electrical Database ServerTask
NumberUser Tool Step Description Comments/ Problems / Workarounds Documentation Link TR / CR Setup Notes
Software Versions: 2007(4.0)
SmartPlant EnterpriseI n s t a l l a t i o n & Se t u p o f Sm a r t P l a n t E le c t r i c a l ( SP EL )
8.2 SPEL Install the SmartPlant Electrical Client software Delivered on SmartPlant Enterprise DVD.
8.3 SPEL Install and Configure the Name Generator Service
8.4 SPEL Insta ll SmartPlant Electr ical PDS Project Transla tors Del ivered on Smar tP lant Enterpr ise DVD.
8.5 SPEL Install PDS Export Tools Delivered on the Installation CD under Prerequisite Software.
8.6 SPEL Install PDS Data Access Delivered on the Installation CD under Prerequisite Software.
8.7 SPEL Install Programming Resources
Not available on CD AutoPlay. Navigate to the
ProgrammingResources folder under the SmartPlant Electrical folder
on the Installation CD. Double-click the ProgrammingResources.msi
file.
8 .8 SPEL Insta ll the Smar tP lant Electr ical Command Wizard Del ivered as part o f the Programming Resources setup.
8.9 SPEL Install the SmartPlant Electrical Symbol/Part DefinitionWizard
Delivered as part of the Programming Resources setup.
Create the SmartPlant Electrical Databases9.0 SPEL Create the Site Server, Plant Structure
9.1 SPEL Create the Site schema
9..2 SPEL Create the Plant schema
9.3 SPEL Assign Access Permissions
Configure the Interference Detection Server10.0 SPEL Set Up Server-Based Interference Checking
10.1 SPEL Install Databases Interference Detection Service
10.2 SPELCreate IFC Permission Group Folder and Permission
Group
11.0 SPELConfigure the SmartPlant Electrical
Integration Plant
For guidelines about integrating SmartPlant Electrical, see
the SmartPlant Enterprise Installation & Setup of
Foundation (SPF) checklist.
Configure SmartPlant
Electrical for an Integrated
Environment
Working in an Integrated Environment
20 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
21/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
22/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
23/54
Unless otherwise specified, the topics listed in the Additional Resources column can be found in theSmartPlant Engineering Manager Installation Guide.
Set Up the SmartPlant Engineering Manager Database ServerTask
NumberUser Tool Step Description Comments/ Problems / Workarounds Documentation Link TR / CR Setup Notes
Software Versions: 2007
(5.0)
SmartPlant EnterpriseI n s t a l la t i o n & Se t u p o f Sm a r t P la n t En g i n e e r i n g M a n a g e r ( SP EM )
8.0 SPEMInstall SmartPlant Engineering Manager
Client Software
8.1 SPEMInstall SmartPlant Engineering Manager Reference
DataDelivered on SmartPlant Enterprise DVD.
8.2 SPEMInstall the SmartPlant Engineering Manager Client
softwareDelivered on SmartPlant Enterprise DVD.
8.3 SPEM Install and Configure the Name Generator Service
8.4 SPEMInstall SmartPlant Engineering Manager PDS Project
TranslatorsDelivered on SmartPlant Enterprise DVD.
8.6 SPEM Install PDS Export Tools Delivered on the Installation CD under Prerequisite Software.
8.7 SPEM Install PDS Data Access Delivered on the Installation CD under Prerequisite Software.
8.8 SPEM Install Programming Resources
o availa le on u o lay. aviga e o e
ProgrammingResources folder under the SmartPlant Engineering
l ll i l - li
8.8.1 SPEM
Install the SmartPlant Engineering Manager
Command Wizard Delivered as part of the Programming Resources setup.
8.8.2 SPEMInstall the SmartPlant Engineering Manager
Symbol/Part Definition WizardDelivered as part of the Programming Resources setup.
Create the SmartPlant Engineering Manager Databases9.0 SPEM Create the Site Server, Plant Structure
9.1 SPEM Create the Site schema
9.2 SPEM Create the Plant schema
9.3 SPEM Assign Access Permissions
Configure the Interference Detection Server10.0 SPEM Set Up Server-Based Interference Checking
10.1 SPEM Install Databases Interference Detection Service
10.2 SPEMCreate IFC Permission Group Folder and Permission
Group
11.0 SPEMConfigure the SmartPlant Engineering
Manager Integration Plant
For guidelines about integrating SmartPlant EngineeringManager, see the SmartPlant Enterprise Installation &
Setup of Foundation (SPF)checklist.
Configure SmartPlantEngineering Manager for an
Integrated Environment
Working in an Integrated Environment
23 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
24/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
25/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
26/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
27/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
28/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
29/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
30/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
31/54
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
32/54
31.1 SPEM Associate P&ID
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
33/54
31.2 SPEMRegister the SmartPlant Electrical plant with
SmartPlant Foundation
31.3 SPEMRetrieve Plant Breakdown Structure from SmartPlant
Foundation
32.0 SPI Configure SmartPlant Instrum entation foran Integrated Environment
Before proceeding with the following sections, use the
SmartPlant Instrum entation Installation Checklisttoverify that the SmartPlant Instrumentation software is
properly installed on the server and workstation computers.
