document6

2
 4''Ox4''O UPVCPIPES 12mmO LIFTBARS 4''Ox4''O UPVCPIPES  AIR SPACE DIGESTIVE CHAMBER FIRST LEACHING CHAMBER SECOND LEACHING CHAMBER 10 mmVERTICAL BARS SPACED AT200 mmO.C.C. INLET OUTLE TTOCANAL SEWERSYSTEM 10 mmHORIZONTAL BARS SPACED EVERYTHIRD LAYER MANHOLE MANHOLE MANHOLE 12 mm O LIFT BARS 12 mm O LIFT BARS OFC.H.B LONGITUDINAL BARSSPACED  AT 200 MM O.C.C. LONGITUDINAL BARSSPACED  AT 200 MM O.C.C. SPACEDAT 200 mm O.C.C. 0.10 m 0.05 m 0.10 m 0.10 m 0.60 m 0.10 m 0.10 m 0.40 m 0.10 m    0  .    3    5   m    0  .    6    0   m GREASE TRAP SECTION CATCH BASIN SECTION GREASE TRAP PLAN CATCH BASIN PLAN SEPTIC TANK PLAN SEPTIC TANK SECTION    1  .    5    0   m 4.00 m 1.00 m 1.00 m 2.00 m    0  .    3    0   m 0.10 m 0.90 m 0.20 m 0.30 m 0.60 m 0.60 m 0.60 m SECOND FLOOR WATERLINE AND DRAINAGE PLAN GROUND FLOOR WATERLINE AND DRAINAGE PLAN    S    E    P    T    I    C    T    A    N    K  M FROM THEWATERSOURCE (SMWD) CB CB CB CB CB CB CB CB CB CB CB CB CB CB SCALE 1:100 SCALE 1:100  SPECIFICATIONS  ALL PLUMBING WOR KS INCLUDED H ERE IN SHALL BE EXE CUTED ACCORD ING TO THE LATEST EDITION OF THE PHILIPPINE PLUMBING CODE. THE NATIONAL BUILDING CODE  AND THE RULE S AND REGULATION OF MU NICIPAL OR CITY.  ALL MATERIALS TO BE U SED SHALL BE BR AND NEW AND MU ST APPROVED TYPE OF PARTICULAR LOCATION AND I NTENDED PURPOSE.  ALL PIPES PASSING TH RU WALLS OR FLOORS SHALL HAVE BE PR OPERLY CORREC TED  AGAINST BREAKAGE. PIPES SHALL BE INSTALLED AS PER PLAN ANY REGULATION OR REVISION SHALL HAVE PRIOR. APPROVAL FROM THE ARCHITECT, ENGR. OR MASTER PLUMBER WHO DESIGNED THE PLANS.    M ISOMETRIC DIAGRAM LAV. LAV. C.O. C.O. CONNECT TO FIRST FLOOR CONNECT TO SECONDFLOOR C.O. SEPTICTANK CB CB CB CB CB CB CB CB CB CB CB CB CB FROM THEWATERSOURCE (SMWD) LAV. C.O. LEGEND SV SEPTIC TANK GT G RE AS E TRAP CB CATCH BASI N VTR VENT THRU ROOF CO CL EAN OUT LAV. LAVATORY WC WATER CLOS ET FB FL OOR D RA IN M WATER METER F FAUCET S SHOWER WATER LINE FB FOOT BATH LOCATION MAP NOT DRAWNTO SCALE    A    C    L    O     S    T  . BONIFACIO ST. PAGAS ST. LUNETA PARK THE SITE L  L  O  C    E     T   A      T      S      O       A       G       R        U       S   Y   G  O  L   O N      H     C     E    T     F     O  E  G E          I U  R G AO C I   T  Y 1969 1975 1955 STUDENT: BSCE - 3A PROJECT TITLE: STARTED: SPEED NEATNESS LEGIBILITY  ACCURAC Y EVALUATED BY: EXERCISE: FINISHED: INSTRUCTOR RATING OCAMPO, MARY KRISTELLE L. ARCH. MARLON C. SOLLOSO PROPOSED TWO STOREY RESIDENTIAL BUILDING

Upload: persistentengineer

Post on 04-Nov-2015

213 views

Category:

Documents


0 download

DESCRIPTION

chuba

TRANSCRIPT

  • 4'' O x 4'' OUPVC PIPES

    12 mm O LIFT BARS

    4'' O x 4'' OUPVC PIPES

    AIR SPACE

    DIGESTIVE CHAMBER

    FIRSTLEACHINGCHAMBER SECONDLEACHING

    CHAMBER10 mm VERTICAL BARS

    SPACED AT 200 mm O.C.C.

