6.6 urban courtyard facades

9
6.6 Urban Courtyard Facades City courtyards offer human scaled settings away from the intense activity of the street. In New York, a number of highly popular, well designed courtyards of similar space to the proposed space offer seating, dining and cafe settings with ordered landscape and opportunity for public art and water features. The dimensions of the courtyard including colonnades are 30x35m offering proportions which are almost twice the width of Paley and Greenacre pocket parks and reaching towards the dimensions of the famous and much loved MoMA court- yard which offers a venue for temporary and permanent sculpture as well as water features and significant tree planting. Two sides of the court will be activated with outdoor dining while a third face will provide a venue for water feature combined with public art. Further shady settings for table and chairs will be interspersed under the grid of rainforest trees which can be further enhanced through misting in summer. The fourth face will offer an intimate address for the hotel with potential for cafe and bar. 113 9.0 technical design consideration streetscape and street level buildings francis-jones morehen thorp

Upload: others

Post on 12-Jan-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

6.6 Urban Courtyard Facades

City courtyards offer human scaled settings away from the intense activity of the street. In New York, a number of highly popular, well designed courtyards of similar space to the proposed space offer seating, dining and cafe settings with ordered landscape and opportunity for public art and water features. The dimensions of the courtyard including colonnades are 30x35m offering proportions which are almost twice the width of Paley and Greenacre pocket parks and reaching towards the dimensions of the famous and much loved MoMA court-yard which offers a venue for temporary and permanent sculpture as well as water features and significant tree planting. Two sides of the court will be activated with outdoor dining while a third face will provide a venue for water feature combined with public art. Further shady settings for table and chairs will be interspersed under the grid of rainforest trees which can be further enhanced through misting in summer. The fourth face will offer an intimate address for the hotel with potential for cafe and bar.

1139.0 technical design consideration streetscape and street level buildingsfrancis-jones morehen thorp

114 fjmt studio architecture interiors urban landscape community 9.0 technical design consideration streetscape and street level buildings

2 Sandstone

3 GRC (Sanstone)

7 Clear glazing

8 Lightly tinted bronze glazing

5 Perforated Bronze Mesh

4 Bronze Aluminium Sunshading

6 Bronze metalic mesh in DGU

2

3

45

6

7

8

1159.0 technical design consideration streetscape and street level buildingsfrancis-jones morehen thorp

116 fjmt studio architecture interiors urban landscape community 9.0 technical design consideration streetscape and street level buildings

1179.0 technical design consideration streetscape and street level buildingsfrancis-jones morehen thorp

The hotel has a special, boutique character which draws from a unique opportunity to locate guest rooms and facilities across a series of podium buildings with distinct yet aligned architectural charac-ters, together with a spectacular tower component.

The hotel provides 158 guest rooms. Podium levels accommodate 21 guest rooms per level within 3 adjoined, boutique wings each with a unique expression and style. The 3 wings are linked by light filled bridges with views for guests to the public space below.

Guest accommodation is also provided across levels 8-17of the South East tower. Each tower level accommodates 8 guest rooms per level with the exception of level 17, where the presidential suite crowning over Castlereagh street is located.

The porte-cochere is located on lower ground. This key arrival space is naturally illuminated and ven-tilated from above. On arrival within the beautifully, crafted porte-cochere guests are afforded framed views towards the towers above and sky beyond. The main pedestrian entry to the hotel is off Castlere-agh Street via the highly activated public square. The double height hotel foyer has a major presence on the public square and accommodates a bar and cafe activating the southern face of the urban courtyard garden.

A secondary pedestrian entry is provide from Pitt Street via a laneway.

All hotel guests have access to the Level 32 / 34 ‘Sky Terrace’ facilities. Level 32 accommodates the lounge bar and restaurant which are afforded spectacular views to the north east towards the harbour. Level 34 accommodates the Gym, Pool and Spa. These facilities position the hotel in a unique category with world’s best facilities.

Hotel guest have easy access to the level 8 Spa located with the south east tower.

— Level 08: Spa

— Level 09-16: Guest accommodation

— Lower Level: Porte Cochere

— Level 17: Presidential Suite

— Sky bridge Level 32 -33: Pool Gym, Food and Beverage6.7 Hotel

— Level 04-08: Guest accommodation

— Ground floor: Hotel Lobby

118 fjmt studio architecture interiors urban landscape community 9.0 technical design consideration streetscape and street level buildings

The Spa is located on Levels 8 of the southeast tower stretching over the rooftop terrace circeling the plaza. Access to the reception is via the hotel lift core, where as the tratments will take place in rooftop pavillions lo-cated on teh landscaped tarrace. Wet areas such as hot tub and suanas are located on teh south west end.

6.7.1 Drop Off and Arrival

Vehicular arrival is by the porte cochere located on lower ground. An art instalation through the palaza brings natural light, air and a framed view of the towers over right down into the vehicle drop off area, opening up the view to the towers and creating a unique arrival experience for guests.