32.0.1 SPIInstall Prerequisite SmartPlant Integration
Software
32.1 SPI Install SmartPlant Schema Component software
32.2 SPI Install SmartPlant Client software
330.0 SPI
Configure the SmartPlant Instrumentation
Integration Plant
33.1 SPI Register the plant with SmartPlant Foundation
33.2 SPIRetrieve Plant Breakdown Structure from SmartPlant
Foundation
33.3 SPI Run To Do list
33.4 SPI Copy intools.ini to each machine
34.0 SPPIDConfigure SmartPlant P&ID for an
Integrated Environment
Before proceeding with the following sections, use theSmartPlant P&ID Installation Checklistto verify that the
SmartPlant Instrumentation software is properly installed on
the server and workstation computers.
34.0.1 SPPIDInstall Prerequisite SmartPlant Integration
Software
34.1 SPPID Install SmartPlant Schema Component software
34.2 SPPID Install SmartPlant Client software
35.0 SPEL Configure the SmartPlant P&ID Integration Plant
35.1 SPEM Associate P&ID
35.2 SPEM Register the plant with SmartPlant Foundation
35.3 SPEMRetrieve Plant Breakdown Structure from SmartPlant
Foundation
36.0 SPEMConfigure SmartPlant Engineering Manager
for an Integrated Environment
Before proceeding with the following sections, use the
SmartPlant Engineering Manager Installation Checklistto verify that the SmartPlant Enginerring Manager software
is properly installed on the server and workstation
computers.
33 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
34/54
36.0.1 SPEMInstall Prerequisite SmartPlant Integration
Software
36.1 SPEM Install SmartPlant Schema Component software
36.2 SPEM Install SmartPlant Client software
37.0 SPELConfigure the SmartPlant Engineering Manager
Integration Plant
37.1 SPEM Associate P&ID
37.2 SPEMRegister the SmartPlant Engineering Manager plant
with SmartPlant Foundation
37.3 SPEMRetrieve Plant Breakdown Structure from SmartPlant
Foundation
38.0 PDSConfigure Plant Design System (PDS) for an
Integrated Environment
Before proceeding with the following sections, use thePlant
Design System (PDS) Installation Checklistto verify that
the PDS software is properly installed on the server andworkstation computers.
Plant Design System (PDS)
Installation and Configuration
Checklist
38.0.1 PDSInstall Prerequisite SmartPlant Integration
Software
38.1 PDS Install SmartPlant Schema Component software
38.2 PDS Install SmartPlant Client software
38.3 SPF
In PDS Loader, set up a database connection that
points to a specific folder where PDS data will be
exported
38.4 PDS
Use the Export to PDME command in the Project
Administrator (PD_Project) module of PDS to export
PDS data to the folder you specified in PDS Loader
34 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
35/54
SmartPlant Enterprise
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
36/54
Unless otherwise specified, the topics listed in the Additional Resources column can be found in theSmartPlant Instrumentation Installation Guide.
Set Up the SmartPlant Instrumentation Database Server
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Documentation Link TR / CR Setup Notes
Software Versions: 2007
(8.0)
I n s t a l l a t i o n & S e t u p o f Sm a r t P l an t I n s t r u m e n t a t i o n ( SP I )
3.3 SPIRegister the database server in the Enterprise
Manager console.
3.4 SPI Assign system administrator privileges.
4.0 SPIInstall Prerequisite Software on SmartPlant
Instrumentation Database Server
4.1 SPI MDAC 2.8 SP1 (2.8.1)
Installed during Windows 2003 setup. For Windows 2000 Server
installations, available on the SmartPlant Enterprise DVD under
Prerequisite Software.
4.2 SPI MSXML 4.0 SP2Delivered on the SmartPlant Enterprise DVD under Prerequisite
Software.
4.3 SPI MSXML 4.0 Hotfix KB832414Delivered on the SmartPlant Enterprise DVD under Prerequisite
Software.
4.4 SPI Internet Explorer 6.0 Service Pack 1Delivered on the SmartPlant Enterprise DVD under Prerequisite
Software.
4.5 SPI Adobe 7.0 Reader Delivered on SmartPlant Enterprise DVD.
4.6 SPI Microsoft NET Framework 2.0 Delivered on the Installation CD under Prerequisite Software.
5.0 SPIInstall Oracle Client Software on the
SmartPlant Instrumentation Workstation
If you are using MSSQL Server 2005 as your database
software, skip this section and go to Task Number 6.0. Do
not use Oracle "light client" as it does not include some of
the DLLs required by SmartPlant Instrumentation.
5.1 SPI Configure the Oracle Client.
5.2 SPI Verify startup of the Oracle Client Services.
6.0 SPIInstall MSSQL Server 2005 Client Sof tware on th e
SmartPlant Instrumentation Workstation
If you are using Oracle 10gR2 as your database software, skip this
section and have completed Task Number 5.0, go to Task Number
7.0.
6.1 SPI Install Microsoft SQL Server 2005 Client Tools
Microsoft SQL Server 2005 requires XML 6.0 and will automaticallyinstall it as part of the SQL Server 2005 Prerequisite installation.
However, the SmartPlant Instrumentation Drawings and Reports task
requires XML 4.0 Service Pack 2. Make sure you have both installed.
Set Up the SmartPlant Instrumentation Workstation Computer
36 1/23/2007]
SmartPlant Enterprise
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
37/54
Unless otherwise specified, the topics listed in the Additional Resources column can be found in theSmartPlant Instrumentation Installation Guide.
