6.1.1 Introduction
The risk assessment study is aimed at identifying the potential sources which pose risks of a
hazard outbreak, determining the probability of such hazard occurrences and their
consequences. In doing so, the risk assessment exercise mitigates the severity of any accident
and facilitates preparation of an effective emergency response plan or disaster management
plan. Hazards in a ship building & repair dock are likely to originate from handling & storing
of hazardous substances, dock operations, natural calamities.
6.1.2 Risk Analysis
The most important step is to recognize all the possible hazards and their associated risks in
the site and its surroundings to ensure the safety and consistency of the dock operations. Risk
analysis is the tool used to determine the consequence of operational failure in the dry dock
activities. This will enable the project proponent to design action plan for improving safety
and address the likely outcomes of any incident in the project site.
6.1.3 Hazard Identification
The hazards associated with the construction & operations of the new dry dock facility are
identified as follows:
Chemical Hazard,
Mechanical/ Operational Hazard,
Electrical Hazard,
Fire/ Explosion Hazard,
Hazard from Natural Calamities.
The scenarios linked with the above identified hazards are elaborated in the following sub-
sections.
6.1.3.1 Chemical Hazard
1) During construction:
The CSL will implement the best industry practices in handling and storing the
hazardous chemical, during construction phase, which will include technology
driven safety, monitoring and fault detection measures.
66
Draft EIA Report for New Dry Dock Facility at Cochin Shipyard, Kochi, Kerala
Asian Consulting Engineers Pvt. Ltd. 6-2
Table 6.1: Likely Chemical Hazards in construction of New Dry Dock Area
S.
No.
Hazardous
Material
Storage Hazardous Scenario
1. Paints
(including
anti-fouling)
On-site existing paint
storage room
Breathing problem/ suffocation in
workers exposed to paints in areas
lacking ventilation.
Being highly flammable, surfaces
exposed to paint residues are highly
susceptible to fire.
2. Diesel On site existing
underground storage
tanks
Highly flammable liquid and may
lead to fire in case of leakage, spill.
2) During Operational:
The ship building and repair activities will entail the use of many chemicals (paints)
and gases. Table 6.2 enlists the various chemicals and gases, their handling and likely
hazards. The dry dock operations will implement the best industry practices in
handling and storing the hazardous chemical which will include technology driven
safety, monitoring and fault detection measures. All these facilities will come under
the purview of fire detection and fighting plan as well.
Table 6.2: Likely Chemical Hazards in New Dry Dock Area
S.
No.
Hazardous
Material
Storage Hazardous Scenario
3. Paints
(including
anti-fouling)
On-site paint storage
room
Breathing problem/ suffocation in
workers exposed to paints in areas
lacking ventilation.
Being highly flammable, surfaces
exposed to paint residues are highly
susceptible to fire.
4. Carbon
dioxide
New bulk storage in
vertical cylindrical
pressurized vessel
within a secured
compound.
Carbon dioxide is an asphyxiant
and in absence of oxygen will
prove to be fatal.
The storage cylinder may explode
in case of temperature buildup
(>52˚C) around it from incidents
such as fire heat.
5. Acetylene New bulk storage in
cylinders connected
Acetylene is an asphyxiant and in
absence of oxygen will prove to be
Draft EIA Report for New Dry Dock Facility at Cochin Shipyard, Kochi, Kerala
Asian Consulting Engineers Pvt. Ltd. 6-3
S.
No.
Hazardous
Material
Storage Hazardous Scenario
to common manifold. fatal.
It is highly flammable and forms an
explosive mixture with air and
oxidizing agent.
Exposure to moderate
concentrations may cause
headache, drowsiness, dizziness,
excitation, excess salivation,
nausea, vomiting, and
unconsciousness.
6. Oxygen Existing liquid
oxygen storage tank.
Oxygen enrichment conditions
highly susceptible to starting fire
and causing fatal burns.
Oxygen enrichment may occur
from:
o Excess use of oxygen in
welding,
o Oxygen leaking from poorly
maintained pipes/ hoses/ valves.
o Oxygen leaking from openpipes/
hoses/ valves.
7. Diesel Highly flammable liquid and may
lead to fire in case of leakage, spill.
6.1.3.2 Mechanical/ Operational Hazard
1) During Construction
Following will be the mechanical/operational hazardous identified during
construction
Collapse of cranes /buildings.
Failure of safety linked control system, detection system, and alarm system.