6.7.2 Spa

— Porte Cochere

— Spa

— Ground Lobby

— Sky Bridge Level 32 -33: Pool Gym, Food and Beverage

— Light Void — Plaza

— Spa plan

6.7.3 Hotel Ameneties

1199.0 technical design consideration streetscape and street level buildingsfrancis-jones morehen thorp

6.7.4 Guest Accommodation

The hotel provides 158 guest rooms. 3 typical guest rooms have been developed. Typ A and B meassures up to 50 m2 and are equiped with a king bed, where as type C will enclose upto 60 m2 and house 2 queen beds. Additionally, the hotel will offer 10% of the rooms premium suits and and a presidential suite. Podium levels accommodate 21 guest rooms per level within 3 adjoined, boutique wings each with a unique expression and style. The 3 wings are linked by light filled bridges with views for guests to the public space below.

10 PLAN Level 10

Fire d

ryris

er

Fire pipeworkriser

Stair press.riser

StairPressurisation

relief

— Hotel room Type A — Hotel room Type B — Hotel room Suite

— Presidential suite

— Guest accommodation

— Guest accommodation

120 fjmt studio architecture interiors urban landscape community 9.0 technical design consideration streetscape and street level buildings

1 Bed Apartment

2 Bed Apartment

3 Bed Apartment

Hotel Amenities

Hotel

Lift, Fire stair,Services

Plant

Circulation

Retail

Parking

Hotel BOH

Boundary

Residential Amenities

Food and Beverage

Hotel Spa

Residential communal garden

553.66 m2

Residential communal garden

321.46 m2

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

WC

KitchenExhaust

KitchenExhaust

Hydraulic PressuriseServices Riser

DAS

Misc Exhaust

Misc Supply

Pipework Riser

CASTLEREAGH STREET

PITT STREET

CarparkAir exhaust

Riser

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

Hydraulic PressuriseServices Riser

DAS

StairPressurisation

relief

0901-BAL

12.63 m2

0904-BAL

10.85 m2

0905-BAL

12.94 m2

0902-BAL

8.14 m2 0903-BAL

10.44 m2

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

Hydraulic PressuriseServices Riser

StairPressurisation

relief

0801-BAL

12.63 m2

0804-BAL

10.85 m2

0805-BAL

12.94 m2

0802-BAL

8.14 m2 0803-BAL

10.44 m2

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Hydraulic PressuriseServices Riser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

DAS

StairPressurisation

relief

1001-BAL

12.63 m2

1004-BAL

10.85 m2

1005-BAL

12.94 m2

1002-BAL

8.14 m2 1003-BAL

10.44 m2

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Hydraulic PressuriseServices Riser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

DAS

StairPressurisation

relief

2101-BAL

12.63 m2

2104-BAL

10.85 m2

2105-BAL

12.94 m2

2102-BAL

8.14 m2 2103-BAL

10.44 m2

Fire

dry

riser

Fire pipeworkriser

Stair press.riser

StairPressurisation

relief

CIRCULATION

96.45 m2

Met

er c

up b

oard

Ele

ctric

alR

iser

MATV

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services Riser

Stairpress.riser

Hot waterpipe riser

HOTEL

47.61 m2

rev date name by chk

GENERAL NOTES

ALL LEVELS RELATIVE TO 'AUSTRALIAN HEIGHT DATUM'.

DO NOT SCALE DRAWINGS.USE FIGURED DIMENSIONS ONLY.

ALL DIMENSIONS AND EXISTING CONDITIONSSHALL BE CHECKED AND VERIFIED BY THECONTRACTOR BEFORE PROCEEDING WITH THE WORK.

fjmt studio architecture interiors landscape urban community

sydney melbourne ukLevel 5, 70 King Street t +61 2 9251 7077 w fjmtstudio.com

0 2 5 10m

legend

C FRANCIS-JONES MOREHEN THORP PTY LTD 2020 ABN 28 101 197 219 NOMINATED ARCHITECT: RICHARD FRANCIS-JONES (REG NO 5301)