    INLET

    OUTLET TO CANAL

    SEWER SYSTEM

    10 mm HORIZONTAL BARSSPACED EVERY THIRD LAYER

    MANHOLE MANHOLE MANHOLE

    12 mm O LIFT BARS

    12 mm O LIFT BARS

    OF C.H.B

    ????????????????????

    LONGITUDINAL BARS SPACEDAT 200 MM O.C.C.

    ????????????????????

    LONGITUDINAL BARS SPACEDAT 200 MM O.C.C.

    ????????????????????????????????????

    SPACED AT 200 mm O.C.C.

    0.10 m

    0.05 m

    0.10 m

    0.10 m0.60 m0.10 m0.10 m0.40 m0.10 m

    0.35

    m

    0.60

    m

    GREASE TRAP SECTIONCATCH BASIN SECTION

    GREASE TRAP PLANCATCH BASIN PLANSEPTIC TANK PLAN

    SEPTIC TANK SECTION

    1.50

    m

    4.00 m

    1.00 m1.00 m2.00 m

    0.30

    m

    0.10 m

    0.90 m

    0.20 m

    0.30 m

    0.60 m0.60 m0.60 m

    SECOND FLOOR WATERLINE AND DRAINAGE PLANGROUND FLOOR WATERLINE AND DRAINAGE PLAN

    CONNECT TO SECOND FLOOR(SOLID WASTE PIPE)

    CONNECT TO FIRST FLOOR(SOLID WASTE LINE)

    CONNECT TO SECOND FLOOR(WATER LINE)

    CONNECT TO FIRST FLOOR(WATER LINE)

    CONNECT TO SECOND FLOOR(WATER LINE)

    CONNECT TO SECOND FLOOR(WATER LINE)

    CONNECT TO FIRST FLOOR(WATER LINE)

    CONNECT TO FIRST FLOOR(WATER LINE)

    SE

    PTI

    C T

    AN

    K

    M

    FROM THE WATER SOURCE(SMWD)

    CB CB CB CB

    CB

    CB CB

    CB CB

    CBCB

    CB

    CB

    CB

    SCALE 1:100SCALE 1:100

    SPECIFICATIONSALL PLUMBING WORKS INCLUDED HERE IN SHALL BE EXECUTED ACCORDING TO THELATEST EDITION OF THE PHILIPPINE PLUMBING CODE. THE NATIONAL BUILDING CODEAND THE RULES AND REGULATION OF MUNICIPAL OR CITY.

    ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND MUST APPROVEDTYPE OF PARTICULAR LOCATION AND INTENDED PURPOSE.

    ALL PIPES PASSING THRU WALLS OR FLOORS SHALL HAVE BE PROPERLY CORRECTEDAGAINST BREAKAGE.PIPES SHALL BE INSTALLED AS PER PLAN ANY REGULATION OR REVISION SHALL HAVEPRIOR. APPROVAL FROM THE ARCHITECT, ENGR. OR MASTER PLUMBER WHO DESIGNEDTHE PLANS.

    M

    ISOMETRIC DIAGRAM

    LAV.

    LAV.

    C.O.

    C.O.

    CONNECT TO FIRST FLOOR

    F

    F

    F

    F

    F

    F

    CONNECT TO SECOND FLOOR

    C.O.

    SEPTIC TANK

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    FROM THE WATER SOURCE(SMWD)

    LAV.

    C.O.

    LEGENDSV SEPTIC TANK

    GT GREASE TRAP

    CB CATCH BASIN

    VTR VENT THRU ROOF

    CO CLEAN OUT

    LAV. LAVATORY

    WC WATER CLOSET

    FB FLOOR DRAIN

    M WATER METER

    F FAUCET

    S SHOWER

    WATER LINE

    FB FOOT BATH

    LOCATION MAPNOT DRAWN TO SCALE

    AC

    LO S

    T.

    BONIFACIO ST.

    PAGAS ST.

    LUNETA PARK

    THESITE

    LLOCETATS

    OA

    G IR

    U S

    YG

    OL

    ON

    HCE

    TFO

    EGE

    S IUR GAO CITY

    1969 1975

    1955

    STUDENT:

    BSCE - 3A

    PROJECT TITLE:

    STARTED:

    SPEED

    NEATNESS

    LEGIBILITY

    ACCURACY

    EVALUATED BY:EXERCISE:

    FINISHED: INSTRUCTOR

    RATING

    OCAMPO, MARY KRISTELLE L. ARCH. MARLON C. SOLLOSOPROPOSED TWO STOREY

    RESIDENTIAL BUILDING