1
Media-Smedley Connector TrailPublic Meeting #1
June 18, 2019
Feasibility Study
Meeting Agenda
1. Welcome and Introductions (7:00)
2. Review of Agenda & Ground Rules (7:02)
3. Presentation (7:05)
a. Trail Examples
b. County Trail Planning
c. Project Scope
d. Existing Plans & Conditions
e. Study Area Findings and Trail Route Alternatives
4. Small Group Discussion (7:45)
5. Next Steps (8:20)
Trail Examples
Off-Road and Park Multi-Use Trails
![Page 2: 6/24/2019 - Microsoft Azure · 2019-06-24 · may be sited on sidewalks, roadsides, and/or roadway • Should meet ADA standards, where feasible. 6/24/2019 9 7/15/16 “Primary Trail](https://reader033.vdocuments.us/reader033/viewer/2022050207/5f5a78158ebbbd4db20ef4dc/html5/thumbnails/2.jpg)
6/24/2019
2
![Page 3: 6/24/2019 - Microsoft Azure · 2019-06-24 · may be sited on sidewalks, roadsides, and/or roadway • Should meet ADA standards, where feasible. 6/24/2019 9 7/15/16 “Primary Trail](https://reader033.vdocuments.us/reader033/viewer/2022050207/5f5a78158ebbbd4db20ef4dc/html5/thumbnails/3.jpg)
6/24/2019
3
![Page 4: 6/24/2019 - Microsoft Azure · 2019-06-24 · may be sited on sidewalks, roadsides, and/or roadway • Should meet ADA standards, where feasible. 6/24/2019 9 7/15/16 “Primary Trail](https://reader033.vdocuments.us/reader033/viewer/2022050207/5f5a78158ebbbd4db20ef4dc/html5/thumbnails/4.jpg)
6/24/2019
4
Sidepaths&
Cycle Tracks
“Cycle Track” – Separated path along roadway that is distinct from the sidewalk. Might beentirely within legal street right-of-way.
Cycle Track “Sidepath” – Parallel to roadway; might not be legally in street right-of-way. May replacethe sidewalk.
Sidepath
On-Road Trails / Bike Lanes
![Page 5: 6/24/2019 - Microsoft Azure · 2019-06-24 · may be sited on sidewalks, roadsides, and/or roadway • Should meet ADA standards, where feasible. 6/24/2019 9 7/15/16 “Primary Trail](https://reader033.vdocuments.us/reader033/viewer/2022050207/5f5a78158ebbbd4db20ef4dc/html5/thumbnails/5.jpg)
6/24/2019
5
![Page 6: 6/24/2019 - Microsoft Azure · 2019-06-24 · may be sited on sidewalks, roadsides, and/or roadway • Should meet ADA standards, where feasible. 6/24/2019 9 7/15/16 “Primary Trail](https://reader033.vdocuments.us/reader033/viewer/2022050207/5f5a78158ebbbd4db20ef4dc/html5/thumbnails/6.jpg)
6/24/2019
6
Signage for Bike Trails
![Page 7: 6/24/2019 - Microsoft Azure · 2019-06-24 · may be sited on sidewalks, roadsides, and/or roadway • Should meet ADA standards, where feasible. 6/24/2019 9 7/15/16 “Primary Trail](https://reader033.vdocuments.us/reader033/viewer/2022050207/5f5a78158ebbbd4db20ef4dc/html5/thumbnails/7.jpg)
6/24/2019
7
Share-the-Road &
Street Crossings
![Page 8: 6/24/2019 - Microsoft Azure · 2019-06-24 · may be sited on sidewalks, roadsides, and/or roadway • Should meet ADA standards, where feasible. 6/24/2019 9 7/15/16 “Primary Trail](https://reader033.vdocuments.us/reader033/viewer/2022050207/5f5a78158ebbbd4db20ef4dc/html5/thumbnails/8.jpg)
6/24/2019
8
Advisory Bike Lanes
Pop-up / Temporary Streetscape Examples
County Trail Planning
Delaware County Primary Trail Network
7/15/16
“Primary Trail”
Primary Trails in Delaware County Network
• “Serve as the main spokes in the countywide network of trails.”
• “Can be considered “planning corridors” for more detailed trail studies in the future.” (Plan shows potential segments, but not specific alignments.)
• “Intended to be Type I and Type II (hardsurface) off-road connector trails owned or managed at the County, municipal, or multi-municipal level.”
• If an entirely off-road trail is not feasible, some sections may be sited on sidewalks, roadsides, and/or roadway
• Should meet ADA standards, where feasible
![Page 9: 6/24/2019 - Microsoft Azure · 2019-06-24 · may be sited on sidewalks, roadsides, and/or roadway • Should meet ADA standards, where feasible. 6/24/2019 9 7/15/16 “Primary Trail](https://reader033.vdocuments.us/reader033/viewer/2022050207/5f5a78158ebbbd4db20ef4dc/html5/thumbnails/9.jpg)
6/24/2019
9
7/15/16
“Primary Trail Network”
Benefits of the Primary Trail Network:
• When completed, the trails will form a network of non-motorized travel and recreation connections near and between all corners of Delaware County, as well as to existing and proposed trails in adjacent counties.