project code sheet no. revision

scale first issued

title

project

338 Pitt Street338 Pitt StreetSydney NSW 2000

HotelLevel 08 - Hotel+Hotel Rooftop Spa +Residential

For Information H338

DD/MM/YYYY1:200 @ A1

0001.14.1

7 1:500PLAN Level 04

1 1:500PLAN Level 07

2 1:500PLAN Level 08

3 1:500PLAN Level 10

4 1:500PLAN Level 17- Hotel Penthouse

5 1:100PLAN Level 04

8 1:100PLAN Level 04

9 1:100PLAN Level 04

10 1:100PLAN Level 10

11 1:100PLAN Level 10

12 1:100PLAN Level 17- Hotel Penthouse

A

A

A

ACBBBBBBBB C C

C.2

Suite Suite

A

A

A

Suite

A

A

A

Suite

A

A A A A

A

A

Suite

A

Presidential Suite

C.2

C.2 Spa

— Hotel Podium Level 4-7

1 Bed Apartment

2 Bed Apartment

3 Bed Apartment

Hotel Amenities

Hotel

Lift, Fire stair,Services

Plant

Circulation

Retail

Parking

Hotel BOH

Boundary

Residential Amenities

Food and Beverage

Hotel Spa

Residential communal garden

553.66 m2

Residential communal garden

321.46 m2

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

WC

KitchenExhaust

KitchenExhaust

Hydraulic PressuriseServices Riser

DAS

Misc Exhaust

Misc Supply

Pipework Riser

CASTLEREAGH STREET

PITT STREET

CarparkAir exhaust

Riser

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

Hydraulic PressuriseServices Riser

DAS

StairPressurisation

relief

0901-BAL

12.63 m2

0904-BAL

10.85 m2

0905-BAL

12.94 m2

0902-BAL

8.14 m2 0903-BAL

10.44 m2

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

Hydraulic PressuriseServices Riser

StairPressurisation

relief

0801-BAL

12.63 m2

0804-BAL

10.85 m2

0805-BAL

12.94 m2

0802-BAL

8.14 m2 0803-BAL

10.44 m2

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Hydraulic PressuriseServices Riser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

DAS

StairPressurisation

relief

1001-BAL

12.63 m2

1004-BAL

10.85 m2

1005-BAL

12.94 m2

1002-BAL

8.14 m2 1003-BAL

10.44 m2

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Hydraulic PressuriseServices Riser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

DAS

StairPressurisation

relief

2101-BAL

12.63 m2

2104-BAL

10.85 m2

2105-BAL

12.94 m2

2102-BAL

8.14 m2 2103-BAL

10.44 m2

Fire

dry

riser

Fire pipeworkriser

Stair press.riser

StairPressurisation

relief

CIRCULATION

96.45 m2

Met

er c

up b

oard

Ele

ctric

alR

iser

MATV

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services Riser

Stairpress.riser

Hot waterpipe riser

HOTEL

47.61 m2

rev date name by chk

GENERAL NOTES

ALL LEVELS RELATIVE TO 'AUSTRALIAN HEIGHT DATUM'.

DO NOT SCALE DRAWINGS.USE FIGURED DIMENSIONS ONLY.

ALL DIMENSIONS AND EXISTING CONDITIONSSHALL BE CHECKED AND VERIFIED BY THECONTRACTOR BEFORE PROCEEDING WITH THE WORK.

fjmt studio architecture interiors landscape urban community

sydney melbourne ukLevel 5, 70 King Street t +61 2 9251 7077 w fjmtstudio.com

0 2 5 10m

legend

C FRANCIS-JONES MOREHEN THORP PTY LTD 2020 ABN 28 101 197 219 NOMINATED ARCHITECT: RICHARD FRANCIS-JONES (REG NO 5301)

project code sheet no. revision

scale first issued

title

project

338 Pitt Street338 Pitt StreetSydney NSW 2000

HotelLevel 08 - Hotel+Hotel Rooftop Spa +Residential

For Information H338

DD/MM/YYYY1:200 @ A1

0001.14.1

7 1:500PLAN Level 04

1 1:500PLAN Level 07

2 1:500PLAN Level 08

3 1:500PLAN Level 10

4 1:500PLAN Level 17- Hotel Penthouse

5 1:100PLAN Level 04

8 1:100PLAN Level 04

9 1:100PLAN Level 04

10 1:100PLAN Level 10

11 1:100PLAN Level 10

12 1:100PLAN Level 17- Hotel Penthouse

A

A

A

ACBBBBBBBB C C

C.2

Suite Suite

A

A

A

Suite

A

A

A

Suite

A

A A A A

A

A

Suite

A

Presidential Suite

C.2

C.2 Spa

— Hotel Podium Level 8

1 Bed Apartment

2 Bed Apartment

3 Bed Apartment

Hotel Amenities

Hotel

Lift, Fire stair,Services

Plant

Circulation

Retail

Parking

Hotel BOH

Boundary

Residential Amenities

Food and Beverage

Hotel Spa

Residential communal garden

553.66 m2

Residential communal garden

321.46 m2

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

WC

KitchenExhaust

KitchenExhaust

Hydraulic PressuriseServices Riser

DAS

Misc Exhaust

Misc Supply

Pipework Riser

CASTLEREAGH STREET

PITT STREET

CarparkAir exhaust

Riser

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

Hydraulic PressuriseServices Riser

DAS

StairPressurisation

relief

0901-BAL

12.63 m2

0904-BAL

10.85 m2

0905-BAL

12.94 m2

0902-BAL

8.14 m2 0903-BAL

10.44 m2

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

Hydraulic PressuriseServices Riser

StairPressurisation

relief

0801-BAL

12.63 m2

0804-BAL

10.85 m2

0805-BAL

12.94 m2

0802-BAL

8.14 m2 0803-BAL

10.44 m2

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Hydraulic PressuriseServices Riser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