Occupational hazards originating from slippery surfaces, elevated surfaces, cuts &
bruises, eye injury from welding activities, burns, heat stress, sprains and strains
from manual handling, dust inhalation, machine handling and other ergonomic non-
compliances.
Injury from rope or cable to workers which may even turn fatal.
Draft EIA Report for New Dry Dock Facility at Cochin Shipyard, Kochi, Kerala
Asian Consulting Engineers Pvt. Ltd. 6-4
2) During operational
The mechanical and operation related hazards in the dry dock are like to be from,
Unstable ship during docking and undocking: this may lead to the collision of vessel
with dock structures causing physical damage to the structures involved and
overturning of vessels. Otherwise catastrophic accidents are prevented by following
appropriate procedures.
Flooding of dock: this is critical.
Collapse of cranes /buildings.
Leakage from /failure of dock gates.
During Material handling, such as oil spill on dock, etc.
Failure of safety linked control system, detection system, and alarm system.
Occupational hazards originating from dock flooding, slippery surfaces, trips from
vessels/ elevated surfaces, cuts & bruises, eye injury from welding activities, burns,
heat stress, sprains and strains from manual handling, dust inhalation, machine
handling and other ergonomic non-compliances.
Injury from rope or cable of hauling-in system which may even turn fatal.
6.1.3.3 Electrical Hazard
Electrical hazards are mostly associated with fires caused due to over loading or short-
circuiting phenomena. Fire may originate in switch room, transformer oil store, and high
voltage electricity cables. Unprotected wiring may prove to be fatal if accidentally touched.
6.1.3.4 Fire/ Explosion Hazard
Apart from the many incidents discussed above in being responsible for starting a fire or
explosion, fire may start at any point, at any given time in the presence of the combined
presence of heat, any fuel and oxygen.
6.1.3.5 Hazard from Natural Calamities
Earth Quake
The project is under Zone-III (Moderate risk zone) as per the BMTPC (Building Materials
and Technology Promotion Council), 2006. This will be an important consideration in
designing the dry dock ensuring structural integrity.
Tsunami
Though the study area falls in the shadow zone of the direction of propagation of tsunamis,
unforeseen damages were incurred by the December 2004 tsunami in the coastal stretch
including that of Ernakulam District. Waves of 3 to 5 m height had hit the coast intermittently
leading to loss of lives (about 176 lives) and many injuries (about 1,600 people).
Draft EIA Report for New Dry Dock Facility at Cochin Shipyard, Kochi, Kerala
Asian Consulting Engineers Pvt. Ltd. 6-5
Cyclone and Flood
According to NDMA1, the vulnerability of Ernakulam to flooding is identified as ‘moderate’
and no cyclones have crossed the district till date. However, the coastal Ernakulam region
where the study area falls is regarded as a major flood prone area. The heavy monsoons along
with dense settlements and reclamation activities have been held responsible for the floods.
The project site coast is also vulnerable to monsoon storm surges and sea level rise2. This may
put the lives of the employees and property at stake.
6.1.4 Risk Evaluation
The evaluation of the risks associated with the above identified hazards in the dry dock is
done using the QRA (Qualitative Risk Assessment) method involving the risk matrix. The
qualitative approach is a structured and documented approach in which observations to
several strategic indicative activities are retrieved and the likelihood and consequences
determined based on technical knowhow, professional judgement and experience.
Observations to the following indicative activities are sought (not limited to):
1Cyclone Prone District Report, 2010.
2Kerala State Disaster Management Authority.
Stratification of All Dock Activities
Identification of Hazards against Each Activity
(if any)
Assessing Probability of Occurrence of Identified
Hazards
Gauging Intensity of Consequences if Hazards
Occur
Drawing Mitigation Measures to Act Against
Consequences
Draft EIA Report for New Dry Dock Facility at Cochin Shipyard, Kochi, Kerala
Asian Consulting Engineers Pvt. Ltd. 6-6
The evaluation of risk probability (P) is given a rating of 1 to 5 i.e. rare to almost certain and
the intensity of consequence is rated from 1 to 5 i.e. insignificant to catastrophic. From this
the level of risk or a score is evaluated as,
Risk = Probability (P) x Consequence (C)
The risk score is further classified as unacceptable& to be eliminated, tolerable with
immediate action, acceptable with immediate action. Thus the risk matrix deduced is shown
in Figure 6.1.
Probability
Consequence/ Severity
1 2 3 4 5
Insignificant Minor Moderate Major Catastrophic
5 Almost
Certain
4 Likely
3 Moderate
2 Unlikely
1 Rare
Low Level Risk Moderate Level Risk High Level Risk Extreme Level Risk
Figure 6.1: Risk Matrix
The risk assessment for the hazards identified for the new dry dock operations is detailed out
in Table6.2.