• Increased access to open space and recreation increases value of housing and tax revenues
• Network will draw trail users into existing downtown commercial districts increased recreation-based commerce
• More safe bicycle routes = less automobile traffic.
Connectivity
Trail Status
Potential
• General corridor has been identified but not further studied
Proposed
• Corridor was studied for feasibility, and alignment or study is in progress
Design
• Detailed design and construction documents in progress or complete
Construction
• Is currently under construction
Existing
• Trail is open!
Media-Smedley Connector Trail
Project Scope
Project Goals
1. Identify alternative alignments for the trail;2. Identify property ownership along the proposed
route and assess the steps necessary to establish public rights-of-way;
3. Identify technical constraints to construction;4. Identify potential connections and adjacent
destinations;5. Describe public benefits of the trail,6. Establish design standards for the trail;7. Recommend an implementation strategy
Scope of Work
• Will fulfill PA DCNR trail feasibility study guidelines, including:• Study Area Background• Project Goals• Trail Benefits & Challenges• Trail Route Alternatives• Design Recommendations• Management and Maintenance• Implementation Strategy• Trail Development Cost Estimates
![Page 10: 6/24/2019 - Microsoft Azure · 2019-06-24 · may be sited on sidewalks, roadsides, and/or roadway • Should meet ADA standards, where feasible. 6/24/2019 9 7/15/16 “Primary Trail](https://reader033.vdocuments.us/reader033/viewer/2022050207/5f5a78158ebbbd4db20ef4dc/html5/thumbnails/10.jpg)
6/24/2019
10
Feasibility Study Project Funding
• Total Project Cost - $70,000• $35,000 PA Department of Conservation
and Natural Resources grant• Matched with $35,000
• County in-kind• County cash
• Developed primarily by County Planning staff.
• Consultant to be hired at an amount not to exceed $25,000 to assist in technical aspects of the plan.
Media-Smedley Connector Trail
Project Tasks
• Fieldwork (ongoing)
• Study Committee Meetings• Consultant RFP/Selection/Contracting• Public Meetings (2-3)
• Public Engagement (website)
• Key Person Interviews/Focus Groups • Development of the Report• County Adoption (target: end of 2020)
Public Participation
• Study Committee (4-6 meetings)• County Planning Staff (Environmental and
Transportation)• County Parks Department• County Conservation District• County Public Works• Municipalities (Media, Nether Prov., Upper Prov.,
Middletown, Springfield)• Media Business Authority• Bike Delaware County (BCGP)• CRC Watersheds Association• DCTMA• Friends of Smedley Park• SEPTA
Final Product
A Trail Feasibility StudyWritten Report including:
• Chapters detailing “Background” and “Benefits”• Actions for securing right-of-way where the route is not
already in public realm. • Trail design recommendations (by phase/section).• Cost Estimates and funding source recommendations
for trail design and development in the various trail sections.
• Ideal lead and supporting agencies for recommended actions.
• Management and maintenance recommendations. • Recommendations for continued public involvement.
Existing Plans & Conditions
![Page 11: 6/24/2019 - Microsoft Azure · 2019-06-24 · may be sited on sidewalks, roadsides, and/or roadway • Should meet ADA standards, where feasible. 6/24/2019 9 7/15/16 “Primary Trail](https://reader033.vdocuments.us/reader033/viewer/2022050207/5f5a78158ebbbd4db20ef4dc/html5/thumbnails/11.jpg)
6/24/2019
11
Study Area Location Study Area Location
7/15/16
Planning Documents
7/15/16
Planning Documents
Media Borough Bike Facility Implementation Plan (2016)
Support Facilities
Image from www.mediaborough.com
![Page 12: 6/24/2019 - Microsoft Azure · 2019-06-24 · may be sited on sidewalks, roadsides, and/or roadway • Should meet ADA standards, where feasible. 6/24/2019 9 7/15/16 “Primary Trail](https://reader033.vdocuments.us/reader033/viewer/2022050207/5f5a78158ebbbd4db20ef4dc/html5/thumbnails/12.jpg)
6/24/2019
12
7/15/16
Planning Documents
7/15/16
Planning Documents
County Parks Signage Design
Study Area Findings and
Trail Route Alternatives
7/15/16
Map Panels
• A – Ridley Creek Road to Media Borough(Third and West Street) (Upper Providence/Media)
• B – Media Borough street network• C – Providence Road to Pine Ridge Road
(Media/Nether Providence)
• D – Smedley County Park (Nether Providence/Springfield)
*Final “phases” may be divided differently
7/15/16
Alternative Routes for Discussion
![Page 13: 6/24/2019 - Microsoft Azure · 2019-06-24 · may be sited on sidewalks, roadsides, and/or roadway • Should meet ADA standards, where feasible. 6/24/2019 9 7/15/16 “Primary Trail](https://reader033.vdocuments.us/reader033/viewer/2022050207/5f5a78158ebbbd4db20ef4dc/html5/thumbnails/13.jpg)
6/24/2019
13
7/15/16
Map Panels
A1
A5
A4
A3A2
A6
Panel A Media-Smedley Connector Trail Map Panel A
N
W
E
S
Ridley Creek Road and Marcella Lane
Media-Smedley Connector Trail Map Panel A
Scott Park Parking off Ridley Creek Road Marcella Lane
Media-Smedley Connector Trail Map Panel A
Kirk Lane – Crossing at Glen Prov. Park Entrance Looking west Towards Diemer Drive
Media-Smedley Connector Trail Map Panel A
Third Street and Glen Providence Park Existing Footpath in Park
A6
Panel B
![Page 14: 6/24/2019 - Microsoft Azure · 2019-06-24 · may be sited on sidewalks, roadsides, and/or roadway • Should meet ADA standards, where feasible. 6/24/2019 9 7/15/16 “Primary Trail](https://reader033.vdocuments.us/reader033/viewer/2022050207/5f5a78158ebbbd4db20ef4dc/html5/thumbnails/14.jpg)
6/24/2019
14
Media-Smedley Connector Trail Map Panel B
N
5th St. at Jackson St.