DAS

StairPressurisation

relief

1001-BAL

12.63 m2

1004-BAL

10.85 m2

1005-BAL

12.94 m2

1002-BAL

8.14 m2 1003-BAL

10.44 m2

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Hydraulic PressuriseServices Riser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

DAS

StairPressurisation

relief

2101-BAL

12.63 m2

2104-BAL

10.85 m2

2105-BAL

12.94 m2

2102-BAL

8.14 m2 2103-BAL

10.44 m2

Fire

dry

riser

Fire pipeworkriser

Stair press.riser

StairPressurisation

relief

CIRCULATION

96.45 m2

Met

er c

up b

oard

Ele

ctric

alR

iser

MATV

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services Riser

Stairpress.riser

Hot waterpipe riser

HOTEL

47.61 m2

rev date name by chk

GENERAL NOTES

ALL LEVELS RELATIVE TO 'AUSTRALIAN HEIGHT DATUM'.

DO NOT SCALE DRAWINGS.USE FIGURED DIMENSIONS ONLY.

ALL DIMENSIONS AND EXISTING CONDITIONSSHALL BE CHECKED AND VERIFIED BY THECONTRACTOR BEFORE PROCEEDING WITH THE WORK.

fjmt studio architecture interiors landscape urban community

sydney melbourne ukLevel 5, 70 King Street t +61 2 9251 7077 w fjmtstudio.com

0 2 5 10m

legend

C FRANCIS-JONES MOREHEN THORP PTY LTD 2020 ABN 28 101 197 219 NOMINATED ARCHITECT: RICHARD FRANCIS-JONES (REG NO 5301)

project code sheet no. revision

scale first issued

title

project

338 Pitt Street338 Pitt StreetSydney NSW 2000

HotelLevel 08 - Hotel+Hotel Rooftop Spa +Residential

For Information H338

DD/MM/YYYY1:200 @ A1

0001.14.1

7 1:500PLAN Level 04

1 1:500PLAN Level 07

2 1:500PLAN Level 08

3 1:500PLAN Level 10

4 1:500PLAN Level 17- Hotel Penthouse

5 1:100PLAN Level 04

8 1:100PLAN Level 04

9 1:100PLAN Level 04

10 1:100PLAN Level 10

11 1:100PLAN Level 10

12 1:100PLAN Level 17- Hotel Penthouse

A

A

A

ACBBBBBBBB C C

C.2

Suite Suite

A

A

A

Suite

A

A

A

Suite

A

A A A A

A

A

Suite

A

Presidential Suite

C.2

C.2 Spa

— Hotel Tower Level 9-16

1 Bed Apartment

2 Bed Apartment

3 Bed Apartment

Hotel Amenities

Hotel

Lift, Fire stair,Services

Plant

Circulation

Retail

Parking

Hotel BOH

Boundary

Residential Amenities

Food and Beverage

Hotel Spa

Residential communal garden

553.66 m2

Residential communal garden

321.46 m2

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

WC

KitchenExhaust

KitchenExhaust

Hydraulic PressuriseServices Riser

DAS

Misc Exhaust

Misc Supply

Pipework Riser

CASTLEREAGH STREET

PITT STREET

CarparkAir exhaust

Riser

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

Hydraulic PressuriseServices Riser

DAS

StairPressurisation

relief

0901-BAL

12.63 m2

0904-BAL

10.85 m2

0905-BAL

12.94 m2

0902-BAL

8.14 m2 0903-BAL

10.44 m2

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

Hydraulic PressuriseServices Riser

StairPressurisation

relief

0801-BAL

12.63 m2

0804-BAL

10.85 m2

0805-BAL

12.94 m2

0802-BAL

8.14 m2 0803-BAL

10.44 m2

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Hydraulic PressuriseServices Riser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

DAS

StairPressurisation

relief

1001-BAL

12.63 m2

1004-BAL

10.85 m2

1005-BAL

12.94 m2

1002-BAL

8.14 m2 1003-BAL

10.44 m2

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Hydraulic PressuriseServices Riser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

DAS

StairPressurisation

relief

2101-BAL

12.63 m2

2104-BAL

10.85 m2

2105-BAL

12.94 m2

2102-BAL

8.14 m2 2103-BAL

10.44 m2

Fire

dry

riser

Fire pipeworkriser

Stair press.riser

StairPressurisation

relief

CIRCULATION

96.45 m2

Met

er c

up b

oard

Ele

ctric

alR

iser

MATV

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services Riser

Stairpress.riser

Hot waterpipe riser

HOTEL

47.61 m2

rev date name by chk

GENERAL NOTES

ALL LEVELS RELATIVE TO 'AUSTRALIAN HEIGHT DATUM'.