Table6.2: Risk Assessment for New Dry Dock Operations
S.
No.
Hazardous
Activity
Probability
(P)
Consequence
(C)
Risk
Level
Risk Classification
1. Chemical Hazard 2 3 6 Moderate Level Risk:
Tolerable with immediate
action.
2. Mechanical/
Operational
Hazard
4 3 12 High Level Risk:
Unacceptable & to be
eliminated.
3. Electrical Hazard 2 2 4 Low Level Risk: Acceptable
with immediate action.
4. Fire/ Explosion
Hazard 4 4 16
High Level Risk:
Unacceptable & to be
eliminated.
5. Hazard from
Natural
Calamities
1 4 4 Moderate Level Risk:
Tolerable with immediate
action.
Draft EIA Report for New Dry Dock Facility at Cochin Shipyard, Kochi, Kerala
Asian Consulting Engineers Pvt. Ltd. 6-7
6.1.5 Mitigation Measures
For the above risk assessment against each type of hazard, the necessary actions required to
control and/ or eliminate the consequences are discussed in this section. Table 6.3 enlists the
mitigation or control measures against the risks for the new dry dock operations and
construction both.
Table 6.3: Mitigation Measures against Risks for New Dry Dock Operations
S. No. Hazardous
Activity
Risk Level Mitigation/ Control Measure
1) Chemical Hazard Moderate
Level Risk:
Tolerable with
immediate
action.
Regular maintenance of all connections and
monitoring of the same.
Strict supervision of all activities involving the use
of hazardous substances is very important.
Provision for on-site medical facility and first aid
for medical emergencies before further treatment,
like Medical support and ambulance. The project
site is adjacent to the following hospitals:
o V.G. Saraf Memorial Hospital (about 250 m,
East),
o Medical Trust Hospital (about 1 km, North).
Material Safety Data Sheets (MSDS) of all
hazardous substances to be well distributed and
displayed for awareness and knowledge in handling
such substances.
Mandatory use of personal protective equipment
(PPE).
Carbon dioxide Outlets will be located in well ventilated areas.
Acetylene Storage facility to be provided with an automatic
deluge system activated automatically by fire
detection system focused on the active area
(complying with Indian Standards and best practices
of NFPA).
Storage facility structure will be fire resistant and
separated from adjacent operations by a security
fence. Access to be limited to authorized personnel
only.
Facility will be isolated as a Hazardous Area
Classification Zone 1 IEC 679 Part 10-1 (for
internal equipment) for design purposes.
Draft EIA Report for New Dry Dock Facility at Cochin Shipyard, Kochi, Kerala
Asian Consulting Engineers Pvt. Ltd. 6-8
S. No. Hazardous
Activity
Risk Level Mitigation/ Control Measure
Building facility and outlets will be well ventilated.
Ignition sources, vehicle traffic to be restricted from
the areas.
All concerned connections will be handed and
identified to avoid confusion with other gas
connections.
Pipe size will be restricted to prevent accidental
deflagration/detonation.
Pipe wall thickness will be suitable to withstand
mechanical impacts, will have suitable corrosion
allowance.
The storage compound will be placed strategically
at South of the grand assembly area.
Compound will be so placed such that jib crane
lifting activities above the facility are prevented.
Oxygen Storage facility is fire protected and complies with
Indian Standards and best practices of NFPA.
Connections will be handed and identified to evade
any confusion with other connections.
2) Mechanical/
Operational
Hazard
High Level
Risk:
Unacceptable
& to be
eliminated.
All installations will be safely designed, built,
maintained, modified and operated in accordance
with OHSAS 18001 and ISO 14001.
Integrated dock flooding warning system including
public address system to ensure working personnel
are timely alerted before flooding, dewatering
activities.
Remote operations to make sure personnel are at a
safe distance from winches, bollards, capstans while
operating machineries.
Soft stop or variable buffer safeguard options will
be considered to cut down on risks to personnel
from cranes.
Regular monitoring of site and coordinated
supervision is very instrumental in eliminating all
probable risks.
Efficient control and civil teams will be deployed
Draft EIA Report for New Dry Dock Facility at Cochin Shipyard, Kochi, Kerala
Asian Consulting Engineers Pvt. Ltd. 6-9
S. No. Hazardous
Activity
Risk Level Mitigation/ Control Measure
for overall monitoring and coordination through
CCTVs and other technology.