Set Up the SmartPlant Instrumentation Database Server
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Documentation Link TR / CR Setup Notes
Software Versions: 2007
(8.0)
I n s t a l l a t i o n & S e t u p o f Sm a r t P l an t I n s t r u m e n t a t i o n ( SP I )
7.0 SPIInstall Prerequisite Software on the
SmartPlant Instrumentation Workstation
7.1 SPI MDAC 2.8 SP1 (2.8.1)
Installed during Windows 2003 setup. For Windows 2000 Server
installations, available on the SmartPlant Enterprise DVD under
Prerequisite Software.
7.2 SPI MSXML 4.0 SP2Delivered on the SmartPlant Enterprise DVD under Prerequisite
Software.
7.3 SPI MSXML 4.0 Hotfix KB832414Delivered on the SmartPlant Enterprise DVD under Prerequisite
Software.
7.4 SPI Internet Explorer 6.0 Service Pack 1Delivered on the SmartPlant Enterprise DVD under Prerequisite
Software.
7.5 SPI Microsoft NET Framework 2.0 Delivered on the Installation CD under Prerequisite Software.
7.6 SPI Install Excel 2003Excel is required for reports generation. Must be installed prior to
SmartPlant Schema Component.
7.7 SPI Adobe 7.0 Reader Delivered on SmartPlant Enterprise DVD.
7.8 SPI SmartPlant Schema ComponentDelivered on SmartPlant Enterprise DVD. Must be installed prior to
SmartPlant Client.
7.9 SPI SmartPlant Client Delivered on SmartPlant Enterprise DVD.
8.0 SPIInstall SmartPlant Instrumentation Client
Software
8.1 SPI Install SmartPlant Instrumentat ion Reference Data. Delivered on SmartPlant Enterprise DVD.
8.2 SPI Insta ll the Smar tP lant Instrumentat ion Cl ient sof tware . Del ivered on Smar tP lant Enterprise DVD.
Create the SmartPlant Instrumentation Databases
9.0 SPI Create the Database, Domain and Plant
9.1 SPI Create the database in the DB Setup Utility
9.2 SPI Define and initialize the domain in Administration
37 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
38/54
Unless otherwise specified, the topics listed in the Additional Resources column can be found in theSmartPlant Instrumentation Installation Guide.
Set Up the SmartPlant Instrumentation Database Server
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Documentation Link TR / CR Setup Notes
Software Versions: 2007
(8.0)
SmartPlant EnterpriseI n s t a l l a t i o n & S e t u p o f Sm a r t P l an t I n s t r u m e n t a t i o n ( SP I )
9.3 SPI Update statistics and register items
10.0 SPIConfigure the SmartPlant Instrumentation
Integration Plant
For guidelines about integrating SmartPlant Instrumentation,
see the SmartPlant Enterprise Installation & Setup of
Foundation (SPF) checklist.
Configure SmartPlant
Instrumentation for an
Integrated Environment
Working in an Integrated Environment
38 1/23/2007]
SmartPlant Enterprise
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
39/54
Unless otherwise specified, the topics listed in theAddition al Resourcescolumn can be found in the SmartPlant Lincense Manager User and Installation Guide.
Setting up the SPLM License Server
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Additional Resources TR / CR Setup Notes
1.0 SPLMLoad the Operating System on SPLM License
Server.
Install server on a stable, single node, hardware
configuration (such as a simple PC), with a static IP
address, because license key inst allation and license
seat usage authentication depends on the information
gathered from the phys ical hardware. Any aut
1.1 SPLMInstall Windows 2003 Server SP1 on SPLM License
Server.
If you are using Windows 2000 Server software,
skip this section and go to Task Number 1.2.
1.2 SPLMInstall Windows 2000 Server SP4 on the SPLM License
Server
If you are using Windows 2003 Server software and have completed
Task Number 1.1, skip this section and go to Task Number 2.0.
2.0 SPLMInstall and Configure License Manager
Software on the License Server
All these tasks requires an account with administrator
privilege.
Installing Software from the
Web / Installing Software from
the Web
2.1 SPLM Install SmartPlant License Manager 2007 (9.0)Installing Software from the Web /
Installing Software from the Web
2.2 SPLM Add pdlice.exe in the Windows Firewall Exception ListThis only applies to Windows XP SP2 and Windows 2003 SP 1
systems.
Configuring Windows Firewall in
Windows XP SP 2 and
Windows 2003 SP 1 for SmartPlant
License Manager
2.3 SPLM Generate the Machine ID Do not attempt to generate the Machine ID more than once.Requesting a License Key for the
License Server
2.4 SPLMSend the Machine ID to Intergraph and request the
license key
Requesting a License Key for the
License Server
2.5 SPLM Install the license keyInstall the license key on top of the previous one. Do not attempt to
delete the previous license key.
Installing a License Key on the
License Server
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Additional Resources TR / CR Setup Notes
3.0 SPLMLoad Operating System on SPLM Client
Machine
Installing Software from the
Web / Installing Software from
the Web
3.1 SPLM Install Windows 2000 SP4 on the SPLM client machineIf you are using Windows XP software,
skip this section and go to Task Number 3.2.
Software Versions: 2007 (9.0)
I n s t a l la t i o n & Se t u p o f Sm a r t P la n t L i ce n s e M a n a g e r ( SPLM )
Setting up the SPLM Client Machine
39 1/23/2007]
SmartPlant Enterprise
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
40/54
Unless otherwise specified, the topics listed in theAddition al Resourcescolumn can be found in the SmartPlant Lincense Manager User and Installation Guide.