E
Media-Smedley Connector Trail Map Panel B
Fifth and Lemon Streets
Fifth and Broomall Streets
Media-Smedley Connector Trail Map Panel B
Third Street Fourth Street
Media-Smedley Connector Trail Map Panel B
Providence Road (Route 252)
A5 A6
Panel C Media-Smedley Connector Trail Map Panel C
Providence Road and State Street / Mulberry Lane / SEPTA Trolley Station & Parking Area
N
E
?
![Page 15: 6/24/2019 - Microsoft Azure · 2019-06-24 · may be sited on sidewalks, roadsides, and/or roadway • Should meet ADA standards, where feasible. 6/24/2019 9 7/15/16 “Primary Trail](https://reader033.vdocuments.us/reader033/viewer/2022050207/5f5a78158ebbbd4db20ef4dc/html5/thumbnails/15.jpg)
6/24/2019
15
Media-Smedley Connector Trail Map Panel C
Behind Acme Behind Chesley Offices Near Trolley
Media-Smedley Connector Trail Map Panel C
Beatty Road Chesley Drive
??
Media-Smedley Connector Trail Map Panel C
Beatty Road to Surrey Lane Beechwood Road
Panel D
Media-Smedley Connector Trail Map Panel D
N
Existing hiking paths
Media-Smedley Connector Trail Map Panel D
Pine Ridge Road
?
?
![Page 16: 6/24/2019 - Microsoft Azure · 2019-06-24 · may be sited on sidewalks, roadsides, and/or roadway • Should meet ADA standards, where feasible. 6/24/2019 9 7/15/16 “Primary Trail](https://reader033.vdocuments.us/reader033/viewer/2022050207/5f5a78158ebbbd4db20ef4dc/html5/thumbnails/16.jpg)
6/24/2019
16
Media-Smedley Connector Trail Map Panel D
Smedley County Park – Near Trolley Tracks
Media-Smedley Connector Trail Map Panel D
Smedley County Park – East of Blue Route, North of Trolley Tracks, looking West
Media-Smedley Connector Trail Map Panel D
Smedley County Park –Walkway in Culvert Under SEPTA Trolley Tracks
Media-Smedley Connector Trail Map Panel D
Smedley County Park
Small Group Discussion
Group Discussion Questions:
A. If this trail existed now,
• How do you envision using it?
• And for what purposes ?
B. Do you have a preferred route(s)
• Which one among the alternatives shown?
• Or do you have other ideas of your own that are not shown?
• Why that route?
C. What challenges and issues do you know about?
[Note the section ID – if site-specific]
D. What type of trail or bikeway…
• …designs would you like to see?
• …support elements would you like to see [types of signage, bike racks, etc.]?
E. Also –Who should we talk to separately in an Interview/Focus Group?
Write names (and contact information, if known) on Index Cards, and hand to a facilitator.
![Page 17: 6/24/2019 - Microsoft Azure · 2019-06-24 · may be sited on sidewalks, roadsides, and/or roadway • Should meet ADA standards, where feasible. 6/24/2019 9 7/15/16 “Primary Trail](https://reader033.vdocuments.us/reader033/viewer/2022050207/5f5a78158ebbbd4db20ef4dc/html5/thumbnails/17.jpg)
6/24/2019
17
Next Steps
• Update Project Website• Continue Collecting Public Comment• Continue Study Area Analysis• Selection of Technical Assistance Consultant • Schedule Interviews/Focus Groups• Continue Writing Draft Report • Study Committee Meeting #2
https://www.delcopa.gov/planning/currentprojects/MediaSmedleyConnectorTrail.html