Provision for on-site medical facility and first aid to
aid to medical emergencies before further treatment.
Availability of 24x7 medical officer and ambulance
is a must.
Timely training to all workers and staff in their
specific work areas.
Mandatory use of personal protective
equipment(PPE).
3) Electrical Hazard Low Level
Risk:
Acceptable
with
immediate
action.
Substations will be sealed.
Regular maintenance of the sub-stations, wiring and
monitoring of the same.
Strict supervision of all day-to-day activities is very
important to prevent any untoward incident.
4) Fire/ Explosion
Hazard
High Level
Risk:
Unacceptable
& to be
eliminated.
The comprehensive fire fighting system of the new
dry dock will be very effective in eliminating any
consequential risk.
5) Hazard from
Natural Calamities
Moderate
Level Risk:
Tolerable with
immediate
action.
All installations will be safely designed, built,
maintained, modified and operated in accordance
with OHSAS 18001 and ISO 14001.
Cochin Shipyard Limited has a very proficient emergency action plan in place to ensure
preparedness during the dry dock operations against any emergency situation arising from the
risks identified in the previous section. The emergency action plan is presented below.
6.2 EMERGENCY ACTION PLAN
The emergency action plan of Cochin Shipyard Ltd. i.e. Procedure for Emergency
Preparedness, Issue: A 02(September 2015) is presented below.
6.2.1 Scope
This Emergency Action Plan covers those designated actions of Emergency Response Team
Members that must be taken to ensure employee safety, protection of company installation&
customer safety from Fire and other identified emergencies.
Draft EIA Report for New Dry Dock Facility at Cochin Shipyard, Kochi, Kerala
Asian Consulting Engineers Pvt. Ltd. 6-10
6.2.2 Procedure
a) Identified Emergencies
The emergencies or hazards and their risks are identified.
b) Incident Prevention & Mitigation
A hazard management system will be the basis for ensuring that installations are safely
designed, built, maintained, modified and operated in accordance with OHSAS 18001 and
ISO 14001. As part of this system, hazards and impacts are identified in each process and are
followed by identification of significant risk levels.
Preventive and Mitigation Measures: All the risks and impacts identified will have their own
control measures and will be implemented in the process. This control measures include,
permit to work systems, dock safety inspections etc. This system will be revised based on the
incidents, dock safety inspections and same implemented in accordance with above standards.
Any incident happening out of these control measures requires the following steps to be
followed.
6.2.3 Key Persons
The following key persons are nominated against each post with alternative for each position.
1 Controller Occupier
Alternative Factory Manager
2 Incident Controller Project Manager of the vessel/
Respective Heads of Department /
Officer in charge of the Area.
3 Fire and safety Controller HOD(S&F) / CSO /Sr. SO
4 Personnel& Administrative
Controller
Chief Welfare officer / Welfare officer
5 Communication officer Company Secretary /Asst. Company
Secretary
6 Fire Officer F O / A F O / In charge of fire brigade
7 Security Officer DC(CISF) / Inspector CISF
8 Traffic Control PFSO / Dy. PFSO
9 Service Dept & Sectional Heads Respective Sectional heads
10 Medical Officer CMO/MO
6.2.4 Informing the Emergency
Immediately report all emergencies to Fire / Emergency control room through:
i. Mobile Phone
Or
ii.PABX
Or
iii. Walkie-talkie.
Draft EIA Report for New Dry Dock Facility at Cochin Shipyard, Kochi, Kerala
Asian Consulting Engineers Pvt. Ltd. 6-11
6.2.5 Emergency Action Plan
i. On receiving emergency call, Fire brigade and ambulance will rush to the spot and commence
their action plan.
ii. In-charge of the Fire Team will assess the gravity of the situation and if the situation demands
further assistance, the same will be communicated to Fire Control Room.
iii. Fire Control Room then will annunciate the siren at fire station for alerting the dock.
iv. Fire & Safety Controller shall communicate the mater to Controller and Incident controller
and decision shall be taken for “Declaring Emergency”.
v. On hearing the Siren, all ‘key personnel’ and ‘emergency team members’ shall gather
information on the incident and proceed to incident location.
6.2.6 Duties and Responsibilities
a) Controller
He will be the overall in-charge of the situation and declare a state of Emergency as per
this plan.
On knowing the emergency; immediately proceed to site. A temporary Control room shall
be made functional near incident location.
Discuss with key persons; make decisions for the action plan arrived at. Instruct all
concerned for effective execution of action plan formulated.