Setting up the SPLM License Server
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Additional Resources TR / CR Setup Notes
Software Versions: 2007 (9.0)
I n s t a l la t i o n & Se t u p o f Sm a r t P la n t L i ce n s e M a n a g e r ( SPLM )
3.2 SPLM Install Windows XP SP2 on the SPLM client machineIf you are using Windows 2000 software and have completed Task
Number 3.1, skip this section and go to Task Number 4.0.
4.0 SPLMInstall and Configure License Manager
Software on the Client MachineAll thes e task s req uir es an ac count w ith adminis trat or p riv ilege.
4.1 SPLMInstall SmartPlant License Manager 2007 (9.0) on the
client machine
Installing Software from the Web /
Installing Software from the Web
4.2 SPLM Add pdlice.exe in the Windows Firewall Exception List This only apply to Windows XP SP2.
Configuring Windows Firewall in
Windows XP SP 2 and
Windows 2003 SP 1 for SmartPlant
License Manager
4.3 SPLM Select the license server Selecting a License Server for a Client
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Additional Resources TR / CR Setup Notes
5.0 SPLMInstall SPLM 2007 (9.0) on Top of the Previou s
Version
It's not required to regenerate a new Machine ID nor
install a new license key. This task requires an account
with administrator privi lege.
Installing Software from the
Web / Installing Software from
the Web
TaskNumber
User Tool Step Description Comments/ Problems / Workarounds Additional Resources TR / CR Setup Notes
6.0 SPLM Load the Operating System on the Laptop
6.1 SPLM Install Windows 2000 SP4 on the SPLM client machineIf you are using Windows XP software,
skip this section and go to Task Number 6.2.
6.2 SPLM Install Windows XP SP2 on the SPLM client machineIf you are using Windows 2000 software and have completed Task
Number 6.1, skip this section and go to Task Number 7.0
7.0 SPLMInstall and Configure License Manager
Software
All these tasks requi res an account with admini st rato r
privilege.
Setting up the SPLM Server and Client on a Laptop
Upgrading from SPLM 8.0
40 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
41/54
Unless otherwise specified, the topics listed in theAddition al Resourcescolumn can be found in the SmartPlant Lincense Manager User and Installation Guide.
Setting up the SPLM License Server
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Additional Resources TR / CR Setup Notes
Software Versions: 2007 (9.0)
SmartPlant EnterpriseI n s t a l la t i o n & Se t u p o f Sm a r t P la n t L i ce n s e M a n a g e r ( SPLM )
7.1 SPLMInstall SmartPlant License Manager 2007 (9.0) on the
license server
Installing Software from the Web /
Installing Software from the Web
7.2 SPLM
Add pdlice.exe in the Windows Firewall Exception List.
This only applies to Windows XP SP2 and Windows 2003
SP 1 systems
Configuring Windows Firewall in
Windows XP SP 2 andWindows 2003 SP 1 for SmartPlant
License Manager
7.3 SPLMInstall Microsoft Loopback Adapter and define a fixed IP
address
Installing SmartPlant License Manager
on a Standalone System
7.4 SPLM Generate the Machine ID
Disable all the network connections except the loopback adapter
before generating the Machine ID. Do not attempt to generate the
Machine ID more than once.
Requesting a License Key for the
License Server
7.5 SPLMSend the Machine ID to Intergraph and request the
license key
Requesting a License Key for the
License Server
7.6 SPLM Install the license keyInstall the license key on top of the previous one. Do not attempt to
delete the previous license key.
Installing a License Key on the
License Server
7.7 SPLM Select the license server Selecting a License Server for a Client
41 1/23/2007]
SmartPlant MarkupI n s t a l la t i o n & Co n f i g u r a t i o n Ch e c k l i s t
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
42/54
Unless otherwise specified, the topics listed in theAdditional Resourcescolumn can be found in the SmartPlant Markup Installation Guide.
Set up the Server or Client Computer
Task Number User Role Tool Step Description Comments/ Problems / Workarounds Additional Resources Setup Notes
1.0SmartPlant
MarkupInstall Operating System
Hardware and Software
Requirements
1.1 Windows 2000 Install Microsoft Windows 2000 Service Pack 4If you are using Microsoft XP Professional Service Pack 2, go to
Task Number 1.2.
1.2Windows XP
Professional
Install Microsoft XP Professional Server Service Pack
2.
2.0SmartPlant
MarkupInstall Prerequisite Software
2.1 MS IIS Install Microsoft Internet Information Services (IIS) 6.0.Required on servers that will be used to install SmartPlant Markup
on workstations over the Web.
2.2 MS InternetExplorer
Install Microsoft Internet Explorer 6.0 Service Pack 1.
2.3 Adobe Reader Install Adobe Reader 7.0.Required to view the Software License Agreement and Printable
Guides.
2.4 IPLOT/InterPlot Install IPLOT/InterPlot Server 10.x. Required if using the IPLOT interface.
Software Versions: 2007 (3.8)
Note:SmartPlant Markup is available as a client or server installation. A client installation provides the complete SmartPlant Markup application for use on a workstation. A server installation provides the complete SmartPlant Markup application, but
also places files in an OnTheWeb folder in the product directory so that users can install the application over the Web from this server. When installing SmartPlant Markup, you are not required to choose between a client or server installation. The
software determines whether each computer is a client or server machine and installs the appropriate configuration for that type of machine. When SmartPlant Markup detects IIS on a machine, you are allowed to select Web Components from a list of
available features for installation. Selecting this option creates the OnTheWeb folder and configures the server for distribution of SmartPlant Markup.