DO NOT SCALE DRAWINGS.USE FIGURED DIMENSIONS ONLY.

ALL DIMENSIONS AND EXISTING CONDITIONSSHALL BE CHECKED AND VERIFIED BY THECONTRACTOR BEFORE PROCEEDING WITH THE WORK.

fjmt studio architecture interiors landscape urban community

sydney melbourne ukLevel 5, 70 King Street t +61 2 9251 7077 w fjmtstudio.com

0 2 5 10m

legend

C FRANCIS-JONES MOREHEN THORP PTY LTD 2020 ABN 28 101 197 219 NOMINATED ARCHITECT: RICHARD FRANCIS-JONES (REG NO 5301)

project code sheet no. revision

scale first issued

title

project

338 Pitt Street338 Pitt StreetSydney NSW 2000

HotelLevel 08 - Hotel+Hotel Rooftop Spa +Residential

For Information H338

DD/MM/YYYY1:200 @ A1

0001.14.1

7 1:500PLAN Level 04

1 1:500PLAN Level 07

2 1:500PLAN Level 08

3 1:500PLAN Level 10

4 1:500PLAN Level 17- Hotel Penthouse

5 1:100PLAN Level 04

8 1:100PLAN Level 04

9 1:100PLAN Level 04

10 1:100PLAN Level 10

11 1:100PLAN Level 10

12 1:100PLAN Level 17- Hotel Penthouse

A

A

A

ACBBBBBBBB C C

C.2

Suite Suite

A

A

A

Suite

A

A

A

Suite

A

A A A A

A

A

Suite

A

Presidential Suite

C.2

C.2 Spa

— Hotel Tower Level17

1 Bed Apartment

2 Bed Apartment

3 Bed Apartment

Hotel Amenities

Hotel

Lift, Fire stair,Services

Plant

Circulation

Retail

Parking

Hotel BOH

Boundary

Residential Amenities

Food and Beverage

Hotel Spa

Residential communal garden

553.66 m2

Residential communal garden

321.46 m2

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

WC

KitchenExhaust

KitchenExhaust

Hydraulic PressuriseServices Riser

DAS

Misc Exhaust

Misc Supply

Pipework Riser

CASTLEREAGH STREET

PITT STREET

CarparkAir exhaust

Riser

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

Hydraulic PressuriseServices Riser

DAS

StairPressurisation

relief

0901-BAL

12.63 m2

0904-BAL

10.85 m2

0905-BAL

12.94 m2

0902-BAL

8.14 m2 0903-BAL

10.44 m2

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

Hydraulic PressuriseServices Riser

StairPressurisation

relief

0801-BAL

12.63 m2

0804-BAL

10.85 m2

0805-BAL

12.94 m2

0802-BAL

8.14 m2 0803-BAL

10.44 m2

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Hydraulic PressuriseServices Riser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

DAS

StairPressurisation

relief

1001-BAL

12.63 m2

1004-BAL

10.85 m2

1005-BAL

12.94 m2

1002-BAL

8.14 m2 1003-BAL

10.44 m2

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Hydraulic PressuriseServices Riser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

DAS

StairPressurisation

relief

2101-BAL

12.63 m2

2104-BAL

10.85 m2

2105-BAL

12.94 m2

2102-BAL

8.14 m2 2103-BAL

10.44 m2

Fire

dry

riser

Fire pipeworkriser

Stair press.riser

StairPressurisation

relief

CIRCULATION

96.45 m2

Met

er c

up b

oard

Ele

ctric

alR

iser

MATV

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services Riser

Stairpress.riser

Hot waterpipe riser

HOTEL

47.61 m2

rev date name by chk

GENERAL NOTES

ALL LEVELS RELATIVE TO 'AUSTRALIAN HEIGHT DATUM'.

DO NOT SCALE DRAWINGS.USE FIGURED DIMENSIONS ONLY.