Depending on the extent/ nature of emergency, decide on for outside help from nearby
industries and hospitals.
Give instructions for shutdown/ evacuation of dock as per the recommendations of
incident controller.
Ensure that causalities are receiving adequate attention and relatives are informed through
P&A Department.
Ensure that statutory authorities are informed.
Ensure availability of funds to meet the contingency.
Ensure that the Company Directors are informed.
He will issue authorized statements to news media through communication officer.
Declare ‘all clear situation’ once the emergency is over.
b) Incident Controller
He shall report directly to controller.
Immediately on knowing about the emergency, proceed to site.
Draft EIA Report for New Dry Dock Facility at Cochin Shipyard, Kochi, Kerala
Asian Consulting Engineers Pvt. Ltd. 6-12
Quickly assess the scale of emergency and inform controller and finalize action required.
Direct all concerned to act according to the action plan arrived at.
Ensure availability of action team members / power / and all other requirements as per the
action plan.
c) Fire and Safety Controller
On hearing the incident; quickly proceed to the scene and take overall charge of the fire
fighting and rescue operations.
He shall report to Incident controller.
He shall inform the emergency to all key persons as per this plan.
He shall arrange for communicating to action team and direct them to report to incident
controller.
Mobile Control room is mobilized to incident spot.
Arrange additional fire brigades from nearby establishments if required with the direction
of Incident controller.
Establish a danger zone, and coordinate with security officer for proper access control to
affected area.
Report all significant development to the incident controller and controller.
Emergency information documents (2 sets) shall be available at main control room at
incident spot.
Ensure provision of sufficient protective equipment and availability of equipment / tools.
Note: In case of Emergency drill, he shall prepare the Emergency drill incident planand Key
position leaf let and forward to Incident controller before planning the drill. Emergency drill
report shall also be prepared by him.
d) Personnel and administrative controller
He shall report to Incident controller.
When emergency is prolonged, arranging transport vehicles / relief/refreshments to
personnel’s engaged.
Ensure that every one reached the muster point.
e) Communication officer
On the receipt of emergency, proceed to control room and maintain communication under the
guidance of the controller and incident controller.
Draft EIA Report for New Dry Dock Facility at Cochin Shipyard, Kochi, Kerala
Asian Consulting Engineers Pvt. Ltd. 6-13
f) Fire officer
On hearing the incident; he will immediately proceed to the scene, quickly assess situation.
He takes immediate action to control and extinguish the fire with rescue operations if
required. He will supervise the work of the firecrew. Declare Emergency by sounding the
Sound hailer from fire tender after obtaining communication from Fire & Safety Controller.
He will ensure replenishing of fire extinguishing agent and also supervise outside Fire
Brigades if called in. Requirement of outside fire brigade help shall be communicated to
incident controller through Fire &Safety Controller. He shall directly report to Fire & Safety
Controller.
g) Security Officer
He shall report to Incident controller. He will control the gates as per the instructions received
from the traffic controller and arrange for reserved manpower (CISF persons) for supporting
emergency requirements including firefighting and rescue operations.
h) Traffic control
He shall report to Incident controller. He shall direct the security officer tonsure only
authorized personnel and vehicle entry to the factory premises through the entry gates.
i) Service Dept and Sectional Heads
He shall report to Incident controller.
On hearing the incident, the Service Dept heads (U&M, CIV, S&C, and) and sectional
heads under whose control the area/activity where the emergency occurred, will
immediately proceed to the scene of emergency and support the Incident Controller.
Discuss with Incident Controller and action to be finalized.
Actions to be taken to enforce the action plan.
j) Medical Officer
He shall report to Incident controller.
First aid and paramedical services shall be mobilized to the incident spot if required.
He shall send the causalities to the appropriate hospital according the type of injuries and
coordinate with hospitals for the better attention to the causalities and keep a track on it.
k) Action Team
On being alerted of any incident through siren, team members shall report to the incident
controller and action to be executed under the direction of Incident controller.
Immediately mobilize the equipment available in CSL at the incident site as required for
the emergency.
Draft EIA Report for New Dry Dock Facility at Cochin Shipyard, Kochi, Kerala
Asian Consulting Engineers Pvt. Ltd. 6-14
l) Control Room
The Emergency Control room shall contain the following:-
Map of the factory showing entrance, roads, emergency escape gates, assembly point,
medical center, and hazardous zones.
All reference documents.
m) Maintenance and Up Keep of Plan
Planned emergency drill will be conducted once in every six months in the dry dock area.