42 1/23/2007]
SmartPlant MarkupI n s t a l la t i o n & Co n f i g u r a t i o n Ch e c k l i s t
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
43/54
Unless otherwise specified, the topics listed in theAdditional Resourcescolumn can be found in the SmartPlant Markup Installation Guide.
Software Versions: 2007 (3.8)
Install SmartPlant MarkupTask Number User Role Tool Step Description Comments/ Problems / Workarounds Additional Resources Setup Notes
3.0SmartPlant
Markup
Install SmartPlant Markup fr om the
SmartPlant Enterprise DVD
If you are installing SmartPlant Markup from the Web,
go to Task Number 5.0.
Install SmartPlant Markup fr om
a CD
3.1Insert Disc 1 of the SmartPlant Enterprise 2007 DVD
set.
3.2
Click Information Management Softwarein the
SmartPlant Enterprise Installationwindow to access
the SmartPlant Markup Installation.
3.3Accept the licensing agreement, enter your registration
information, and select an installation location.
3.4 Select components to install.
If you are installing on a server machine (where IIS is installed), a
Web Componentsoption appears in the list of available
components. Select that option if you want others to be able to
connect to this machine to install SmartPlant Markup.
3.5 Continue installation steps.
3.6 Associate file types with SmartPlant Markup.Items you associate with SmartPlant Markup from the File Type
Associations dialog box will open in SmartPlant Markup by default.Associating File Types
3.7 Finish installation steps.
4.0SmartPlant
MarkupConfigure Web Server Settings
If you installed SmartPlant Markup on a server machine,
you should fo llow the procedure below before installing
from this server onto other workstations.
Configure Web Server Settings
4.1AllowAnonym ous Acc essfor the SPMarkupvirtual
directory in Microsoft Management Console.
4.2Add SmartPlant Markup to the Windows Firewall
Exceptionslist.The program to add is: \Bin\dmredl.exe.
4.3Use the Windows Firewall Advanced tab to allow theclient to access the Web Server (HTTP) and Secure
Web Server (HTTPS) services.
5.0SmartPlant
MarkupInstall SmartPlant Markup f rom t he Web
To install SmartPlant Markup over the Web, refer to the
procedure titled " Install SmartPlant Markup from the
Web" in the SmartPlant Markup Installation Guide.
Install SmartPlant Markup fr om
the Web
5.1 Configure Automatic Web Upgrades
If you installed SmartPlant Markup on workstations using a Web
installation, you can configure when or if the workstations upgrade
their software.
Configuring Automatic Web Upgrades
43 1/23/2007]
SmartPlant MarkupI n s t a l la t i o n & Co n f i g u r a t i o n Ch e c k l i s t
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
44/54
Unless otherwise specified, the topics listed in theAdditional Resourcescolumn can be found in the SmartPlant Markup Installation Guide.
Software Versions: 2007 (3.8)
Associate File TypesTask Number User Role Tool Step Description Comments/ Problems / Workarounds Additional Resources Setup Notes
6.0SmartPlant
MarkupAssoci ate f ile t ypes wit h Smar tPlant Markup .
These associations specify which file types are to be
opened in SmartPlant Markup by default.Ass oci ating File Types
6.1From the Startmenu, clickAll Prog rams > Inter graph
SmartPlant Markup > File Type Registration .
This dialog box is available at the end of the installation process for
initial setup, but you can access it at any time to make modifications.
It is also available in the SmartPlant Markup application as a tab of
the Optionsdialog box available by clicking Tools > Options .
6.2Indicate the types of files you want to be able to open
in SmartPlant Markup.
Note:Types of files that are not selected on this dialog box may still
be viewed or annotated in SmartPlant Markup.
44 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
45/54
SmartPlant EnterpriseI n s t a l l a t i o n & Se t u p o f S m a r t P l an t P& I D ( SPP I D )
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
46/54
Unless otherwise specified, the topics listed in the Additional Resources column can be found in theSmartPlant P&ID Installation Guide .
Set Up the SmartPlant P&ID Database Server
Task
NumberTool Step Description Comments/ Problems / Workarounds Documentation Link TR / CR Setup Notes
p ( )
Software Versions: 2007 (5.0)
4.0 SP-P&IDInstall Prerequisite Software on SmartPlant
P&ID Database Server
4.1 SP-P&ID MDAC 2.8 SP1 (2.8.1)
Installed during Windows 2003 setup. For Windows 2000 Server
installations, available on the SmartPlant Enterprise DVD under
Prerequisite Software.
4.2 SP-P&ID MSXML 4.0 SP2Delivered on the SmartPlant Enterprise DVD under Prerequisite
Software.
4.3 SP-P&ID MSXML 4.0 Hotfix KB832414Delivered on the SmartPlant Enterprise DVD under Prerequisite
Software.
4 .4 SP-P&ID Internet Exp lorer 6 .0 Serv ice Pack 1Delivered on the SmartPlant Enterprise DVD under Prerequisite
Software.