ALL DIMENSIONS AND EXISTING CONDITIONSSHALL BE CHECKED AND VERIFIED BY THECONTRACTOR BEFORE PROCEEDING WITH THE WORK.

fjmt studio architecture interiors landscape urban community

sydney melbourne ukLevel 5, 70 King Street t +61 2 9251 7077 w fjmtstudio.com

0 2 5 10m

legend

C FRANCIS-JONES MOREHEN THORP PTY LTD 2020 ABN 28 101 197 219 NOMINATED ARCHITECT: RICHARD FRANCIS-JONES (REG NO 5301)

project code sheet no. revision

scale first issued

title

project

338 Pitt Street338 Pitt StreetSydney NSW 2000

HotelLevel 08 - Hotel+Hotel Rooftop Spa +Residential

For Information H338

DD/MM/YYYY1:200 @ A1

0001.14.1

7 1:500PLAN Level 04

1 1:500PLAN Level 07

2 1:500PLAN Level 08

3 1:500PLAN Level 10

4 1:500PLAN Level 17- Hotel Penthouse

5 1:100PLAN Level 04

8 1:100PLAN Level 04

9 1:100PLAN Level 04

10 1:100PLAN Level 10

11 1:100PLAN Level 10

12 1:100PLAN Level 17- Hotel Penthouse

A

A

A

ACBBBBBBBB C C

C.2

Suite Suite

A

A

A

Suite

A

A

A

Suite

A

A A A A

A

A

Suite

A

Presidential Suite

C.2

C.2 Spa

1 Bed A

partment

2 Bed A

partment

3 Bed A

partment

Hotel A

menities

Hotel

Lift, Fire stair,

Services

Plant

Circulation

Retail

Parking

Hotel B

OH

Boundary

Residential A

menities

Food and B

everage

Hotel S

pa

Residential

comm

unal garden553.66 m

2

Residential

comm

unal garden321.46 m

2

Condenser w

aterpipe riser

Fire dryriser

Fire dryriser

Fire pipeworkriser

Stairpress.riser

Fire pipeworkriser

NB

N

Fire pipew

orkriser

Stairpress.riser

Meter cup board

Hot waterpipe riser

MAT

V

Hydraulic P

ressuriseS

ervices Riser

StairPressurisation

relief

CO

MM

S

ElectricalR

iser

WC

Kitchen

Exhaust

Kitchen

Exhaust

Hydraulic P

ressuriseS

ervices Riser

DA

S

Misc E

xhaust

Misc S

upply

Pipew

ork Riser

CA

ST

LER

EA

GH

ST

RE

ET

PIT

T ST

RE

ET

Carpark

Air exhaust

Riser

ElectricalRiser

Meter cup board

ElectricalRiser

Condenser w

aterpipe riser

Fire dryriser

Fire dryriser

Fire pipeworkriser

Stairpress.riser

Fire pipeworkriser

NB

N

Fire pipew

orkriser

Stairpress.riser

Meter cup board

Hot waterpipe riser

MAT

V

Hydraulic P

ressuriseS

ervices Riser

StairPressurisation

relief

CO

MM

S

ElectricalR

iser

Condenser w

aterpipe riser

Hydraulic

PressuriseS

ervicesR

iser

NBN

linenchute

MAT

V

Fire dryriser

Fire pipew

orkriser

Fire pipew

orkriser

Fire dryriser

Hydraulic

Pressurise

Services R

iserS

tairpress.riser

Stair press.

riser

Hotel

CO

MM

S

Hot w

aterpipe riser

DAS

COMMS

Hydraulic P

ressuriseS

ervices Riser

DA

S

Stair

Pressurisation

relief

09

01

-BA

L

12.63 m2

09

04

-BA

L

10.85 m2

09

05

-BA

L

12.94 m2

09

02

-BA

L

8.14 m2

09

03

-BA

L

10.44 m2

ElectricalRiser

Meter cup board

ElectricalRiser

Condenser w

aterpipe riser

Fire dryriser

Fire dryriser

Fire pipeworkriser

Stairpress.riser

Fire pipeworkriser

NB

N

Fire pipew

orkriser

Stairpress.riser

Meter cup board

Hot waterpipe riser

MAT

V

Hydraulic P

ressuriseS

ervices Riser

StairPressurisation

relief

CO

MM

S

ElectricalR

iser

Condenser w

aterpipe riser

Hydraulic

PressuriseS

ervicesR

iser

NBN

linenchute

MAT

V

Fire dryriser

Fire pipew

orkriser

Fire pipew

orkriser

Fire dryriser

Hydraulic

Pressurise

Services R

iserS

tairpress.riser

Stair press.

riser

Hotel

CO

MM

S

Hot w

aterpipe riser

DAS

COMMS

Hydraulic P

ressuriseS

ervices Riser

Stair

Pressurisation

relief

08

01

-BA

L

12.63 m2

08

04

-BA

L

10.85 m2

08

05

-BA

L

12.94 m2

08

02

-BA

L

8.14 m2

08

03

-BA

L

10.44 m2

Condenser w

aterpipe riser

Fire dryriser

Fire dryriser

Fire pipeworkriser

Stairpress.riser

Fire pipeworkriser

NB

N

Fire pipew

orkriser

Stairpress.riser

Meter cup board

Hot waterpipe riser

MAT

V

Hydraulic P

ressuriseS

ervices Riser

StairPressurisation

relief

CO

MM

S

ElectricalR

iser

ElectricalRiser

Meter cup board

ElectricalRiser

Hydraulic P

ressuriseS

ervices Riser

Condenser w

aterpipe riser

Hydraulic

PressuriseS

ervicesR

iser

NBN

linenchute

MAT

V

Fire dryriser

Fire pipew

orkriser

Fire pipew

orkriser

Fire dryriser

Hydraulic

Pressurise

Services R

iserS

tairpress.riser

Stair press.