4.5 SP-P&ID Adobe 7.0 Reader Delivered on SmartPlant Enterprise DVD.
4.6 SP-P&ID Microsoft NET Framework 2.0 Delivered on the Installation CD under Prerequisite Software.
5.0 SP-P&IDInstall Oracle Client Software on the
SmartPlant P&ID Workstation
If you are using MSSQL Server 2005 as your database
software, skip this section and go to Task Number 6.0. Do
not use Oracle "light client" as it does not include some of
the DLLs required by SmartPlant P&ID.
5.1 SP-P&ID Configure the Oracle Client
5 .2 SP-P&ID Ver ify s tar tup of the Oracle Cl ien t Serv ices
6.0 SP-P&IDInstall MSSQL Server 2005 Client Software
on t he SmartPlant P&ID Workstation
If you are using Oracle 10gR2 as your database software,
skip this section and have completedTask Number 5.0, go
to Task Number 7.0.
6.1 SP-P&ID Install Microsoft SQL Server 2005 Client Tools
Microsoft SQL Server 2005 requires XML 6.0 and will automatically
install it as part of the SQL Server 2005 Prerequisite installation.
However, the SmartPlant P&ID Drawings and Reports task requires
XML 4.0 Service Pack 2. Make sure you have both versions
7.0 SP-P&IDInstall Prerequisite Software on the
SmartPlant P&ID Workstation
7.1 SP-P&ID MDAC 2.8 SP1 (2.8.1)
Installed during Windows 2003 setup. For Windows 2000 Server
installations, available on the SmartPlant Enterprise DVD under
Prerequisite Software.
Set Up the SmartPlant P&ID Workstation Computer
46 1/23/2007]
SmartPlant EnterpriseI n s t a l l a t i o n & Se t u p o f S m a r t P l an t P& I D ( SPP I D )
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
47/54
Unless otherwise specified, the topics listed in the Additional Resources column can be found in theSmartPlant P&ID Installation Guide .
Set Up the SmartPlant P&ID Database Server
Task
NumberTool Step Description Comments/ Problems / Workarounds Documentation Link TR / CR Setup Notes
I n s t a l l a t i o n & Se t u p o f S m a r t P l an t P& I D ( SPP I D )
Software Versions: 2007 (5.0)
7.2 SP-P&ID MSXML 4.0 SP2Delivered on the SmartPlant Enterprise DVD under Prerequisite
Software.
7.3 SP-P&ID MSXML 4.0 Hotfix KB832414Delivered on the SmartPlant Enterprise DVD under Prerequisite
Software.
7 .4 SP-P&ID Internet Exp lorer 6 .0 Serv ice Pack 1Delivered on the SmartPlant Enterprise DVD under Prerequisite
Software.
7.5 SP-P&ID Microsoft NET Framework 2.0 Delivered on the Installation CD under Prerequisite Software.
7.6 SP-P&ID Install Excel 2003Excel is required for reports generation. Must be installed prior to
SmartPlant Schema Component.
7.7 SP-P&ID Adobe 7.0 Reader Delivered on SmartPlant Enterprise DVD.
7.8 SP-P&ID SmartPlant Schema ComponentDelivered on SmartPlant Enterprise DVD. Must be installed prior to
SmartPlant Client.
7.9 SP-P&ID SmartPlant Client Delivered on SmartPlant Enterprise DVD.
8.0 SP-P&ID Instal l SmartPlant P&ID Cl ient Software
8.1 SP-P&ID Install SmartPlant P&ID Reference Data Delivered on SmartPlant Enterprise DVD.
8.2 SP-P&ID Install the SmartPlant P&ID Client software Delivered on SmartPlant Enterprise DVD.
8.3 SP-P&ID Install and Configure the Name Generator Service
8.4 SP-P&ID Install SmartPlant P&ID PDS Project Translators Delivered on SmartPlant Enterprise DVD.
8.5 SP-P&ID Integrate with SmartPlant P&ID
8.6 SP-P&ID Install PDS Export Tools Delivered on the Installation CD under Prerequisite Software.
8.8 SP-P&ID Install Programming Resources
Not available on CD AutoPlay. Navigate to the
ProgrammingResources folder under the SmartPlant P&ID folder on
the Installation CD. Double-click the ProgrammingResources.msi file.
8.9 SP-P&ID Install the SmartPlant P&ID Command Wizard Delivered as part of the Programming Resources setup.
47 1/23/2007]
S Pl E i
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
48/54
Unless otherwise specified, the topics listed in the Additional Resources column can be found in theSmartPlant P&ID Installation Guide .
Set Up the SmartPlant P&ID Database Server
Task
NumberTool Step Description Comments/ Problems / Workarounds Documentation Link TR / CR Setup Notes
SmartPlant EnterpriseI n s t a l l a t i o n & Se t u p o f S m a r t P l an t P& I D ( SPP I D )
Software Versions: 2007 (5.0)
8.1 SP-P&ID
Install the SmartPlant P&ID Symbol/Part Definition
Wizard Delivered as part of the Programming Resources setup.
Create the SmartPlant P&ID Databases
9.0 SP-P&ID Create the Si te Server, Plant Structure
9.1 SP-P&ID Create the Site schema
9.2 SP-P&ID Create the Plant schema
9.3 SP-P&ID Assign Access Permissions
Configure the Interference Detection Server
10.0 SP-P&ID Set Up Server-Based Interference Checking
10.1 SP-P&ID Install Databases Interference Detection Service
10.2 SP-P&IDCreate IFC permission group folder and permission
group
11.0 SP-P&IDConfigure the SmartPlant P&ID Integration
Plant
For guidelines about integrating SmartPlant P&ID, see the
SmartPlant Enterprise Installation & Setup of
Foundation (SPF) checklist.
Configure the SmartPlant P&ID
for an Integrated Environment
Working in an Integrated Environment
48 1/23/2007]
SmartPlant EnterpriseI n s t a l la t i o n & Se t u p o f Sm a r t P la n t R e v i e w ( SP R)
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
49/54
Unless otherwise specified, the topics listed in theAdditional Resourcescolumn can be found in the SmartPlant Review Installation Guide .
Set Up Licensing for SmartPlant Review
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Additional Resources TR / CR Setup Notes
1.0 SPLMInstall SmartPlant License Manager 9.0.2 on
the site lic ense server
See the SmartPlant License
Manager Installation and
Configuration Checklist.
(SPLMInstall_Checklist.xls)
2.0 SPLM
Install and config ure SmartPlant Lic ense
Manager Client 9.0.2 on indiv idual SPRworkstations
See the SmartPlant License
Manager Installation and
Configuration Checklist.
(SPLMInstall_Checklist.xls)
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Additional Resources TR / CR Setup Notes
3.0 SPR Install supported operating systemSee the documentation that came
with your operating system.
3.1 SPR Microsoft Windows XP Professional Service Pack 2
3.2 SPR Microsoft Windows 2000 Professional Service Pack 4To run SmartPlant Review on Windows 2000, users must be
members of the Power User or Administrators permissions groups.
3.3 SPRMicrosoft Windows 2000 Server Service Pack 4 and
Advanced ServerEnable TCP/IP.
3.4 SPR Microsoft Windows 2003 Server Service Pack 1 or R2
4.0 SPR Install Prerequisite Software
4.1 SPR MDAC 2.8 SP1 (2.8.1)
Installed during Windows XP Service Pack 2 setup. For Windows
2000 users, MDAC is available on the product CD under
Prerequisite Software. If you are running SPR on a non-English
operating system and locale, you must download the locale-specific
version of MDAC from Microsoft. SmartPlant Review may not work
correctly with multi-byte characters when using the English version of
MDAC.
SmartPlant Review Workstation
4.2 SPR Microsoft NET Framework 1.1 Installed automatically during SmartPlant Review set up.
4.3 SPR Microsoft DirectX 8.1
Required for using a joystick with SmartPlant Review.
Installed during Windows XP Service Pack 1 setup. For Windows
2000 users, DirectX is delivered on the the product CD under
Prerequisite Software. 64-bit systems require version 9.0, availablefrom Micr
4.5 SPR Internet Explorer 6.0 Service Pack 1Required for viewing the online documentaiton delivered with the
software.
Software Versions: 6.2
Set Up the SmartPlant Review Workstation Computer
49 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
50/54
Unless otherwise specified, the topics listed in theAdditional Resourcescolumn can be found in the SmartPlant Review Installation Guide .
Set Up Licensing for SmartPlant Review
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Additional Resources TR / CR Setup Notes
Software Versions: 6.2
SmartPlant EnterpriseI n s t a l la t i o n & Se t u p o f Sm a r t P la n t R e v i e w ( SP R)
4.7 SPR Adobe 7.0 Reader Delivered on the product CD.
Required to view the License Agreement and Printable Guides.
5.0 SPR Install SmartPlant Review Software Install SmartPlant Review
5.1 SPR Install SmartPlant Review ModulesAdd Individual Modules After Installing
the Core Product
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Additional Resources TR / CR Setup Notes
6.0 SPR Configure SmartPlant Review fo r anintegrated environment
For guidelines about integrating SmartPlant Review, see the
SmartPlant Enterprise Installation & Setup ofFoundation (SPF) checklist.
Configure SmartPlant Reviewfor an Integrated Environment
Working in an Integrated Environment
50 1/23/2007]
SmartPlant Enterprise
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
51/54
Unless otherwise specified, the topics listed in theAdditional Resourcescolumn can be found in the SmartPlant Review Publisher Installation Guide.
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Additional Resources TR / CR Setup Notes
1.0 SPRPub Install operating systemInstall one of the supported operating systems listed in
steps 1.1 - 1.4 below.
See the documentation that came
with your operating system.
1.1 SPRPub Microsoft Windows XP Professional Service Pack 2
1.2 SPRPub Microsoft Windows 2000 Professional Service Pack 4To run SmartPlant Review Publisher on Windows 2000, users must
be members of the Power User or Administrators permissions
groups.
1.3 SPRPubMicrosoft Windows 2000 Server Service Pack 4 and
Advanced ServerEnable TCP/IP.
1.4 SPRPub Microsoft Windows 2003 Server Service Pack 1 or R2
2.0 SPRPub Install Prerequisite SoftwareSmartPlant Review Publisher
Workstation
2.1 SPRPub MDAC 2.8 SP1 (2.8.1)Installed during Windows XP Service Pack 2 setup. For Windows
2000 users, MDAC is available on the product CD under
Prerequisite Software.