riser

Hotel

CO

MM

S

Hot w

aterpipe riser

DAS

COMMS

DA

S

Stair

Pressurisation

relief

10

01

-BA

L

12.63 m2

10

04

-BA

L

10.85 m2

10

05

-BA

L

12.94 m2

10

02

-BA

L

8.14 m2

10

03

-BA

L

10.44 m2

Condenser w

aterpipe riser

Fire dryriser

Fire dryriser

Fire pipeworkriser

Stairpress.riser

Fire pipeworkriser

NB

N

Fire pipew

orkriser

Stairpress.riser

Meter cup board

Hot waterpipe riser

MAT

V

Hydraulic P

ressuriseS

ervices Riser

StairPressurisation

relief

CO

MM

S

ElectricalR

iser

ElectricalRiser

Meter cup board

ElectricalRiser

Hydraulic P

ressuriseS

ervices Riser

Condenser w

aterpipe riser

Hydraulic

PressuriseS

ervicesR

iser

NBN

linenchute

MAT

V

Fire dryriser

Fire pipew

orkriser

Fire pipew

orkriser

Fire dryriser

Hydraulic

Pressurise

Services R

iserS

tairpress.riser

Stair press.

riser

Hotel

CO

MM

S

Hot w

aterpipe riser

DAS

COMMS

DA

S

Stair

Pressurisation

relief

21

01

-BA

L

12.63 m2

21

04

-BA

L

10.85 m2

21

05

-BA

L

12.94 m2

21

02

-BA

L

8.14 m2

21

03

-BA

L

10.44 m2

Fire dryriser

Fire pipew

orkriser

Stair press.

riser

Stair

Pressurisation

relief

CIR

CU

LA

TIO

N

96.45 m2

Meter cup board

ElectricalRiser

MAT

V

Fire pipew

orkriser

Fire dryriser

Hydraulic

Pressurise

Services R

iser

Stair

press.riser

Hot w

aterpipe riser

HO

TE

L

47.61 m2

rev

date

nam

eb

ych

k

GE

NE

RA

L N

OTE

S

AL

L L

EV

ELS

RE

LA

TIV

E TO

'AU

ST

RA

LIA

N H

EIG

HT

DA

TU

M'.

DO

NO

T S

CA

LE

DR

AW

ING

S.

US

E F

IGU

RE

D D

IME

NS

ION

S O

NLY

.

AL

L D

IME

NS

ION

S A

ND

EX

IST

ING

CO

ND

ITIO

NS

SH

AL

L B

E C

HE

CK

ED

AN

D V

ER

IFIE

D B

Y T

HE

CO

NT

RA

CTO

R B

EF

OR

E P

RO

CE

ED

ING

WIT

H T

HE

WO

RK

.

fjmt studio architecture interiors landscape urban com

munity

sydney melb

ourne ukL

evel 5, 70

King

Street t +

61

2 9

251

707

7 w

fjmtstudio.com

02

510m

leg

en

d

CF

RA

NC

IS-JO

NE

S M

OR

EH

EN

TH

OR

P P

TY

LTD

20

20

AB

N 2

8 101

197

219

NO

MIN

AT

ED

AR

CH

ITE

CT

: RIC

HA

RD

FR

AN

CIS

-JON

ES

(RE

G N

O 5

301

)

pro

ject c

od

esh

eet n

o.