2.3 SPRPub Microsof t NET Framework 1.1 Installed automatically during SmartPlant Review Publisher set up.
2.2 SPRPub Intergraph Batch Services 5.0
Map the local user accounts (the users who will submit publication
and distribution jobs) to the user accounts on the target servers. Use
the Batch Manager Server > Account Mappingcommand to grant
Log On Locally permissions to the user accounts on the ta
Contact Intergraph Support at
http://ppm.intergraph.com/support/.
2.5 SPRPub Internet Explorer 6.0 Service Pack 1Required for viewing the online documentaiton delivered with the
software.
2.6 SPRPub Adobe 7.0 ReaderDelivered on the product CD.
Required to view the License Agreement and Printable Guides.
3.0 SPRPubInstall SmartPlant Review Publisher
SoftwareInstall SmartPlant Review Publisher
3.1 SPRPub Set system permissionsAdministrator privileges are required to install SmartPlant Review
Publisher, to interactively publish and distribute files, and to
schedule publication and distribution settings.
SmartPlant Review Publisher
Workstation
4.0 SPRPubInstall SmartPlant Review Publisher Service
(SPRPubService) Install and start this service on each subscriber's computer.Configuring SmartPlant Review
Publisher Service
Software Versions: 6.2
I n s t a l la t i o n & Se t u p o f Sm a r t P la n t R ev i e w P u b l i s h e r ( SP RPu b )
Set Up the SmartPlant Review Publisher Workstation Computer
51 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
52/54
Unless otherwise specified, the topics listed in theAdditional Resourcescolumn can be found in the SmartPlant Review Publisher Installation Guide.
Software Versions: 6.2
SmartPlant EnterpriseI n s t a l la t i o n & Se t u p o f Sm a r t P la n t R ev i e w P u b l i s h e r ( SP RPu b )
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Additional Resources TR / CR Setup Notes
5.0 SPRPubConfigure SmartPlant Review Publisher for
an integrated environment
For guidelines about integrating SmartPlant Review
Publisher, see the SmartPlant Enterprise Installation &
Setup of Foundation (SPF) checklist.
Configure SmartPlant Review
Publisher for an Integrated
Environment
Working in an Integrated Environment
52 1/23/2007]
SmartPlant EnterpriseI n s t a l la t i o n & Se t u p o f Sm a r t S k e t c h ( S SK )
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
53/54
Unless otherwise specified, the topics listed in theAdditional Resourcescolumn can be found in the SmartSketch Installation Guide .
Set Up Licensing for Smart Sketch
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Additional Resources TR / CR Setup Notes
1.0 SPLMInstall SmartPlant License Manager 9.0.2 on
the site license server.
Some SmartSketch installations do not require
SmartPlant License Manager. Ask yo ur System
Administ rator o r cont act Intergraph Suppo rt Servi ces i f
you have a question about SmartSketch licensing
re uirements.
See the SmartPlant License
Manager Installation and
Configuration Checklist.
(SPLMInstall_Checklist.xls)
2.0 SPLM
Install and config ure SmartPlant Lic ense
Manager Client 9.0.2 on individual
SmartSketch works tations.
Some SmartSketch installations do not require
SmartPlant License Manager. Ask yo ur System
Administ rator o r cont act Intergraph Suppo rt Servi ces i f
you have a question about SmartSketch licensing
re uirements.
See the SmartPlant License
Manager Installation and
Configuration Checklist.
(SPLMInstall_Checklist.xls)
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Additional Resources TR / CR Setup Notes
3.0 SSK Install supported operating systemSee the documentation thatcame with your operating
system.
3.1 SSK Microsoft Windows XP Professional Service Pack 2
3.2 SSK Microsoft Windows 2000 Professional Service Pack 4To run SmartSketch on Windows 2000, users must be members of
the Power User or Administrators permissions groups.
3.3 SSKMicrosoft Windows 2000 Server Service Pack 4 and
Advanced ServerEnable TCP/IP.
3.4 SSK Microsoft Windows 2003 Server Service Pack 1
4.0 SSK Install Prerequisite Software
4.1 SSK Internet Explorer 6.0 Service Pack 1Required for viewing the online documentaiton delivered with the
software.
Hardware and Software
Recommendations
4.2 SSK Adobe Reader 7.0Delivered on the product CD.
Required to view the License Agreement and Printable Guides.
5.0 SSK Install SmartSketch Software Install SmartSketch
5.1 SSK Install SmartSketch OptionsAdd and Remove Options After
Installing the Core Product
Set Up the SmartSketch Workstation Computer
Software Versions: 2007 (5.2)
53 1/23/2007]
-
7/22/2019 66346697 Smart Plant Enterprise Install Checklist
54/54
Unless otherwise specified, the topics listed in theAdditional Resourcescolumn can be found in the SmartSketch Installation Guide .
Set Up Licensing for Smart Sketch
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Additional Resources TR / CR Setup Notes
SmartPlant EnterpriseI n s t a l la t i o n & Se t u p o f Sm a r t S k e t c h ( S SK )
Software Versions: 2007 (5.2)
Task
NumberUser Tool Step Description Comments/ Problems / Workarounds Additional Resources TR / CR Setup Notes
6.0 SSKConfigure SmartSketch f or an integrated
environment
For guidelines about configuring SmartSketch for an
integrated environment, see the SmartPlant Enterprise
Installation & Setup of Foundation (SPF) checklist.
Configure Smart Sketch for an
Integrated Environment
Working in an Integrated Environment
54 1/23/2007]