revis

ion

scale

first is

su

ed

title

pro

ject

338 P

itt Stre

et

33

8 P

itt Street

Sydney N

SW

20

00

Ho

tel

Level 0

8 - H

ote

l+H

ote

l Ro

ofto

p S

pa +

Resid

en

tial

Fo

r Info

rmatio

nH

338

DD

/MM

/YY

YY

1:2

00

@ A

1

0001.1

4.1

71:500P

LAN

Level 04

11:500P

LAN

Level 072

1:500P

LAN

Level 08

31:500P

LAN

Level 10

41:500P

LAN

Level 17- Hotel P

enthouse

51:100P

LAN

Level 04

81:100P

LAN

Level 04

91:100P

LAN

Level 04

10

1:100P

LAN

Level 10

11

1:100P

LAN

Level 10

12

1:100P

LAN

Level 17- Hotel P

enthouse

A A

A AC

BB

BB

BB

BB

CC

C.2

Suite

Suite

A

A A

Suite

AA A

Suite

A AA

AA

A A

Suite

A

Presidential S

uite

C.2

C.2

Spa

— Hotel room Type B — Hotel room Type C

— Hotel room Type C.2

1 Bed Apartment

2 Bed Apartment

3 Bed Apartment

Hotel Amenities

Hotel

Lift, Fire stair,Services

Plant

Circulation

Retail

Parking

Hotel BOH

Boundary

Residential Amenities

Food and Beverage

Hotel Spa

Residential communal garden

553.66 m2

Residential communal garden

321.46 m2

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

WC

KitchenExhaust

KitchenExhaust

Hydraulic PressuriseServices Riser

DAS

Misc Exhaust

Misc Supply

Pipework Riser

CASTLEREAGH STREET

PITT STREET

CarparkAir exhaust

Riser

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

Hydraulic PressuriseServices Riser

DAS

StairPressurisation

relief

0901-BAL

12.63 m2

0904-BAL

10.85 m2

0905-BAL

12.94 m2

0902-BAL

8.14 m2 0903-BAL

10.44 m2

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

Hydraulic PressuriseServices Riser

StairPressurisation

relief

0801-BAL

12.63 m2

0804-BAL

10.85 m2

0805-BAL

12.94 m2

0802-BAL

8.14 m2 0803-BAL

10.44 m2

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Hydraulic PressuriseServices Riser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

DAS

StairPressurisation

relief

1001-BAL

12.63 m2

1004-BAL

10.85 m2

1005-BAL

12.94 m2

1002-BAL

8.14 m2 1003-BAL

10.44 m2

Condenser waterpipe riser

Fire

dry

riser Fire dry

riser

Fire

pip

ewor

kris

er

Sta

irpr

ess.

riser

Fire

pip

ewor

kris

er

NBN

Fire pipeworkriser

Sta

irpr

ess.

riser

Meter cup board

Hot

wat

erpi

pe r

iser

MATV

Hydraulic PressuriseServices Riser

Sta

irP

ress

uris

atio

nre

lief

COMMS

ElectricalRiser

Ele

ctric

alR

iser

Met

er c

up b

oard

Ele

ctric

alR

iser

Hydraulic PressuriseServices Riser

Condenser waterpipe riser

HydraulicPressuriseServices

Riser NB

N

linenchute

MATV

Fire

dry

riser

Fire pipeworkriser

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services RiserStairpress.riser

Stair press.riser

HotelCOMMS

Hot waterpipe riser

DA

S

CO

MM

S

DAS

StairPressurisation

relief

2101-BAL

12.63 m2

2104-BAL

10.85 m2

2105-BAL

12.94 m2

2102-BAL

8.14 m2 2103-BAL

10.44 m2

Fire

dry

riser

Fire pipeworkriser

Stair press.riser

StairPressurisation

relief

CIRCULATION

96.45 m2

Met

er c

up b

oard

Ele

ctric

alR

iser

MATV

Fire pipeworkriser

Fire

dry

riser

HydraulicPressurise

Services Riser

Stairpress.riser

Hot waterpipe riser

HOTEL

47.61 m2

rev date name by chk

GENERAL NOTES

ALL LEVELS RELATIVE TO 'AUSTRALIAN HEIGHT DATUM'.

DO NOT SCALE DRAWINGS.USE FIGURED DIMENSIONS ONLY.

ALL DIMENSIONS AND EXISTING CONDITIONSSHALL BE CHECKED AND VERIFIED BY THECONTRACTOR BEFORE PROCEEDING WITH THE WORK.

fjmt studio architecture interiors landscape urban community

sydney melbourne ukLevel 5, 70 King Street t +61 2 9251 7077 w fjmtstudio.com

0 2 5 10m

legend

C FRANCIS-JONES MOREHEN THORP PTY LTD 2020 ABN 28 101 197 219 NOMINATED ARCHITECT: RICHARD FRANCIS-JONES (REG NO 5301)

project code sheet no. revision

scale first issued

title

project

338 Pitt Street338 Pitt StreetSydney NSW 2000

HotelLevel 08 - Hotel+Hotel Rooftop Spa +Residential

For Information H338

DD/MM/YYYY1:200 @ A1

0001.14.1

7 1:500PLAN Level 04

1 1:500PLAN Level 07

2 1:500PLAN Level 08

3 1:500PLAN Level 10

4 1:500PLAN Level 17- Hotel Penthouse

5 1:100PLAN Level 04

8 1:100PLAN Level 04

9 1:100PLAN Level 04

10 1:100PLAN Level 10

11 1:100PLAN Level 10

12 1:100PLAN Level 17- Hotel Penthouse

A

A

A

ACBBBBBBBB C C

C.2

Suite Suite

A

A

A

Suite

A

A

A

Suite

A

A A A A

A

A

Suite

A

Presidential Suite

C.2

C.2 Spa

— Hotel room Presidential Suite

1219.0 technical design consideration streetscape and street level buildingsfrancis-jones morehen thorp